Syngas Production from Petroleum Coke Gasification

46
Syngas Production from Petroleum Coke Gasification Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept. Of Chemical Engineering April 5, 2011 1 4/5/2011

description

Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept. Of Chemical Engineering April 5 , 2011. Syngas Production from Petroleum Coke Gasification. Project Purpose. What we are doing? - PowerPoint PPT Presentation

Transcript of Syngas Production from Petroleum Coke Gasification

Page 1: Syngas Production from Petroleum Coke Gasification

Syngas Production from Petroleum Coke Gasification

Team Hotel:Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala

Advisors:Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept. Of Chemical Engineering

April 5, 2011 14/5/2011

Page 2: Syngas Production from Petroleum Coke Gasification

Project Purpose What we are doing?

Producing syngas from petcoke Using entrained flow gasifier Implementing a rigorous syngas

cleaning

Why we are doing this? Making syngas for acetic acid

production Chemical production team specs▪ CO to H2 molar ratio of 0.409▪ CO2 and N2 mixed in

2

http://coalgasificationnews.com/tag/petcoke-gasification/

4/5/2011

Page 3: Syngas Production from Petroleum Coke Gasification

Overall Block Flow

34/5/2011

Page 4: Syngas Production from Petroleum Coke Gasification

Recap Discussed our Aspen PDF

Gasifier Sulfur Removal Water Gas Shift CO2 Removal Claus Process

Heat Loads Optimization

Equipment Costs and Sizes Individual Economics

Sensitivity Analysis Location

44/5/2011

Page 5: Syngas Production from Petroleum Coke Gasification

Agenda

PFD Initial Control Scheme Plant Layout (General Arrangement) Calculations Refined Economics Report

Poster Preview????

54/5/2011

Page 6: Syngas Production from Petroleum Coke Gasification

Flow Sheeting: Overall Process

64/5/2011

Gasification Sulfur Removal Claus Process

Water Gas ShiftCO2 Removal

Page 7: Syngas Production from Petroleum Coke Gasification

Flow Sheeting: Gasification

74/5/2011

To Sulfur Remov

al

Page 8: Syngas Production from Petroleum Coke Gasification

Flow Sheeting: Sulfur Removal

84/5/2011To WGS

To Claus

Page 9: Syngas Production from Petroleum Coke Gasification

Flow Sheeting: WGS & CO2

94/5/2011

Capture

Ready CO2

To Chem Producti

on

Page 10: Syngas Production from Petroleum Coke Gasification

Flow Sheeting: Claus Process

104/5/2011

To Supercl

aus

Page 11: Syngas Production from Petroleum Coke Gasification

Flow Sheeting: Claus Cont.

114/5/2011

Page 12: Syngas Production from Petroleum Coke Gasification

Heat Loads for Claus Plant

12

Claus Process Equipment Heat Load (MMBtu/hr)Claus Furnace -3.26 Condenser 1 -31.3 Condenser 2 -11.2Condenser 3 -5.97Condenser 4 -3.92 Re-heater 1 9.72 Re-heater 2 5.29 Re-heater 3 3.46

Catalytic Reactor 1 3.03 Catalytic Reactor 2 1.72Catalytic Reactor 3 -5.73

4/5/2011

Page 13: Syngas Production from Petroleum Coke Gasification

Heat Sink Optimization

Stream Pre-heating Lower Heater / Cooler Duties Heat Duty and Heat Ex. Cost Tradeoff

13

Furnace CoolerHX

Acid Gas Cold

Acid Gas Hot

To Claus Catalyst

s Hot Furnace

Gas

Cold Furnace

Gas

4/5/2011

Page 14: Syngas Production from Petroleum Coke Gasification

WGS ReactorCO2 Absorption

Final syngasproduct

Claus Process

Gasification Price

$240,306,575

Solid Removal

4/5/2011 14

Sulfur Removal

Economics and Size

Page 15: Syngas Production from Petroleum Coke Gasification

Gasification

SIZE INDIRECT COST

DIRECT COST

Air SeparationUnit

Facility N/A $100,000,000

Petroleum Coke Crusher TBD $ 5,401,890 $ 7,022,455

Gasifier (x2) 2000 TPD N/A $ 132,000,000

Heat Exchanger (x2)

3350 sq ft $611,480 $ 1,284,120 154/5/2011

Page 16: Syngas Production from Petroleum Coke Gasification

WGS ReactorCO2 AbsorptionFinal syngas

product

Claus Process

Gasification Price

$240,306,575

Solid Removal$670,000

4/5/2011 16

Sulfur Removal

Equipment Cost and SizeCont.

