SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWAL …

13
DRAWING TITLE REV SCALES PROJECT NO : 15031 DRAWING NO DRAWN BY CHECKED TONKIN ZULAIKHA GREER ARCHITECTS EMAIL [email protected] 117 Reservoir Street P: (02) 9215 4900 ARCHITECT PROJECT : F: (02) 9215 4901 PHASE SOH Trust DA Phone: 0452 527 490 John Collins Email: [email protected] WEB www.tzg.com.au DATE MECHANICAL ENGINEER HYDRAULIC ENGINEER FIRE SERVICES ELECTRICAL ENGINEER STRUCTURAL ENGINEER BCA/PCA CONSULTANT Steensen Varming / Ivan Mira Aecom / Kheng Ip AECOM / Jonathan Onslow Warren Smith Partners / Stuart Sullivan Warren Smith Partners / Manu John Group DLA / Shane Berry VERTICAL TRANSPORT CONSULTANT NDY / Brendan Byrne LIGHTING ARCHITECT Steensen Varming / Ashleigh Bretherton Cundall / Iris Chan ESD CONSULTANT Group DLA / Elisa Moechtar ACCESSIBILITY CONSULTANT Design 5 / Alan Croker HERITAGE CONSULTANT Atlus Group / Jason Finn COST PLANNING CONSULTANT Arup / Shane Norton SECURITY CONSULTANT DATE REV DESCRIPTION RM, TG FIRE ENGINEER Arup / Alistair Morrison Arup / Shane Norton SECURITY CONSULTANT CLIENT: A-0000 ABN: 46002722349 Sydney Opera House - Front of House Renewal Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF COVER PAGE @ A1 NOTES: Do not scale off drawings. Use figured dimensions only. Report any discrepencies to the architect. These designs, plans, specifications and the copyright therein are the property of Tonkin Zulaikha Greer Architects Pty Ltd, and must not be reproduced or copied wholly or in part without written permission of Tonkin Zulaikha Greer Architects Pty Ltd. 02.08.2016 A ISSUED FOR DA MB, TS, RM, RL TG July 2021 B 21.07.2021 B ISSUED FOR DA ENTRY FOYER A 0000 GENERAL INFORMATION A 0100 DEMOLITION PLANS A 1000 GENERAL ARRANGEMENT PLANS A 2000 SECTIONS A 6000 STAIRS RAMPS LIFT & ESCALATORS A 9000 FINISHES + PRODUCT INFORMATION A-0000 A-0001 A-0101 A-1001 A-1002 A-1003 A-2001 A-2002 A-6001 A-6002 A-6003 A-6004 A-9001 COVER PAGE LOCATION PLAN (+30) DEMOLITION LEVEL 1 PLAN (+30) PROPOSED GROUND FLOOR PLAN (+12) PROPOSED LEVEL 1 PLAN (+30) PROPOSED LEVEL 2 PLAN (+42) WALL ELEVATIONS 01 WALL ELEVATIONS 02 UTZON ESCALATOR DETAIL PLANS UTZON ESCALATOR DETAIL SECTIONS PROPOSED LIFT 36 PLANS GR +21 AND L1 +30 LIFT 36 PLANS L2 (+42), ROOF (+51) AND SECTION FINISHES + PRODUCT INFORMATION Scale @ A1 1:250 1:100 1:100 1:100 1:100, 1:200 1:50 1:50 1:100 1:50 1:50 1:50 Code AC AC ACC ACR ADJ AF AFFL AFS AH AP1 AP2 AP3 AP4 AP5 AU AV BCT BG BIK BIN BIT BL BLD BLD1 BLD2 BLD3 BLP BLR BOL BR1 BR2 BR3 BR4 BR5 BR6 BRRP BT1 BT2 C CFC CFS CM CO2 CO2P COMMS COS CPT1 CPT2 CPT3 CRN CT CTF CTS CTV CTW CUR CUR 1 DB DP DS1 DS2 DW EF F F1 F1.5 F2 FB1 FC FE FFL FG FH FHR FM FRL FSL FW FWC FWC1 FWC2 FWC3 FX GCB GF GL Description Acrylic Air-Conditioning Accessible Acrylic Solid Surface Material Adjustable Shelf Access Floor Above Finished Floor Level AFS concrete paint finish Flush Access Panel Acoustic Panel No Finish Acoustic Panel, ceiling, perf. Metal Finish Acoustic Panel, ceiling, perf. Metal Finish Acoustic Panel No Finish Acoustic Panel, Felt Finish Acoustic Underlay Audio Visual Baby Change Table Glass balustrade Bike Racks Under sink garbage bin Bitumin Fair Faced Blockwork Roller Blinds Roller Blinds (Sunscreen) Roller Blinds (Block Out Blinds) Roller Blinds (Green Screen) Blockwork, paint finish Blockwork, reinforced Bollard Brass counterfronts, EF Brass counterfronts, SF Brass seat, UTS Bronze joinery, EF Bronze handrail, UTS Bronze handrail, CLC and FC Brickwork, Rendered and Painted Benchtop, Marblo Benchtop, Glass Concrete Compressed Fibre cement Concrete steel trowel finish Suspended Ceiling, Metal Class 2C Off form Concrete Class 2 Off form Concrete Paint Finish Communications Cupboard Check On Site Carpet, Entry Foyer Seating Carpet, Entry Foyer Ticketing Carpet, Theatre & Events Offices Concrete Render Cooktop Ceramic Floor Tiles Ceramic Skirting Ceiling Timber Veneer Ceramic Wall Tiles Curtains Felt Dividing Panel Curtain Colour backed glass Down Pipe Door stop - Floor mounted door stop Door stop - wall mounted door stop Dishwasher Extraction Fan Ceiling Mounted Fridge 60 FRL 90 FRL 120 FRL Floor Box, electrical+data Set Fibre Cement 6mm painted Fire extinguisher Finished Floor Level Façade Glazing Fire Hydrant Fire Hose Reel Floor Mat Fire Resistant Level Finshed Structural level Floor Waste Textured Felt-Brass Wall Felt Wall Covering, Entry Foyer Felt Wall Covering, Function Centre Felt Wall Covering, Creative Learning Centre Fixture Colour backed glass Frameless Glazing Glazing, brown tint Code GL1 GL2 GL3 GLBF GLBF1 GLBF2 GLBF3 GLMF1 GLMF2 GR1 GR2 GR3 H HD HJ HK HR HRM