SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWAL …
Transcript of SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWAL …
DRAWING TITLE
REV
SCALES
PROJECT NO : 15031DRAWING NO
DRAWN BY
CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS
EMAIL [email protected]
117 Reservoir Street
P: (02) 9215 4900
ARCHITECTPROJECT :
F: (02) 9215 4901
PHASE
SOH Trust
DA
Phone: 0452 527 490 John CollinsEmail: [email protected]
WEB www.tzg.com.au
DATE
MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES
ELECTRICAL ENGINEER
STRUCTURAL ENGINEER
BCA/PCA CONSULTANT
Steensen Varming / Ivan Mira
Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John
Group DLA / Shane Berry
VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne
LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton
Cundall / Iris ChanESD CONSULTANT
Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT
Design 5 / Alan CrokerHERITAGE CONSULTANT
Atlus Group / Jason FinnCOST PLANNING CONSULTANT
Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION
RM, TG
FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton
SECURITY CONSULTANT CLIENT:
A-0000
ABN: 46002722349
Sydney Opera House -Front of House Renewal
Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF
COVER PAGE
@ A1
NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.
02.08.2016 A ISSUED FOR DA MB, TS, RM, RL
TG
July 2021
B
21.07.2021 B ISSUED FOR DA
ENTRY FOYER
A 0000 GENERAL INFORMATION
A 0100 DEMOLITION PLANS
A 1000 GENERAL ARRANGEMENT PLANS
A 2000 SECTIONS
A 6000 STAIRS RAMPS LIFT & ESCALATORS
A 9000 FINISHES + PRODUCT INFORMATION
A-0000A-0001
A-0101
A-1001A-1002A-1003
A-2001A-2002
A-6001A-6002A-6003A-6004
A-9001
COVER PAGELOCATION PLAN (+30)
DEMOLITION LEVEL 1 PLAN (+30)
PROPOSED GROUND FLOOR PLAN (+12)PROPOSED LEVEL 1 PLAN (+30)PROPOSED LEVEL 2 PLAN (+42)
WALL ELEVATIONS 01WALL ELEVATIONS 02
UTZON ESCALATOR DETAIL PLANSUTZON ESCALATOR DETAIL SECTIONSPROPOSED LIFT 36 PLANS GR +21 AND L1 +30LIFT 36 PLANS L2 (+42), ROOF (+51) AND SECTION
FINISHES + PRODUCT INFORMATION
Scale @ A1
1:250
1:100
1:1001:1001:100, 1:200
1:501:50
1:1001:501:501:50
CodeACACACCACRADJAFAFFLAFSAHAP1AP2AP3AP4AP5AUAVBCTBGBIKBINBITBLBLDBLD1BLD2BLD3BLPBLRBOLBR1BR2BR3BR4BR5BR6BRRPBT1BT2CCFCCFSCMCO2CO2PCOMMSCOSCPT1CPT2CPT3CRNCTCTFCTSCTVCTWCURCUR 1DBDPDS1DS2DWEFFF1F1.5F2FB1FCFEFFLFGFHFHRFMFRLFSLFWFWCFWC1FWC2FWC3FXGCBGFGL
DescriptionAcrylicAir-ConditioningAccessibleAcrylic Solid Surface MaterialAdjustable ShelfAccess FloorAbove Finished Floor LevelAFS concrete paint finishFlush Access PanelAcoustic Panel No FinishAcoustic Panel, ceiling, perf. Metal FinishAcoustic Panel, ceiling, perf. Metal FinishAcoustic Panel No FinishAcoustic Panel, Felt FinishAcoustic UnderlayAudio VisualBaby Change TableGlass balustradeBike RacksUnder sink garbage binBituminFair Faced BlockworkRoller BlindsRoller Blinds (Sunscreen)Roller Blinds (Block Out Blinds)Roller Blinds (Green Screen)Blockwork, paint finishBlockwork, reinforcedBollardBrass counterfronts, EFBrass counterfronts, SFBrass seat, UTSBronze joinery, EFBronze handrail, UTSBronze handrail, CLC and FCBrickwork, Rendered and PaintedBenchtop, MarbloBenchtop, GlassConcreteCompressed Fibre cementConcrete steel trowel finishSuspended Ceiling, MetalClass 2C Off form ConcreteClass 2 Off form Concrete Paint FinishCommunications CupboardCheck On SiteCarpet, Entry Foyer SeatingCarpet, Entry Foyer TicketingCarpet, Theatre & Events OfficesConcrete RenderCooktopCeramic Floor TilesCeramic SkirtingCeiling Timber VeneerCeramic Wall TilesCurtainsFelt Dividing Panel CurtainColour backed glassDown PipeDoor stop - Floor mounted door stopDoor stop - wall mounted door stopDishwasherExtraction Fan Ceiling MountedFridge60 FRL90 FRL120 FRLFloor Box, electrical+dataSet Fibre Cement 6mm paintedFire extinguisherFinished Floor LevelFaçade GlazingFire HydrantFire Hose ReelFloor MatFire Resistant LevelFinshed Structural levelFloor WasteTextured Felt-Brass WallFelt Wall Covering, Entry FoyerFelt Wall Covering, Function CentreFelt Wall Covering, Creative Learning CentreFixtureColour backed glassFrameless GlazingGlazing, brown tint
CodeGL1GL2GL3GLBFGLBF1GLBF2GLBF3GLMF1GLMF2GR1GR2GR3HHDHJHKHRHRMHRTHWUJPJPBKPLAMLAMMMA1MB1MCPMFMIRMLFMLOMMMPBPMPGMSMTMWOVPBF2PBPPC1PC2PC3PFPPPP1PSTPTDRFRF1RFSRHRLRPRSKSAPSC1SC2SCDBSCISCVSD1SHS1SKYSMCSNKSNKCSNKLSSTAP1TAP2TAP3TFTF2THRTITIKTMTMETOWTPTP1TPCTPC1
DescriptionGlazing, clearGlazing, frostedGlazing, TerraGlazBronze-framed Glass Door, Hingebronze-framed Glass Door, hingebronze-framed Glass Door, slidingbronze-framed Glass Door, pivotsteel-framed Glass Door, sliding (Wind-break)steel-framed Glass Wall, fixed (Wind-break)Grab Rail 1 - Accessible shower railGrab Rail 2 - Accessible WCGrab Rail 3 - Ambulant WCHydraulic riserHand DryerHorizontal JointsHook - CoatsHanging RailHandrail MetalHandrail TimberHot Water UnitJoinery PullJoinery Pin BoardKick PlateLaminateLaminate FinishMechanical RiserMarbloMetal Balustrade Type 1Metal Column, paintedMetal FlashingMirrorMetal Louvre- FixedMetal Operable LouvreMetal Mesh (stretched)Moisture Resistant Plasterboard Ceiling, paint finishMetal Pipe RiggingStair MetalMetalMetal Windows, bronze-framedOven2 hour Fire Rated Plasterboard13mm plasterboard Paint FinishPrecast Granite, PaverPrecast Granite, Wall PanelPrecast Granite, Ceiling PanelPaint Finish2 pack Polyurethane PaintPolyurethane Paint - High reflective blackTimber Seal SystemPaper Towel DispenserResilient Finish Type CLCResilient Finish Type EFResiliant Flooring - Slip ResistantRangehoodReduced LevelRigging PointsResilient Coved SkirtingSuspended acoustic panelsServices Carriage (light, sound, sprinkler)Services Carriage (light, sound, acoustic, rigging)SCI Door Distribution BoardSolid core door internalSprinkler Control ValveSoap Dispenserwall shelfSkylightStretched Membrane Ceiling (Barrisol)Sink - kitchenSink - CleanerSink - LaundryStainless SteelTapware, Washbasin Mixer, regularTapware, Washbasin Mixer, accessibleTapware, Kitchen Sink MixerTimber flooringTimber Sprung flooringThreshold Ramp max. 1 in 8Tactile IndicatorsTicketing/Information KiosksTimberTo Match ExistingTop of wallToilet partitionsTimber Panel, Slatted, Brush BoxGRC Precast Floor Tile, honed CLCGRC Precast Floor Tile, honed EF
CodeTPDTPHTRTS1TS2TSN1TV1TV2UIOURVJWB1WB2WB3WC1WC2WC3WFWP1WP2WP3WP4WP5WPBWTMXXACXAPXBXBOLXBRXBSXCXCAXCPXCPSXCPTXCTFXDXDBXDPXEPXFBXFHXGLXGL1XGL2XGLBFXGLBF2XHRMXMBXMBXMGXMSXPXPXPBPXPC1XPC2XPC3XPFXPWXRPXSCXTBXTCWXTFXTFXTPCXTSXTSXTSKXTV1XWFXWPYG
DescriptionToilet partition doorsToilet Paper HolderTowel railTerrazzo Stone FlooringStone TileStair Nosing Type 1Timber Veneer, Entry FoyerTimber Veneer, Creative Learning CentreUnless Indicated OtherwiseUrinalVertical JointsWash Basin Type 1(normal)Wash Basin Type 2 accessibleWash Basin Type 3 (Trough Handwashing Kids)Water Closet (normal)Water Closet accessibleWater Closet AmbulantWater Drinking FountainRepurposed existing Wobbly Panel, operableRepurposed existing Wobbly Panel, operable and adjustableRepurposed existing Wobbly Panel, fixedRepurposed existing Wobbly Panel, integratedRepurposed existing Wobbly Panel, ceilingWall PlasterboardWall TimberExistingExisting ACExisting Acoustic Ceiling PanelExisting Architectural BronzeExisting BollardExisting Bronze ElementExisting Bench SeatExisting ConcreteExisting Concrete with acoustic treatmentExisting Concrete Painted (or Sealed)Existing Concrete Paint Finish, strippedExisting CarpetExisting Ceramic TilesExisting Door to remainExisting Distribution BoardExisting DownpipesEvent PitFloor Box, electrical+dataExisting Fire HydrantExisting Glazing, brown tintExisting Glazing, clearExisting Glazing, frostedExisting bronze-framed Glass Door, hingeExisting bronze-framed Glass Door, slidingExisting Handrail MetalExisting Metal BalustradeExisting Metal BalustradeExisting Metal GateExisting Metal StairExisting PaintedExisting PaintedExisting Plasterboad PaintedExisting Precast Granite, PaverExisting Precast Granite, Wall PanelExisting Precast Granite, Ceiling PanelExisting External Painted RenderExisting Potable WaterExisting Rendered and PaintedExisting Services Carriage (light, sound, sprinkler)Existing Timber BalustradeExisting Heritage Ceramic TilesExisting Timber FloorExisting Timber FloorExisting GRC Precast Floor Tile, honedExisting Terrazzo Stone FlooringExisting Timber StairExisting SkirtingExisting Timber VeneerExisting Water FountainExisting Wobbly PanelYard Gully
SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWALENTRY FOYER
LEGENDDRAWING LIST
DRAWING TITLE
REV
SCALES
PROJECT NO : 15031DRAWING NO
DRAWN BY
CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS
EMAIL [email protected]
117 Reservoir Street
P: (02) 9215 4900
ARCHITECTPROJECT :
F: (02) 9215 4901
PHASE
SOH Trust
DA
Phone: 0452 527 490 John CollinsEmail: [email protected]
WEB www.tzg.com.au
DATE
MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES
ELECTRICAL ENGINEER
STRUCTURAL ENGINEER
BCA/PCA CONSULTANT
Steensen Varming / Ivan Mira
Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John
Group DLA / Shane Berry
VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne
LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton
Cundall / Iris ChanESD CONSULTANT
Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT
Design 5 / Alan CrokerHERITAGE CONSULTANT
Atlus Group / Jason FinnCOST PLANNING CONSULTANT
Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION
RM, TG
FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton
SECURITY CONSULTANT CLIENT:
A-0001
ABN: 46002722349
Sydney Opera House -Front of House Renewal
Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF
LOCATION PLAN (+30)
1:250 @ A1
NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.
02.08.2016 A ISSUED FOR DA MB, TS, RM, RL
TG
July 2021
B
21.07.2021 B ISSUED FOR DA
ENTRY FOYER
N
X30
X30
X20
X20
X10
X10
Y50
Y50
X40
X40
X50
X50
X60
X60
X70
X70
X80
X80
Y40
Y40
Y30
Y30
Y20
Y20
Y10
Y10
Y00
Y00
X11
0X
110
X10
0X
100
X90
X90
X12
0X
120
X13
0X
130
X14
0X
140
X0
X0
LOCATION PLAN1:250
ENTRYFOYER
1:500 @ A3
DRAWING TITLE
REV
SCALES
PROJECT NO : 15031DRAWING NO
DRAWN BY
CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS
EMAIL [email protected]
117 Reservoir Street
P: (02) 9215 4900
ARCHITECTPROJECT :
F: (02) 9215 4901
PHASE
SOH Trust
DA
Phone: 0452 527 490 John CollinsEmail: [email protected]
WEB www.tzg.com.au
DATE
MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES
ELECTRICAL ENGINEER
STRUCTURAL ENGINEER
BCA/PCA CONSULTANT
Steensen Varming / Ivan Mira
Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John
Group DLA / Shane Berry
VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne
LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton
Cundall / Iris ChanESD CONSULTANT
Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT
Design 5 / Alan CrokerHERITAGE CONSULTANT
Atlus Group / Jason FinnCOST PLANNING CONSULTANT
Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION
RM, TG
FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton
SECURITY CONSULTANT CLIENT:
A-0101
ABN: 46002722349
Sydney Opera House -Front of House Renewal
Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF
DEMOLITION LEVEL 1 PLAN (+30)
1:100 @ A1
NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.