Page 17: Syngas Production from Petroleum Coke Gasification

Solid Removal

SizeINDIRECT

COSTDIRECT

COSTFilter 16 sq ft $ 364,770 $ 510,680

Cyclone (x3) 5 ft (diameter) $ 307,800 $ 477,000

174/5/2011

Page 18: Syngas Production from Petroleum Coke Gasification

WGS ReactorCO2 AbsorptionFinal syngas

product

Claus Process

Gasification Price

$240,306,575

Solid Removal$670,000

4/5/2011 18

Sulfur Removal

$9,600,000

Equipment Cost and SizeCont.

Page 19: Syngas Production from Petroleum Coke Gasification

Sulfur Removal

194/5/2011

SIZE EQUIP COST TOTAL COST

Absorber (x2) 12.7 x 60 ft $ 2,400,000 $ 4,800,000

Stripper (x2) 17 x 30 ft $ 1,560,000 $ 3,300,000

Flash Vessels (x2)383 cu. ft

$ 707,215 $ 808,1106980 cu ft

Heat Exchanger 1200 sq ft $ 121,980 $ 256,155

Reactor (x3)TBD $ (103,115)* $ (164,985)*

Cooler 6739 sq ft$ 185,500 $ 400,000

440 sq ft

Page 20: Syngas Production from Petroleum Coke Gasification

WGS ReactorCO2 AbsorptionFinal syngas

product

Claus Process$12,500,000

Gasification Price

$240,306,575

Solid Removal$670,000

4/5/2011 20

Sulfur Removal$9,600,000

Equipment Cost and SizeCont.

Page 21: Syngas Production from Petroleum Coke Gasification

21

Equipment Used in Claus Process

Equipment Size Equip Cost Total Cost

Heat Exchanger 298 sq ft TBD TBD

Claus Furnace N/A TBD TBD

Cooler (x3) 439 sq ft

$ 148,300.00 $ 222,600.00257 sq ft162 sq ft

Flash (x3) 680 cu ft$ 263,033.00 $ 358,000.00461 cu ft

461 cu ftHeater (x2) 1574 sq ft TBD TBD

996 sq ft

4/5/2011

Page 22: Syngas Production from Petroleum Coke Gasification

WGS ReactorCO2 Absorption$35,700,000

Final syngasproduct

Claus Process$12,500,000

Gasification Price

$240,306,575

Solid Removal$670,000

4/5/2011 22

Sulfur Removal$9,600,000

144 ft3$360,000

Equipment Cost and SizeCont.

Page 23: Syngas Production from Petroleum Coke Gasification

CO2 AbsorptionEquipment Size Equip Cost Direct Cost

CO2 Absorber (x2) 12.7 x 60 ft N/A $ 3,000,000

CO2 Stripper (x2) 17 x 30 ft $ 203,170 $ 256,800

Compressor N/A$ 272,889 $ 409,333

234/5/2011

Page 24: Syngas Production from Petroleum Coke Gasification

Overall Summary of

Capital CostWGS Reactor

144 ft3$360,000

CO2 Absorption$35,700,000

Final syngasProduct$300,000,000

Claus Process$12,500,000

Gasification Price

$240,306,575

Solid Removal$670,000

4/5/2011 24

Sulfur Removal

$9,600,000

Page 25: Syngas Production from Petroleum Coke Gasification

Other Fixed Cost

Other Fixed Cost

License Fees and Royalties

2% of Capital Cost

Maintenance

5% of Capital

Cost

Laboratory Cost

30% Labor Cost

Insurance1%

Capital Cost

Capital Cost as of now= $ 300,000,000Labor Cost as of now = $ 24,000,000

254/5/2011

Page 26: Syngas Production from Petroleum Coke Gasification

Overall Expenses

Type Cost of year 1 ($ Million/year)

Cost at the end of 25th year

Loan $18 $ 1

Cooling water $2 $ 6

Electrical $2 $ 6

Salaries and Fringes $ 24 $ 77

Maintenance $15 $ 48

Royalties $ 6 $19

Insurance $3 $ 10

Raw materials $ 54 $175

Depreciation $12 $12

Total $136 $355 26

Capital Cost as of now = $ 300,000,000

4/5/2011

Page 27: Syngas Production from Petroleum Coke Gasification

Expected RevenueProduct and

Side ProductsUnit Price (per ton)

Revenue (In MM $ / year)

Syngas $200.00 $ 115.50

CO2 $40.00 $ 7.00

Sulfur $100.00 $ 3.50

Total $ 126.00

274/5/2011

Page 28: Syngas Production from Petroleum Coke Gasification

284/5/2011

Economic Analysis($ million/year)

Total Capital Cost $300

Total Expense $136

Total Revenue $126

Income Before the Taxes -$10

40 % Tax on the Income -$4

Income After the Taxes -$6

Add Back Depreciation $12

Cash Flow $6

Net Present Value $-52

Internal Rate of Return 3.58% < 5%

Payback Period 19 years

Page 29: Syngas Production from Petroleum Coke Gasification

29

Sensitivity Analysis

4/5/2011

$150.00 $170.00 $190.00 $210.00 $230.00 $250.00

-300-250-200-150-100-50

050

100150200 NPV vs. Syngas Prices

NPV

Syngas($/ton)