HRT HWU JP JPB KP LAM LAM M MA1 MB1 MCP MF MIR MLF MLO MM MPBP MPG MS MT MW OV PBF2 PBP PC1 PC2 PC3 PF PP PP1 PST PTD RF RF1 RFS RH RL RP RSK SAP SC1 SC2 SCDB SCI SCV SD1 SHS1 SKY SMC SNK SNKC SNKL SS TAP1 TAP2 TAP3 TF TF2 THR TI TIK TM TME TOW TP TP1 TPC TPC1 Description Glazing, clear Glazing, frosted Glazing, TerraGlaz Bronze-framed Glass Door, Hinge bronze-framed Glass Door, hinge bronze-framed Glass Door, sliding bronze-framed Glass Door, pivot steel-framed Glass Door, sliding (Wind-break) steel-framed Glass Wall, fixed (Wind-break) Grab Rail 1 - Accessible shower rail Grab Rail 2 - Accessible WC Grab Rail 3 - Ambulant WC Hydraulic riser Hand Dryer Horizontal Joints Hook - Coats Hanging Rail Handrail Metal Handrail Timber Hot Water Unit Joinery Pull Joinery Pin Board Kick Plate Laminate Laminate Finish Mechanical Riser Marblo Metal Balustrade Type 1 Metal Column, painted Metal Flashing Mirror Metal Louvre- Fixed Metal Operable Louvre Metal Mesh (stretched) Moisture Resistant Plasterboard Ceiling, paint finish Metal Pipe Rigging Stair Metal Metal Metal Windows, bronze-framed Oven 2 hour Fire Rated Plasterboard 13mm plasterboard Paint Finish Precast Granite, Paver Precast Granite, Wall Panel Precast Granite, Ceiling Panel Paint Finish 2 pack Polyurethane Paint Polyurethane Paint - High reflective black Timber Seal System Paper Towel Dispenser Resilient Finish Type CLC Resilient Finish Type EF Resiliant Flooring - Slip Resistant Rangehood Reduced Level Rigging Points Resilient Coved Skirting Suspended acoustic panels Services Carriage (light, sound, sprinkler) Services Carriage (light, sound, acoustic, rigging) SCI Door Distribution Board Solid core door internal Sprinkler Control Valve Soap Dispenser wall shelf Skylight Stretched Membrane Ceiling (Barrisol) Sink - kitchen Sink - Cleaner Sink - Laundry Stainless Steel Tapware, Washbasin Mixer, regular Tapware, Washbasin Mixer, accessible Tapware, Kitchen Sink Mixer Timber flooring Timber Sprung flooring Threshold Ramp max. 1 in 8 Tactile Indicators Ticketing/Information Kiosks Timber To Match Existing Top of wall Toilet partitions Timber Panel, Slatted, Brush Box GRC Precast Floor Tile, honed CLC GRC Precast Floor Tile, honed EF Code TPD TPH TR TS1 TS2 TSN1 TV1 TV2 UIO UR VJ WB1 WB2 WB3 WC1 WC2 WC3 WF WP1 WP2 WP3 WP4 WP5 WPB WTM X XAC XAP XB XBOL XBR XBS XC XCA XCP XCPS XCPT XCTF XD XDB XDP XEP XFB XFH XGL XGL1 XGL2 XGLBF XGLBF2 XHRM XMB XMB XMG XMS XP XP XPBP XPC1 XPC2 XPC3 XPF XPW XRP XSC XTB XTCW XTF XTF XTPC XTS XTS XTSK XTV1 XWF XWP YG Description Toilet partition doors Toilet Paper Holder Towel rail Terrazzo Stone Flooring Stone Tile Stair Nosing Type 1 Timber Veneer, Entry Foyer Timber Veneer, Creative Learning Centre Unless Indicated Otherwise Urinal Vertical Joints Wash Basin Type 1(normal) Wash Basin Type 2 accessible Wash Basin Type 3 (Trough Handwashing Kids) Water Closet (normal) Water Closet accessible Water Closet Ambulant Water Drinking Fountain Repurposed existing Wobbly Panel, operable Repurposed existing Wobbly Panel, operable and adjustable Repurposed existing Wobbly Panel, fixed Repurposed existing Wobbly Panel, integrated Repurposed existing Wobbly Panel, ceiling Wall Plasterboard Wall Timber Existing Existing AC Existing Acoustic Ceiling Panel Existing Architectural Bronze Existing Bollard Existing Bronze Element Existing Bench Seat Existing Concrete Existing Concrete with acoustic treatment Existing Concrete Painted (or Sealed) Existing Concrete Paint Finish, stripped Existing Carpet Existing Ceramic Tiles Existing Door to remain Existing Distribution Board Existing Downpipes Event Pit Floor Box, electrical+data Existing Fire Hydrant Existing Glazing, brown tint Existing Glazing, clear Existing Glazing, frosted Existing bronze-framed Glass Door, hinge Existing bronze-framed Glass Door, sliding Existing Handrail Metal Existing Metal Balustrade Existing Metal Balustrade Existing Metal Gate Existing Metal Stair Existing Painted Existing Painted Existing Plasterboad Painted Existing Precast Granite, Paver Existing Precast Granite, Wall Panel Existing Precast Granite, Ceiling Panel Existing External Painted Render Existing Potable Water Existing Rendered and Painted Existing Services Carriage (light, sound, sprinkler) Existing Timber Balustrade Existing Heritage Ceramic Tiles Existing Timber Floor Existing Timber Floor Existing GRC Precast Floor Tile, honed Existing Terrazzo Stone Flooring Existing Timber Stair Existing Skirting Existing Timber Veneer Existing Water Fountain Existing Wobbly Panel Yard Gully SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWAL ENTRY FOYER LEGEND DRAWING LIST