02.08.2016 A ISSUED FOR DA MB, TS, RM, RL
TG
July 2021
B
21.07.2021 B ISSUED FOR DA
ENTRY FOYER
XPC2
XPC2
XPC2
XC
XPC2
Cloak Room1526B
SOH Shop #11526H
Toilet1527F/1
F21527F/2
Lobby1527G
Toilet1527H/1
Box Office1527H/2
Box Office1527K/2
Store1527L/1
Office1527L/2
Office1527L/3
Office1527L/5
R31527L/7
Foyer1527P/1
Store1527Q
Corridor1527R/2
FOYER1557A/1
CLOAK ROOM1557B
CONTROL ROOMGM573J
1A-
6002
2A-6002
2A-6002
4A-2101
4A-2101
N
FFL +9140
3A
-600
43
A-6
004
XPC2
GEN.100ENTRY FOYERXPC1
LOBBY
1525/1KICTHENETTE
1525
/3U
TZO
N R
OO
M
1525/4LOBBY
1525/5STORE
1525A/1XPC1
1526AEAST FOYER
1526CFEMALEXTS1
1526D
1526EMALE
XTS1
1526F
1526HJDUCT
XC
1526K
1527AGREEN ROOM
1527DSERVERY
1527E/1GREEN ROOM KITCHEN
1527E/2STORE
1527E/3STORE
1527
F/3
F3
1527K/1PR#33
XC
1527NDUCT
1527PCENTRE FOYER
1527TCORRIDOR
1528BDUCT
1528C.1
1528C.3STORE
1528D/2STORE
1551GLOBBY
1551G.1STORE
1551H
1551J
1557AWEST FOYER
1557CFEMALEXTS1
1557DMALE
XTS11557GCORRIDOR
1557G/1CORRIDOR
1557KStore
1558AMAIN KITCHEN
1L.01LIFT 01
1L05LIFT SHAFT
1L15LIFT SHAFT
1L16Shaft
1L17LIFT SHAFT
<Floor Finish>
G573APLAYHOUSE
G573A/1PLAYHOUSE STAGE
G573U
GM573APR#13
GM573B
GM573CCONTROL ROOMXCPT
GM573D
GM573E
GM573FCONTROL ROOMXCPT
GM573H
GM573K
GM573VUPPER WINCH GRID
L1S154STAIR
L1S155Stair
L1S91STAIR
V29XC
V30XC
#14EXISTING PLANTROOMXC
1526GDUCT
GRS31JST STAIRXPC1
GS45CH STAIRXPC1
VOIDJST SCENERY ROOMXC
GS32GREEN RM STAIRXC
L1S64CH STAIRXPC1
L1S55JST STAIRXPC1
L15161
GM573GCORRIDOR
1527MBOX OFFICE
Y10
Y10
Y20
Y20
Y30
Y30
Y40
Y40
X80X80
X70X70
X60X60
X50X50
1 DEMOLITION LEVEL 1 FLOOR PLAN (+30)1:100
SCOPE OF ARM ARCHITECTURE
SCOPE OF FIVE FOOT ONE
1:200 @ A3
DRAWING TITLE
REV
SCALES
PROJECT NO : 15031DRAWING NO
DRAWN BY
CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS
EMAIL [email protected]
117 Reservoir Street
P: (02) 9215 4900
ARCHITECTPROJECT :
F: (02) 9215 4901
PHASE
SOH Trust
DA
Phone: 0452 527 490 John CollinsEmail: [email protected]
WEB www.tzg.com.au
DATE
MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES
ELECTRICAL ENGINEER
STRUCTURAL ENGINEER
BCA/PCA CONSULTANT
Steensen Varming / Ivan Mira
Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John
Group DLA / Shane Berry
VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne
LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton
Cundall / Iris ChanESD CONSULTANT
Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT
Design 5 / Alan CrokerHERITAGE CONSULTANT
Atlus Group / Jason FinnCOST PLANNING CONSULTANT
Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION
RM, TG
FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton
SECURITY CONSULTANT CLIENT:
A-1001
ABN: 46002722349
Sydney Opera House -Front of House Renewal
Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF
PROPOSED GROUND FLOORPLAN (+12)
1:100 @ A1
NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.
02.08.2016 A ISSUED FOR DA MB, TS, RM, RL
TG
July 2021
B
21.07.2021 B ISSUED FOR DA
ENTRY FOYER
2A-6001
+7,415
FFL +3,658
New doorDGR-02
WF
AP1
XPC2 XPC2
XPC2
XPC2
STA
GE
DO
OR
GL.36LIFT 365.14 m2
1A-
6002
1A-
6002
2A-6002
2A-6002
1
N
23
FFL +3,658
2A
-210
12
A-2
101
Reduced ceilingheight. Refer to 02/A4501 Section
G523ASTAFF FACILITIES
G523A/1LOBBY
G523BPANTRY
G523CMALE
G523D
G523JCORRIDORG524A
MALE
G524BG524D
G524EFEMALE
G524G
G525DSITE MANAGEMENT
G525E
G526ABDM (O&M)
G526BCORRIDOR
G527CORRIDOR
G528AOFFICE
G528A/1
G528BMEETING ROOM
G530LOCKER ROOM
G531FOH STAFF
G531/1STAIR
G532OFFICE
G532/1OFFICE
G533CORRIDORG534A
CENTRAL PASSAGE
G534BSTAGE DOOR
GS.205ESCALATOR
GRS31JST STAIR
G521ASET STORAGE AREA
G521A/1SET WORKSHOP
G521A/2OFFICE
G534A/1EQUIP RM
GD27DUCT
G522APR #08G522C
CORRIDOR
G522FOFFICE
G522GSTAIR
G525AEPRG
G525A/1CORRIDOR
G525BEPRG
G525COFFICE
G525C/1STAIR
LIFT 15SHAFT
G521A/T1WORKSHOP
G521BLIFT SHAFT
G522BTTS STAGING STORE
3A
-600
43
A-6
004
1
2
3
1 PROPOSED GROUND FLOOR PLAN (+12)1:100
1:200 @ A3
Double escalatorReplace existing stairs with new doubleescalator. COS width of void
Relocate Workshop door
1L36New public lift to Corridor 2. Access toGround Floor and Southern Foyers
DRAWING TITLE
REV
SCALES
PROJECT NO : 15031DRAWING NO
DRAWN BY
CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS
EMAIL [email protected]
117 Reservoir Street
P: (02) 9215 4900
ARCHITECTPROJECT :
F: (02) 9215 4901
PHASE
SOH Trust
DA
Phone: 0452 527 490 John CollinsEmail: [email protected]
WEB www.tzg.com.au
DATE
MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES
ELECTRICAL ENGINEER
STRUCTURAL ENGINEER
BCA/PCA CONSULTANT
Steensen Varming / Ivan Mira
Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John
Group DLA / Shane Berry
VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne
LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton
Cundall / Iris ChanESD CONSULTANT
Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT
Design 5 / Alan CrokerHERITAGE CONSULTANT
Atlus Group / Jason FinnCOST PLANNING CONSULTANT
Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION
RM, TG
FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton
SECURITY CONSULTANT CLIENT:
A-1002
ABN: 46002722349
Sydney Opera House -Front of House Renewal
Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF
PROPOSED LEVEL 1 PLAN (+30)
1:100 @ A1
NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.
02.08.2016 A ISSUED FOR DA MB, TS, RM, RL
TG
July 2021
B
21.07.2021 B ISSUED FOR DA
ENTRY FOYER
6.8m
FFL +9,140
E1
E02
E03
A-2002
C3
C2C4 A-2001
XCPS
XC
DL1-13
XCPS
XPC2
XPC2
XPC2
XPC2
XPC2
XPC2 XPC2
PC2
XPC2XPC2
XPC2
XPC2
XC
XPC2 PC2
ESCALATORSCONNECTINGUNDER THESTAIRS TO
UTZON ROOM
43 pax
ESCL
#7
ESCL
#8
Cloak Room1526B
Toilet1527F/1
Toilet1527H/1
FOYER1557A/1
CLOAK ROOM1557B
CONTROL ROOMGM573J
1A-
6002
2A-6002
2A-6002
DL1-12
4A-2101
4A-2101
2
1
3
14
10
7
4A-6001
2A-5001
3A
-600
43
A-6
004
ACP1
XPC2
XPC2
1525/1KICTHENETTE
1525
/3U
TZO
N R
OO
M
1525/4LOBBY
1525/5STORE
1525A/1XPC1
1526AEAST FOYER
1.109WC ENTRY 1XPC1
1.111WC ENTRY 2XPC1
1526CFEMALEXTS1
1526D
1526EMALE
XTS1
1526F
1526HJDUCT
XC
1526K
1527AGREEN ROOM
1527DSERVERY
1527E/1GREEN ROOM KITCHEN
1527E/2STORE
1527E/3STORE
1527
F/3
F3
1527K/1PR#33
XC
1527NDUCT
1527PCENTRE FOYER
1527TCORRIDOR
1528BDUCT
1.101L1 LOBBYTPC1
1528C.1
1528C.3STORE
STORE1551GLOBBY
1551G.1STORE
1551H
1551J
1557AWEST FOYER
1557CFEMALEXTS1
1557DMALE
XTS11557GCORRIDOR
1557G/1CORRIDOR
1.120WC ENTRY 4XPC1
1.114WC ENTRY 3XPC1
1557KStore
1558AMAIN KITCHEN
1L.01LIFT 01
1L05LIFT SHAFT
1L15LIFT SHAFT
1L16Shaft
1L17LIFT SHAFT
<Floor Finish>
G573APLAYHOUSE
G573A/1PLAYHOUSE STAGE
G573U
GM573APR#13
GM573B
GM573CCONTROL ROOMXCPT
GM573D
GM573E
GM573FCONTROL ROOMXCPT
1.123CORRIDOR 2CPT2
GM573H
GM573K
GM573VUPPER WINCH GRID
L1S154STAIR
L1S155Stair
L1S91STAIR
V29XC
V30XC
#14EXISTING PLANTROOMXC
1526GDUCT
GRS31JST STAIRXPC1
GS.30UTZON ESCALATORS
GS45CH STAIRXPC1
VOIDJST SCENERY ROOMXC
GS32GREEN RM STAIRXC
L1S64CH STAIRXPC1
L1S55JST STAIRXPC1
1.122CORRIDOR 1XC
1.124CASH HANDLINGCPT2
L15161
GM573GCORRIDOR
1.125PR#33.1
1527MBOX OFFICE
Y10
Y10
Y20
Y20
Y30
Y30
Y40
Y40
X80X80
X70X70
X60X60
X50X50
XCPS
WTM04
WTM04
WTM04
WTM04
Sydney Opera House Trust
Phone: +61 2 9250 7541email: [email protected]
Sydney Opera House Trust
A1
RevSheet:Drawing No:Location
Project
Title
Date
Status
Dwn
Contract
Ckd Scale
LocationDateApvdDrwnDescriptionIssue
©
NOTES1. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES.2. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY.3. INFORMATION INDICATED IN THIS DOCUMENT MAY BE CRUCIAL TO THESAFE AND PROPER FUNCTIONING OF THE SYDNEY OPERA HOUSE. DO NOTALTER ANY ASPECT WITHOUT WRITTEN PERMISSION.4. ALL NEW WORKS MUST COMPLY WITH THE SYDNEY OPERA HOUSEBUILDING SERVICES STANDARD SPECIFICIATION (BSSS) AND RELEVANTAUSTRALIAN STANDARDS. NEW WORKS MUST ALSO COMPLY WITH THEREQUIREMENTS OF THE BUILDING CODES OF AUSTRALIA.
COPYRIGHTTHIS DRAWING AND DESIGN ARESUBJECT TO COPYRIGHT AND SHALLNOT BE COPIED IN ANY FORMWITHOUT THE WRITTEN PERMISSIONOF THE SYDNEY OPERA HOUSETRUST
GPO Box 4274 Sydney NSW Australia 2001
ARCHITECTTONKIN ZULAIKHAGREER ARCHITECTS117 Reservoir StreetABN: 46002722349P: (02) 9215 4900F: (02) 9215 4901EMAIL [email protected] www.tzg.com.au
NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.