Net

Pre

sent

val

ue (

$mill

ion)

Page 30: Syngas Production from Petroleum Coke Gasification

30

Sensitivity Analysis

4/5/2011

$150.00 $170.00 $190.00 $210.00 $230.00 $250.00

-8.00%-6.00%-4.00%-2.00%0.00%2.00%4.00%6.00%8.00%

10.00% IRR vs. Syngas Price

NPV

Syngas ($/ton)

Inte

rnal

Rat

e of

ret

urn

Page 31: Syngas Production from Petroleum Coke Gasification

31

Sensitivity Analysis

4/5/2011

$20 $30 $40 $50 $60 $70 $80 $90

-$150.00

-$100.00

-$50.00

$0.00

$50.00

$100.00

$150.00

$200.00

$250.00

$300.00

NPV vs. Petcoke Cost

NPV

Petcoke Price ($/ton)

Net

Pre

sent

val

ue(

$ m

illio

ns)

Page 32: Syngas Production from Petroleum Coke Gasification

32

Sensitivity Analysis

4/5/2011

$20 $30 $40 $50 $60 $70 $80 $900.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

IRR vs. Cost of Petcoke

IRR

Petcoke Price ($/ton)

Inte

rnal

rat

e of

ret

urn

Page 33: Syngas Production from Petroleum Coke Gasification

Location Victoria, Texas Between Houston

and Corpus Christi 200 acres Kansas City

Southern, Union Pacific, and Burlington Northern Santa Fe railways

Gulf Intracoastal Waterway

334/5/2011

Page 34: Syngas Production from Petroleum Coke Gasification

34

Possible Alternatives

Alberta, Canada Sits on excess

petroleum coke from refineries

Is it Economically viable? Demand Transportation costs

4/5/2011

Page 35: Syngas Production from Petroleum Coke Gasification

35

Conclusion

Overall ASPEN procedure Gasification Syngas Clean Up CO2 Removal

Rough Economics

Location: Victoria, Texas Possible Change

4/5/2011

Page 36: Syngas Production from Petroleum Coke Gasification

36

Next Steps

Final process flow diagram Control scheme Optimize economy scale

Revise capital costs Major equipments list and plant layout Revise report

4/5/2011

Page 37: Syngas Production from Petroleum Coke Gasification

37

Questions?

4/5/2011

Page 39: Syngas Production from Petroleum Coke Gasification

Report Outline

Final Report: Executive Summary IP Discussion IP Recommendations IP

Appendices Design Basis: Done Block Flow Diagram: Done Process Flow Showing Major Equip.: IP

394/5/2011

Page 40: Syngas Production from Petroleum Coke Gasification

Report Outline

Appendices (Continued) Material and Energy Balances: IP Calculations: IP Annotated Equip. List: IP Econ. Eval. Factored from Equip. Costs:

IP Utilities: IP Conceptual Control Scheme: N/A Major Equipment Layout: IP

404/5/2011

Page 41: Syngas Production from Petroleum Coke Gasification

Report Outline

Appendices (Continued) Distribution and End-use Issues:

IP Constraints Review: IP Applicable Standards: IP Project Communications File: IP Information Sources and References:

IP

414/5/2011

Page 42: Syngas Production from Petroleum Coke Gasification

42

Energy Balance Around WGS Reactor

4/5/2011

Page 43: Syngas Production from Petroleum Coke Gasification

Energy BalanceAround WGS ReactorInlet Fraction Clean Syngas Component

Flow for WGS Reactor (lbmoles/hr) for WGS Cp (btu/lbmole* F)

Outlet Syngas Comp (lbmole/hr) from

(WGS)

CO 4946.233 7.118 123.395

H2O 6424.688 15.367 1601.850

N2 199.954 7.158 199.954

H2* 2960.168 6.948 7783.006

CO2 469.211 10.559 5292.049

CH4* 0.255

12.432 0.255

H2S 0.000 0.000 0.000

COS 0.000 0.000 0.000

Total 15000.509 15000.509

434/5/2011

Page 44: Syngas Production from Petroleum Coke Gasification

Heat LoadsGasifier Equipment Heat Load (MMBtu/hr)

Gasifier -34.7 HP Steam Heat Exchanger 139.0 MP Steam Heat Exchanger 281

Cooler -106.8 Flash 2.99

Sulfur Clean Up Equipment Heat Load (MMBtu/hr)Sulfur Stripper Reboiler 57.0Sulfur Stripper Cooler -200.0

Selexol Cooler -40.7 Rich / Lean Heat Exchanger 274.9

4/5/2011 44

Page 45: Syngas Production from Petroleum Coke Gasification

45

CO2 Sequestration

CO2 in our syngas is absorbed on Selexol to be selectively removed

Delete only one CO2 slide.

4/5/2011