Transcript of SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWAL …

Page 1: SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWAL …

DRAWING TITLE

REV

SCALES

PROJECT NO : 15031DRAWING NO

DRAWN BY

CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS

EMAIL [email protected]

117 Reservoir Street

P: (02) 9215 4900

ARCHITECTPROJECT :

F: (02) 9215 4901

PHASE

SOH Trust

DA

Phone: 0452 527 490 John CollinsEmail: [email protected]

WEB www.tzg.com.au

DATE

MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES

ELECTRICAL ENGINEER

STRUCTURAL ENGINEER

BCA/PCA CONSULTANT

Steensen Varming / Ivan Mira

Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John

Group DLA / Shane Berry

VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne

LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton

Cundall / Iris ChanESD CONSULTANT

Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT

Design 5 / Alan CrokerHERITAGE CONSULTANT

Atlus Group / Jason FinnCOST PLANNING CONSULTANT

Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION

RM, TG

FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton

SECURITY CONSULTANT CLIENT:

A-0000

ABN: 46002722349

Sydney Opera House -Front of House Renewal

Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF

COVER PAGE

@ A1

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

02.08.2016 A ISSUED FOR DA MB, TS, RM, RL

TG

July 2021

B

21.07.2021 B ISSUED FOR DA

ENTRY FOYER

A 0000 GENERAL INFORMATION

A 0100 DEMOLITION PLANS

A 1000 GENERAL ARRANGEMENT PLANS

A 2000 SECTIONS

A 6000 STAIRS RAMPS LIFT & ESCALATORS

A 9000 FINISHES + PRODUCT INFORMATION

A-0000A-0001

A-0101

A-1001A-1002A-1003

A-2001A-2002

A-6001A-6002A-6003A-6004

A-9001

COVER PAGELOCATION PLAN (+30)

DEMOLITION LEVEL 1 PLAN (+30)

PROPOSED GROUND FLOOR PLAN (+12)PROPOSED LEVEL 1 PLAN (+30)PROPOSED LEVEL 2 PLAN (+42)

WALL ELEVATIONS 01WALL ELEVATIONS 02

UTZON ESCALATOR DETAIL PLANSUTZON ESCALATOR DETAIL SECTIONSPROPOSED LIFT 36 PLANS GR +21 AND L1 +30LIFT 36 PLANS L2 (+42), ROOF (+51) AND SECTION