Size:SOH-513
BUILDING RENEWAL PROGRAMVERTICAL TRANSPORT CONSULTANTUDY / Brendan Byrne
FIRE ENGINEERINGWarren Smith Partners / David Bolt
KITCHEN CONSULTANTMack Group / Nisha Ghantwal
ACOUSTIC ENGINEERArup / Christopher Sims
HYDRAULIC ENGINEERWarren Smith Partners / Campbell Hazelton
COST PLANNING CONSULTANTAtlus Group / Jason Finn
AV CONSULTANTArup / Tom Brickhill
LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton
HERITAGE CONSULTANTDesign 5 / Alan Croker
SECURITY CONSULTANTArup / Shane Norton
MECHANICAL ENGINEERAecom / Kheng Ip
FIRE CONSULTANTArup / Alistair Morrison
ELECTRICAL ENGINEERSteensen Varming / Ivan Mira
STRUCTURAL ENGINEERAECOM / Jonathan Onslow
ACCESSIBILITY CONSULTANTI-Access / Richard Seidman
BCA/PCA CONSULTANTGroup DLA / Shane Berry
ESD CONSULTANTCundall / Iris Chan
1:100 @ A1
LEVEL 1 FLOOR PLAN
A101
FACADE CONSULTANTPrism / Toby Fuller & Heather Webster
LIFT 36
BX VA
FOR CONSTRUCTION
49 BR TZG03 EWRM, CE
TG, RM C0024.07.2017
Issued For ConstructionC00 VVS TG 12/07/17
XFHR
XFHR
XFHR
XFH
R
FHR
FFL 9,155XSSL 9,130
2A203
2A203
1A
200
1A
200
1A200
1A200
2A203
2A203
1A
053
4A
200
4A
200
1A
201
1A
201
18 A-7002
5
6
7
A301
DL1-26
DL1-24
DL1-10b
DB
(Future Retail byOthers)
1527F/1TOILET
1527F/2F2
1527GLOBBY
1527H/1TOILET
1527H/2STORE
1527K/2OFFICE
1527L/1STORE
1527L/2OFFICE
1527L/3OFFICE
R3
1527QSTORE
1528C.3ELEC
10A453
10A453
DL1-09
DL1-09
6
7
8
5 A304
1
2
3
4 A301
FFL 9,155XSSL 9,065
1
23 A300
MP3
ESCL
#7
ESCL
#8
1.10
2L1
CO
RR
IDO
R
1.101L1 LOBBY
1557KStore
GS.30UTZON ESCALATORS
VOIDJST SCENERY DOCK
1L.36LIFT 36
1.107LIFT 36 LOBBY
1.113EXISTING VIP / INFO COUNTER 1L16
ShaftL1S155
Stair
1557CFEMALE
1557DMALE
1527L/5OFFICE
1525/1ELECTRICAL CUPBOARD
1525
/3
1525/4LOBBY
1525/5STORE
1525A/1
1526CFEMALE
1526D
1526EMALE
1526F
1526HJDUCT
1526
K
1527DSERVERY
1527E/1GREEN ROOM KITCHEN
1527E/2STORE
1527E/3STORE
1527
F/3
F3
1527K/1PR#33
1527NDUCT
1527PCENTRE FOYERXPC1
1527TCORRIDOR
1528BDUCT
1528C.1
LOBBY
1551G.1STORE
1551
H
1551J
1557AWEST FOYERXPC1
1557GCORRIDOR
1557G/1CORRIDOR
1558AMAIN KITCHEN
1L.01LIFT 01
1L05LIFT SHAFT
1L17LIFT SHAFT
G573APLAYHOUSE
G573A/1PLAYHOUSE STAGE
G573U
GM573B
GM573CCONTROL ROOMXCPT
GM573D
GM573E
GM573FCONTROL ROOMXCPT
GM573H
GM573K
L1S154STAIR
L1S91STAIR
V29 V30
#14EXISTING PLANTROOMXC
1526GDUCT
GRS31JST STAIR
GS45CH STAIR
GS32GREEN RM STAIR
L1S64CH STAIRXPC1
L1S55JST STAIR
L15161
GM573GCORRIDOR
GM573VUPPER WINCH GRID
LIFT 15SHAFT
1527MBOX OFFICE
RETAIL SHOP
01 1 2 3 4 5m
N
Y10 Y20 Y30 Y40X
80X
70X
60X
50
1:200 @ A3,
NOTE:- AREA MARKED IN GREY NOT PART OF LIFT 36 EARLY WORKS PACKAGE- AREA MARKED IN GREY NOT PART OF THIS CERTIFICATE
C01 Lift Car Set-out, Project Boundary, Drawing List CE TG 21/05/18
C02
C02 Retail Shop Note CE TG 26/06/18
1
2
3
4
5
6
7
8
9
10
1 PROPOSED LEVEL 1 FLOOR PLAN (+30)1:100
SCOPE OF ARM ARCHITECTURE
SCOPE OF FIVE FOOT ONE
1:200 @ A3
5
4
6
8
Double escalatorReplace existing stairs with new doubleescalator. COS width of void
New Retail ShopShop fit-out designed <externally>New Accessible WC & AdultChangeroomscope of ARM Architecture
Accessible Seatingwith upholstered accessible banquetteseating
Lift Lobbyscope of ARM Architecture
Front of House Corridorscope of ARM Architecture
Box Office Officesscope of ARM Architecture
VIP Ticketing and Information counter
Cloak StorageFree standing joinery wall for coats
1L36New public lift to Corridor 2. Access toGround Floor and Southern Foyers
DRAWING TITLE
REV
SCALES
PROJECT NO : 15031DRAWING NO
DRAWN BY
CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS
EMAIL [email protected]
117 Reservoir Street
P: (02) 9215 4900
ARCHITECTPROJECT :
F: (02) 9215 4901
PHASE
SOH Trust
DA
Phone: 0452 527 490 John CollinsEmail: [email protected]
WEB www.tzg.com.au
DATE
MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES
ELECTRICAL ENGINEER
STRUCTURAL ENGINEER
BCA/PCA CONSULTANT
Steensen Varming / Ivan Mira
Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John
Group DLA / Shane Berry
VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne
LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton
Cundall / Iris ChanESD CONSULTANT
Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT
Design 5 / Alan CrokerHERITAGE CONSULTANT
Atlus Group / Jason FinnCOST PLANNING CONSULTANT
Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION
RM, TG
FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton
SECURITY CONSULTANT CLIENT:
A-1003
ABN: 46002722349
Sydney Opera House -Front of House Renewal
Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF
PROPOSED LEVEL 2 PLAN (+42)
1:100, 1:200 @ A1
NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.
02.08.2016 A ISSUED FOR DA MB, TS, RM, RL
TG
July 2021
B
21.07.2021 B ISSUED FOR DA
ENTRY FOYER
X70
X80
X90
FFL +13,100
XPC1
GLD
L2-01
3A
-600
4
GL1GL1
2
1
XGL
1
2
1 PROPOSED LEVEL 2 FLOOR PLAN (+42)1:100
1:200 @ A3
JOAN SUTHERLANDTHEATRE (JST)
2.106JST BOHRF 7 FW
2.103JST BRUSHBOX VOID
2.102JST BAR + MERCHANDISINGRF6
2.101JST SOUTHERN FOYERXPC1
PODIUMXPC1
2.105JST EASTERN FOYERXPC1
Relocate existing glazed bronze doorand re-align external glass facade toaccommodate new lift shaft
1L36New public lift to Corridor 2. Access toGround Floor and Southern Foyers
DRAWING TITLE
REV
SCALES
PROJECT NO : 15031DRAWING NO
DRAWN BY
CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS
EMAIL [email protected]
117 Reservoir Street
P: (02) 9215 4900
ARCHITECTPROJECT :
F: (02) 9215 4901
PHASE
SOH Trust
DA
Phone: 0452 527 490 John CollinsEmail: [email protected]
WEB www.tzg.com.au
DATE
MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES
ELECTRICAL ENGINEER
STRUCTURAL ENGINEER
BCA/PCA CONSULTANT
Steensen Varming / Ivan Mira
Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John
Group DLA / Shane Berry
VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne
LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton
Cundall / Iris ChanESD CONSULTANT
Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT
Design 5 / Alan CrokerHERITAGE CONSULTANT
Atlus Group / Jason FinnCOST PLANNING CONSULTANT
Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION
RM, TG
FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton
SECURITY CONSULTANT CLIENT:
A-2001
ABN: 46002722349
Sydney Opera House -Front of House Renewal
Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF
WALL ELEVATIONS 01
1:50 @ A1
NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.
02.08.2016 A ISSUED FOR DA MB, TS, RM, RL
TG
July 2021
B
21.07.2021 B ISSUED FOR DA
ENTRY FOYER
+9,140L1 +30
+12,800L2 +42
CO2
XPC1XPC1
XSC XSC XSC XC
XC
XC
XPC2 XPC2 XPC2 XPC2PC2PC2 XCPSXCPS
XCPS
DL1-01
XCPS
1.102CORRIDOR 1
1.101LIFT LOBBY
1.112ENTRY FOYER
LIFT TO SOUTHERNFOYERS
X60 X70X80
U/S SSL +2,640
XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC XCXC XC XC XC XC XC XC XC XC XC XC XC XC XC XCXCXC
Y30 4A-2101
+6,400GM +21
+9,140L1 +30
+12,800L2 +42
Existing Plant roombehind to remain
XCBLP
PC2
XC
CPT1
CPS
TPC1
XCPS
AP4
1.104UTZON BAR
1.102CORRIDORTO LIFT 1
GS32STAIR TO
GREEN ROOM
XCXC
XPC2 XPC2 XPC2 XPC2 XPC2 XPC2
XCPS AP4SC2 SC2 SC2 SC2 SC2 SC2 SC2 SC2 SC2
X70 X60TO UTZON
ROOM
1527E/1GREENROOM
KICTHEN REFER TO EASTELEVATIONS A-2002FOR EAST FOYER
1.112ENBTRY FOYER
JPB-01JPB-01JPB-01D.L1.59 D.L1.60
FOH
CORRIDOR
L1.CO.01
WTM-04WTM-04
CRN-01 CRN-01
XCPS
WTM-04
C4 WALL ELEVATION C41:50
C3 WALL ELEVATION C31:50
C2 WALL ELEVATION C21:50
SCOPE OF ARM ARCHITECTURE
SCOPE OF ARM ARCHITECTURE
SCOPE OF ARM ARCHITECTURE
1:100 @ A3
HOT DESKOPEN OFFICE
CASH-UP ROOMBEYOND
TRACEY'SOFFICE BEYOND
XC
WC FOYERBEYOND
1.102FOH CORRIDOR
1.102FOH CORRIDOR
1.101LIFT LOBBY
DRAWING TITLE
REV
SCALES
PROJECT NO : 15031DRAWING NO
DRAWN BY
CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS
EMAIL [email protected]
117 Reservoir Street
P: (02) 9215 4900
ARCHITECTPROJECT :
F: (02) 9215 4901
PHASE
SOH Trust
DA
Phone: 0452 527 490 John CollinsEmail: [email protected]
WEB www.tzg.com.au
DATE
MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES
ELECTRICAL ENGINEER
STRUCTURAL ENGINEER
BCA/PCA CONSULTANT
Steensen Varming / Ivan Mira
Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John
Group DLA / Shane Berry
VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne
LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton
Cundall / Iris ChanESD CONSULTANT
Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT
Design 5 / Alan CrokerHERITAGE CONSULTANT
Atlus Group / Jason FinnCOST PLANNING CONSULTANT
Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION
RM, TG
FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton
SECURITY CONSULTANT CLIENT:
A-2002
ABN: 46002722349
Sydney Opera House -Front of House Renewal
Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF
WALL ELEVATIONS 02
1:50 @ A1
NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.
02.08.2016 A ISSUED FOR DA MB, TS, RM, RL
TG
July 2021
B
21.07.2021 B ISSUED FOR DA
ENTRY FOYER
X70 X60
+9,1404 L1 +30
+12,8005 L2 +42
XPC1
BR4
TPC1
TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01
MT-01
TM-01TM-01
XPC2 XPC2XPC2XPC2XPC2 XPC2XPC2 XPC2XPC2XPC2PC2 PC2 TM-02 TM-02 FX-04 TM-02 TM-02
TM-01
MT-04
AC-01TM-01
TM-01
TM-01
TM-01
TM-01
TM-01
MT-04
LAM-02
TM-01
XSCXSC
PBP
XBR
XGL1
1.107CORRIDOR 2
1.108RETAIL STORE
1525A/1TO UTZON ROOM
L1S155STAIR
1526HJDUCT
1L.36LIFT 36
XC
Y30 Y40
+9,140L1 +30
+12,800L2 +42
2,64
0
PC2XPC2
FWC1
XSC XSC XSC XSC XSC XSC XSC XSC XSC TM-01
TM-01
TM-01 TM-01 TM-01MT-04
AC-01
TM-02
TM-02
TM-02
TM-02
TM-02
TM-02
TM-02
TM-02
TM-02
TM-02
TM-02
TM-02
TM-02TM-02
TM-02
TM-02
TM-02
TM-02
TM-02
TM-01TM-01
AC-02
TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01 XGL1XGL1XGL1XGL1XGL1XGL1
XGL1XGL1XGL1
XPC2 XPC2 XPC2 XPC2 XPC2 XPC2 XPC2
XC
XPC2PC2 PC2XPC2
EXISTING STAIRS TOTHE JOAN
SUTHERLAND THEATRESOUTHERN FOYER
LIFT TOSOUTHERN
FOYER
EXISTING BOX OFFICECOUNTER
REF
ER T
O W
ESTE
RN
WA
LL E
LEVA
TIO
NS
A-2
010
L1S55JST STAIR
CORRIDOR TOLIFT 01
XC XC XC XC XCXC XC XC XCXCXC XC XC XCXCXC XC XCXC
Y40 Y30
+9,140L1 +30
+12,800L2 +42
2,64
02,
200
XPC2
XGL1XGL1 GLBF1
XGL1XGL1XGL1
XGF
GLBF1 GLBF1 GLBF1 GLBF1 GLBF1 GLBF1
XGL1 XGL1 XGL1 XGL1XGL1
XCXSC XSC
XSC XSC XSC XSC XSC XSC
XBR
NEW ESCALATORSTO UNDER THE
STAIRS
TO UTZONROOM
TO MAINFORECOURT
1.110CLOAKING
EXISTING STAIRSTO UNDER THE
STAIRS
REF
ER T
O W
ESTE
RN
WA
LL E
LEVA
TIO
NS
A-2
010
XCXPC2XPC2XPC2
XTV1
XTV1
XCXPC2
XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC
New double escalators
SC3 SC3 SC3XSC XSC XSC XSC XSC XSC XSC
GRS31JST STAIR
ES#7ESCALATOR
ES#8ESCALATOR
Sydney Opera House Trust
Phone: +61 2 9250 7541email: [email protected]
Sydney Opera House Trust
A1
RevSheet:Drawing No:Location
Project
Title
Date
Status
Dwn
Contract
Ckd Scale
LocationDateApvdDrwnDescriptionIssue
©
NOTES1. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES.2. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY.3. INFORMATION INDICATED IN THIS DOCUMENT MAY BE CRUCIAL TO THESAFE AND PROPER FUNCTIONING OF THE SYDNEY OPERA HOUSE. DO NOTALTER ANY ASPECT WITHOUT WRITTEN PERMISSION.4. ALL NEW WORKS MUST COMPLY WITH THE SYDNEY OPERA HOUSEBUILDING SERVICES STANDARD SPECIFICIATION (BSSS) AND RELEVANTAUSTRALIAN STANDARDS. NEW WORKS MUST ALSO COMPLY WITH THEREQUIREMENTS OF THE BUILDING CODES OF AUSTRALIA.
COPYRIGHTTHIS DRAWING AND DESIGN ARESUBJECT TO COPYRIGHT AND SHALLNOT BE COPIED IN ANY FORMWITHOUT THE WRITTEN PERMISSIONOF THE SYDNEY OPERA HOUSETRUST
GPO Box 4274 Sydney NSW Australia 2001
ARCHITECTTONKIN ZULAIKHAGREER ARCHITECTS117 Reservoir StreetABN: 46002722349P: (02) 9215 4900F: (02) 9215 4901EMAIL [email protected] www.tzg.com.au
NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.
