THE VIRGINIA TRANSPORTATION
Commonwealth Transportation BoardVirginia Department of Transportation
Virginia Department of Rail and Public Transportation
2015 – 2020
Worki
ng Dra
ft
nortHern virginia DiStrict
-
This Page Is Intentionally Left Blank
484 04/16/2014
-
FY15 DRAFT
FY2015-2020 Six-Year Improvement Program NORTHERN VIRGINIA DISTRICT
FY2019 FY2020FY2018FY2017FY2016FY2015Fund Source Name
Funding Allocation Summary (000's)
NORTHERN VIRGINIA DISTRICT
System Totals
Interstate
Bond Proceeds
$0$17,474$20,000$32,775$27,600$0GARVEE Bonds $97,849
CTB Formula
0 0 0 2,501 2,499 7,414Bridge - State 12,414
0 1,199 0 0 0 0High Priority - Federal 1,199
0 300 0 0 0 0High Priority - Soft Match 300
3,999 0 500 6,000 4,159 0High Priority - State 14,658
0 0 0 0 0 1,163ITS - State 1,163
0 0 1,145 1,055 5,351 2,462Paving - Federal 10,014
0 0 286 264 1,338 616Paving - Soft Match 2,503
0 0 9,581 10,571 0 0Paving - State 20,152
0 0 0 0 0 400PPTA - Federal 400
0 0 0 0 0 100PPTA - Soft Match 100
Highway Safety Improvements
0 0 0 0 450 0Federal 450
0 0 0 0 50 0Soft Match 50
NHPP
0 0 1,629 4,001 23,424 24,775Statewide - Federal 53,830
0 0 267 999 5,856 6,194Statewide - Soft Match 13,316
STP
0 0 1,449 0 0 0Statewide - Federal 1,449
0 0 362 0 0 0Statewide - Soft Match 362
$3,999$18,973$35,220$58,167$70,727$43,123Total $230,210
Primary
Bond Proceeds
$0$4,000$4,000$8,000$0$0GARVEE Bonds $16,000
CMAQ
9,839 8,160 11,036 3,603 4,852 2,467MPO - Federal 39,957
2,460 2,040 2,759 901 1,213 617MPO - State Match 9,989
0 1,418 0 3,618 0 3,706PM 2.5 - Federal 8,742
0 355 0 904 0 927PM 2.5 - State Match 2,186
0 0 596 979 1,275 1,878TERMS - Federal 4,728
0 0 149 245 319 469TERMS - State Match 1,182
CTB Formula
0 2,617 13,049 7,500 4,000 236Bridge - State 27,402
8,000 1,000 7,679 9,250 5,825 0High Priority - State 31,753
0 0 0 0 0 246ITS - State 246
0 0 3,326 2,204 2,075 1,038Paving - Federal 8,643
0 0 831 551 519 259Paving - Soft Match 2,161
0 0 1,500 3,000 0 0Paving - State 4,500
Highway Safety Improvements
0 0 0 0 3,173 0Federal 3,173
0 0 0 0 353 0Soft Match 353
Local Project Contributions
0 0 0 0 0 13,852Local 13,852
NHPP
2,212 262 189 934 989 1,907Bridge - Federal 6,494
553 66 47 234 247 477Bridge - Soft Match 1,623
0 0 0 0 0 4,030Statewide - Federal 4,030
0 0 0 0 0 1,007Statewide - Soft Match 1,007
04/16/2014 485*
-
FY15 DRAFT
FY2015-2020 Six-Year Improvement Program NORTHERN VIRGINIA DISTRICT
FY2019 FY2020FY2018FY2017FY2016FY2015Fund Source Name
Funding Allocation Summary (000's)
NORTHERN VIRGINIA DISTRICT - cont.
System Totals
Residue Parcel Revenue
0 0 0 0 0 926State 926
RSTP (STP Regional)
26,301 20,974 21,234 22,540 26,497 17,451MPO - Federal 134,998
6,575 5,244 5,309 5,635 6,624 4,363MPO - State Match 33,749
State Earmark
0 0 0 0 0 10,926State 10,926
STP
2,065 1,860 2,381 1,358 1,514 637Bridge - Federal 9,814
516 465 595 339 379 159Bridge - Soft Match 2,453
0 0 0 0 1,837 0Statewide - Federal 1,837
0 0 0 0 459 0Statewide - Soft Match 459
$58,521$48,460$74,680$71,795$62,152$67,578Total $383,186
Secondary
Accounts Receivable
$0$0$0$0$12,000$16,000Local $28,000
CMAQ
0 0 0 3,777 0 1,827MPO - Federal 5,604
0 0 0 944 0 457MPO - State Match 1,401
0 0 0 0 322 0TERMS - Federal 322
0 0 0 0 81 0TERMS - State Match 81
CTB Formula
0 0 0 0 0 100High Priority - Federal 100
0 0 0 0 0 25High Priority - Soft Match 25
0 10,787 15,168 10,470 2,111 0High Priority - State 38,536
1,462 1,511 1,405 1,386 948 507Unpaved - State 7,218
Highway Safety Improvements
0 0 0 0 0 2,878Federal 2,878
0 0 0 0 0 320Soft Match 320
Local Project Contributions
0 0 2,000 8,000 8,875 11,500Local 30,375
RSTP (STP Regional)
1,166 2,781 5,600 6,632 4,204 7,698MPO - Federal 28,080
291 695 1,400 1,658 1,051 1,924MPO - State Match 7,020
STP
449 432 789 562 522 513BROS - Federal 3,268
112 108 197 141 131 128BROS - Soft Match 817
0 640 0 0 0 0Statewide - Federal 640
0 160 0 0 0 0Statewide - Soft Match 160
$3,480$17,113$26,558$33,570$30,245$43,877Total $154,844
Urban
CMAQ
$536$1,027$414$54$307$1,612MPO - Federal $3,950
134 257 103 14 77 403MPO - State Match 988
CTB Formula
2,300 2,375 425 0 0 0High Priority - State 5,100
RSTP (STP Regional)
4,798 3,709 2,766 1,887 604 5,626MPO - Federal 19,390
1,200 927 691 472 151 1,406MPO - State Match 4,847
$8,968$8,295$4,399$2,427$1,138$9,048Total $34,275
486* 04/16/2014
-
FY15 DRAFT
FY2015-2020 Six-Year Improvement Program NORTHERN VIRGINIA DISTRICT
FY2019 FY2020FY2018FY2017FY2016FY2015Fund Source Name
Funding Allocation Summary (000's)
NORTHERN VIRGINIA DISTRICT - cont.
System Totals
Enhancement
TAP
$2,547$2,547$2,547$2,547$2,547$2,551MPO - Federal $15,285
$2,547$2,547$2,547$2,547$2,547$2,551Total $15,285
Transit
Accounts Receivable
$0$0$0$0$2,067$3,000Local $5,067
CMAQ
5,989 4,834 5,371 8,611 10,119 9,191MPO - Federal 44,114
1,497 1,208 1,343 2,153 2,530 2,298MPO - State Match 11,029
6,411 4,993 6,411 2,794 6,411 2,731PM 2.5 - Federal 29,752
1,603 1,248 1,603 698 1,603 683PM 2.5 - State Match 7,438
RSTP (STP Regional)
0 4,322 2,185 646 400 167MPO - Federal 7,721
0 1,080 546 162 100 42MPO - State Match 1,930
$15,500$17,686$17,460$15,063$23,230$18,111Total $107,051
Rail
CMAQ
$0$0$0$400$1,536$1,200MPO - Federal $3,136
0 0 0 100 384 300MPO - State Match 784
$0$0$0$500$1,920$1,500Total $3,920
Other
CMAQ
$846$3,189$389$765$396$387MPO - Federal $5,971
211 797 97 191 99 97MPO - State Match 1,493
CTB Formula
0 0 0 0 703 647ITS - State 1,350
Highway Safety Improvements
0 0 0 0 0 9,585Federal 9,585
0 0 0 0 0 1,065Soft Match 1,065
Prescoping Funds
2,687 2,628 2,571 2,515 2,460 2,407State 15,269
RSTP (STP Regional)
0 480 480 560 560 560MPO - Federal 2,640
0 120 120 140 140 140MPO - State Match 660
$3,745$7,214$3,657$4,171$4,358$14,888Total $38,033
Grand Total $96,761$120,288$164,522$188,240$196,318$200,676 $966,804
04/16/2014 487*
-
This Page Is Intentionally Left Blank
488 04/16/2014
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
ATMS SYSTEM MAINTENANCE / INTEGRATION
PROJECT
UPC NO.: 61247
FOProject Report Req'd
FROM: OpenTMS / ASSIST SYSTEMS ADMN,
MAINTENANCE, AND INTEGRATION TO: @ PSTOC AND
THROUGHOUT THE NORTHERN REGION
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 3,999 0 0 0 0 0CTB Formula: High Priority - State
0 0 0 0 0 0 8,313Interstate: Federal
0 0 0 0 0 0 1,756Interstate: State Match
0 0 0 0 0 0 6(X) Maintenance Funds: Statewide
0 0 0 0 0 0 1,283NHPP: Statewide - Federal
0 0 0 0 0 0 321NHPP: Statewide - Soft Match
0 0 0 0 0 0 322Soft Match: Federal
3,999 0 0 0 0 0 12,001Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
NOVA INTERSTATE SIGNS DISTRICTWIDE
PROJECT
UPC NO.: 70656
NFODistrict-wide
VARIOUS ROUTESDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 204Interstate: Federal
0 0 0 0 0 0 23Interstate: State Match
0 0 0 0 0 0 227Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
HOV LANE ENFORCEMENT
PROJECT
UPC NO.: 72835
NFODistrict-wide
DISTRICTWIDEDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,160Interstate: Federal
0 0 0 0 0 0 450Interstate: State Match
0 0 0 0 0 0 90Soft Match: Federal
0 0 0 0 0 0 2,700Total
04/16/2014 489
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
BRAC STATEWIDE ADMINISTRATION
PROJECT
UPC NO.: 81738
NFOProject Report Req'd
PTF and State Funds - AC for future federal conversion.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,417Interstate: Federal
0 0 0 0 0 0 225Interstate: State Match
0 0 0 0 0 0 15Local Project Contributions: Local
0 0 0 0 0 0 37National Highway System Allocations: Federal
0 0 0 0 0 0 9National Highway System Allocations: State Match
0 0 0 0 0 0 45NHPP: State Match
0 0 0 0 0 0 682NHPP: Statewide - Federal