FINISHES + PRODUCT INFORMATION

Scale @ A1

1:250

1:100

1:1001:1001:100, 1:200

1:501:50

1:1001:501:501:50

CodeACACACCACRADJAFAFFLAFSAHAP1AP2AP3AP4AP5AUAVBCTBGBIKBINBITBLBLDBLD1BLD2BLD3BLPBLRBOLBR1BR2BR3BR4BR5BR6BRRPBT1BT2CCFCCFSCMCO2CO2PCOMMSCOSCPT1CPT2CPT3CRNCTCTFCTSCTVCTWCURCUR 1DBDPDS1DS2DWEFFF1F1.5F2FB1FCFEFFLFGFHFHRFMFRLFSLFWFWCFWC1FWC2FWC3FXGCBGFGL

DescriptionAcrylicAir-ConditioningAccessibleAcrylic Solid Surface MaterialAdjustable ShelfAccess FloorAbove Finished Floor LevelAFS concrete paint finishFlush Access PanelAcoustic Panel No FinishAcoustic Panel, ceiling, perf. Metal FinishAcoustic Panel, ceiling, perf. Metal FinishAcoustic Panel No FinishAcoustic Panel, Felt FinishAcoustic UnderlayAudio VisualBaby Change TableGlass balustradeBike RacksUnder sink garbage binBituminFair Faced BlockworkRoller BlindsRoller Blinds (Sunscreen)Roller Blinds (Block Out Blinds)Roller Blinds (Green Screen)Blockwork, paint finishBlockwork, reinforcedBollardBrass counterfronts, EFBrass counterfronts, SFBrass seat, UTSBronze joinery, EFBronze handrail, UTSBronze handrail, CLC and FCBrickwork, Rendered and PaintedBenchtop, MarbloBenchtop, GlassConcreteCompressed Fibre cementConcrete steel trowel finishSuspended Ceiling, MetalClass 2C Off form ConcreteClass 2 Off form Concrete Paint FinishCommunications CupboardCheck On SiteCarpet, Entry Foyer SeatingCarpet, Entry Foyer TicketingCarpet, Theatre & Events OfficesConcrete RenderCooktopCeramic Floor TilesCeramic SkirtingCeiling Timber VeneerCeramic Wall TilesCurtainsFelt Dividing Panel CurtainColour backed glassDown PipeDoor stop - Floor mounted door stopDoor stop - wall mounted door stopDishwasherExtraction Fan Ceiling MountedFridge60 FRL90 FRL120 FRLFloor Box, electrical+dataSet Fibre Cement 6mm paintedFire extinguisherFinished Floor LevelFaçade GlazingFire HydrantFire Hose ReelFloor MatFire Resistant LevelFinshed Structural levelFloor WasteTextured Felt-Brass WallFelt Wall Covering, Entry FoyerFelt Wall Covering, Function CentreFelt Wall Covering, Creative Learning CentreFixtureColour backed glassFrameless GlazingGlazing, brown tint

CodeGL1GL2GL3GLBFGLBF1GLBF2GLBF3GLMF1GLMF2GR1GR2GR3HHDHJHKHRHRMHRTHWUJPJPBKPLAMLAMMMA1MB1MCPMFMIRMLFMLOMMMPBPMPGMSMTMWOVPBF2PBPPC1PC2PC3PFPPPP1PSTPTDRFRF1RFSRHRLRPRSKSAPSC1SC2SCDBSCISCVSD1SHS1SKYSMCSNKSNKCSNKLSSTAP1TAP2TAP3TFTF2THRTITIKTMTMETOWTPTP1TPCTPC1

DescriptionGlazing, clearGlazing, frostedGlazing, TerraGlazBronze-framed Glass Door, Hingebronze-framed Glass Door, hingebronze-framed Glass Door, slidingbronze-framed Glass Door, pivotsteel-framed Glass Door, sliding (Wind-break)steel-framed Glass Wall, fixed (Wind-break)Grab Rail 1 - Accessible shower railGrab Rail 2 - Accessible WCGrab Rail 3 - Ambulant WCHydraulic riserHand DryerHorizontal JointsHook - CoatsHanging RailHandrail MetalHandrail TimberHot Water UnitJoinery PullJoinery Pin BoardKick PlateLaminateLaminate FinishMechanical RiserMarbloMetal Balustrade Type 1Metal Column, paintedMetal FlashingMirrorMetal Louvre- FixedMetal Operable LouvreMetal Mesh (stretched)Moisture Resistant Plasterboard Ceiling, paint finishMetal Pipe RiggingStair MetalMetalMetal Windows, bronze-framedOven2 hour Fire Rated Plasterboard13mm plasterboard Paint FinishPrecast Granite, PaverPrecast Granite, Wall PanelPrecast Granite, Ceiling PanelPaint Finish2 pack Polyurethane PaintPolyurethane Paint - High reflective blackTimber Seal SystemPaper Towel DispenserResilient Finish Type CLCResilient Finish Type EFResiliant Flooring - Slip ResistantRangehoodReduced LevelRigging PointsResilient Coved SkirtingSuspended acoustic panelsServices Carriage (light, sound, sprinkler)Services Carriage (light, sound, acoustic, rigging)SCI Door Distribution BoardSolid core door internalSprinkler Control ValveSoap Dispenserwall shelfSkylightStretched Membrane Ceiling (Barrisol)Sink - kitchenSink - CleanerSink - LaundryStainless SteelTapware, Washbasin Mixer, regularTapware, Washbasin Mixer, accessibleTapware, Kitchen Sink MixerTimber flooringTimber Sprung flooringThreshold Ramp max. 1 in 8Tactile IndicatorsTicketing/Information KiosksTimberTo Match ExistingTop of wallToilet partitionsTimber Panel, Slatted, Brush BoxGRC Precast Floor Tile, honed CLCGRC Precast Floor Tile, honed EF

