Syngas Production from Petroleum Coke Gasification
description
Transcript of Syngas Production from Petroleum Coke Gasification
![Page 1: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/1.jpg)
Syngas Production from Petroleum Coke Gasification
Team Hotel:Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala
Advisors:Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept. Of Chemical Engineering
April 5, 2011 14/5/2011
![Page 2: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/2.jpg)
Project Purpose What we are doing?
Producing syngas from petcoke Using entrained flow gasifier Implementing a rigorous syngas
cleaning
Why we are doing this? Making syngas for acetic acid
production Chemical production team specs▪ CO to H2 molar ratio of 0.409▪ CO2 and N2 mixed in
2
http://coalgasificationnews.com/tag/petcoke-gasification/
4/5/2011
![Page 3: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/3.jpg)
Overall Block Flow
34/5/2011
![Page 4: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/4.jpg)
Recap Discussed our Aspen PDF
Gasifier Sulfur Removal Water Gas Shift CO2 Removal Claus Process
Heat Loads Optimization
Equipment Costs and Sizes Individual Economics
Sensitivity Analysis Location
44/5/2011
![Page 5: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/5.jpg)
Agenda
PFD Initial Control Scheme Plant Layout (General Arrangement) Calculations Refined Economics Report
Poster Preview????
54/5/2011
![Page 6: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/6.jpg)
Flow Sheeting: Overall Process
64/5/2011
Gasification Sulfur Removal Claus Process
Water Gas ShiftCO2 Removal
![Page 7: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/7.jpg)
Flow Sheeting: Gasification
74/5/2011
To Sulfur Remov
al
![Page 8: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/8.jpg)
Flow Sheeting: Sulfur Removal
84/5/2011To WGS
To Claus
![Page 9: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/9.jpg)
Flow Sheeting: WGS & CO2
94/5/2011
Capture
Ready CO2
To Chem Producti
on
![Page 10: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/10.jpg)
Flow Sheeting: Claus Process
104/5/2011
To Supercl
aus
![Page 11: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/11.jpg)
Flow Sheeting: Claus Cont.
114/5/2011
![Page 12: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/12.jpg)
Heat Loads for Claus Plant
12
Claus Process Equipment Heat Load (MMBtu/hr)Claus Furnace -3.26 Condenser 1 -31.3 Condenser 2 -11.2Condenser 3 -5.97Condenser 4 -3.92 Re-heater 1 9.72 Re-heater 2 5.29 Re-heater 3 3.46
Catalytic Reactor 1 3.03 Catalytic Reactor 2 1.72Catalytic Reactor 3 -5.73
4/5/2011
![Page 13: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/13.jpg)
Heat Sink Optimization
Stream Pre-heating Lower Heater / Cooler Duties Heat Duty and Heat Ex. Cost Tradeoff
13
Furnace CoolerHX
Acid Gas Cold
Acid Gas Hot
To Claus Catalyst
s Hot Furnace
Gas
Cold Furnace
Gas
4/5/2011
![Page 14: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/14.jpg)
WGS ReactorCO2 Absorption
Final syngasproduct
Claus Process
Gasification Price
$240,306,575
Solid Removal
4/5/2011 14
Sulfur Removal
Economics and Size
![Page 15: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/15.jpg)
Gasification
SIZE INDIRECT COST
DIRECT COST
Air SeparationUnit
Facility N/A $100,000,000
Petroleum Coke Crusher TBD $ 5,401,890 $ 7,022,455
Gasifier (x2) 2000 TPD N/A $ 132,000,000
Heat Exchanger (x2)
3350 sq ft $611,480 $ 1,284,120 154/5/2011
![Page 16: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/16.jpg)
WGS ReactorCO2 AbsorptionFinal syngas
product
Claus Process
Gasification Price
$240,306,575
Solid Removal$670,000
4/5/2011 16
Sulfur Removal
Equipment Cost and SizeCont.
![Page 17: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/17.jpg)
Solid Removal
SizeINDIRECT
COSTDIRECT
COSTFilter 16 sq ft $ 364,770 $ 510,680
Cyclone (x3) 5 ft (diameter) $ 307,800 $ 477,000
174/5/2011
![Page 18: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/18.jpg)
WGS ReactorCO2 AbsorptionFinal syngas
product
Claus Process
Gasification Price
$240,306,575
Solid Removal$670,000
4/5/2011 18
Sulfur Removal
$9,600,000
Equipment Cost and SizeCont.