0 0 0 0 0 0 69NHPP: Statewide - Soft Match
0 0 0 0 0 0 893Priority Transportation Funds: State
0 0 0 0 0 0 129Soft Match: Federal
0 0 0 0 0 0 86Special Grant Projects: Federal
0 0 0 0 0 0 3,608Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
REGION TRANSP MGMT PLAN
PROJECT
UPC NO.: 87396
FOProject Report Req'd
FROM: Congestion Management Plan TO: Congestion
Management Plan
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 41,902Interstate: Federal
0 0 0 0 0 0 4,690Interstate: State Match
0 0 0 0 0 0 8,000NHPP: Statewide - Federal
0 0 0 0 0 0 2,000NHPP: Statewide - Soft Match
0 0 0 0 0 0 2,000Soft Match: Federal
0 0 0 0 0 0 58,592Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I-95 & I-66 CORR CONGEST IMPROVDMS
UPGRADE TRAVELER INFO
PROJECT
UPC NO.:
ROUTE:
105372
NFO
FY2015
SCHEDULE
600
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Northern Virginia MPO
CN
FROM: Various TO: Various (55.8500 MI)DESCRIPTION: RW
PROJECT LENGTH: 55.8500 MISCOPE OF WORK: Traffic Management/Engineering TO 600
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 8CTB Formula: ITS - Federal
0 0 0 0 0 0 2CTB Formula: ITS - Soft Match
0 0 0 0 0 590 0CTB Formula: ITS - State
0 0 0 0 0 0 590 10Total
490 04/16/2014
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
UPGRADE OVERHEAD GUIDE SIGNS
PROJECT
UPC NO.:
ROUTE:
102522
NFO0000
Complete
SCHEDULE
22
ESTIMATED COST (000's)
JURISDICTION:
VARIOUS INTERSTATES & APPROACH ROUTESSTREET NAME:
PENorthern Virginia District-wide
Complete 283CN
FROM: NRO WIDE TO: NRO WIDEDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Traffic Management/Engineering TO 305
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 523Interstate: Federal
0 0 0 0 0 0 58Interstate: State Match
-276 0 0 0 0 0 0 581Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
BUILD INTERCHANGE @ RT 29 & LINTON HALL
RD IN GAINESVILLE
PROJECT
UPC NO.:
ROUTE:
52326
FO0066
Complete
SCHEDULE
11,300
ESTIMATED COST (000's)
JURISDICTION:
I-66STREET NAME:
PEPrince William County
Underway 97,069CN
CompleteFROM: Rte 29/Virginia Oaks Drive Intersection TO: 0.033
Mile South of WB I-66 Baseline (1.1530 MI)
DESCRIPTION: 107,700RW
PROJECT LENGTH: 1.1530 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 216,070
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 214Demonstration Funds: Federal
0 0 0 0 0 0 4,493FRAN Bond Proceeds: FRAN
0 0 0 0 0 0 102,424Interstate: Federal
0 0 0 0 0 0 19,267Interstate: State Match
0 0 0 0 0 1,555 29,467NHPP: Statewide - Federal
0 0 0 0 0 389 7,367NHPP: Statewide - Soft Match
0 0 0 0 0 0 365Non-Formula: State Match
0 0 0 0 0 0 31Regular: Federal
0 0 0 0 0 0 1,350RSTP (STP Regional): Federal
0 0 0 0 0 0 29,543SAFETEA-LU Earmarks: Federal
0 0 0 0 0 0 2,316SAFETEA-LU Earmarks: State Bond Match
0 0 0 0 0 0 5,069SAFETEA-LU Earmarks: State Match
0 0 0 0 0 0 5,660Soft Match: Federal
0 0 0 0 0 0 6,560TEA-21 High Priority Funds: Statewide
0 0 0 0 0 0 1,944 214,126Total
04/16/2014 491
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
RTE 66 - PRELIMINARY ENGINEERING FOR EIS
- PE ONLY
PROJECT
UPC NO.:
ROUTE:
54911
FO0066
Complete
SCHEDULE
35,263
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENorthern Virginia District-wide
CN
FROM: ROUTE 495 (CAPITAL BELTWAY) TO: ROUTE 15DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Preliminary Engineering TO 35,263
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 500Bond Proceeds: CPR Bonds
0 0 0 500 6,000 0 0CTB Formula: High Priority - State
0 0 0 0 0 400 0CTB Formula: PPTA - Federal
0 0 0 0 0 100 0CTB Formula: PPTA - Soft Match
0 0 0 0 0 0 980Demonstration Funds: Federal
0 0 0 0 0 0 5,104FRAN Bond Proceeds: FRAN
0 0 0 0 0 0 7,456Interstate: Federal
0 0 0 0 0 0 1,864Interstate: State Match
2,148 0 0 0 0 2,462 5,278NHPP: Statewide - Federal
537 0 0 0 0 615 1,319NHPP: Statewide - Soft Match
0 0 0 500 6,000 2,685 3,577 22,501Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
RTE I-66 SPOT IMPROVEMENT 3
PROJECT
UPC NO.:
ROUTE:
78827
FO0066
Revised schedule requiredREPORT NOTE:
Underway
SCHEDULE
3,300
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEArlington County
FY2015 20,837CNFROM: 0.045 Mi. E. of Glebe Road (Route 120) TO: 0.095
Mi. W. of Lee Highway (Route 29) (1.1270 MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.1270 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 24,137
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 278Bond Proceeds: CPR Bonds
0 0 0 0 0 0 1,296Interstate: Federal
0 0 0 0 0 0 324Interstate: State Match
0 0 0 0 0 0 1,344SAFETEA-LU Earmarks: Federal
0 0 0 0 0 0 332SAFETEA-LU Earmarks: State Bond Match
0 0 0 0 0 0 4SAFETEA-LU Earmarks: State Match
20,559 0 0 0 0 0 0 3,578Total
492 04/16/2014
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
WESTBOUND ACCEL/DECEL LN FROM
WESTMORELAND ST TO HAYCOCK RD
PROJECT
UPC NO.:
ROUTE:
78828
FO0066
Complete
SCHEDULE
4,900
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEArlington County
Underway 28,194CNFROM: 0.2 Mi West of Rte 703 (Haycock Rd) TO: Rte 29
(Lee Hwy) (1.6000 MI)
DESCRIPTION: RW
181,189 83,86PROJECT LENGTH: 1.6000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: New Construction Roadway TO 33,094
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 11,799Bond Proceeds: CPR Bonds
0 0 0 0 0 0 2,720Interstate: Federal
0 0 0 0 0 0 680Interstate: State Match
0 0 0 0 0 0 289NHPP: Statewide - Federal
0 0 0 0 0 0 72NHPP: Statewide - Soft Match
0 0 0 0 0 0 14,028SAFETEA-LU Earmarks: Federal
0 0 0 0 0 0 1,027SAFETEA-LU Earmarks: State Bond Match
0 0 0 0 0 0 2,480SAFETEA-LU Earmarks: State Match
0 0 0 0 0 0 0 33,094Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I-66 - GMU/VIENNA METRO STATION
ACCESSIBILITY IMPROVMENT
PROJECT
UPC NO.:
ROUTE:
81009
FO0066
MPO Project. NVTA Project.REPORT NOTE:
Underway
SCHEDULE
2,800
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFairfax County
FY2015 50,149CN
FY2015FROM: 0.301 MILES WEST OF BLAKE LANE TO:
VADEN DRIVE (0.8140 MI)
DESCRIPTION: 1,000RW
PROJECT LENGTH: 0.8140 MISCOPE OF WORK: New Construction Roadway TO 53,949
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 12,621CMAQ: Federal
0 0 0 0 0 0 2,852CMAQ: State Match
0 0 0 0 0 0 246Local Project Contributions: Local
0 0 0 0 0 0 700Non-Formula: Statewide
0 0 0 0 0 0 225Project Contributions: Various Sources
0 0 0 0 0 0 6,897RSTP (STP Regional): Federal
0 0 0 0 0 0 10,784RSTP (STP Regional): MPO - Federal
0 0 0 0 0 0 2,696RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 1,724RSTP (STP Regional): State Match
0 0 0 0 0 0 2,800RSTP (STP Regional): Statewide
0 0 0 0 0 0 583Transit Statewide STP: Federal
11,820 0 0 0 0 0 0 42,129Total
04/16/2014 493
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I-66 WIDENING TO RTE 15 (1 HOV+1 SOV EACH
DIR)
PROJECT
UPC NO.:
ROUTE:
93577
FO0066
Complete
SCHEDULE
2,362
ESTIMATED COST (000's)
JURISDICTION:
I-66STREET NAME:
PEPrince William County
Underway 70,325CN
CompleteFROM: MP 39.6 - 1.2 mile west of Rte 15 TO: MP 44.3 -
1.0 mile east of Rte 29 (4.7000 MI)
DESCRIPTION: 795RW
PROJECT LENGTH: 4.7000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 73,482
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 17,058Bond Proceeds: CPR Bonds
0 0 0 0 0 0 190Demonstration Funds: Federal
0 0 0 0 0 0 3,140Interstate: Federal
0 0 0 0 0 0 396Interstate: State Match
0 0 0 0 0 0 705NHPP: State Match
21,277 0 0 620 3,995 9,361 7,610NHPP: Statewide - Federal
5,319 0 0 155 999 2,340 316NHPP: Statewide - Soft Match
0 0 0 775 4,993 26,596 11,702 29,416Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
ARRA - I66 PAVEMENT
PROJECT
UPC NO.: 96105