CodeTPDTPHTRTS1TS2TSN1TV1TV2UIOURVJWB1WB2WB3WC1WC2WC3WFWP1WP2WP3WP4WP5WPBWTMXXACXAPXBXBOLXBRXBSXCXCAXCPXCPSXCPTXCTFXDXDBXDPXEPXFBXFHXGLXGL1XGL2XGLBFXGLBF2XHRMXMBXMBXMGXMSXPXPXPBPXPC1XPC2XPC3XPFXPWXRPXSCXTBXTCWXTFXTFXTPCXTSXTSXTSKXTV1XWFXWPYG

DescriptionToilet partition doorsToilet Paper HolderTowel railTerrazzo Stone FlooringStone TileStair Nosing Type 1Timber Veneer, Entry FoyerTimber Veneer, Creative Learning CentreUnless Indicated OtherwiseUrinalVertical JointsWash Basin Type 1(normal)Wash Basin Type 2 accessibleWash Basin Type 3 (Trough Handwashing Kids)Water Closet (normal)Water Closet accessibleWater Closet AmbulantWater Drinking FountainRepurposed existing Wobbly Panel, operableRepurposed existing Wobbly Panel, operable and adjustableRepurposed existing Wobbly Panel, fixedRepurposed existing Wobbly Panel, integratedRepurposed existing Wobbly Panel, ceilingWall PlasterboardWall TimberExistingExisting ACExisting Acoustic Ceiling PanelExisting Architectural BronzeExisting BollardExisting Bronze ElementExisting Bench SeatExisting ConcreteExisting Concrete with acoustic treatmentExisting Concrete Painted (or Sealed)Existing Concrete Paint Finish, strippedExisting CarpetExisting Ceramic TilesExisting Door to remainExisting Distribution BoardExisting DownpipesEvent PitFloor Box, electrical+dataExisting Fire HydrantExisting Glazing, brown tintExisting Glazing, clearExisting Glazing, frostedExisting bronze-framed Glass Door, hingeExisting bronze-framed Glass Door, slidingExisting Handrail MetalExisting Metal BalustradeExisting Metal BalustradeExisting Metal GateExisting Metal StairExisting PaintedExisting PaintedExisting Plasterboad PaintedExisting Precast Granite, PaverExisting Precast Granite, Wall PanelExisting Precast Granite, Ceiling PanelExisting External Painted RenderExisting Potable WaterExisting Rendered and PaintedExisting Services Carriage (light, sound, sprinkler)Existing Timber BalustradeExisting Heritage Ceramic TilesExisting Timber FloorExisting Timber FloorExisting GRC Precast Floor Tile, honedExisting Terrazzo Stone FlooringExisting Timber StairExisting SkirtingExisting Timber VeneerExisting Water FountainExisting Wobbly PanelYard Gully

SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWALENTRY FOYER

LEGENDDRAWING LIST

Page 2: SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWAL …

DRAWING TITLE

REV

SCALES

PROJECT NO : 15031DRAWING NO

DRAWN BY

CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS

EMAIL [email protected]

117 Reservoir Street

P: (02) 9215 4900

ARCHITECTPROJECT :

F: (02) 9215 4901

PHASE

SOH Trust

DA

Phone: 0452 527 490 John CollinsEmail: [email protected]

WEB www.tzg.com.au

DATE

MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES

ELECTRICAL ENGINEER

STRUCTURAL ENGINEER

BCA/PCA CONSULTANT

Steensen Varming / Ivan Mira

Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John

Group DLA / Shane Berry

VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne

LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton

Cundall / Iris ChanESD CONSULTANT

Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT

Design 5 / Alan CrokerHERITAGE CONSULTANT

Atlus Group / Jason FinnCOST PLANNING CONSULTANT

Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION

RM, TG

FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton

SECURITY CONSULTANT CLIENT:

A-0001

ABN: 46002722349

Sydney Opera House -Front of House Renewal

Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF

LOCATION PLAN (+30)

1:250 @ A1

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

02.08.2016 A ISSUED FOR DA MB, TS, RM, RL

TG

July 2021

B

21.07.2021 B ISSUED FOR DA

ENTRY FOYER

N

X30

X30

X20

X20

X10

X10

Y50

Y50

X40

X40

X50

X50

X60

X60

X70

X70

X80

X80

Y40

Y40

Y30

Y30

Y20

Y20

Y10

Y10

Y00

Y00

X11

0X

110

X10

0X

100

X90

X90

X12

0X

120

X13

0X

130

X14

0X

140

X0

X0

LOCATION PLAN1:250

ENTRYFOYER

1:500 @ A3

Page 3: SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWAL …

DRAWING TITLE

REV

SCALES

PROJECT NO : 15031DRAWING NO

DRAWN BY

CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS

EMAIL [email protected]

117 Reservoir Street

P: (02) 9215 4900

ARCHITECTPROJECT :

F: (02) 9215 4901

PHASE

SOH Trust

DA

Phone: 0452 527 490 John CollinsEmail: [email protected]

WEB www.tzg.com.au

DATE

MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES

ELECTRICAL ENGINEER

STRUCTURAL ENGINEER

BCA/PCA CONSULTANT

Steensen Varming / Ivan Mira

Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John

Group DLA / Shane Berry

VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne

LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton

Cundall / Iris ChanESD CONSULTANT

Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT

Design 5 / Alan CrokerHERITAGE CONSULTANT

Atlus Group / Jason FinnCOST PLANNING CONSULTANT

Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION

RM, TG

FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton

SECURITY CONSULTANT CLIENT:

A-0101

ABN: 46002722349

Sydney Opera House -Front of House Renewal

Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF

DEMOLITION LEVEL 1 PLAN (+30)

1:100 @ A1

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

02.08.2016 A ISSUED FOR DA MB, TS, RM, RL

TG

July 2021

B

21.07.2021 B ISSUED FOR DA

ENTRY FOYER

XPC2

XPC2

XPC2

XC

XPC2

Cloak Room1526B

SOH Shop #11526H

Toilet1527F/1

F21527F/2

Lobby1527G

Toilet1527H/1

Box Office1527H/2

Box Office1527K/2

Store1527L/1

Office1527L/2

Office1527L/3

Office1527L/5

R31527L/7

Foyer1527P/1

Store1527Q

Corridor1527R/2

FOYER1557A/1

CLOAK ROOM1557B

CONTROL ROOMGM573J

1A-

6002

2A-6002

2A-6002

4A-2101

4A-2101

N

FFL +9140

3A

-600

43

A-6

004

XPC2

GEN.100ENTRY FOYERXPC1

LOBBY

1525/1KICTHENETTE

1525

/3U

TZO

N R

OO

M

1525/4LOBBY

1525/5STORE

1525A/1XPC1

1526AEAST FOYER

1526CFEMALEXTS1

1526D

1526EMALE

XTS1

1526F

1526HJDUCT

XC

1526K

1527AGREEN ROOM

1527DSERVERY

1527E/1GREEN ROOM KITCHEN

1527E/2STORE

1527E/3STORE

1527

F/3

F3

1527K/1PR#33

XC

1527NDUCT

1527PCENTRE FOYER

1527TCORRIDOR

1528BDUCT

1528C.1

1528C.3STORE

1528D/2STORE

1551GLOBBY

1551G.1STORE

1551H

1551J

1557AWEST FOYER

1557CFEMALEXTS1

1557DMALE

XTS11557GCORRIDOR

1557G/1CORRIDOR

1557KStore

1558AMAIN KITCHEN

1L.01LIFT 01

1L05LIFT SHAFT

1L15LIFT SHAFT

1L16Shaft

1L17LIFT SHAFT

<Floor Finish>

G573APLAYHOUSE

G573A/1PLAYHOUSE STAGE

G573U

GM573APR#13

GM573B

GM573CCONTROL ROOMXCPT

GM573D

GM573E

GM573FCONTROL ROOMXCPT

GM573H

GM573K

GM573VUPPER WINCH GRID

L1S154STAIR

L1S155Stair

L1S91STAIR

V29XC

V30XC

#14EXISTING PLANTROOMXC

1526GDUCT

GRS31JST STAIRXPC1

GS45CH STAIRXPC1

VOIDJST SCENERY ROOMXC

GS32GREEN RM STAIRXC

L1S64CH STAIRXPC1

L1S55JST STAIRXPC1

L15161

GM573GCORRIDOR

1527MBOX OFFICE

Y10

Y10

Y20

Y20

Y30

Y30

Y40

Y40

X80X80

X70X70

X60X60

X50X50

1 DEMOLITION LEVEL 1 FLOOR PLAN (+30)1:100

SCOPE OF ARM ARCHITECTURE

SCOPE OF FIVE FOOT ONE

1:200 @ A3

Page 4: SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWAL …

DRAWING TITLE

REV

SCALES

PROJECT NO : 15031DRAWING NO

DRAWN BY

CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS

EMAIL [email protected]