Size:SOH-513
BUILDING RENEWAL PROGRAMVERTICAL TRANSPORT CONSULTANTUDY / Brendan Byrne
FIRE ENGINEERINGWarren Smith Partners / David Bolt
KITCHEN CONSULTANTMack Group / Nisha Ghantwal
ACOUSTIC ENGINEERArup / Christopher Sims
HYDRAULIC ENGINEERWarren Smith Partners / Campbell Hazelton
COST PLANNING CONSULTANTAtlus Group / Jason Finn
AV CONSULTANTArup / Tom Brickhill
LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton
HERITAGE CONSULTANTDesign 5 / Alan Croker
SECURITY CONSULTANTArup / Shane Norton
MECHANICAL ENGINEERAecom / Kheng Ip
FIRE CONSULTANTArup / Alistair Morrison
ELECTRICAL ENGINEERSteensen Varming / Ivan Mira
STRUCTURAL ENGINEERAECOM / Jonathan Onslow
ACCESSIBILITY CONSULTANTI-Access / Richard Seidman
BCA/PCA CONSULTANTGroup DLA / Shane Berry
ESD CONSULTANTCundall / Iris Chan
1:50, 1:10, 1:71.43 @ A1
LIFT LOBBY WALL ELEVATION
A304
FACADE CONSULTANTPrism / Toby Fuller & Heather Webster
LIFT 36
BX VA
FOR CONSTRUCTION
49 BR TZG03 EWRM, CE
TG, RM C0024.07.2017
Issued For ConstructionC00 VVS TG 12/07/17
FFL 9,155LEVEL ONE
FCL 11,555U/S CENTRAL BEAM
FCL 12,227U/S SSL
3,072
PC2 PC2 BR1C
XMLF
XCS
XCS
1.107LIFT LOBBY 36
FHR
6
7
8
5 A304
MP3
1L.36LIFT 36
1.107LIFT 36 LOBBY
FFL 9,155LEVEL ONE
FCL11,555U/S CENTRAL BEAM
FCL 12,227U/S SSL
1,3002,2
1020
34
550
550
900
PC2
XMLF
C02F
BR1C
BR1C
PBP
PC2
XCS
1.107LIFT LOBBY 36
Allow block out in concrete wallfor lift call button.Confirm block out size with liftmanufacturer.
2,18
565
XCSXCS
CO2F
CO2F1.101
LIFT 36 LOBBY
GL6
3,07
2TO
U/S
OF
SLA
B
2140
TO U
/S O
F E
XIS
TIN
G B
EA
M
2,40
0TO
U/S
OF
CE
NTR
AL
BE
AM
2,23
034
XCS XCS
BR1C
OPE
NING
FFL 9,155LEVEL ONE
FCL 11,791U/S BEAM
FCL 12,375U/S SSL
2,21
0
RL 11,365EXISTING PANELS
100
700 160
1,40
0
OPE
NING
XC
PC2PC2
550
900
9090
2040
8 8830
8 88 88 8847
18
20
18
20
18
10
18
20
18
20
1850
18
20
18
10
18
20
18
10
18
20
18
10
1840
2070
7080
30
20 30 180 20
250
250
700
180
2038
20 1,170
125 125
50 50
XX
Card scannerLift call button
1.107LIFT LOBBY 36
SIGN TYPE D5: Engraved Bronze PlateDirectional Lift Sign parameters
Sign Length: 250mmSign Height: 180 + 695 + 250mmText border (T/R/B/L): 15mmText Height: 18mmText Thickness / Weight: Arial 55 RomanPictogram Height: 18mmAFFL: refer drawingFixing: Wall mounted on split bracket
1
Text content tobe confirmed
2 Joan Sutherland
Southern
Northern
Level 2 Podium
1 Box OfficeUtzon RoomBennelong
Cloaking
Theatre
Restaurant
Do not use liftif there is a fire
When this lift is busyplease give priority toour patrons with limitedmobility
Toilets
Foyer Bar
Foyer
Permanently illuminated perspex level indicator
Illuminated perspex arrow to light up when lift arrives
LIFT 36 LOBBY WEST1:50
5
LIFT 36 LOBBY DETAIL PLAN1:50
10
LIFT 36 LOBBY EAST1:50
7
LIFT 36 LOBBY NORTH1:50
6
LIFT 36 LOBBY SOUTH1:50
8
TICKETING/CLOAKING EAST ELEVATION1:50
9
LIFT SIGNAGE L11:10
1
1:100, 1:40 @ A3,
NOTE:- AREA MARKED IN GREY NOT PART OF LIFT 36 EARLY WORKS PACKAGE- AREA MARKED IN GREY NOT PART OF THIS CERTIFICATE
14/8/17Issued For ConstructionC01 VVS TGLift Car Set-out, Project Boundary, Drawing ListC02 CE TG 21/05/18
C07
Lift shaft set-outC03 RM TG 06/07/18Finishes UpdateC04 RM TG 01/08/18
RM 17/10/18Level 2 Western doors deletedC05 TGRM 15/05/19New lift signage and lift call buttonC06 TG
New Lift 36 signage to match Lift 31signage font, pictograms andconstruction details.
Precast Wall Panel set-outC07 RM TG 24/07/19
XCS
E02 WALL ELEVATION E21:50
E1 WALL ELEVATION E11:50
E03 WALL ELEVATION E31:50
SCOPE OF ARM ARCHITECTURE
SCOPE OF FIVE FOOT ONE
SCOPE OF FIVE FOOT ONE
1:100 @ A3
DRAWING TITLE
REV
SCALES
PROJECT NO : 15031DRAWING NO
DRAWN BY
CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS
EMAIL [email protected]
117 Reservoir Street
P: (02) 9215 4900
ARCHITECTPROJECT :
F: (02) 9215 4901
PHASE
SOH Trust
DA
Phone: 0452 527 490 John CollinsEmail: [email protected]
WEB www.tzg.com.au
DATE
MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES
ELECTRICAL ENGINEER
STRUCTURAL ENGINEER
BCA/PCA CONSULTANT
Steensen Varming / Ivan Mira
Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John
Group DLA / Shane Berry
VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne
LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton
Cundall / Iris ChanESD CONSULTANT
Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT
Design 5 / Alan CrokerHERITAGE CONSULTANT
Atlus Group / Jason FinnCOST PLANNING CONSULTANT
Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION
RM, TG
FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton
SECURITY CONSULTANT CLIENT:
A-6001
ABN: 46002722349
Sydney Opera House -Front of House Renewal
Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF
UTZON ESCALATOR DETAILPLANS
1:100 @ A1
NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.
02.08.2016 A ISSUED FOR DA MB, TS, RM, RL
TG
July 2021
B
21.07.2021 B ISSUED FOR DA
ENTRY FOYER
ESCALATORS TOUTZON ROOM
1A-
6002
1A-
6002
2A-6002
2A-6002
CORRIDORGM523A
MALE LOCKERGM523B
GM524F
GM
524GG
M52
4H
GM524J
CH
AN
GE
RO
OM
GM
530
STOREGM530/1
STAIRGRS54
ENTRY FOYER
ESCL
#7
ESCL
#81
A-60
021
A-60
02
2A-6002
2A-6002
1525
/3U
TZO
N R
OO
M
1525/5STORE
1525A/1XPC1
1.109WC ENTRY 1XPC1
1526F1526K
1L16Shaft
L1S155Stair
GS.30UTZON ESCALATORS
CORRIDORCORRIDOR STOREB530D
OFF
ICE
B53
2OFFICEB533
OFF
ICE
B53
4
1A-
6002
1A-
6002
2A-6002
2A-6002
NEW STRUCTURALASSEMBLY BELOW
TO ENABLEESCALATOR PIT
XPC2
1A-
6002
1A-
6002
2A-6002
2A-6002
Reduced ceilingheight. Refer to 02/A4501 Section
G523CMALE
G523JCORRIDOR
G524B
G528AOFFICE
G528A/1
G528BMEETING ROOM
G530LOCKER ROOM
G533CORRIDOR
GS.205ESCALATOR
G522FOFFICE 1
1
3 UTZON ESCALATORS (GM +21)1:100
4 UTZON ESCALATORS (L1 +30)1:100
1 UTZON ESCALATORS (B1 +01)1:100
2 UTZON ESCALATORS (GR +12)1:100
1:200 @ A3
Double escalatorDemolish Utzon stairs and install two800mm wide up and down escalatorsbetween existing precast granite wallpanels.
DRAWING TITLE
REV
SCALES
PROJECT NO : 15031DRAWING NO
DRAWN BY
CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS
EMAIL [email protected]
117 Reservoir Street
P: (02) 9215 4900
ARCHITECTPROJECT :
F: (02) 9215 4901
PHASE
SOH Trust
DA
Phone: 0452 527 490 John CollinsEmail: [email protected]
WEB www.tzg.com.au
DATE
MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES
ELECTRICAL ENGINEER
STRUCTURAL ENGINEER
BCA/PCA CONSULTANT
Steensen Varming / Ivan Mira
Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John
Group DLA / Shane Berry
VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne
LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton
Cundall / Iris ChanESD CONSULTANT
Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT
Design 5 / Alan CrokerHERITAGE CONSULTANT
Atlus Group / Jason FinnCOST PLANNING CONSULTANT
Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION
RM, TG
FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton
SECURITY CONSULTANT CLIENT:
A-6002
ABN: 46002722349
Sydney Opera House -Front of House Renewal
Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF
UTZON ESCALATOR DETAILSECTIONS
1:50 @ A1
NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.
02.08.2016 A ISSUED FOR DA MB, TS, RM, RL
TG
July 2021
B
21.07.2021 B ISSUED FOR DA
ENTRY FOYER
Sydney Opera House Trust
Phone: +61 2 9250 7541email: [email protected]
Sydney Opera House Trust
A1
RevSheet:Drawing No:Location
Project
Title
Date
Status
Dwn
Contract
Ckd Scale
Location
©
NOTES1. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES.2. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY.3. INFORMATION INDICATED IN THIS DOCUMENT MAY BE CRUCIAL TO THE SAFE ANDPROPER FUNCTIONING OF THE SYDNEY OPERA HOUSE. DO NOT ALTER ANY ASPECTWITHOUT WRITTEN PERMISSION.4. ALL NEW WORKS MUST COMPLY WITH THE SYDNEY OPERA HOUSE BUILDINGSERVICES STANDARD SPECIFICIATION (BSSS) AND RELEVANT AUSTRALIANSTANDARDS. NEW WORKS MUST ALSO COMPLY WITH THE REQUIREMENTS OF THEBUILDING CODES OF AUSTRALIA.5. BACKGROUNDS OUTSIDE THE WORKZONE MIGHT NOT BE ACCURATE AND NEED TOBE VERIFIED BY THE CONTRACTOR ON SITE.
COPYRIGHTTHIS DRAWING AND DESIGN ARESUBJECT TO COPYRIGHT AND SHALLNOT BE COPIED IN ANY FORMWITHOUT THE WRITTEN PERMISSIONOF THE SYDNEY OPERA HOUSETRUST
GPO Box 4274 Sydney NSW Australia 2001
ARCHITECTTONKIN ZULAIKHAGREER ARCHITECTS117 Reservoir StreetABN: 46002722349P: (02) 9215 4900F: (02) 9215 4901EMAIL [email protected] www.tzg.com.au
NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.
Size:SOH-513
BUILDING RENEWAL PROGRAMVERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne
FIRE ENGINEERINGWarren Smith Partners / Manu John
HYDRAULIC ENGINEERWarren Smith Partners / Stuart Sullivan
LIGHTING DESIGNERSteensen Varming / Ashleigh Bretherton
HERITAGE CONSULTANTDesign 5 / Alan Croker
MECHANICAL ENGINEERAecom / Kheng Ip
FIRE ENGINEERArup / Alistair Morrison
ELECTRICAL ENGINEERSteensen Varming / Ivan Mira
STRUCTURAL ENGINEERARUP / Xavier Nuttal
ACCESSIBILITY CONSULTANTGroup DLA / Elisa Moechtar
BCA/PCA CONSULTANTGroup DLA / Shane Berry
ESD CONSULTANTCundall / Iris Chan 1:50 @ A1
ESCALATOR PLANS AND N-SSECTION
A45012/7/21
C00
ENTRY FOYER ESCALATORS
Issue Description Drwn Apvd DateC00 ISSUED FOR CONSTRUCTION RM TG 12.07.21
BX VA 49 BR TZG09TG, RM
FOR TENDER
TS, RM
Y41
Y42
Y44
Y45
2A
450
XFFL 9,155
XS
SL 8,975
PC
8
PC
8
X57
X56
X55
X54
X53
X52
X51
Y43
FFL +9,155
3A-450
XP
C8
XP
C8M
P2
GS.30
UTZO
N ESC
ALATO
RS
1L16Shaft
L1S155Stair
1525A/1
1526AEA
ST FOYER
1526EM
ALE
1526F
3,2607A451
XG
L2
XG
LBF
XM
P3
X50
X49
X48
X47
X46
X45
X44
X43
X42
X41
X40
XP
C8
PC
8
XP
C8
PC
8
XP
C8
PC
8
3,022
2,763 (Precast to P
recast)
2,720 Escalator (tbc)
5A
4515
A451
6A
4516
A451
MP
2
ESCALATOR 07
ESCALATOR 08
GS.205
ESCA
LATOR
G528B
MEETIN
G R
OO
M
G528A
OFFIC
E
G528A
/1
G529A
STOR
E
G530
LOC
KER
RO
OM
3A-450
X50 X51 X52 X53 X54 X55 X56 X57X40 X41 X42 X43 X44 X45 X46 X47 X48 X49
2A451
-300B1 +01
-300B1 +01
+3,658GR +12
+3,658GR +12
+6,400GM +21
+6,400GM +21
+9,140L1 +30
+9,140L1 +30
+12,800L2 +42
+12,800L2 +42
~2,2
40M
aint
ain
heig
ht to
exi
stin
g se
rvic
es2,210 (2,239 max)
RL +11,375
RL +7,104
2,990
15,822 (overall length of escalator tbc)
FFL +9,155
2,918 13,056
550
1,080
580
+11,791
+3,660
+9,140 +9,155
+3,658
SSL +2,563 (tbc)
2,45
674
045
0
2,66
3
30.0°
6A
451
XPC2
XGL2
XPC8XPC1
XMP3
MP2
XGLBF
Install new sections of precast wall panels toStructural Engineer's detail. For scope ofworks for precast wall panels refer toPrecast Wall Panel Schedule on A452.
Extend of glassfacade and door
Extend of aluminiumlanding plate
Extend of handrail
Extend of handrailExtend of aluminiumlanding plate
PC8
2hr fire-rated lightweight wall and ceiling suspended of concretewalls. Gyprock shaft wall system CSR7715 (or similar). PBF2lining (3 x 16mm Fyrcheck plasterboard). Paint Finish.
CO2PF Concrete pit (refer Structural Engineer'sdocuments). XCP Paint Finish to all exposed new concrete.
Protect existing stormwater pipeduring construction. For invertlevels refer to Utility Survey,
New southern assembly withconcrete encasing (referStructural Engineer's documents).
Concrete encased northern assembly (refer Structural Engineer'sdocuments).
Reinstate existing precast floorpavers (refer note F2).
WST
New waterproofing membrane tounderside of slab and around newsteel cable penetration. Provide aminimum of 300mm overlap ofexisting and new membrane.