FOARRA09
ARRA project UPC 96105; ARRA-C project 97216REPORT NOTE:
FROM: Rte 50 TO: I495 (5.6000 MI)DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 20,066American Recovery and Reinvestment Act: Flexible
0 0 0 0 0 0 234Highway Safety Improvements: Federal
0 0 0 0 0 0 26Highway Safety Improvements: State Match
0 0 0 0 0 0 24,461Interstate: Federal
0 0 0 0 0 0 3,159Interstate: State Match
0 0 0 0 0 0 47,946Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I-66 MULTI MODAL STUDY
PROJECT
UPC NO.:
ROUTE:
97586
FO0066
Complete
SCHEDULE
2,500
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Northern Virginia MPO
CNFROM: Interstate 66 (DC Line) TO: Interstate 495 (Capital
Beltway) (16.5000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 16.5000 MISCOPE OF WORK: Preliminary Engineering TO 2,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,250Interstate: Federal
0 0 0 0 0 0 250Interstate: State Match
0 0 0 0 0 0 0 2,500Total
494 04/16/2014
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I-66 ACTIVE TRAFFIC MANAGEMENT PROJECT
PROJECT
UPC NO.:
ROUTE:
98017
FO0066
Complete
SCHEDULE
4,574
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENorthern Virginia District-wide
Underway 33,992CNFROM: I-66 MM 40 (East of US15) TO: I-66 MM 75 DC
Line, Potomac River; Roosevelt Bridge (35.0000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 35.0000 MISCOPE OF WORK: Safety TO 38,566
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,629CMAQ: MPO - Federal
0 0 0 0 0 0 907CMAQ: MPO - State Match
0 0 0 0 0 0 779CMAQ TERMS: Federal
0 0 0 0 0 0 195CMAQ TERMS: State Match
0 0 0 0 0 0 5,907Highway Safety Improvements: Federal
0 0 0 0 0 0 146Highway Safety Improvements: Soft Match
0 0 0 0 0 0 511Highway Safety Improvements: State Match
0 0 0 0 0 0 22,720Interstate: Federal
0 0 0 0 0 0 2,585Interstate: State Match
0 0 0 0 0 0 32NHPP: State Match
0 0 0 0 0 0 291NHPP: Statewide - Federal
0 0 0 0 0 0 1NHPP: Statewide - Soft Match
0 0 0 0 0 0 691RSTP (STP Regional): MPO - Federal
0 0 0 0 0 0 173RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 0 38,566Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I-66 / ROUTE 15 INTERCHANGE
RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
100566
FO0066
Complete
SCHEDULE
3,298
ESTIMATED COST (000's)
JURISDICTION:
I-66STREET NAME:
PEPrince William County
Underway 61,819CN
CompleteFROM: MP 3.6 - 0.4 Miles West of Rte 15 TO: MP 4.4 -
0.6 Miles East of Rte 15 (0.8380 MI)
DESCRIPTION: 8,126RW
PROJECT LENGTH: 0.8380 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 73,244
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,461Bond Proceeds: CPR Bonds
0 0 17,474 20,000 20,000 0 0Bond Proceeds: GARVEE Bonds
0 0 99 0 0 0 99CTB Formula: High Priority - Federal
0 0 25 0 0 0 25CTB Formula: High Priority - Soft Match
0 0 0 0 0 0 3,060Interstate: Federal
0 0 0 0 0 0 340Interstate: State Match
0 0 0 0 0 0 100NHPP: State Match
0 0 0 0 0 5,231 3,398NHPP: Statewide - Federal
0 0 0 0 0 1,308 625NHPP: Statewide - Soft Match
0 0 17,598 20,000 20,000 0 6,538 9,108Total
04/16/2014 495
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I-66 @ ROUTE 28 INTERCHANGE
IMPROVEMENTS - PH1
PROJECT
UPC NO.:
ROUTE:
103317
FO0066
Underway
SCHEDULE
12,000
ESTIMATED COST (000's)
JURISDICTION:
Interstate 66STREET NAME:
PEFairfax County
FY2018 25,000CN
FY2016FROM: 1.0 mi. west of Route 28 TO: 1.0 mi. east of Route
28 (2.0000 MI)
DESCRIPTION: 13,000RW
PROJECT LENGTH: 2.0000 MISCOPE OF WORK: Preliminary Engineering TO 50,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 10,000Bond Proceeds: CPR Bonds
25,100 0 0 0 12,775 0 0Bond Proceeds: GARVEE Bonds
0 0 1,100 0 0 0 400CTB Formula: High Priority - Federal
0 0 275 0 0 0 100CTB Formula: High Priority - Soft Match
0 0 0 0 0 0 225Highway Safety Improvements: Federal
0 0 0 0 0 0 25Highway Safety Improvements: State Match
0 0 1,375 0 12,775 25,100 0 10,750Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
AIR RIGHTS PILOT PROJECT LEASING
AIRSPACE ABOVE I-66
PROJECT
UPC NO.:
ROUTE:
105241
FO0066
Underway
SCHEDULE
175
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEArlington County
CNFROM: North Washington Street TO: North Lynn Street
(5.0000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 5.0000 MISCOPE OF WORK: Preliminary Engineering TO 175
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 60Interstate: Federal
0 0 0 0 0 0 15Interstate: State Match
0 0 0 0 0 0 90NHPP: Statewide - Federal
0 0 0 0 0 0 10NHPP: Statewide - Soft Match
0 0 0 0 0 0 0 175Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I-66 CORR CONGEST IMPROV ROSYLN
TUNNEL SAFETY IMPROVMENTS
PROJECT
UPC NO.:
ROUTE:
105364
NFO0066
FY2016
SCHEDULE
373
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEArlington County
CNFROM: East Portal - Rosslyn Tunnel TO: West Portal -
Rossyln Tunnel (1.0000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Safety TO 373
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 373 0CTB Formula: ITS - State 0
496 04/16/2014
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I66 AT RTE 28 WB SHOULDER IMPROVEMENT
PROJECT
UPC NO.:
ROUTE:
105596
NFO0066
New Project
Revised schedule requiredREPORT NOTE:
Underway
SCHEDULE
120
ESTIMATED COST (000's)
JURISDICTION:
Interstate 66STREET NAME:
PEFairfax County
FY2016 370CN
FY2015FROM: 2,038 ft West of Exit Ramp 53B TO: Exit Ramp
53B (1.5000 MI)
DESCRIPTION: 10RW
PROJECT LENGTH: 0.3860 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
450 0 0 0 0 0 0Highway Safety Improvements: Federal
50 0 0 0 0 0 0Highway Safety Improvements: Soft Match
0 0 0 0 0 500 0 0Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
BUILD HOV RAMPS BETWEEN I-95 AND
CAPITAL BELTWAY- FAIRFAX CO
PROJECT
UPC NO.:
ROUTE:
14682
FO0095
Phase 8 - RTE 495 - CAPITAL BELTWAY HOT LANESREPORT NOTE:
Complete
SCHEDULE
21,192
ESTIMATED COST (000's)
JURISDICTION:
SPRINGFIELD INTSTREET NAME:
PEFairfax County
Complete 106,790CNHOV ROADWAYS BETWEEN ROUTES I-95/I-395/I-495
(1.7000 MI)
DESCRIPTION: RW
27457,28597,28598,28599,28600,28601,28602 -2,83,90PROJECT LENGTH: 1.7000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Traffic Management/Engineering TO 127,982
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,434Accounts Receivable: Local
0 0 0 0 0 0 85,771Interstate: Federal
0 0 0 0 0 0 10,370Interstate: State Match
0 0 0 0 0 0 1,671NHPP: State Match
0 0 0 0 0 0 25,383NHPP: Statewide - Federal
0 0 0 0 0 0 1,835NHPP: Statewide - Soft Match
0 0 0 0 0 0 517Soft Match: Federal
0 0 0 0 0 0 0 127,982Total
04/16/2014 497
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
RTE 95 - SECURING OF CONSULTANT
PROJECT
UPC NO.:
ROUTE:
17071
FO0095
Woodrow Wilson Bridge Project.REPORT NOTE:
Complete
SCHEDULE
152,615
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEAlexandria
CNFROM: MANAGEMENT, COORDINATION,
SCHEDULING, ADMINISTRATION TO: AND COMMUNITY
RELATIONS AT WOODROW WILSON BRIDGE
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Preliminary Engineering TO 152,615
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 10,854Accounts Receivable: Local
0 0 0 0 0 0 82,098Demonstration Funds: Federal
0 0 0 0 0 0 24,205FRAN Bond Proceeds: FRAN
0 0 0 0 0 0 27,173Interstate: Federal
0 0 0 0 0 0 15,322Interstate: State Match
0 0 0 0 0 0 1(X) Maintenance Funds: Statewide
-7,039 0 0 0 0 0 0 159,653Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
RTE 95 - WIDEN TO ADD ADDITIONAL LANES
PROJECT
UPC NO.:
ROUTE:
18136
FO0095
Woodrow Wilson Bridge ProjectREPORT NOTE:
Complete
SCHEDULE
21,431
ESTIMATED COST (000's)
JURISDICTION:
WWB/TELEGRAPHSTREET NAME:
PEAlexandria
Complete 239,959CN