117 Reservoir Street

P: (02) 9215 4900

ARCHITECTPROJECT :

F: (02) 9215 4901

PHASE

SOH Trust

DA

Phone: 0452 527 490 John CollinsEmail: [email protected]

WEB www.tzg.com.au

DATE

MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES

ELECTRICAL ENGINEER

STRUCTURAL ENGINEER

BCA/PCA CONSULTANT

Steensen Varming / Ivan Mira

Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John

Group DLA / Shane Berry

VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne

LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton

Cundall / Iris ChanESD CONSULTANT

Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT

Design 5 / Alan CrokerHERITAGE CONSULTANT

Atlus Group / Jason FinnCOST PLANNING CONSULTANT

Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION

RM, TG

FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton

SECURITY CONSULTANT CLIENT:

A-1001

ABN: 46002722349

Sydney Opera House -Front of House Renewal

Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF

PROPOSED GROUND FLOORPLAN (+12)

1:100 @ A1

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

02.08.2016 A ISSUED FOR DA MB, TS, RM, RL

TG

July 2021

B

21.07.2021 B ISSUED FOR DA

ENTRY FOYER

2A-6001

+7,415

FFL +3,658

New doorDGR-02

WF

AP1

XPC2 XPC2

XPC2

XPC2

STA

GE

DO

OR

GL.36LIFT 365.14 m2

1A-

6002

1A-

6002

2A-6002

2A-6002

1

N

23

FFL +3,658

2A

-210

12

A-2

101

Reduced ceilingheight. Refer to 02/A4501 Section

G523ASTAFF FACILITIES

G523A/1LOBBY

G523BPANTRY

G523CMALE

G523D

G523JCORRIDORG524A

MALE

G524BG524D

G524EFEMALE

G524G

G525DSITE MANAGEMENT

G525E

G526ABDM (O&M)

G526BCORRIDOR

G527CORRIDOR

G528AOFFICE

G528A/1

G528BMEETING ROOM

G530LOCKER ROOM

G531FOH STAFF

G531/1STAIR

G532OFFICE

G532/1OFFICE

G533CORRIDORG534A

CENTRAL PASSAGE

G534BSTAGE DOOR

GS.205ESCALATOR

GRS31JST STAIR

G521ASET STORAGE AREA

G521A/1SET WORKSHOP

G521A/2OFFICE

G534A/1EQUIP RM

GD27DUCT

G522APR #08G522C

CORRIDOR

G522FOFFICE

G522GSTAIR

G525AEPRG

G525A/1CORRIDOR

G525BEPRG

G525COFFICE

G525C/1STAIR

LIFT 15SHAFT

G521A/T1WORKSHOP

G521BLIFT SHAFT

G522BTTS STAGING STORE

3A

-600

43

A-6

004

1

2

3

1 PROPOSED GROUND FLOOR PLAN (+12)1:100

1:200 @ A3

Double escalatorReplace existing stairs with new doubleescalator. COS width of void

Relocate Workshop door

1L36New public lift to Corridor 2. Access toGround Floor and Southern Foyers

Page 5: SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWAL …

DRAWING TITLE

REV

SCALES

PROJECT NO : 15031DRAWING NO

DRAWN BY

CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS

EMAIL [email protected]

117 Reservoir Street

P: (02) 9215 4900

ARCHITECTPROJECT :

F: (02) 9215 4901

PHASE

SOH Trust

DA

Phone: 0452 527 490 John CollinsEmail: [email protected]

WEB www.tzg.com.au

DATE

MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES

ELECTRICAL ENGINEER

STRUCTURAL ENGINEER

BCA/PCA CONSULTANT

Steensen Varming / Ivan Mira

Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John

Group DLA / Shane Berry

VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne

LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton

Cundall / Iris ChanESD CONSULTANT

Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT

Design 5 / Alan CrokerHERITAGE CONSULTANT

Atlus Group / Jason FinnCOST PLANNING CONSULTANT

Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION

RM, TG

FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton

SECURITY CONSULTANT CLIENT:

A-1002

ABN: 46002722349

Sydney Opera House -Front of House Renewal

Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF

PROPOSED LEVEL 1 PLAN (+30)