XWST
Signage box
Existing servicesconduit pipe
PC2PC2
PC2
Temporary hitch and fixing beams (to beremoved after escalator installation). Shouldpatching be required to the concrete, asample and methodology for approval isrequired before proceeding.
XPC8PC8
MP2PC8
1.112ENRTY FOYER
G523CMALE AMENITIES
GM523ACORRIDOR
G533CORRIDOR
G529ASTORE
GRS54STAIR
WP
GM523BMALE LOCKER
XPC2
XPC2
XC
XC
XC
XCP
XCP
Reinstate ceiling services to Office B533 after installation ofescalator (refer Mechanical, Electrical and Fire servicesConsultant's documents).
CO2PF
CO2PF
XPC2
XPC2
XPC2
XPC2
XPC2
XPC2
XPC2
XPC2
XPC2
XPC2
XPC2 XPC2 XPC2 XPC2 XPC2 XPC2
PC2
PC2
GRS30 STAIR
1A451
4A451
9,521(9,495 min)
2,62
5
95250
872
3,022(2500 min)
5A
451
New slab and edgebeam refer to StructuralEngineers details.
GF09UNDER THE
STEPS
-300B1 +01
B533OFFICE
B530BCORRIDOR
WP
PROPOSED DETAIL PLAN - LEVEL 11:50
2PROPOSED DETAIL PLAN - GROUND1:50
1
PROPOSED SECTION NS1:50
5
Sydney Opera House Trust
Phone: +61 2 9250 7541email: [email protected]
Sydney Opera House Trust
A1
RevSheet:Drawing No:Location
Project
Title
Date
Status
Dwn
Contract
Ckd Scale
Location
©
NOTES1. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES.2. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY.3. INFORMATION INDICATED IN THIS DOCUMENT MAY BE CRUCIAL TO THE SAFE ANDPROPER FUNCTIONING OF THE SYDNEY OPERA HOUSE. DO NOT ALTER ANY ASPECTWITHOUT WRITTEN PERMISSION.4. ALL NEW WORKS MUST COMPLY WITH THE SYDNEY OPERA HOUSE BUILDINGSERVICES STANDARD SPECIFICIATION (BSSS) AND RELEVANT AUSTRALIANSTANDARDS. NEW WORKS MUST ALSO COMPLY WITH THE REQUIREMENTS OF THEBUILDING CODES OF AUSTRALIA.5. BACKGROUNDS OUTSIDE THE WORKZONE MIGHT NOT BE ACCURATE AND NEED TOBE VERIFIED BY THE CONTRACTOR ON SITE.
COPYRIGHTTHIS DRAWING AND DESIGN ARESUBJECT TO COPYRIGHT AND SHALLNOT BE COPIED IN ANY FORMWITHOUT THE WRITTEN PERMISSIONOF THE SYDNEY OPERA HOUSETRUST
GPO Box 4274 Sydney NSW Australia 2001
ARCHITECTTONKIN ZULAIKHAGREER ARCHITECTS117 Reservoir StreetABN: 46002722349P: (02) 9215 4900F: (02) 9215 4901EMAIL [email protected] www.tzg.com.au
NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.
Size:SOH-513
BUILDING RENEWAL PROGRAMVERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne
FIRE ENGINEERINGWarren Smith Partners / Manu John
HYDRAULIC ENGINEERWarren Smith Partners / Stuart Sullivan
LIGHTING DESIGNERSteensen Varming / Ashleigh Bretherton
HERITAGE CONSULTANTDesign 5 / Alan Croker
MECHANICAL ENGINEERAecom / Kheng Ip
FIRE ENGINEERArup / Alistair Morrison
ELECTRICAL ENGINEERSteensen Varming / Ivan Mira
STRUCTURAL ENGINEERARUP / Xavier Nuttal
ACCESSIBILITY CONSULTANTGroup DLA / Elisa Moechtar
BCA/PCA CONSULTANTGroup DLA / Shane Berry
ESD CONSULTANTCundall / Iris Chan 1:5, 1:10, 1:50 @ A1
ESCALATOR DETAILS AND E-WSECTIONS
A45112/7/21
C00
ENTRY FOYER ESCALATORS
Issue Description Drwn Apvd DateC00 ISSUED FOR CONSTRUCTION RM TG 12.07.21
BX VA 49 BR TZG09TG, RM
FOR TENDER
TS, RM
align
EX SSL
FFL 3,663
MP2: Escalatorthreshold plate tomatch Escalator 5
PC8: Reinstate existingprecast granite paver
Sub-floor to be detailedby escalator contractor.
New concrete slab asper structuralengineers details.
Smooth transition,grout to match existingin Entry Foyer.
align
+8,975
FFL +9,155 PC8: New precastgranite paver
Support and levellingfor PC8 to matchexisting detail.
Sub-floor to be detailedby escalator contractor.
MP2: Ribbed aluminiumlanding plate, to matchEscalator 5.
Smooth transition,grout to match existing.
New concrete slab asper structuralengineers details.
2hr fire-rated (fromboth sides)lightweight wall andceiling suspended ofconcrete side walls.Gyprock shaft wallsystem CSR7715 (orsimilar). PBF2 lining(3 x 16mm Fyrcheckplasterboard). PaintFinish.
Existing concretewall. 2 hr fire rated.
Escalator
150
Backing rod
Continuously fillgap with FireMastic to 13mmmin depth
Y42 Y43 Y44
-300B1 +01
+3,658GR +12
+6,400GM +21
+9,140L1 +30
3,259
XPC2XPC2
G529ASTORE
ES#7 ES#8
3A451
102 2,768
Refer to precast panelschedule on A452 for changescope and to StructuralEngineer's drawings for fixingdetails.
CO2PF Concrete encasing tonorthern structural assembly(refer Structural Engineer'sdocuments). Paint Finish.
PBPF2
B533OFFICE
FFL +3,663GROUND
FFL +6,400MEZZANINE
FFL +9,155LEVEL 1
2,969
FFL -300BASEMENT B1
2,720
269 2,720 (escalator width tbc) 270
294 800 544 800 281
XCXC
ES#7 ES#8
Y42 Y43 Y44
3A451
3,259 (wall to wall)2,763 (precast to precast)
Refer to Granite precastpanels schdule fortreatment.
XL XL
Carefully remove, storeand reinstate existingconcealed uplights. refer toElectrical Engineer's detail.
XPC2 Precast wallpanels supported byconcrete hob below
Concrete shear wall
CO2PF Concrete floor slab(refer Structural Engineer'sdocuments). Paint Finish.
PC2 Precast wall panelconcealed fixed to steelbracket fixed to concretewall (refer to StructuralEngineer's documents).
B533OFFICE
Y41 Y42 Y43 Y44 Y45
ExistingSignage box
Remove, retain and re-installfacade section, incl. bronzedoor, door hardware, thresholdfloor box, signage box, downlights and glazing wall (refernote F2).
Remove, retain and re-installprecast wall panels (refer noteF2).
XGL2 XPC2 XPC2 XPC2 XPC2XPC2XPC2XPC2XPC2
XGLBF XGLBFXGLBF
XCXC
XGL2
XGLBF
ESCALATOR BASE THRESHOLD DETAIL1:5
1 ESCALATOR TOP THRESHOLD DETAIL1:5
2
SOFFIT LINING DETAIL1:5
4
PROPOSED SECTION EW11:50
5 PROPOSED SECTION EW21:50
6
PROPOSED EXTERNAL ELEVATION1:50
7
250
30
Existing precast panels on newwall brackets. Refer to structuralEngineer's drawings for fixingdetails.
141 100
5015
050
See Structural Engineers drawings for PC2 fixing details.
Existing wall
New precast wall panel conceal fixed tosteel brackets. Refer to structuralEngineer's drawings for fixing details.
All fixings in gap betweenexisting panel and new PC2panel to be painted black.
PRECAST WALL PANEL DETAIL1:10
3
UTZON ESCALATOR LONG SECTION1:501 UTZON ESCALATOR CROSS SECTION
1:502
1:100 @ A3 1:50 @ A1
DRAWING TITLE
REV
SCALES
PROJECT NO : 15031DRAWING NO
DRAWN BY
CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS
EMAIL [email protected]
117 Reservoir Street
P: (02) 9215 4900
ARCHITECTPROJECT :
F: (02) 9215 4901
PHASE
SOH Trust
DA
Phone: 0452 527 490 John CollinsEmail: [email protected]
WEB www.tzg.com.au
DATE
MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES
ELECTRICAL ENGINEER
STRUCTURAL ENGINEER
BCA/PCA CONSULTANT
Steensen Varming / Ivan Mira
Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John
Group DLA / Shane Berry
VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne
LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton
Cundall / Iris ChanESD CONSULTANT
Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT
Design 5 / Alan CrokerHERITAGE CONSULTANT
Atlus Group / Jason FinnCOST PLANNING CONSULTANT
Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION
RM, TG
FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton
SECURITY CONSULTANT CLIENT:
A-6003
ABN: 46002722349
Sydney Opera House -Front of House Renewal
Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF
PROPOSED LIFT 36 PLANS GR+21 AND L1 +30
1:50 @ A1
NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.
02.08.2016 A ISSUED FOR DA MB, TS, RM, RL
TG
July 2021
B
21.07.2021 B ISSUED FOR DA
ENTRY FOYER
FFL +9,140
DL1-13
PC2
XPC2 PC2
3A
-600
4
3A
-600
4
1526AEAST FOYER
1526HJDUCT
XC
1L15LIFT SHAFT
VOIDJST SCENERY ROOMXC
1.106M
AC
HIN
E RO
OM
XC
1L.36LIFT 36
L1S55JST STAIRXPC1
1.107L36 CORRIDORTPC1
FFL +3,658
DGR-02
G522BTTS STAGING STORE
GL.36LIFT 365.14 m2
2A
-210
1
Relocate Workshop door
G522CCORRIDOR
G522GSTAIR
G525AEPRG
G525BEPRG
G525C/1
LIFT 15SHAFT
G521A/T1WORKSHOP
G521BLIFT SHAFT
G522BTTS STAGING STORE
3A
-600
4
3A
-600
4
Sydney Opera House Trust
Phone: +61 2 9250 7541email: [email protected]
Sydney Opera House Trust
A1
RevSheet:Drawing No:Location
Project
Title
Date
Status
Dwn
Contract
Ckd Scale
LocationDateApvdDrwnDescriptionIssue
©
NOTES1. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES.2. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY.3. INFORMATION INDICATED IN THIS DOCUMENT MAY BE CRUCIAL TO THESAFE AND PROPER FUNCTIONING OF THE SYDNEY OPERA HOUSE. DO NOTALTER ANY ASPECT WITHOUT WRITTEN PERMISSION.4. ALL NEW WORKS MUST COMPLY WITH THE SYDNEY OPERA HOUSEBUILDING SERVICES STANDARD SPECIFICIATION (BSSS) AND RELEVANTAUSTRALIAN STANDARDS. NEW WORKS MUST ALSO COMPLY WITH THEREQUIREMENTS OF THE BUILDING CODES OF AUSTRALIA.
COPYRIGHTTHIS DRAWING AND DESIGN ARESUBJECT TO COPYRIGHT AND SHALLNOT BE COPIED IN ANY FORMWITHOUT THE WRITTEN PERMISSIONOF THE SYDNEY OPERA HOUSETRUST
GPO Box 4274 Sydney NSW Australia 2001
ARCHITECTTONKIN ZULAIKHAGREER ARCHITECTS117 Reservoir StreetABN: 46002722349P: (02) 9215 4900F: (02) 9215 4901EMAIL [email protected] www.tzg.com.au
NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.