CompleteFROM: 2.10 MILES WEST TELEGRAPH ROAD TO: 0.45
MILE EAST TELEGRAPH ROAD (1.7000 MI)
DESCRIPTION: 1,320RW
6409,26436,26438,26439,26441,26443 66,67,71,74,79,81PROJECT LENGTH: 1.7000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Reconstruction w/o Added Capacity TO 262,710
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 163Accounts Receivable: Local
0 0 0 0 0 0 56,171Demonstration Funds: Federal
0 0 0 0 0 0 7,515FRAN Bond Proceeds: FRAN
0 0 0 0 0 0 148,699Interstate: Federal
0 0 0 0 0 0 49,012Interstate: State Match
0 0 0 0 0 0 1,150PTF Prior to District Distribution: Federal
0 0 0 0 0 0 0 262,710Total
498 04/16/2014
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
RTE 95 - WOODROW WILSON MEMORIAL
BRIDGE - R/W ONLY
PROJECT
UPC NO.:
ROUTE:
55516
FO0095
Woodrow Wilson Bridge Project - R/W OnlyREPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEAlexandria
CN
CompleteFROM: 0.30 MILE WEST WASHINGTON STREET (IN
ALEXANDRIA) TO: MARYLAND STATE LINE
DESCRIPTION: 18,543RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Right of Way TO 18,543
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 27,783Demonstration Funds: Federal
0 0 0 0 0 0 10,151Interstate: Federal
0 0 0 0 0 0 1,674Interstate: State Match
0 0 0 0 0 0 5,657PTF Prior to District Distribution: Federal
-26,722 0 0 0 0 0 0 45,265Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
RTE 95 - TELEGRAPH RD & RAMP IMPROV -
(PHASE I-CONTRACT VB2)
PROJECT
UPC NO.:
ROUTE:
64524
FO0095
Woodrow Wilson Bridge Project; Tapered Match AppliedREPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
WWBSTREET NAME:
PENorthern Virginia District-wide
Complete 19,359CN
CompleteAT TELEGRAPH ROAD INTERCHANGEDESCRIPTION: 33,876RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Bridge, New Construction TO 53,234
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 25,608Demonstration Funds: Federal
0 0 0 0 0 0 3,500FRAN Bond Proceeds: FRAN
0 0 0 0 0 0 8,240Interstate: Federal
0 0 0 0 0 0 15,057Interstate: State Match
0 0 0 0 0 0 4,316Project Contributions: Various Sources
-3,486 0 0 0 0 0 0 56,721Total
04/16/2014 499
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
RTE 95 - JONES POINT PARK IMPROVEMENTS
- CONTRACT VA8
PROJECT
UPC NO.:
ROUTE:
64614
FO0095
Woodrow Wilson Bridge ProjectREPORT NOTE:
Complete
SCHEDULE
3,901
ESTIMATED COST (000's)
JURISDICTION:
WWBSTREET NAME:
PENorthern Virginia District-wide
Complete 17,854CNFROM: 0.43 Mi. E. of US Route 1 TO: 0.80 Mi. E. of US
Route 1 (0.3700 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.3700 MISCOPE OF WORK: Acqusition of Scenic Easement or Sites TO 21,754
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 720Demonstration Funds: Federal
0 0 0 0 0 0 16,709Interstate: Federal
0 0 0 0 0 0 4,226Interstate: State Match
0 0 0 0 0 0 1,246Project Contributions: Various Sources
-1,146 0 0 0 0 0 0 22,900Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
RTE 95 - JONES POINT PARK BULKHEAD &
INTERIM IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
64615
FO0095
Woodrow Wilson Bridge Project.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
WWBSTREET NAME:
PENorthern Virginia District-wide
Complete 158CNFROM: 0.43 Mi. E of US Route 1 TO: 0.80 Mi. E. of US
Route 1 (0.3700 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.3700 MISCOPE OF WORK: New Construction Roadway TO 158
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 113Accounts Receivable: Local
0 0 0 0 0 0 7Demonstration Funds: Federal
0 0 0 0 0 0 451Interstate: Federal
0 0 0 0 0 0 115Interstate: State Match
-528 0 0 0 0 0 0 686Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
RTE 95 - JONES POINT PARK
REFORESTATION - CONTRACT VM5
PROJECT
UPC NO.:
ROUTE:
64616
FO0095
Woodrow Wilson Bridge ProjectREPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
WWBSTREET NAME:
PENorthern Virginia District-wide
Complete 1,753CNFROM: 0.43 Mi. E. of US Route 1 TO: 0.80 Mi. E. of US
Route 1 (0.3700 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.3700 MISCOPE OF WORK: Landscaping/Beautification TO 1,753
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 801Demonstration Funds: Federal
0 0 0 0 0 0 919Interstate: Federal
0 0 0 0 0 0 366Interstate: State Match
-332 0 0 0 0 0 0 2,085Total
500 04/16/2014
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
RTE 95 - WETLAND MITIGATION AT CAMERON
RUN-CONTR VM6 FOR WWB
PROJECT
UPC NO.:
ROUTE:
64619
FO0095
Woodrow Wilson Bridge ProjectREPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
WWBSTREET NAME:
PENorthern Virginia District-wide
Complete 1,944CN
AT TELEGRAPH ROAD INTERCHANGE (0.5000 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Safety TO 1,944
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 812Interstate: Federal
0 0 0 0 0 0 203Interstate: State Match
0 0 0 0 0 0 713Project Contributions: Various Sources
215 0 0 0 0 0 0 1,729Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
RTE 95 - US1 CMS-ITS INTEGRATION
PROJECT
UPC NO.:
ROUTE:
64628
FO0095
Woodrow Wilson Bridge ProjectREPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
WWBSTREET NAME:
PENorthern Virginia District-wide
Complete 531CN
AT ROUTE 1 INTERCHANGEDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 531
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 30Demonstration Funds: Federal
0 0 0 0 0 0 239Interstate: Federal
0 0 0 0 0 0 60Interstate: State Match
0 0 0 0 0 0 310Project Contributions: Various Sources
-107 0 0 0 0 0 0 638Total
04/16/2014 501
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Multiple MPOsInterstate
PROGRAM/SYSTEM
I-95/395 PRELIMINARY ENGINEERING STUDIES
PROJECT
UPC NO.:
ROUTE:
70849
FO0095
I-95/395 HOT Lanes Project; Project linked to UPC 77616.REPORT NOTE:
Underway
SCHEDULE
41,365
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENorthern Virginia District-wide
CN
FROM: Garrisonville Road TO: 1 Mile North of Edsall Rd.DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 41,365
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 180Accounts Receivable: Local
0 0 0 0 0 0 532Bonus OA: State Match
0 0 0 0 0 0 25,682Interstate: Federal
0 0 0 0 0 0 3,620Interstate: State Match
0 0 0 0 0 0 38NHPP: State Match
0 0 0 0 0 0 338NHPP: Statewide - Federal
0 0 0 0 0 0 1,096Soft Match: Federal
0 0 0 0 0 0 10,000Toll Facilities: Toll Facilities Revolving
-121 0 0 0 0 0 0 41,486Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
RTE 95 - FREEDMEN'S CEMETARY
ENHANCEMENTS
PROJECT
UPC NO.:
ROUTE:
76210
FO0095
Woodrow Wilson Bridge ProjectREPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEAlexandria
Complete 3,813CN
CompleteFROM: 1001 SOUTH WASHINGTON STREET TO: 714
CHURCH STREET
DESCRIPTION: 6,134RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: New Construction Roadway TO 9,947
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 6,980Interstate: Federal
0 0 0 0 0 0 1,745Interstate: State Match
0 0 0 0 0 0 1,038Local Project Contributions: Local
183 0 0 0 0 0 0 9,763Total
502 04/16/2014
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
RTE 95 - GRADE SEPARATION OF SOUTHERN
INTERSECTION
PROJECT
UPC NO.:
ROUTE:
77923
FO0095
Woodrow Wilson Bridge ProjectREPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEAlexandria
Complete 40,627CN
CompleteFROM: 0.5 MILE WEST OF I-95/TELEGRAPH ROAD
INTERCHANGE TO: 0.5 MILE EAST OF
I-95/TELEGRAPH ROAD INTERCHANGE (1.0000 MI)
DESCRIPTION: 1,748RW
PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 42,375
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 158Demonstration Funds: Federal
0 0 0 0 0 0 29,258Interstate: Federal
0 0 0 0 0 0 7,354Interstate: State Match