![Page 19: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/19.jpg)
Sulfur Removal
194/5/2011
SIZE EQUIP COST TOTAL COST
Absorber (x2) 12.7 x 60 ft $ 2,400,000 $ 4,800,000
Stripper (x2) 17 x 30 ft $ 1,560,000 $ 3,300,000
Flash Vessels (x2)383 cu. ft
$ 707,215 $ 808,1106980 cu ft
Heat Exchanger 1200 sq ft $ 121,980 $ 256,155
Reactor (x3)TBD $ (103,115)* $ (164,985)*
Cooler 6739 sq ft$ 185,500 $ 400,000
440 sq ft
![Page 20: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/20.jpg)
WGS ReactorCO2 AbsorptionFinal syngas
product
Claus Process$12,500,000
Gasification Price
$240,306,575
Solid Removal$670,000
4/5/2011 20
Sulfur Removal$9,600,000
Equipment Cost and SizeCont.
![Page 21: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/21.jpg)
21
Equipment Used in Claus Process
Equipment Size Equip Cost Total Cost
Heat Exchanger 298 sq ft TBD TBD
Claus Furnace N/A TBD TBD
Cooler (x3) 439 sq ft
$ 148,300.00 $ 222,600.00257 sq ft162 sq ft
Flash (x3) 680 cu ft$ 263,033.00 $ 358,000.00461 cu ft
461 cu ftHeater (x2) 1574 sq ft TBD TBD
996 sq ft
4/5/2011
![Page 22: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/22.jpg)
WGS ReactorCO2 Absorption$35,700,000
Final syngasproduct
Claus Process$12,500,000
Gasification Price
$240,306,575
Solid Removal$670,000
4/5/2011 22
Sulfur Removal$9,600,000
144 ft3$360,000
Equipment Cost and SizeCont.
![Page 23: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/23.jpg)
CO2 AbsorptionEquipment Size Equip Cost Direct Cost
CO2 Absorber (x2) 12.7 x 60 ft N/A $ 3,000,000
CO2 Stripper (x2) 17 x 30 ft $ 203,170 $ 256,800
Compressor N/A$ 272,889 $ 409,333
234/5/2011
![Page 24: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/24.jpg)
Overall Summary of
Capital CostWGS Reactor
144 ft3$360,000
CO2 Absorption$35,700,000
Final syngasProduct$300,000,000
Claus Process$12,500,000
Gasification Price
$240,306,575
Solid Removal$670,000
4/5/2011 24
Sulfur Removal
$9,600,000
![Page 25: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/25.jpg)
Other Fixed Cost
Other Fixed Cost
License Fees and Royalties
2% of Capital Cost
Maintenance
5% of Capital
Cost
Laboratory Cost
30% Labor Cost
Insurance1%
Capital Cost
Capital Cost as of now= $ 300,000,000Labor Cost as of now = $ 24,000,000
254/5/2011
![Page 26: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/26.jpg)
Overall Expenses
Type Cost of year 1 ($ Million/year)
Cost at the end of 25th year
Loan $18 $ 1
Cooling water $2 $ 6
Electrical $2 $ 6
Salaries and Fringes $ 24 $ 77
Maintenance $15 $ 48
Royalties $ 6 $19
Insurance $3 $ 10
Raw materials $ 54 $175
Depreciation $12 $12
Total $136 $355 26
Capital Cost as of now = $ 300,000,000
4/5/2011
![Page 27: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/27.jpg)
Expected RevenueProduct and
Side ProductsUnit Price (per ton)
Revenue (In MM $ / year)
Syngas $200.00 $ 115.50
CO2 $40.00 $ 7.00
Sulfur $100.00 $ 3.50
Total $ 126.00
274/5/2011
![Page 28: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/28.jpg)
284/5/2011
Economic Analysis($ million/year)
Total Capital Cost $300
Total Expense $136
Total Revenue $126
Income Before the Taxes -$10
40 % Tax on the Income -$4
Income After the Taxes -$6
Add Back Depreciation $12
Cash Flow $6
Net Present Value $-52
Internal Rate of Return 3.58% < 5%
Payback Period 19 years
![Page 29: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/29.jpg)
29
Sensitivity Analysis
4/5/2011
$150.00 $170.00 $190.00 $210.00 $230.00 $250.00
-300-250-200-150-100-50
050
100150200 NPV vs. Syngas Prices
NPV
Syngas($/ton)
Net
Pre
sent
val
ue (
$mill
ion)
![Page 30: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/30.jpg)
30
Sensitivity Analysis
4/5/2011
$150.00 $170.00 $190.00 $210.00 $230.00 $250.00
-8.00%-6.00%-4.00%-2.00%0.00%2.00%4.00%6.00%8.00%
10.00% IRR vs. Syngas Price
NPV
Syngas ($/ton)
Inte
rnal
Rat
e of
ret
urn
![Page 31: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/31.jpg)
31
Sensitivity Analysis
4/5/2011
$20 $30 $40 $50 $60 $70 $80 $90
-$150.00
-$100.00
-$50.00
$0.00
$50.00
$100.00
$150.00
$200.00
$250.00
$300.00
NPV vs. Petcoke Cost
NPV
Petcoke Price ($/ton)