Size:SOH-513
BUILDING RENEWAL PROGRAMVERTICAL TRANSPORT CONSULTANTUDY / Brendan Byrne
FIRE ENGINEERINGWarren Smith Partners / David Bolt
KITCHEN CONSULTANTMack Group / Nisha Ghantwal
ACOUSTIC ENGINEERArup / Christopher Sims
HYDRAULIC ENGINEERWarren Smith Partners / Campbell Hazelton
COST PLANNING CONSULTANTAtlus Group / Jason Finn
AV CONSULTANTArup / Tom Brickhill
LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton
HERITAGE CONSULTANTDesign 5 / Alan Croker
SECURITY CONSULTANTArup / Shane Norton
MECHANICAL ENGINEERAecom / Kheng Ip
FIRE CONSULTANTArup / Alistair Morrison
ELECTRICAL ENGINEERSteensen Varming / Ivan Mira
STRUCTURAL ENGINEERAECOM / Jonathan Onslow
ACCESSIBILITY CONSULTANTI-Access / Richard Seidman
BCA/PCA CONSULTANTGroup DLA / Shane Berry
ESD CONSULTANTCundall / Iris Chan
1:100 @ A1
LEVEL 1 FLOOR PLAN
A101
FACADE CONSULTANTPrism / Toby Fuller & Heather Webster
LIFT 36
BX VA
FOR CONSTRUCTION
49 BR TZG03 EWRM, CE
TG, RM C0024.07.2017
Issued For ConstructionC00 VVS TG 12/07/17
XFHR
XFHR
XFHR
XFH
R
FHR
FFL 9,155XSSL 9,130
2A203
2A203
1A
200
1A
200
1A200
1A200
2A203
2A203
1A
053
4A
200
4A
200
1A
201
1A
201
18 A-7002
5
6
7
A301
DL1-26
DL1-24
DL1-10b
DB
(Future Retail byOthers)
1527F/1TOILET
1527F/2F2
1527GLOBBY
1527H/1TOILET
1527H/2STORE
1527K/2OFFICE
1527L/1STORE
1527L/2OFFICE
1527L/3OFFICE
R3
1527QSTORE
1528C.3ELEC
10A453
10A453
DL1-09
DL1-09
6
7
8
5 A304
1
2
3
4 A301
FFL 9,155XSSL 9,065
1
23 A300
MP3
ESCL
#7
ESCL
#8
1.10
2L1
CO
RR
IDO
R
1.101L1 LOBBY
1557KStore
GS.30UTZON ESCALATORS
VOIDJST SCENERY DOCK
1L.36LIFT 36
1.107LIFT 36 LOBBY
1.113EXISTING VIP / INFO COUNTER 1L16
ShaftL1S155
Stair
1557CFEMALE
1557DMALE
1527L/5OFFICE
1525/1ELECTRICAL CUPBOARD
1525
/3
1525/4LOBBY
1525/5STORE
1525A/1
1526CFEMALE
1526D
1526EMALE
1526F
1526HJDUCT
1526
K
1527DSERVERY
1527E/1GREEN ROOM KITCHEN
1527E/2STORE
1527E/3STORE
1527
F/3
F3
1527K/1PR#33
1527NDUCT
1527PCENTRE FOYERXPC1
1527TCORRIDOR
1528BDUCT
1528C.1
LOBBY
1551G.1STORE
1551
H
1551J
1557AWEST FOYERXPC1
1557GCORRIDOR
1557G/1CORRIDOR
1558AMAIN KITCHEN
1L.01LIFT 01
1L05LIFT SHAFT
1L17LIFT SHAFT
G573APLAYHOUSE
G573A/1PLAYHOUSE STAGE
G573U
GM573B
GM573CCONTROL ROOMXCPT
GM573D
GM573E
GM573FCONTROL ROOMXCPT
GM573H
GM573K
L1S154STAIR
L1S91STAIR
V29 V30
#14EXISTING PLANTROOMXC
1526GDUCT
GRS31JST STAIR
GS45CH STAIR
GS32GREEN RM STAIR
L1S64CH STAIRXPC1
L1S55JST STAIR
L15161
GM573GCORRIDOR
GM573VUPPER WINCH GRID
LIFT 15SHAFT
1527MBOX OFFICE
RETAIL SHOP
01 1 2 3 4 5m
N
Y10 Y20 Y30 Y40
X80
X70
X60
X50
1:200 @ A3,
NOTE:- AREA MARKED IN GREY NOT PART OF LIFT 36 EARLY WORKS PACKAGE- AREA MARKED IN GREY NOT PART OF THIS CERTIFICATE
C01 Lift Car Set-out, Project Boundary, Drawing List CE TG 21/05/18
C02
C02 Retail Shop Note CE TG 26/06/18
1
2
1
2
1 PROPPOSED LIFT 36 LEVEL 1 PLAN1:50
2 PROPPOSED LIFT 36 GROUND FLOOR PLAN1:50
SCOPE OF FIVE FOOT ONE
1:100 @ A3
1L36LIFT 36
MP3
1.107LIFT 36 LOBBY
Lift 36 Pit only at Ground FloorLift service from L1 to L2 only
Reduced Workshop Areawith new access doors
DRAWING TITLE
REV
SCALES
PROJECT NO : 15031DRAWING NO
DRAWN BY
CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS
EMAIL [email protected]
117 Reservoir Street
P: (02) 9215 4900
ARCHITECTPROJECT :
F: (02) 9215 4901
PHASE
SOH Trust
DA
Phone: 0452 527 490 John CollinsEmail: [email protected]
WEB www.tzg.com.au
DATE
MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES
ELECTRICAL ENGINEER
STRUCTURAL ENGINEER
BCA/PCA CONSULTANT
Steensen Varming / Ivan Mira
Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John
Group DLA / Shane Berry
VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne
LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton
Cundall / Iris ChanESD CONSULTANT
Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT
Design 5 / Alan CrokerHERITAGE CONSULTANT
Atlus Group / Jason FinnCOST PLANNING CONSULTANT
Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION
RM, TG
FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton
SECURITY CONSULTANT CLIENT:
A-6004
ABN: 46002722349
Sydney Opera House -Front of House Renewal
Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF
LIFT 36 PLANS L2 (+42), ROOF(+51) AND SECTION
1:50 @ A1
NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.
02.08.2016 A ISSUED FOR DA MB, TS, RM, RL
TG
July 2021
B
21.07.2021 B ISSUED FOR DA
ENTRY FOYER
X70
-300B1 +01
±0AHD
+600LC
+3,658GR +12
+6,400GM +21
+9,140L1 +30
+12,800L2 +42
+13,450L2A (Computation Level)
+15,540L3 +51
+17,440L3A (Computation Level)
+18,590L4 +61
FFL +13,100
2,43
944
03,
310
CO
RR
IDO
R 2
ENTRYFOYER
No brass lid to lift shaft.Subject to further advice
No ceiling to lift carRetain existing bronze canopy fascia
STOP L1
STOP L2
Structural concrete lift walls
PC2 PC2
Existing A/C duct. Indicative only
TPC1
PBP
New slab to JST Dock
Lift carriage
LIFT36
1.107CORRIDOR 2
JST SOUTHERNFOYER
2,40
0LI
FT C
AR
LIFT 36
3A
-600
4
NO BRONZE LID TO LIFTSHAFT SUBJECT TOFURTHER ADVICE
BR4XCPC1
LINE OF GLASS
RETAIN EXTERNAL FASCIA OFEXISTING BRONZE CANOPY
NEW BRONZE CANOPY TOMATCH EXISTING CANOPYDETAILS
NO CEILING TO LIFT CAR
EXISTING CONCRETESTRUCTURE OVER STAIRS
JST SOUTHERN FOYER
PODIUM
FFL +13,100
XPC1
GL
DL2-01
3A
-600
4
3A
-600
4
GL1GL1
XGL
2L.36LIFT 36
JST SOUTHERN FOYER
PODIUM
3 LIFT 36 SECTION1:50
2 PROPPOSED LIFT 36 LEVEL 3 PLAN1:50
1 PROPPOSED LIFT 36 LEVEL 2 PLAN1:50
1:100 @ A3
DRAWING TITLE
REV
SCALES
PROJECT NO : 15031DRAWING NO
DRAWN BY
CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS
EMAIL [email protected]
117 Reservoir Street
P: (02) 9215 4900
ARCHITECTPROJECT :
F: (02) 9215 4901
PHASE
SOH Trust
DA
Phone: 0452 527 490 John CollinsEmail: [email protected]
WEB www.tzg.com.au
DATE
MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES
ELECTRICAL ENGINEER
STRUCTURAL ENGINEER
BCA/PCA CONSULTANT
Steensen Varming / Ivan Mira
Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John
Group DLA / Shane Berry
VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne
LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton
Cundall / Iris ChanESD CONSULTANT
Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT
Design 5 / Alan CrokerHERITAGE CONSULTANT
Atlus Group / Jason FinnCOST PLANNING CONSULTANT
Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION
RM, TG
FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton
SECURITY CONSULTANT CLIENT:
A-9001
ABN: 46002722349
Sydney Opera House -Front of House Renewal
Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF
FINISHES + PRODUCTINFORMATION
@ A3
NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.
MB, TS, RM, RL
B
July 2021
02.08.2016 A ISSUED FOR DA21.07.2021 B ISSUED FOR DA
0999 ENTRY CORRIDOR A0306 INTERNAL MATERIALS FINISHES SCHEDULE
Ref.Code
General Description Detailed / Proprietary Description Indicative Location Rev
WTI TILINGWTI-01 Wall Tile Academy Unglazed straight edge KK 47 OP
Code: 11151Tile size: 50 x 50 including joint spacingColour: off whiteLay: gridJoint Spacing: 3mmPattern lay: refer to plansGrout: Ardex (epoxy) Colour to be advisedSubstrate: Levelling screed as required. Grade to waste.
WTM TIMBERWTM-02 Timber - Brush Box Existing Brush Box timber panels.
New panel breakup constructed from existing Nom. 20mm x 20mm thick laminated strip.Seal Coat: PST-01
Box Office
WTM-04 Timber - Brush Box to match existing
New brush box panels. 20mm thk laminations of Brushbox in 3 different panel sizes, some with 20mm gaps. Black Mesh backing and timber finish all to match existing.Seal coat: PST-01Refer A5216 for details for panel types
Entry Corridor
CEX EXISTING CEILINGCEX-01 Existing exposed painted concrete ceiling.
Finish: Refer to Applied Finishes section - PPF-04
CNC No Ceiling
eCNC Existing No Ceiling
CPB-02 Plasterboard - Standard Gyprock or similar approved Flush Plasterboard - standard paperfaced - 13mm thick square set unless noted otherwise.Suspension: Rondo to suitPaint finish: Refer to Applied Finishes section
CPB-12 Plasterboard - Acoustic Perforated
Gyprock or similar approved Flush Plasterboard - Rigitone Galaxy acoustic perforated - 13mm thick square set unless noted otherwise.Suspension: Rondo to suitPaint finish: Refer to Applied Finishes section
CPB-13 Plasterboard - Moisture Resistant
Gyprock or similar approved Flush Plasterboard - 13mm thick square set unless noted otherwise.Suspension: Rondo to suitPaint finish: Refer to Applied Finishes section
CTV-01A Timber Veneer - New custom formed perforated to match existing
Straight and curved plywood panels with veneer overlay to seen face.Veneer: select grade white birch rotary cut Size: size, radius, perforation & thickness to match existing 'wobbly' panels.Backing: black metal flywire to match existingAcoustic batts: black - density & thickness to Acoustic Specification) Finish: Refer to Applied Finishes Section - PST-01 Fixing: concealed suspension
Office
CRN RENDER
armarchitecture.com.auL:\0999 SOH Concert Hall\0999 Filing\10 ARM\13 Schedules\A0306_Internal Materials & Finishes Schedule - Additional Works\A0306(-)-A4~INTERNAL MATERIALS & FINISHES LEGEND -
ENTRY CORRIDOR.xlsx4 OF 8
0999 ENTRY CORRIDOR A0306 INTERNAL MATERIALS FINISHES SCHEDULE
Ref.Code
General Description Detailed / Proprietary Description Indicative Location Rev
WTI TILINGWTI-01 Wall Tile Academy Unglazed straight edge KK 47 OP
Code: 11151Tile size: 50 x 50 including joint spacingColour: off whiteLay: gridJoint Spacing: 3mmPattern lay: refer to plansGrout: Ardex (epoxy) Colour to be advisedSubstrate: Levelling screed as required. Grade to waste.
WTM TIMBERWTM-02 Timber - Brush Box Existing Brush Box timber panels.
New panel breakup constructed from existing Nom. 20mm x 20mm thick laminated strip.Seal Coat: PST-01
Box Office
WTM-04 Timber - Brush Box to match existing
New brush box panels. 20mm thk laminations of Brushbox in 3 different panel sizes, some with 20mm gaps. Black Mesh backing and timber finish all to match existing.Seal coat: PST-01Refer A5216 for details for panel types
Entry Corridor
CEX EXISTING CEILINGCEX-01 Existing exposed painted concrete ceiling.
Finish: Refer to Applied Finishes section - PPF-04
CNC No Ceiling
eCNC Existing No Ceiling
CPB-02 Plasterboard - Standard Gyprock or similar approved Flush Plasterboard - standard paperfaced - 13mm thick square set unless noted otherwise.Suspension: Rondo to suitPaint finish: Refer to Applied Finishes section
CPB-12 Plasterboard - Acoustic Perforated
Gyprock or similar approved Flush Plasterboard - Rigitone Galaxy acoustic perforated - 13mm thick square set unless noted otherwise.Suspension: Rondo to suitPaint finish: Refer to Applied Finishes section
CPB-13 Plasterboard - Moisture Resistant
Gyprock or similar approved Flush Plasterboard - 13mm thick square set unless noted otherwise.Suspension: Rondo to suitPaint finish: Refer to Applied Finishes section
CTV-01A Timber Veneer - New custom formed perforated to match existing
Straight and curved plywood panels with veneer overlay to seen face.Veneer: select grade white birch rotary cut Size: size, radius, perforation & thickness to match existing 'wobbly' panels.Backing: black metal flywire to match existingAcoustic batts: black - density & thickness to Acoustic Specification) Finish: Refer to Applied Finishes Section - PST-01 Fixing: concealed suspension
Office
CRN RENDER
armarchitecture.com.auL:\0999 SOH Concert Hall\0999 Filing\10 ARM\13 Schedules\A0306_Internal Materials & Finishes Schedule - Additional Works\A0306(-)-A4~INTERNAL MATERIALS & FINISHES LEGEND -
ENTRY CORRIDOR.xlsx4 OF 8
0999 ENTRY CORRIDOR A0306 INTERNAL MATERIALS FINISHES SCHEDULE
Ref.Code
General Description Detailed / Proprietary Description Indicative Location Rev
WTI TILINGWTI-01 Wall Tile Academy Unglazed straight edge KK 47 OP
Code: 11151Tile size: 50 x 50 including joint spacingColour: off whiteLay: gridJoint Spacing: 3mmPattern lay: refer to plansGrout: Ardex (epoxy) Colour to be advisedSubstrate: Levelling screed as required. Grade to waste.
WTM TIMBERWTM-02 Timber - Brush Box Existing Brush Box timber panels.
New panel breakup constructed from existing Nom. 20mm x 20mm thick laminated strip.Seal Coat: PST-01
Box Office
WTM-04 Timber - Brush Box to match existing
New brush box panels. 20mm thk laminations of Brushbox in 3 different panel sizes, some with 20mm gaps. Black Mesh backing and timber finish all to match existing.Seal coat: PST-01Refer A5216 for details for panel types
Entry Corridor
CEX EXISTING CEILINGCEX-01 Existing exposed painted concrete ceiling.
Finish: Refer to Applied Finishes section - PPF-04
CNC No Ceiling
eCNC Existing No Ceiling
CPB-02 Plasterboard - Standard Gyprock or similar approved Flush Plasterboard - standard paperfaced - 13mm thick square set unless noted otherwise.Suspension: Rondo to suitPaint finish: Refer to Applied Finishes section
CPB-12 Plasterboard - Acoustic Perforated
Gyprock or similar approved Flush Plasterboard - Rigitone Galaxy acoustic perforated - 13mm thick square set unless noted otherwise.Suspension: Rondo to suitPaint finish: Refer to Applied Finishes section
CPB-13 Plasterboard - Moisture Resistant
Gyprock or similar approved Flush Plasterboard - 13mm thick square set unless noted otherwise.Suspension: Rondo to suitPaint finish: Refer to Applied Finishes section
CTV-01A Timber Veneer - New custom formed perforated to match existing
Straight and curved plywood panels with veneer overlay to seen face.Veneer: select grade white birch rotary cut Size: size, radius, perforation & thickness to match existing 'wobbly' panels.Backing: black metal flywire to match existingAcoustic batts: black - density & thickness to Acoustic Specification) Finish: Refer to Applied Finishes Section - PST-01 Fixing: concealed suspension
Office
CRN RENDER
armarchitecture.com.auL:\0999 SOH Concert Hall\0999 Filing\10 ARM\13 Schedules\A0306_Internal Materials & Finishes Schedule - Additional Works\A0306(-)-A4~INTERNAL MATERIALS & FINISHES LEGEND -
ENTRY CORRIDOR.xlsx4 OF 8
0999 ENTRY CORRIDOR A0306 INTERNAL MATERIALS FINISHES SCHEDULE
Ref.Code
General Description Detailed / Proprietary Description Indicative Location Rev
CRN-01 Render - Concrete Parchem Construction Products Renderoc FCFinish coat: clear water based sealer Durafloor HD System.