0 0 0 0 0 0 9,913Project Contributions: Various Sources
-4,307 0 0 0 0 0 0 46,682Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
NOVA GEC MEGA PROJECT ADMINISTRATION
PROJECT
UPC NO.:
ROUTE:
86527
FO0095
Complete
SCHEDULE
63,939
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFairfax County
CNFROM: Manage, Coordinate, Schedule, Administration
TO: and Community Relations for NOVA Mega Projects
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 63,939
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 41,465Interstate: Federal
0 0 0 0 0 0 5,966Interstate: State Match
0 0 0 0 0 0 1,020NHPP: State Match
0 0 0 0 0 0 10,707NHPP: Statewide - Federal
0 0 0 0 0 0 382NHPP: Statewide - Soft Match
0 0 0 0 0 0 4,400Soft Match: Federal
0 0 0 0 0 0 0 63,939Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
STREETSCAPE IMPROVEMENTS IN THE CITY
OF ALEXANDRIA
PROJECT
UPC NO.:
ROUTE:
87414
FO0095
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
S. Washington StreetSTREET NAME:
PEAlexandria
Complete 2,672CN
Streetscape Improvements in the City of AlexandriaDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 2,672
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,738Demonstration Funds: Federal
0 0 0 0 0 0 400Interstate: Federal
0 0 0 0 0 0 534Interstate: State Match
0 0 0 0 0 0 0 2,672Total
04/16/2014 503
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I-95 INTERCHANGE IMPROVEMENTS PHASE
VIII SUPPORT
PROJECT
UPC NO.:
ROUTE:
90159
FO0095
Complete
SCHEDULE
400
ESTIMATED COST (000's)
JURISDICTION:
Springfield InterchangeSTREET NAME:
PEFairfax County
Complete 3,600CNHOV Roadways Between Routes i-95/I-395/I-495 (1.3000
MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.3000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 4,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,200Interstate: Federal
0 0 0 0 0 0 300Interstate: State Match
0 0 0 0 0 0 5,000Toll Facilities: Toll Facilities Revolving
-2,500 0 0 0 0 0 0 6,500Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I-95 NB DIRECTIONAL OFF RAMP TO NB
FAIRFAX COUNTY PARKWAY
PROJECT
UPC NO.:
ROUTE:
93033
FO0095
Revised schedule requiredREPORT NOTE:
Complete
SCHEDULE
8,100
ESTIMATED COST (000's)
JURISDICTION:
Interstate 95STREET NAME:
PEFairfax County
FY2016 64,524CN
UnderwayFROM: FXCO Parkway Exit 166 TO: 0.6 Mi W. of Exit 166
(0.6000 MI)
DESCRIPTION: 10,000RW
PROJECT LENGTH: 0.6000 MISCOPE OF WORK: New Construction Roadway TO 82,624
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,718Demonstration Funds: Federal
0 0 0 0 0 0 32Interstate: Federal
0 0 0 0 0 0 483Interstate: State Match
78,391 0 0 0 0 0 0 4,233Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
DAR RAMPS INTO FORT BELVOIR EPG
PROJECT
UPC NO.:
ROUTE:
96256
FO0095
Complete
SCHEDULE
1,300
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFairfax County
Complete 360CN
CompleteFROM: From Heller Road (149 Feet) TO: I-95 HOV
lanes(approx 3500 ft N. of FFX CO PKWY) (0.2000 MI)
DESCRIPTION: 6,624RW
PROJECT LENGTH: 0.2000 MISCOPE OF WORK: New Construction Roadway TO 8,284
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 8,284Special Grant Projects: Federal 0
504 04/16/2014
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
ENGINEERING STUDIES FOR I-95 NB RAMPS &
ROLLNG RD. LOOP RAMP
PROJECT
UPC NO.:
ROUTE:
96259
NFO0095
Complete
SCHEDULE
2,111
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFairfax County
CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Environmental Only TO 2,111
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,153Accounts Receivable: Local
0 0 0 0 0 0 211Priority Transportation Funds: State
0 0 0 0 0 0 1,900Special Grant Projects: Federal
-1,153 0 0 0 0 0 0 3,264Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
TELEGRAPH ROAD P&R ACCESS
IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
102578
NFO0095
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Telegraph RoadSTREET NAME:
PEPrince William County
Complete 7,062CNFROM: 0.20 Mi South of Caton Hill Road TO: 0.37 Mi
North of Caton Hill Road (0.5700 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.5700 MISCOPE OF WORK: Traffic Management/Engineering TO 7,062
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,114CMAQ: TERMS - Federal
0 0 0 0 0 0 529CMAQ: TERMS - State Match
0 0 0 0 0 0 2,573CMAQ TERMS: Federal
0 0 0 0 0 0 643CMAQ TERMS: State Match
0 0 0 0 0 0 595Local Project Contributions: Local
0 0 0 0 0 487 0NHPP: Statewide - Federal
0 0 0 0 0 122 0NHPP: Statewide - Soft Match
0 0 0 0 0 0 608 6,454Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I-95 PARKING MANAGEMENT SYSTEM - PE
ONLY
PROJECT
UPC NO.:
ROUTE:
105378
NFO0095
FY2015
SCHEDULE
600
ESTIMATED COST (000's)
JURISDICTION:
I-95STREET NAME:
PENorthern Virginia District-wide
CNFROM: Stafford / Prince William County line TO:
Washington DC (29.0000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 29.0000 MISCOPE OF WORK: Preliminary Engineering TO 600
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 480CTB Formula: ITS - Federal
0 0 0 0 0 0 120CTB Formula: ITS - Soft Match
0 0 0 0 0 0 0 600Total
04/16/2014 505
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
RTE 395 - INCIDENT MANAGEMENT
PROJECT
UPC NO.:
ROUTE:
69132
NFO0395
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEArlington County
Underway 1,944CNFROM: 14TH STREET BRIDGE TO: VA 7 / ALEXANDRIA
CITY LIMITS
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 1,944
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,287CMAQ TERMS: Federal
0 0 0 0 0 0 322CMAQ TERMS: State Match
0 0 0 0 0 0 363(X) Maintenance Funds: Federal
0 0 0 0 0 0 36(X) Maintenance Funds: Statewide
-63 0 0 0 0 0 0 2,007Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
EADS STREET EXIT RAMP IMPROVEMENT
PROJECT
UPC NO.:
ROUTE:
77262
FO0395
Complete
SCHEDULE
506
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEArlington County
Complete 1,554CNFROM: BEGINNING OF EXIT GORE TO: EADS STREET
(0.1000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Safety TO 2,060
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 561CMAQ: TERMS - Federal
0 0 0 0 0 0 140CMAQ: TERMS - State Match
0 0 0 0 0 0 683CMAQ TERMS: Federal
0 0 0 0 0 0 171CMAQ TERMS: State Match
0 0 0 0 0 0 205Interstate: Federal
0 0 0 0 0 0 51Interstate: State Match
0 0 0 0 0 0 200(X) Maintenance Funds: Federal
0 0 0 0 0 0 50(X) Maintenance Funds: Statewide
0 0 0 0 0 0 0 2,060Total
506 04/16/2014
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I-395 HOV RAMP @ SEMINARY ROAD
PROJECT
UPC NO.:
ROUTE:
96261
FO0395
Complete
SCHEDULE
11,621
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEAlexandria
Underway 46,477CN
CompleteFROM: 0.048 mi. south of Sanger Avenue TO: 0.039 mi.
north of Seminary Road (0.7080 MI)
DESCRIPTION: 2,130RW
PROJECT LENGTH: 0.7080 MISCOPE OF WORK: Other TO 60,228
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 258Accounts Receivable: Local
0 0 0 0 0 0 23,607Bond Proceeds: CPR Bonds
2,499 0 0 0 2,501 7,414 0CTB Formula: Bridge - State
0 0 0 0 0 0 6,979Interstate: Federal
0 0 0 0 0 0 1,157Interstate: State Match
0 0 0 0 0 0 243Local Project Contributions: Local
0 0 0 0 0 0 1,000NHPP: State Match
0 0 0 0 0 0 13,456NHPP: Statewide - Federal
0 0 0 0 0 0 1,114NHPP: Statewide - Soft Match
0 0 0 0 2,501 2,499 7,414 47,814Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I-395 AUXILIARY LANE
PROJECT
UPC NO.:
ROUTE:
102437
FO0395
Complete
SCHEDULE
1,756
ESTIMATED COST (000's)
JURISDICTION:
Shirley HighwaySTREET NAME:
PEAlexandria
Underway 13,839CN
CompleteFROM: 0.280 mi. north of Duke Street TO: 0.048 mi.