Net
Pre
sent
val
ue(
$ m
illio
ns)
![Page 32: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/32.jpg)
32
Sensitivity Analysis
4/5/2011
$20 $30 $40 $50 $60 $70 $80 $900.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
IRR vs. Cost of Petcoke
IRR
Petcoke Price ($/ton)
Inte
rnal
rat
e of
ret
urn
![Page 33: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/33.jpg)
Location Victoria, Texas Between Houston
and Corpus Christi 200 acres Kansas City
Southern, Union Pacific, and Burlington Northern Santa Fe railways
Gulf Intracoastal Waterway
334/5/2011
![Page 34: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/34.jpg)
34
Possible Alternatives
Alberta, Canada Sits on excess
petroleum coke from refineries
Is it Economically viable? Demand Transportation costs
4/5/2011
![Page 35: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/35.jpg)
35
Conclusion
Overall ASPEN procedure Gasification Syngas Clean Up CO2 Removal
Rough Economics
Location: Victoria, Texas Possible Change
4/5/2011
![Page 36: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/36.jpg)
36
Next Steps
Final process flow diagram Control scheme Optimize economy scale
Revise capital costs Major equipments list and plant layout Revise report
4/5/2011
![Page 37: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/37.jpg)
37
Questions?
4/5/2011
![Page 38: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/38.jpg)
References
http://fossil.energy.gov/images/programs/sequestration/what_sequestration_lg.jpg
http://coalgasificationnews.com/tag/petcoke-gasification/
http://www.huffingtonpost.com/dr-orin-levine/questions-as-mileposts-of_b_448870.html
http://www.chinaep-tech.com/upload/accessary/8173/DZY08092502.pdf
http://www.chemicals-technology.com/projects/gulfpetrochemicalsco/ 384/5/2011
![Page 39: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/39.jpg)
Report Outline
Final Report: Executive Summary IP Discussion IP Recommendations IP
Appendices Design Basis: Done Block Flow Diagram: Done Process Flow Showing Major Equip.: IP
394/5/2011
![Page 40: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/40.jpg)
Report Outline
Appendices (Continued) Material and Energy Balances: IP Calculations: IP Annotated Equip. List: IP Econ. Eval. Factored from Equip. Costs:
IP Utilities: IP Conceptual Control Scheme: N/A Major Equipment Layout: IP
404/5/2011
![Page 41: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/41.jpg)
Report Outline
Appendices (Continued) Distribution and End-use Issues:
IP Constraints Review: IP Applicable Standards: IP Project Communications File: IP Information Sources and References:
IP
414/5/2011
![Page 42: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/42.jpg)
42
Energy Balance Around WGS Reactor
4/5/2011
![Page 43: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/43.jpg)
Energy BalanceAround WGS ReactorInlet Fraction Clean Syngas Component
Flow for WGS Reactor (lbmoles/hr) for WGS Cp (btu/lbmole* F)
Outlet Syngas Comp (lbmole/hr) from
(WGS)
CO 4946.233 7.118 123.395
H2O 6424.688 15.367 1601.850
N2 199.954 7.158 199.954
H2* 2960.168 6.948 7783.006
CO2 469.211 10.559 5292.049
CH4* 0.255
12.432 0.255
H2S 0.000 0.000 0.000
COS 0.000 0.000 0.000
Total 15000.509 15000.509
434/5/2011
![Page 44: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/44.jpg)
Heat LoadsGasifier Equipment Heat Load (MMBtu/hr)
Gasifier -34.7 HP Steam Heat Exchanger 139.0 MP Steam Heat Exchanger 281
Cooler -106.8 Flash 2.99
Sulfur Clean Up Equipment Heat Load (MMBtu/hr)Sulfur Stripper Reboiler 57.0Sulfur Stripper Cooler -200.0
Selexol Cooler -40.7 Rich / Lean Heat Exchanger 274.9
4/5/2011 44
![Page 45: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/45.jpg)
45
CO2 Sequestration
CO2 in our syngas is absorbed on Selexol to be selectively removed
Delete only one CO2 slide.
4/5/2011
![Page 46: Syngas Production from Petroleum Coke Gasification](https://reader038.fdocuments.in/reader038/viewer/2022110105/56815a4c550346895dc77dc7/html5/thumbnails/46.jpg)
46http://fossil.energy.gov/images/programs/sequestration/what_sequestration_lg.jpg4/5/2011