Corridor, lobbies
JBS-01 Banquet Seat Joinery Banquet Seat- finishes to match bench seat in Box Office Foyerseat - refer MMA-01- refer also WMC-01
Amenities Lobby
JBT-01 Timber Benchtop Brush-box timber benchtop 30mm thickness, nom. 20mm x 20mm thick laminated stripsPencil-round lead-edges at top and bottom. Seal Coat: PST-01Note: 10mm shadow-gap to underbench joinery
Office
JTV-01 Navlam Sand Blasted Beechwood compact veneer laminate seen faces. White melamine all internal faces.Edge Trim: Nav Diverso ABS Edgebanding - Lamora Oak Ply
Office overhead joinery
JTV-01a Navlam Sand Blasted Black Pearl compact veneer laminate seen faces. Black melamine all internal faces.Edge Trim: Nav Diverso ABS Edgebanding - Black PearlNavlam Sandblasted Black Pearl
Office underbench joinery & skirting
Unless otherwise noted- carcass construction 20mm MDF- end-panels 30mm MDF- benchtop construction 30mm Brush-box timber, 10mm shadowline detail to underbench joinery- overhead joinery; white melamine finish to all internal surfaces both faces- underbench joinery; black melamine finish to all internal surfaces both faces- 20mm shadowline detail to wall junctions & ceiling junctions
JMI MIRROR
JMI-10 Mirror Silver backed mirror with polished edges, frameless. Size: 600 wide x 1000 high Mounting board : Astral Marine Plywood A-C grade 12mm thick
Adult Change
J. JOINERY
JIT Joinery Item
GENERAL NOTE
armarchitecture.com.auL:\0999 SOH Concert Hall\0999 Filing\10 ARM\13 Schedules\A0306_Internal Materials & Finishes Schedule - Additional Works\A0306(-)-A4~INTERNAL MATERIALS & FINISHES LEGEND -
ENTRY CORRIDOR.xlsx5 OF 8
0999 ENTRY CORRIDOR A0306 INTERNAL MATERIALS FINISHES SCHEDULE
Ref.Code
General Description Detailed / Proprietary Description Indicative Location Rev
JPB PINBOARD
JPB-01 Pinboard Forbo Bulletin Board Size: 600w x 2000h x 6mm thickColour: 2209 black oliveNOTE: mount to 8mm MDF backing board with thin profile black anodised aluminium L section. Float mount 6mm
Office
MMA MISCELLANEOUS MATERIAL
MMA-01 Miscellaneous Material - Seating Fabric
Macquarie Textiles 100% Wool Custom commertial upholstery SOH Colour: Purple & JetBasecloth Number: 7689
Amenities Lobby
BFH Fire Hydrant Refer to Fire Consultants drawingsBFR Fire Hose Reel Refer to Fire Consultants drawings
PPF-02 Paint - Acrylic Low Sheen for Plasterboard Walls
Dulux Wash n Wear Advance Low Sheen on plasterboard New InteriorSpec Sheet Code: AUSD0002
PPF-02a Colour Code: (light)PPF-02b Colour Code: (dark)
PPF-03 Paint - Acrylic Semi Gloss for plasterboard walls & ceiling
Dulux Wash n Wear Kitchen & Bathroom Semi Gloss on Plasterboard New InteriorSpec Sheet Code: AUSD4848
PPF-03a Colour Code: (light)PPF-03b Colour Code: (dark)
PPF-04 Paint - Acrylic Low Sheen for Concrete Blockwork Walls, Insitu & Precast Concrete & Fibre Cement Sheet
Dulux Low Sheen Acrylic PremiumSpec Sheet Code: AUSD3284
PPF-04a Colour Code: (light)PPF-04b Colour Code: (dark)
PPF-10 Paint - Acrylic Flat Plasterboard Ceilings
Dulux Professional Enviro02 Tintable Ceiling Flat on Plasterboard New InteriorSpec Sheet Code: AUSD4308
PPF-10a Colour Code: (light)PPF-10b Colour Code: (dark)
INTERIORP. APPLIED FINISHES
B. BUILDING SERVICES
M. MISCELLANEOUS FIXTURES & FITTINGS
armarchitecture.com.auL:\0999 SOH Concert Hall\0999 Filing\10 ARM\13 Schedules\A0306_Internal Materials & Finishes Schedule - Additional Works\A0306(-)-A4~INTERNAL MATERIALS & FINISHES LEGEND -
ENTRY CORRIDOR.xlsx6 OF 8
0999 ENTRY CORRIDOR A0306 INTERNAL MATERIALS FINISHES SCHEDULE
Ref.Code
General Description Detailed / Proprietary Description Indicative Location Rev
PPF-15 Paint - Wash & Wear Matt on New Plywood
Dulux Wash & Wear Matt on New Plywood New InteriorSpec Sheet Code: AUSD12531
PPF-15a Colour Code: (light)PPF-15b Colour Code: (dark)
PPF-20 Paint - Enamel Gloss Timber Doors/Windows/Trim
Dulux Super Enamel Gloss/Professional oil undercoat for Timber New InteriorSpecification Sheet Code: AUSD4603
PPF-20a Colour Code: (light)PPF-20b Colour Code: (dark)
PPF-30 Paint - Enamel Gloss New Metal Pre-primed Metal Doors & Pressed Metal Frames
Dulux Super Enamel Gloss/Professional oil undercoat for Metal New InteriorSpecification Sheet Code: AUSD4603
PPF-30a Colour Code: (light)PPF-30b Colour Code: (dark)PPF-31 Paint - Enamel Gloss
New Metal Canopy & Column Trim
Akzonobel International Paints Semi Gloss Paint SystemIntercure 200 with Interthane 990 topcoatData Sheet Code: 130614-BMUTIM-17C1/4
PPF-31a Colour Code: (light)PPF-31b Colour Code: (dark)
PPO-01 Powdercoat Dulux Duralloy (select colour)PPO-02 Powdercoat Dulux Duralloy (select colour)
PSR-10 Slip Resistant Coating - concrete
Sika Sikaflor 264T - 3 COAT SYSTEM 45 MESH FINISHRefer to Sika Data SheetSlip rating: R11 Colour: window grey
PST-01 Seal System - timber Mirotone Clear Coat Seal Sealer: Mirotec WB 8022 Clear SealerTopcoat: Mirotec WB 8052/30 Clear Satin (2 coats)Refer to Mirotone Data Sheet for full preparation & application detail Builder to supply samples of both Matt & Satin finishes to Architect for approval
timber panelling
armarchitecture.com.auL:\0999 SOH Concert Hall\0999 Filing\10 ARM\13 Schedules\A0306_Internal Materials & Finishes Schedule - Additional Works\A0306(-)-A4~INTERNAL MATERIALS & FINISHES LEGEND -
ENTRY CORRIDOR.xlsx7 OF 8
Schedule of FinishesProject name: SOH Box Office RetailProject number: 1905Revision: Date: Description:
A 14.10.2019 Issue for Tender
code opt. qty description indicative location supplier specification indicative image comments revFINISHES
AC-01 Acrylic POS counter / Fixed Spinner Units
All PlasticsVic KalloghlianT: 02 8038 2000
spec: Acrylic Cleardims: 2440 x1220 x 3mmcolour: clear
A
AC-02 Acrylic Low Table DisplaysAll PlasticsVic KalloghlianT: 02 8038 2000
spec: Acrylic Cleardims: 2440 x1220 x 6mmcolour: clear
A
CR-01 Corian Top shelf of low height table displays
CASFRachel Polidano T: 02 8869 6106
spec: Coriandims: 1828 x 760 x 12mm3658 x 760 x 12mm2745 x 760 x 12mm910 x 760 x 12mmcolour: Summit White (B)
A
GL-01 Toughened Glass Secured Storage cabinet Doors
CONTRACTOR spec: Toughened glassdims: TH 6mm
A
LAM-01 Laminate Internal drawers and cuboards
LAMINEXDoug WilsonT: 0408 331 006
colour: Greycode: TBCfinish: Absolute matte finish
A
LAM-02 Laminate Fixed Spinner UnitsLaminexDoug WilsonT: 0408 331 006
colour: Whitecode: 200 finish: absolute matte finish
A
MT-01 Specialty Bronze Patina Finish
BRONZEWORKSCREATIVE METALST: 02 9319 6331 [email protected]
spec: All brass finishes and fixtures to be finished in Sydney Opera House Bronze special finish by Creative Metals only.
NO SUBSTITUTE ACCEPTED
* Creative Metals to provide finished sample for SOH and designer approval.
A
Schedule of FinishesProject name: SOH Box Office RetailProject number: 1905Revision: Date: Description:
A 14.10.2019 Issue for Tender
code opt. qty description indicative location supplier specification indicative image comments revFINISHES
AC-01 Acrylic POS counter / Fixed Spinner Units
All PlasticsVic KalloghlianT: 02 8038 2000
spec: Acrylic Cleardims: 2440 x1220 x 3mmcolour: clear
A
AC-02 Acrylic Low Table DisplaysAll PlasticsVic KalloghlianT: 02 8038 2000
spec: Acrylic Cleardims: 2440 x1220 x 6mmcolour: clear
A
CR-01 Corian Top shelf of low height table displays
CASFRachel Polidano T: 02 8869 6106
spec: Coriandims: 1828 x 760 x 12mm3658 x 760 x 12mm2745 x 760 x 12mm910 x 760 x 12mmcolour: Summit White (B)
A
GL-01 Toughened Glass Secured Storage cabinet Doors
CONTRACTOR spec: Toughened glassdims: TH 6mm
A
LAM-01 Laminate Internal drawers and cuboards
LAMINEXDoug WilsonT: 0408 331 006
colour: Greycode: TBCfinish: Absolute matte finish
A
LAM-02 Laminate Fixed Spinner UnitsLaminexDoug WilsonT: 0408 331 006
colour: Whitecode: 200 finish: absolute matte finish
A
MT-01 Specialty Bronze Patina Finish
BRONZEWORKSCREATIVE METALST: 02 9319 6331 [email protected]
spec: All brass finishes and fixtures to be finished in Sydney Opera House Bronze special finish by Creative Metals only.
NO SUBSTITUTE ACCEPTED
* Creative Metals to provide finished sample for SOH and designer approval.
A
MT-02 Mesh Shopfront Door panels SPEC TBC - pending weight restrictions for panels A
MT-03 Brass Rod Display BoxesLow Display Tables
BRONZEWORKST: 03 9427 7157 [email protected]
spec: solid brass rodfinish: MT-01dims: DIA6 / 9 /4mm refer to drawingsinstall: Rod to be cleanly curved and spot welded where needed. Ensure clean finish. Refer to drawings.
A
MT-04 Brass Sheet POS Counter Pandor Display Skirtings
BRONZEWORKST: 03 9427 7157 [email protected]
spec: Brass sheetfinish: MT-01dims: various thicknesses Refer to drawingsfixing: Conceal fixed
A
Mt-05 Brass angle Watch DisplayTimber display boxes
BRONZEWORKST: 03 9427 7157 [email protected]
spec: Brass anglefinish: MT-01dims: various dims Refer to drawingsfixing: Conceal fixed
A
PC-01 Powdercoat - Bronze Folding Shopfront System
DULUXT: 03 8787 4500
range: Electrocode: 9068183Kcolour: medium bronzefinish: flat
A
PT-01 Magnetic paint Fixed Spinner Units RESENE
spec: Magnetic Magic application: must be spray appliedbase coat: Magnetic base coating, 2-3 coats for maximum magnetic strengthtop coat: Resene SpaceCote Low Sheen waterborne enamel, colour: TBC
A
TM-01 Solid Brushbox Timber ThroughoutBritton TimbersAnthony LongT: 02 8783 9900
spec: Solid Brushbox dims: Various thicknesses, refer to drawingsfinish: 2-pac clear PU coating 5%gloss, open grain.
* Joiner to provide finished sampl for SOH and designer approval.TM-01 & TM-02 to match
A
TM-02 Timber Veneer - Brushbox
Briggs VeneersHelen KerstensT: 02 9732 7888 or similar
spec: Brushbox veneercolour: medium dims: 2450mm x 1250mm x 0.6mmother lengths: 2750mm or 3010mmcut type: quarter cutmatching: slip matched
* Joiner to provide finished sampl for SOH and designer approval.TM-01 & TM-02 to match
A
MT-02 Mesh Shopfront Door panels SPEC TBC - pending weight restrictions for panels A
MT-03 Brass Rod Display BoxesLow Display Tables
BRONZEWORKST: 03 9427 7157 [email protected]
spec: solid brass rodfinish: MT-01dims: DIA6 / 9 /4mm refer to drawingsinstall: Rod to be cleanly curved and spot welded where needed. Ensure clean finish. Refer to drawings.
A
MT-04 Brass Sheet POS Counter Pandor Display Skirtings
BRONZEWORKST: 03 9427 7157 [email protected]
spec: Brass sheetfinish: MT-01dims: various thicknesses Refer to drawingsfixing: Conceal fixed
A
Mt-05 Brass angle Watch DisplayTimber display boxes
BRONZEWORKST: 03 9427 7157 [email protected]
spec: Brass anglefinish: MT-01dims: various dims Refer to drawingsfixing: Conceal fixed
A
PC-01 Powdercoat - Bronze Folding Shopfront System
DULUXT: 03 8787 4500
range: Electrocode: 9068183Kcolour: medium bronzefinish: flat
A
PT-01 Magnetic paint Fixed Spinner Units RESENE
spec: Magnetic Magic application: must be spray appliedbase coat: Magnetic base coating, 2-3 coats for maximum magnetic strengthtop coat: Resene SpaceCote Low Sheen waterborne enamel, colour: TBC
A
TM-01 Solid Brushbox Timber ThroughoutBritton TimbersAnthony LongT: 02 8783 9900
spec: Solid Brushbox dims: Various thicknesses, refer to drawingsfinish: 2-pac clear PU coating 5%gloss, open grain.