south of Sanger Avenue (0.6250 MI)
DESCRIPTION: 224RW
PROJECT LENGTH: 0.6250 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 15,818
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 4,644Bond Proceeds: CPR Bonds
4,159 0 0 0 0 0 0CTB Formula: High Priority - State
0 0 0 0 0 0 1,040Interstate: Federal
0 0 0 0 0 4,000 519NHPP: Statewide - Federal
0 0 0 0 0 1,000 130NHPP: Statewide - Soft Match
0 0 0 0 0 0 67Public Lands Highway Discretionary Funds: Federal
0 0 0 0 0 0 260Soft Match: Federal
0 0 0 0 0 4,159 5,000 6,659Total
04/16/2014 507
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
MARK CENTER SHORT TERM TRAFFIC
MONITORING (PE ONLY)
PROJECT
UPC NO.:
ROUTE:
102898
NFO0395
Complete
SCHEDULE
524
ESTIMATED COST (000's)
JURISDICTION:
I-395STREET NAME:
PEAlexandria
CN
FROM: Seminary Road TO: Seminary RoadDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 524
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 93Accounts Receivable: Local
0 0 0 0 0 0 430Demonstration Funds: Federal
0 0 0 0 0 0 0 524Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
MARK CENTER MID TERM IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
102900
NFO0395
Complete
SCHEDULE
20
ESTIMATED COST (000's)
JURISDICTION:
I-395STREET NAME:
PEAlexandria
Complete 20CN
CompleteFROM: Seminary TO: SeminaryDESCRIPTION: 1,570RW
PROJECT LENGTH: _SCOPE OF WORK: Right of Way TO 1,610
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,610Demonstration Funds: Federal
0 0 0 0 0 0 1,079Special Grant Projects: Federal
-1,079 0 0 0 0 0 0 2,689Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
MARK CENTER SHORT TERM IMPROVEMENT
#1 (CN ONLY)
PROJECT
UPC NO.:
ROUTE:
102902
NFO0395
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
I-395STREET NAME:
PEAlexandria
Complete 37CN
FROM: Seminary TO: SeminaryDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 37
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 37Demonstration Funds: Federal 0
508 04/16/2014
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I-395 CONSTRUCT 4TH SOUTHBOUND LANE
PROJECT
UPC NO.:
ROUTE:
103316
FO0395
Underway
SCHEDULE
6,500
ESTIMATED COST (000's)
JURISDICTION:
Interstate 395STREET NAME:
PEFairfax County
CNFROM: North of Duke Street TO: South of Edsall (2.1000
MI)
DESCRIPTION: RW
PROJECT LENGTH: 2.1000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 6,500
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 4,350Bond Proceeds: CPR Bonds
0 0 0 0 0 0 968Highway Safety Improvements: Federal
0 0 0 0 0 0 108Highway Safety Improvements: State Match
0 0 0 0 0 0 1,075Special Grant Projects: Federal
0 0 0 0 0 0 0 6,500Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I-395 RAMP METERING ITS SYSTEMS
UPGRADE
PROJECT
UPC NO.:
ROUTE:
103590
NFO0395
Complete
SCHEDULE
159
ESTIMATED COST (000's)
JURISDICTION:
I-395STREET NAME:
PEArlington County
Underway 1,769CNFROM: Edsall Road TO: Boundary Channel Drive (8.5600
MI)
DESCRIPTION: RW
PROJECT LENGTH: 8.5600 MISCOPE OF WORK: Traffic Management/Engineering TO 1,928
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,719Interstate: Federal
0 0 0 0 0 0 208Interstate: State Match
1 0 0 0 0 0 0 1,926Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I-395 GATE ITS SYSTEMS UPGRADE
PROJECT
UPC NO.:
ROUTE:
103591
FO0395
Complete
SCHEDULE
450
ESTIMATED COST (000's)
JURISDICTION:
I-395STREET NAME:
PEArlington County
Underway 9,500CNFROM: Edsall Road TO: Boundary Channel Drive (8.5600
MI)
DESCRIPTION: RW
PROJECT LENGTH: 8.5600 MISCOPE OF WORK: Safety TO 9,950
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 6,277Interstate: Federal
0 0 0 0 0 0 416Interstate: State Match
0 0 0 0 0 1,679 4NHPP: Statewide - Federal
0 0 0 0 0 420 1NHPP: Statewide - Soft Match
0 0 0 0 0 0 1,153Soft Match: Federal
0 0 0 0 0 0 2,099 7,851Total
04/16/2014 509
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I-395 CORR CONGEST IMPROV UPGRADE
RAMP METERING
PROJECT
UPC NO.:
ROUTE:
105363
NFO0395
FY2015
SCHEDULE
300
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Northern Virginia MPO
CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 300
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 80CTB Formula: ITS - Federal
0 0 0 0 0 0 20CTB Formula: ITS - Soft Match
0 0 0 0 0 200 0CTB Formula: ITS - State
0 0 0 0 0 0 200 100Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
BUILD 4-HOT LANES FROM SPRINGFIELD TO
N OF DULLES TOLL RD
PROJECT
UPC NO.:
ROUTE:
68805
FO0495
RTE 495 - CAPITAL BELTWAY HOT LANESREPORT NOTE:
Complete
SCHEDULE
1,357,585
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFairfax County
Complete 84,746CN
N/AFROM: SPRINGFIELD INTERCHANGE TO: Georgetown
Pike (Route 193) (12.0000 MI)
DESCRIPTION: 244,812RW
PROJECT LENGTH: 12.0000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,687,142
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 41,351Accounts Receivable: Local
0 0 0 0 0 0 6,000Concession Funds: State
0 0 0 0 0 0 67,616Interstate: Federal
0 0 0 0 0 0 8,519Interstate: State Match
0 0 0 0 0 0 1(X) Maintenance Funds: Statewide
0 0 0 0 0 0 403NHPP: State Match
0 0 0 0 0 0 3,788NHPP: Statewide - Federal
0 0 0 0 0 0 40NHPP: Statewide - Soft Match
0 0 0 0 0 0 3,250Soft Match: Federal
0 0 0 0 0 0 1,524,013TIFIA/PAB: PAB & Private Equity
0 0 0 0 0 0 46,369Transportation Partnership Opportunity Fund: State
-14,209 0 0 0 0 0 0 1,701,351Total
510 04/16/2014
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
HOT LANES PAVEMENT REHABILITATION AND
OTHER CONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
84742
FO0495
RTE 495 - CAPITAL BELTWAY HOT LANES.REPORT NOTE:
Complete
SCHEDULE
5,953
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFairfax County
Complete 57,146CN
Pavement Rehabilitation and Other ConstructionDESCRIPTION: RW
6644,28655,28656,28657,28658,28659,28660,28661-2,0,15,62,73,74,78,94PROJECT LENGTH: _ STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Restoration and Rehabilitation TO 63,099
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 52,435Interstate: Federal
0 0 0 0 0 0 6,541Interstate: State Match
0 0 0 0 0 0 4,122Transportation Partnership Opportunity Fund: State
0 0 0 0 0 0 0 63,099Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I-495 HOT LANE SUPPORT
PROJECT
UPC NO.: 89486
FOProject Report Req'd
FROM: Springfield Interchange TO: Dulles Toll/Access
Road (12.0000 MI)
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 75Accounts Receivable: Local
0 0 0 0 0 0 32,943Interstate: Federal
0 0 0 0 0 0 4,373Interstate: State Match
0 0 0 0 0 0 95Local Project Contributions: Local
0 0 0 0 0 0 3,737Soft Match: Federal
0 0 0 0 0 0 26,600Toll Facilities: Toll Facilities Revolving
0 0 0 0 0 0 67,823Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
GEC DESIGN SERVICES I495/DAAH
INTERCHANGE IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
94611
NFO0495
Complete
SCHEDULE
6,570
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFairfax County
Complete 55,700CN
CompleteFROM: 0.10 M E of Spring Hill Road (Rte. 684) TO: I-495
Capital Beltway
DESCRIPTION: 700RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/o Added Capacity TO 62,970
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 16,648Interstate: Federal
0 0 0 0 0 0 3,875Interstate: State Match
0 0 0 0 0 0 50,000MWAA: Local
0 0 0 0 0 0 277Soft Match: Federal
-7,830 0 0 0 0 0 0 70,800Total
04/16/2014 511
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Interstate
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
NOISE BARRIERS 13A AND 13E ON I-495
PROJECT
UPC NO.:
ROUTE:
94944
FO0495
Part of I-495 HOT Lanes. Goes with UPC 89486.REPORT NOTE:
Complete
SCHEDULE
1,323
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFairfax County
Complete 5,582CN
FROM: Old Dominion Blvd TO: Georgetown PikeDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Environmental Only TO 6,905
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 5,524Interstate: Federal
0 0 0 0 0 0 1,381Interstate: State Match
0 0 0 0 0 0 0 6,905Total
MPO Area
Northern VirginiaInterstate
PROGRAM/SYSTEM
I-495 NORTHERN SECTION SHOULDER USE
PROJECT
UPC NO.:
ROUTE:
105130
FO0495
Complete
SCHEDULE
3,000
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFairfax County
Underway 17,000CNFROM: South of Old Dominion Drive overpass TO: George