* Joiner to provide finished sampl for SOH and designer approval.TM-01 & TM-02 to match
A
TM-02 Timber Veneer - Brushbox
Briggs VeneersHelen KerstensT: 02 9732 7888 or similar
spec: Brushbox veneercolour: medium dims: 2450mm x 1250mm x 0.6mmother lengths: 2750mm or 3010mmcut type: quarter cutmatching: slip matched
* Joiner to provide finished sampl for SOH and designer approval.TM-01 & TM-02 to match
A
RETAIL FIXTURES / HARDWARE
FX-01 Xero L P/L profile Set - Electrified
Rear Wall adjustable shelving
MADE RETAIL SYSTEMSZoe LoughlinT: 0487 773 217
spec: Xero L P/L profile set - electrifieddims: Lengths - 1200/2400/3000mm cut down lengths to suit, refer to drawings.finish: Blackweight load: 100kg per 1000mm
A
FX-02 Xero L P/L Brackets for wooden shelf
Rear Wall adjustable shelving
MADE RETAIL SYSTEMSZoe LoughlinT: 0487 773 217
spec: Xero L P/L Brackets for wooden shelfwith single power adapter 24Vdims: D406mm - max display depth 380mfinish: .07 Khaki Bronceweight load: 25kg
A
FX-03 Brass rod T-Shirt DisplayPOS Wrapping
CONTRACTOR
spec: Brass tube finish: MT-01dims: refer to drawingsinstall: Rods fixed with recessed brass flange to side panels with flush small flat screws.
A
FX-04 Visplay Invisible Horizontal
Artwork Display Wall /Gondola & Fixed spinner units
MADE RETAIL SYSTEMSZoe LoughlinT: 0487 773 217
spec: Invisible 3 Profile for wooden panelsweight load: max weight load - 12kg per 625mm finish: natural anodised aluminium
A
FX-05 Castor Wheel Mobile cupboard unit TENTET: 1300 836 831
Joiner to advise best castor spec for weight of units
A
FX-06 Fixed adjustable foot Gondola and low display tables
CASTOR & INDUSTRIALT: 1800 074 633 or equal to
item: Fixed adjustable feetcode: AF41/40/M10/35finish: stainless steel / Black dims: dia40 x H55mm
A
FX-07 Shelf Bracket for Wooden shelf
Artwork Display WallBY JOINERDetails to be discussed with designer.
spec: Hanger Framedims: various sizes finish: Custom - Brushbox timber with solid hardware fixings Qty: Refer to Drawings
A
FX-08 Xero L P/L profile Set - Non Electrified
Gondola Adjustable shelving
MADE RETAIL SYSTEMSZoe LoughlinT: 0487 773 217
spec: Xero L P/L profile set - non-electrifieddims: Lengths - 1200/2400/3000mm cut down lengths to suit, refer to drawings.finish: .Blackweight load: 100kg per 1000mm
A
Schedule of FinishesProject name: SOH Box Office RetailProject number: 1905Revision: Date: Description:
A 14.10.2019 Issue for Tender
code opt. qty description indicative location supplier specification indicative image comments revFINISHES
AC-01 Acrylic POS counter / Fixed Spinner Units
All PlasticsVic KalloghlianT: 02 8038 2000
spec: Acrylic Cleardims: 2440 x1220 x 3mmcolour: clear
A
AC-02 Acrylic Low Table DisplaysAll PlasticsVic KalloghlianT: 02 8038 2000
spec: Acrylic Cleardims: 2440 x1220 x 6mmcolour: clear
A
CR-01 Corian Top shelf of low height table displays
CASFRachel Polidano T: 02 8869 6106
spec: Coriandims: 1828 x 760 x 12mm3658 x 760 x 12mm2745 x 760 x 12mm910 x 760 x 12mmcolour: Summit White (B)
A
GL-01 Toughened Glass Secured Storage cabinet Doors
CONTRACTOR spec: Toughened glassdims: TH 6mm
A
LAM-01 Laminate Internal drawers and cuboards
LAMINEXDoug WilsonT: 0408 331 006
colour: Greycode: TBCfinish: Absolute matte finish
A
LAM-02 Laminate Fixed Spinner UnitsLaminexDoug WilsonT: 0408 331 006
colour: Whitecode: 200 finish: absolute matte finish
A
MT-01 Specialty Bronze Patina Finish
BRONZEWORKSCREATIVE METALST: 02 9319 6331 [email protected]
spec: All brass finishes and fixtures to be finished in Sydney Opera House Bronze special finish by Creative Metals only.
NO SUBSTITUTE ACCEPTED
* Creative Metals to provide finished sample for SOH and designer approval.
A
Schedule of FinishesProject name: SOH Box Office RetailProject number: 1905Revision: Date: Description:
A 14.10.2019 Issue for Tender
code opt. qty description indicative location supplier specification indicative image comments revFINISHES
AC-01 Acrylic POS counter / Fixed Spinner Units
All PlasticsVic KalloghlianT: 02 8038 2000
spec: Acrylic Cleardims: 2440 x1220 x 3mmcolour: clear
A
AC-02 Acrylic Low Table DisplaysAll PlasticsVic KalloghlianT: 02 8038 2000
spec: Acrylic Cleardims: 2440 x1220 x 6mmcolour: clear
A
CR-01 Corian Top shelf of low height table displays
CASFRachel Polidano T: 02 8869 6106
spec: Coriandims: 1828 x 760 x 12mm3658 x 760 x 12mm2745 x 760 x 12mm910 x 760 x 12mmcolour: Summit White (B)
A
GL-01 Toughened Glass Secured Storage cabinet Doors
CONTRACTOR spec: Toughened glassdims: TH 6mm
A
LAM-01 Laminate Internal drawers and cuboards
LAMINEXDoug WilsonT: 0408 331 006
colour: Greycode: TBCfinish: Absolute matte finish
A
LAM-02 Laminate Fixed Spinner UnitsLaminexDoug WilsonT: 0408 331 006
colour: Whitecode: 200 finish: absolute matte finish
A
MT-01 Specialty Bronze Patina Finish
BRONZEWORKSCREATIVE METALST: 02 9319 6331 [email protected]
spec: All brass finishes and fixtures to be finished in Sydney Opera House Bronze special finish by Creative Metals only.
NO SUBSTITUTE ACCEPTED
* Creative Metals to provide finished sample for SOH and designer approval.
A
MT-02 Mesh Shopfront Door panels SPEC TBC - pending weight restrictions for panels A
MT-03 Brass Rod Display BoxesLow Display Tables
BRONZEWORKST: 03 9427 7157 [email protected]
spec: solid brass rodfinish: MT-01dims: DIA6 / 9 /4mm refer to drawingsinstall: Rod to be cleanly curved and spot welded where needed. Ensure clean finish. Refer to drawings.
A
MT-04 Brass Sheet POS Counter Pandor Display Skirtings
BRONZEWORKST: 03 9427 7157 [email protected]
spec: Brass sheetfinish: MT-01dims: various thicknesses Refer to drawingsfixing: Conceal fixed
A
Mt-05 Brass angle Watch DisplayTimber display boxes
BRONZEWORKST: 03 9427 7157 [email protected]
spec: Brass anglefinish: MT-01dims: various dims Refer to drawingsfixing: Conceal fixed
A
PC-01 Powdercoat - Bronze Folding Shopfront System
DULUXT: 03 8787 4500
range: Electrocode: 9068183Kcolour: medium bronzefinish: flat
A
PT-01 Magnetic paint Fixed Spinner Units RESENE
spec: Magnetic Magic application: must be spray appliedbase coat: Magnetic base coating, 2-3 coats for maximum magnetic strengthtop coat: Resene SpaceCote Low Sheen waterborne enamel, colour: TBC
A
TM-01 Solid Brushbox Timber ThroughoutBritton TimbersAnthony LongT: 02 8783 9900
spec: Solid Brushbox dims: Various thicknesses, refer to drawingsfinish: 2-pac clear PU coating 5%gloss, open grain.
* Joiner to provide finished sampl for SOH and designer approval.TM-01 & TM-02 to match
A
TM-02 Timber Veneer - Brushbox
Briggs VeneersHelen KerstensT: 02 9732 7888 or similar
spec: Brushbox veneercolour: medium dims: 2450mm x 1250mm x 0.6mmother lengths: 2750mm or 3010mmcut type: quarter cutmatching: slip matched
* Joiner to provide finished sampl for SOH and designer approval.TM-01 & TM-02 to match
A
MT-02 Mesh Shopfront Door panels SPEC TBC - pending weight restrictions for panels A
MT-03 Brass Rod Display BoxesLow Display Tables
BRONZEWORKST: 03 9427 7157 [email protected]
spec: solid brass rodfinish: MT-01dims: DIA6 / 9 /4mm refer to drawingsinstall: Rod to be cleanly curved and spot welded where needed. Ensure clean finish. Refer to drawings.
A
MT-04 Brass Sheet POS Counter Pandor Display Skirtings
BRONZEWORKST: 03 9427 7157 [email protected]
spec: Brass sheetfinish: MT-01dims: various thicknesses Refer to drawingsfixing: Conceal fixed
A
Mt-05 Brass angle Watch DisplayTimber display boxes
BRONZEWORKST: 03 9427 7157 [email protected]
spec: Brass anglefinish: MT-01dims: various dims Refer to drawingsfixing: Conceal fixed
A
PC-01 Powdercoat - Bronze Folding Shopfront System
DULUXT: 03 8787 4500
range: Electrocode: 9068183Kcolour: medium bronzefinish: flat
A
PT-01 Magnetic paint Fixed Spinner Units RESENE
spec: Magnetic Magic application: must be spray appliedbase coat: Magnetic base coating, 2-3 coats for maximum magnetic strengthtop coat: Resene SpaceCote Low Sheen waterborne enamel, colour: TBC
A
TM-01 Solid Brushbox Timber ThroughoutBritton TimbersAnthony LongT: 02 8783 9900
spec: Solid Brushbox dims: Various thicknesses, refer to drawingsfinish: 2-pac clear PU coating 5%gloss, open grain.
* Joiner to provide finished sampl for SOH and designer approval.TM-01 & TM-02 to match
A
TM-02 Timber Veneer - Brushbox
Briggs VeneersHelen KerstensT: 02 9732 7888 or similar
spec: Brushbox veneercolour: medium dims: 2450mm x 1250mm x 0.6mmother lengths: 2750mm or 3010mmcut type: quarter cutmatching: slip matched
* Joiner to provide finished sampl for SOH and designer approval.TM-01 & TM-02 to match
A
RETAIL FIXTURES / HARDWARE
FX-01 Xero L P/L profile Set - Electrified
Rear Wall adjustable shelving
MADE RETAIL SYSTEMSZoe LoughlinT: 0487 773 217
spec: Xero L P/L profile set - electrifieddims: Lengths - 1200/2400/3000mm cut down lengths to suit, refer to drawings.finish: Blackweight load: 100kg per 1000mm
A
FX-02 Xero L P/L Brackets for wooden shelf
Rear Wall adjustable shelving
MADE RETAIL SYSTEMSZoe LoughlinT: 0487 773 217
spec: Xero L P/L Brackets for wooden shelfwith single power adapter 24Vdims: D406mm - max display depth 380mfinish: .07 Khaki Bronceweight load: 25kg
A
FX-03 Brass rod T-Shirt DisplayPOS Wrapping
CONTRACTOR
spec: Brass tube finish: MT-01dims: refer to drawingsinstall: Rods fixed with recessed brass flange to side panels with flush small flat screws.
A
FX-04 Visplay Invisible Horizontal
Artwork Display Wall /Gondola & Fixed spinner units
MADE RETAIL SYSTEMSZoe LoughlinT: 0487 773 217
spec: Invisible 3 Profile for wooden panelsweight load: max weight load - 12kg per 625mm finish: natural anodised aluminium
A
FX-05 Castor Wheel Mobile cupboard unit TENTET: 1300 836 831
Joiner to advise best castor spec for weight of units
A
FX-06 Fixed adjustable foot Gondola and low display tables
CASTOR & INDUSTRIALT: 1800 074 633 or equal to
item: Fixed adjustable feetcode: AF41/40/M10/35finish: stainless steel / Black dims: dia40 x H55mm
A
FX-07 Shelf Bracket for Wooden shelf
Artwork Display WallBY JOINERDetails to be discussed with designer.
spec: Hanger Framedims: various sizes finish: Custom - Brushbox timber with solid hardware fixings Qty: Refer to Drawings
A
FX-08 Xero L P/L profile Set - Non Electrified
Gondola Adjustable shelving
MADE RETAIL SYSTEMSZoe LoughlinT: 0487 773 217
spec: Xero L P/L profile set - non-electrifieddims: Lengths - 1200/2400/3000mm cut down lengths to suit, refer to drawings.finish: .Blackweight load: 100kg per 1000mm
A
CEILING FINISH
XC- Existing pre-form concrete columns and walls
XC - Existing pre-form concrete beams.BR1 -
Brass plate to counter fronts withgradually darkened patina. Top ofbrass counter to be natural/ off themill brass colour, bottom to be pre-aged/ burnished brass colour
FLOOR FINISHES
XPC2 - Existing precast granite wall Panels (Cleaned and lightened)
XPC1 - Precast granite pavers with grout infill and brass screws for levelling. Resilient slip resistant compliant for external use.
XCPS- Existing Boarded Precast Concrete Strutural Walls Painted
XGLBF - North Wall Bronze framed double door, hinged entry door XFGL - Existing frosted glazing. Bathroomhingeddoors
DOORS
JOINERY FINISHES
PRODUCT INFORMATION
FURNITURE
Morosso Serpentine Lounge by Tom Dixon, amended to suitAS1428.2, upholstery: 'UNIFORM' Blueberry
SERVICES
XSC - Existing suspended aluminium service carriage by Steensen Varming. Emergency fire, sprinkler, speakers, security cameras, rigging points and lighting elements incorporated.
SC1, - New suspended aluminium service carriages to SC3 match existing.
WALL FINISHES
BT1 -
Acrylic solid surface, equal toMarblo Opal series, colour Ariel(cream white)
BR4 -
Pre-aged/ burnished brass plate tocounter fronts skirting.
ARM ARCHITECTURE FINISHES taken from drawing 49-BR-ARM01-A0306(4) fromARM Architecture's Construction Drawing Set
FIVE FOOT ONE FINISHES taken from drawing SOH Box Office Retail Schedule ofFinishes Revision A from Five Foot One's Tender Drawing Set