Washington Memorial Parkway (1.8000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.8000 MISCOPE OF WORK: Other TO 20,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 500Bond Proceeds: CPR Bonds
2,500 0 0 0 0 0 17,000Bond Proceeds: GARVEE Bonds
0 0 0 0 0 2,500 0 17,500Total
MPO Area
NonMPOInterstate
PROGRAM/SYSTEM
NORTHERN VIRGINIA INTERSTATE PAVING
BALANCE ENTRY
PROJECT
UPC NO.: T13511
NFOBalance Entry
FROM: various TO: variousDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
5,351 0 0 1,145 1,055 2,462 560CTB Formula: Paving - Federal
1,338 0 0 286 264 616 62CTB Formula: Paving - Soft Match
0 0 0 9,581 10,571 0 0CTB Formula: Paving - State
0 0 0 1,009 6 0 0NHPP: Statewide - Federal
0 0 0 112 1 0 0NHPP: Statewide - Soft Match
0 0 0 1,449 0 0 0STP: Statewide - Federal
0 0 0 362 0 0 0STP: Statewide - Soft Match
0 0 13,945 11,897 6,689 3,078 622Total
512 04/16/2014
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Primary
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
PROPOSED TRI-COUNTY PARKWAY - 4-LANE -
EIS STUDY ONLY
PROJECT
UPC NO.:
ROUTE:
52405
NFO
MPO Project - PE Only. State funds - AC for future federal conversion.REPORT NOTE:
Underway
SCHEDULE
5,600
ESTIMATED COST (000's)
JURISDICTION:
TRI-COUNTY PKWYSTREET NAME:
PENorthern Virginia District-wide
CNFROM: ROUTE 234 (SUDLEY ROAD) CITY OF
MANASSAS TO: ROUTE 620 (BRADDOCK ROAD)
LOUDOUN COUNTY (10.0000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 10.0000 MISCOPE OF WORK: Environmental Only TO 5,600
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 40Bond Match: State Bond Match
0 0 0 0 0 0 1,500Bond Proceeds: CPR Bonds
0 0 0 0 0 0 160Minimum Guarantee: Federal
0 0 0 0 0 0 120NHPP: Statewide - Federal
0 0 0 0 0 0 30NHPP: Statewide - Soft Match
0 0 0 0 0 0 860Non-Formula: State Match
0 0 0 0 0 0 450Primary Formula: State
0 0 0 0 0 0 3,440RSTP (STP Regional): Federal
-1,000 0 0 0 0 0 0 6,600Total
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
NOVA PRIMARY GUARDRAIL DISTRICTWIDE
PROJECT
UPC NO.: 70657
NFODistrict-wide
VARIOUS ROUTESDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 233Primary Formula: State
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
NOVA PRIMARY SIGNAL DISTRICTWIDE
PROJECT
UPC NO.: 70661
NFODistrict-wide
VARIOUS ROUTESDESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 8Local Project Contributions: Local
0 0 0 0 0 0 323Primary Formula: State
0 0 0 0 0 0 331Total
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
NOVA PRIMARY TECHNOLOGY DISTRICTWIDE
PROJECT
UPC NO.: 70670
FODistrict-wide
FROM: VARIOUS ROUTES TO: MISC. FUNDS
MONITORING
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 461Bonus OA: State Match
0 0 0 0 0 0 4,148Interstate: Federal
0 0 0 0 0 0 1(X) Maintenance Funds: Statewide
0 0 0 0 0 0 867Primary Formula: State
0 0 0 0 0 0 5,476Total
04/16/2014 513
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Primary
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
NOVA SIGNAL TIMING OPTIMIZATION &
SYSTEM OPERATIONS
PROJECT
UPC NO.:
ROUTE:
77184
FO
Qualifies for 100% Federal Reimbursement.REPORT NOTE:
Underway
SCHEDULE
12,020
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENorthern Virginia District-wide
CN
NORTHERN VIRGINIA DISTRICTWIDEDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 12,020
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 7,100Bonus OA: Federal
0 0 0 0 0 0 290Bonus OA: State Match
0 0 0 0 0 0 1,160CMAQ: Federal
0 0 0 0 0 0 3,470(X) Maintenance Funds: Federal
0 0 0 0 0 0 0 12,020Total
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
NORTHERN VIRGINIA TERMS
PROJECT
UPC NO.: 78210
NFOProject Report Req'd
FROM: FUNDING FOR TRANSPORTATION EMISSION
REDUCTION MEASURES FOR TO: NORTHERN
VIRGINIA REGION
DESCRIPTION:
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
1,275 0 0 596 979 1,878 1,829CMAQ: TERMS - Federal
319 0 0 149 245 469 457CMAQ: TERMS - State Match
0 0 0 0 0 0 13,812CMAQ TERMS: Federal
0 0 0 0 0 0 3,453CMAQ TERMS: State Match
0 0 745 1,224 1,594 2,347 19,551Total
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
BIKESHARING CAPITAL & OPERATIONS -
ROSSLYN-BALLSTON CORR.
PROJECT
UPC NO.:
ROUTE:
99518
NFO
MPO Project. Revised schedule required.REPORT NOTE:
Complete
SCHEDULE
10
ESTIMATED COST (000's)
JURISDICTION:
Washington BoulevardSTREET NAME:
PEArlington County
Complete 2,128CN
FROM: Various Locations TO: Clarendon BoulevardDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,138
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,710CMAQ: Federal
0 0 200 0 0 0 0CMAQ: MPO - Federal
0 0 50 0 0 0 0CMAQ: MPO - State Match
0 0 0 0 0 0 249CMAQ: State Match
0 0 0 0 0 0 179Local Project Contributions: Local
-250 0 250 0 0 0 0 2,138Total
514 04/16/2014
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Primary
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
VRE RIPPON PLATFORMS
PROJECT
UPC NO.:
ROUTE:
T10671
FO0001
MPO Project. Revised schedule required.REPORT NOTE:
FY2016
SCHEDULE
2,100
ESTIMATED COST (000's)
JURISDICTION:
Jefferson Davis HighwaySTREET NAME:
PEPrince William County
FY2018 8,790CN
FROM: Farm Creek Drive TO: Rippon BoulevardDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 10,890
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
1,600 0 0 1 1,600 1,830 276CMAQ: MPO - Federal
400 0 0 0 400 458 69CMAQ: MPO - State Match
4,256 0 0 1 2,000 2,000 2,288 345Total
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
REPLACE AND WIDEN BRIDGE AND
APPROACHES AT NEABSCO CREEK
PROJECT
UPC NO.:
ROUTE:
16422
NFO0001
Complete
SCHEDULE
3,883
ESTIMATED COST (000's)
JURISDICTION:
JEFF DAVIS HWYSTREET NAME:
PEPrince William County
Complete 23,170CN
CompleteFROM: 0.117 MI S CARDINAL DRIVE TO: 0.131 MI N
BLACKBURN ROAD (0.4330 MI)
DESCRIPTION: 10,771RW
14158 46PROJECT LENGTH: 0.4330 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 37,824
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 357Accounts Receivable: Local
0 0 0 0 0 0 191Bond Match: State Bond Match
0 0 0 0 0 0 7,000Bridge Replacement: Federal
0 0 0 0 0 0 7,105FRAN Bond Proceeds: FRAN
0 0 0 0 0 0 3,000Minimum Guarantee: Federal
0 0 0 0 0 0 11,824Primary Formula: Federal
0 0 0 0 0 0 4,643Primary Formula: State
0 0 0 0 0 0 2,956Primary Formula: State Match
0 0 0 0 0 0 760Priority Transportation Funds: State
-13 0 0 0 0 0 0 37,837Total
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
RTE 1 -BUS RAPID TRANSIT RELATD IMPR
(TRF SIGNALS)
PROJECT
UPC NO.:
ROUTE:
72898
NFO0001
Complete
SCHEDULE
250
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEArlington County
Complete 1,696CNFROM: ALEXANDRIA CORPORATE LIMITS TO:
PENTAGON (1.8000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.8000 MISCOPE OF WORK: Safety TO 1,946
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 443Demonstration Funds: Federal
0 0 0 0 0 0 240Non-Formula: State Match
0 0 0 0 0 0 303Primary Formula: State
0 0 0 0 0 0 960RSTP (STP Regional): Federal
0 0 0 0 0 0 0 1,946Total
04/16/2014 515
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Primary
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
RT.1-FULLER HEIGHTS ROAD-FULLER ROAD
RELOCATION PROJE.
PROJECT
UPC NO.:
ROUTE:
92999
NFO0001
Complete
SCHEDULE
1,148
ESTIMATED COST (000's)
JURISDICTION:
Jefferson Davis Hwy/Fuller Heights/Fuller RoadSTREET NAME:
PEPrince William County
FY2016 4,627CN
UnderwayFROM: Intersection Improvements at Rt. 1 /Rt. 619 TO:
Intersection Improvements at Rt. 1/Rt. 619 (0.2000 MI)
DESCRIPTION: 2,767RW
30031 -1PROJECT LENGTH: 0.2000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Reconstruction w/o Added Capacity TO 8,543
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 701Highway Safety Improvements: Federal
0 0 0 0 0 0 78Highway Safety Improvements: State Match
0 0 0 0 0 0 156Local Project Contributions: Local
0 0 0 0 0 0 738Primary Formula: Federal
0 0 0 0 0 0 185Primary Formula: State Match
0 0 0 0 0 0 3,685Public Lands Highway Discretionary Funds: Federal
0 0 0 0 0 0 2,400RSTP (STP Regional): Federal
0 0 0 0 0 0 600RSTP (STP Regional): State Match
0 0 0 0 0 0 0 8,543Total
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
RT. 1 WIDENING FROM 4-6 LANES
PROJECT
UPC NO.:
ROUTE:
94904
NFO0001
MPO Project.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Jefferson DavisSTREET NAME:
PEPrince William County
Complete 9,649CNFROM: Rt. 619 Joplin Rd. TO: Rt. 1109 Brady's Hill Rd.
(0.6000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.6000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 9,649
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 100Local Project Contributions: Local
0 0 0 0 0 0 1,083Non-Formula: State Match
0 0 0 0 0 0 11,510RSTP (STP Regional): Federal
0 0 0 0 0 0 1,795RSTP (STP Regional): State Match
-4,839 0 0 0 0 0 0 14,488Total
516 04/16/2014
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Primary
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
MULTI-MODAL ENHANCEMENTS - DUMFRIES
PROJECT
UPC NO.:
ROUTE:
96734
NFO0001
MPO Project.REPORT NOTE:
Underway
SCHEDULE
113
ESTIMATED COST (000's)
JURISDICTION:
Jefferson Davis HighwaySTREET NAME:
PEDumfries
FY2014 255CN
FROM: Route 234 TO: Mainstreet (0.4300 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.4300 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 368
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 411RSTP (STP Regional): Federal
0 0 0 0 0 0 189RSTP (STP Regional): MPO - Federal
0 0 0 0 0 0 47RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 103RSTP (STP Regional): State Match
-383 0 0 0 0 0 0 750Total
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
UPGRADE SIGNAL AND PED FACILITIES ON
US 1 AT RT 630
PROJECT
UPC NO.:
ROUTE:
98427
NFO0001
Complete
SCHEDULE
40
ESTIMATED COST (000's)
JURISDICTION:
US 1 Richmond HighwaySTREET NAME:
PEFairfax County
Complete 215CNFROM: SR 630 Quander Road/Fairhaven Avenue TO: SR
630 Quander Road/Fairhaven Avenue
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 255
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 230Highway Safety Improvements: Federal
0 0 0 0 0 0 26Highway Safety Improvements: State Match
0 0 0 0 0 0 0 255Total
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
PE ONLY - RTE 1 INSTALL CROSSWALKS -
PH2 @ VARIOUS SITES
PROJECT
UPC NO.:
ROUTE:
98753
NFO0001
MPO Project. Revised estimate required.REPORT NOTE:
Complete
SCHEDULE
720
ESTIMATED COST (000's)
JURISDICTION:
Richmond HighwaySTREET NAME:
PEFairfax County
CN
FROM: Route 7100 TO: Route 1332 (Huntington Avenue)DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 720
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,664CMAQ: Federal
0 0 0 0 0 0 16CMAQ: State Match
0 0 0 0 0 0 1,500Local Project Contributions: Local
0 0 0 0 0 0 400Primary Formula: State
-2,860 0 0 0 0 0 0 3,580Total
04/16/2014 517
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Primary
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
RTE 1 - INSTALL CROSSWALKS - RW PHASE 1
PROJECT
UPC NO.:
ROUTE:
99054
NFO0001
MPO Project. Revised schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Richmond HwySTREET NAME:
PEFairfax County
FY2016 3,354CN
UnderwayFROM: 0.025 Miles North of Belford Drive TO: 0.134 Miles
West of Lukens Lane
DESCRIPTION: 1,872RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 5,226
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,636CMAQ: Federal
0 0 0 0 0 0 409CMAQ: State Match
0 0 0 0 0 0 1,660Local Project Contributions: Local
1,521 0 0 0 0 0 0 3,705Total
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
CONSTRUCT CHANNELIZATION, PED
FACILITIES ON US 1
PROJECT
UPC NO.:
ROUTE:
100649
NFO0001
Complete
SCHEDULE
203
ESTIMATED COST (000's)
JURISDICTION:
US 1STREET NAME:
PEPrince William County
Complete 256CN
CompleteFROM: Prince William Pkwy/ Longview Drive TO: Prince
William Pkwy/ Longview Drive
DESCRIPTION: 33RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 492
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 451Highway Safety Improvements: Federal
0 0 0 0 0 0 50Highway Safety Improvements: State Match
-9 0 0 0 0 0 0 501Total
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
WIDENING OF US 1 TO 6 LANES BETWEEN
TELEGRAPH RD AND RT 235
PROJECT
UPC NO.:
ROUTE:
103073
FO0001
Complete
SCHEDULE
400
ESTIMATED COST (000's)
JURISDICTION:
Richmond HighwaySTREET NAME:
PEFairfax County
Underway 500CN
CompleteFROM: Pohick Road TO: Mt Vernon Memorial Highway
(3.6600 MI)
DESCRIPTION: 53,000RW
PROJECT LENGTH: 3.6600 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 53,900
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 53,900Federal Grants: Federal 0
518 04/16/2014
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Primary
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
TURN LANE MODIFICATIONS AT
INTERSECTION OF RT 1 & RT 234
PROJECT
UPC NO.:
ROUTE:
104102
NFO0001
Underway
SCHEDULE
300
ESTIMATED COST (000's)
JURISDICTION:
Jefferson Davis HighwaySTREET NAME:
PEPrince William County
FY2015 1,598CN
FY2014Route 234 Intersection (0.1000 MI)DESCRIPTION: 232RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,130
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,876Local Partnership: State
0 0 0 0 0 0 253Primary Formula: State
0 0 0 0 0 0 0 2,130Total
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
WIDEN ROUTE 1 TO SIX LANES - PE & RW
ONLY
PROJECT
UPC NO.:
ROUTE:
104303
NFO0001
MPO Project. Revised schedule required.REPORT NOTE:
FY2018
SCHEDULE
6,300
ESTIMATED COST (000's)
JURISDICTION:
JEFFERSON DAVIS HIGHWAYSTREET NAME:
PEPrince William County
CN
FY2019FROM: FEATHERSTONE ROAD TO: MARY'S WAY
(1.3100 MI)
DESCRIPTION: 19,600RW
PROJECT LENGTH: 1.3100 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 25,900
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 6,208 6,852 4,126 0 0 0RSTP (STP Regional): MPO - Federal
0 1,552 1,713 1,032 0 0 0RSTP (STP Regional): MPO - State Match
4,417 7,760 8,565 5,158 0 0 0 0Total
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
RTE 7 - WIDEN TO 6 LANES
PROJECT
UPC NO.:
ROUTE:
52327
NFO0007
NVTA Project.REPORT NOTE:
Complete
SCHEDULE
5,800
ESTIMATED COST (000's)
JURISDICTION:
LEESBURG PIKESTREET NAME:
PEFairfax County
Underway 24,895CN
CompleteFROM: Rolling Holly Drive (Mile Marker 50.5) TO: 0.15 mi
East of Reston Avenue (Mile Marker 51.7) (1.1720 MI)
DESCRIPTION: 3,578RW
PROJECT LENGTH: 1.1720 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 34,273
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 30,009Bond Proceeds: NVTD Bonds
0 0 0 0 0 0 367Minimum Guarantee: Federal
0 0 0 0 0 0 38Primary Formula: Federal
0 0 0 0 0 0 789Primary Formula: State
0 0 0 0 0 0 9Primary Formula: State Match
0 0 0 0 0 0 134Priority Transportation Funds: State
0 0 0 0 0 0 2,341RSTP (STP Regional): Federal
0 0 0 0 0 0 585RSTP (STP Regional): State Match
0 0 0 0 0 0 0 34,273Total
04/16/2014 519
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Primary
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
RTE 7 - WIDEN TO 6 LANES - PE ONLY
PROJECT
UPC NO.:
ROUTE:
52328
FO0007
Partial PE Only for study of alternative solutions; Includes FY05/06 Federal Omnibus Bill
Allocations
REPORT NOTE:
Underway
SCHEDULE
30,000
ESTIMATED COST (000's)
JURISDICTION:
LEESBURG PIKESTREET NAME:
PEFairfax County
CNFROM: Reston Avenue (Mile Marker 51.4) TO: Jarrett
Valley Drive (Mile Marker 58.3) (6.9000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 6.9000 MISCOPE OF WORK: Preliminary Engineering TO 30,000
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 5,322Bond Proceeds: NVTD Bonds
0 0 0 0 0 0 2,370Demonstration Funds: Federal
22,308 0 0 0 0 0 0 7,692Total
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
BRIDGE DECKS REPLACEMENT AND
WIDENING OF ROUTE 7 OVER DATR
PROJECT
UPC NO.:
ROUTE:
82135
NFO0007
Complete
SCHEDULE
1,700
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEFairfax County
FY2015 32,100CN
UnderwayFROM: 0.564 Mile West of Tyco Road TO: 0.134 Mile
West of Tyco Road (0.2600 MI)
DESCRIPTION: 600RW
PROJECT LENGTH: 0.2600 MISCOPE OF WORK: Bridge Rehab w/ Added Capacity TO 34,400
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 219Bond Match: State Bond Match
0 0 0 0 0 0 613Bond Proceeds: CPR Bonds
0 0 4,000 4,000 8,000 0 0Bond Proceeds: GARVEE Bonds
0 0 0 0 0 0 912Bridge Replacement: Federal
0 0 2,617 0 0 0 0CTB Formula: Bridge - State
0 0 0 0 0 13,852 0Local Project Contributions: Local
0 0 0 0 0 0 141Primary Formula: Federal
0 0 0 0 0 0 2Primary Formula: State
0 0 0 0 0 0 35Primary Formula: State Match
0 0 0 0 0 0 9Soft Match: Federal
0 0 6,617 4,000 8,000 0 13,852 1,931Total
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
UPGRD SGNL+PED XING @ BUS 7 MAIN ST &
SR 722 MAPLE ST
PROJECT
UPC NO.:
ROUTE:
98436
NFO0007
Complete
SCHEDULE
15
ESTIMATED COST (000's)
JURISDICTION:
BUS 7 Main StreetSTREET NAME:
PELoudoun County
Complete 129CN
FROM: SR 722 Maple Street TO: SR 722 Maple StreetDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 145
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 130Highway Safety Improvements: Federal
0 0 0 0 0 0 14Highway Safety Improvements: State Match
0 0 0 0 0 0 0 145Total
520 04/16/2014
-
NORTHERN VIRGINIA DISTRICTFY2015-2020 Six-Year Improvement Program
FY15 DRAFT Primary
MPO Area
Northern VirginiaPrimary
PROGRAM/SYSTEM
ROUTE 7 - WIDEN TO SIX LANES
PROJECT
UPC NO.:
ROUTE:
99478
NFO0007
MPO Project. Revised scheduled required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Leesburg PikeSTREET NAME:
PEFairfax County
FY2020 9,000CN
FY2018FROM: Reston Avenue (Mile Marker 51.5) TO: Reston
Parkway (Mile Marker 52.0) (0.5000 MI)
DESCRIPTION: 1,200RW
PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 10,200
REQ'D AFTER
2020FY2020 FY2019FY2018FY2017FY2016FY2015Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 3,480 1,262 2,800 0 0 0RSTP (STP Regional): MPO - Federal
0 870 316 700 0 0 0RSTP (STP Regional): MPO - State Match
772 4,3