1:100 @ A1

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

02.08.2016 A ISSUED FOR DA MB, TS, RM, RL

TG

July 2021

B

21.07.2021 B ISSUED FOR DA

ENTRY FOYER

6.8m

FFL +9,140

E1

E02

E03

A-2002

C3

C2C4 A-2001

XCPS

XC

DL1-13

XCPS

XPC2

XPC2

XPC2

XPC2

XPC2

XPC2 XPC2

PC2

XPC2XPC2

XPC2

XPC2

XC

XPC2 PC2

ESCALATORSCONNECTINGUNDER THESTAIRS TO

UTZON ROOM

43 pax

ESCL

#7

ESCL

#8

Cloak Room1526B

Toilet1527F/1

Toilet1527H/1

FOYER1557A/1

CLOAK ROOM1557B

CONTROL ROOMGM573J

1A-

6002

2A-6002

2A-6002

DL1-12

4A-2101

4A-2101

2

1

3

14

10

7

4A-6001

2A-5001

3A

-600

43

A-6

004

ACP1

XPC2

XPC2

1525/1KICTHENETTE

1525

/3U

TZO

N R

OO

M

1525/4LOBBY

1525/5STORE

1525A/1XPC1

1526AEAST FOYER

1.109WC ENTRY 1XPC1

1.111WC ENTRY 2XPC1

1526CFEMALEXTS1

1526D

1526EMALE

XTS1

1526F

1526HJDUCT

XC

1526K

1527AGREEN ROOM

1527DSERVERY

1527E/1GREEN ROOM KITCHEN

1527E/2STORE

1527E/3STORE

1527

F/3

F3

1527K/1PR#33

XC

1527NDUCT

1527PCENTRE FOYER

1527TCORRIDOR

1528BDUCT

1.101L1 LOBBYTPC1

1528C.1

1528C.3STORE

STORE1551GLOBBY

1551G.1STORE

1551H

1551J

1557AWEST FOYER

1557CFEMALEXTS1

1557DMALE

XTS11557GCORRIDOR

1557G/1CORRIDOR

1.120WC ENTRY 4XPC1

1.114WC ENTRY 3XPC1

1557KStore

1558AMAIN KITCHEN

1L.01LIFT 01

1L05LIFT SHAFT

1L15LIFT SHAFT

1L16Shaft

1L17LIFT SHAFT

<Floor Finish>

G573APLAYHOUSE

G573A/1PLAYHOUSE STAGE

G573U

GM573APR#13

GM573B

GM573CCONTROL ROOMXCPT

GM573D

GM573E

GM573FCONTROL ROOMXCPT

1.123CORRIDOR 2CPT2

GM573H

GM573K

GM573VUPPER WINCH GRID

L1S154STAIR

L1S155Stair

L1S91STAIR

V29XC

V30XC

#14EXISTING PLANTROOMXC

1526GDUCT

GRS31JST STAIRXPC1

GS.30UTZON ESCALATORS

GS45CH STAIRXPC1

VOIDJST SCENERY ROOMXC

GS32GREEN RM STAIRXC

L1S64CH STAIRXPC1

L1S55JST STAIRXPC1

1.122CORRIDOR 1XC

1.124CASH HANDLINGCPT2

L15161

GM573GCORRIDOR

1.125PR#33.1

1527MBOX OFFICE

Y10

Y10

Y20

Y20

Y30

Y30

Y40

Y40

X80X80

X70X70

X60X60

X50X50

XCPS

WTM04

WTM04

WTM04

WTM04

Sydney Opera House Trust

Phone: +61 2 9250 7541email: [email protected]

Sydney Opera House Trust

A1

RevSheet:Drawing No:Location

Project

Title

Date

Status

Dwn

Contract

Ckd Scale

LocationDateApvdDrwnDescriptionIssue

©

NOTES1. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES.2. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY.3. INFORMATION INDICATED IN THIS DOCUMENT MAY BE CRUCIAL TO THESAFE AND PROPER FUNCTIONING OF THE SYDNEY OPERA HOUSE. DO NOTALTER ANY ASPECT WITHOUT WRITTEN PERMISSION.4. ALL NEW WORKS MUST COMPLY WITH THE SYDNEY OPERA HOUSEBUILDING SERVICES STANDARD SPECIFICIATION (BSSS) AND RELEVANTAUSTRALIAN STANDARDS. NEW WORKS MUST ALSO COMPLY WITH THEREQUIREMENTS OF THE BUILDING CODES OF AUSTRALIA.

COPYRIGHTTHIS DRAWING AND DESIGN ARESUBJECT TO COPYRIGHT AND SHALLNOT BE COPIED IN ANY FORMWITHOUT THE WRITTEN PERMISSIONOF THE SYDNEY OPERA HOUSETRUST

GPO Box 4274 Sydney NSW Australia 2001

ARCHITECTTONKIN ZULAIKHAGREER ARCHITECTS117 Reservoir StreetABN: 46002722349P: (02) 9215 4900F: (02) 9215 4901EMAIL [email protected] www.tzg.com.au

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

Size:SOH-513

BUILDING RENEWAL PROGRAMVERTICAL TRANSPORT CONSULTANTUDY / Brendan Byrne

FIRE ENGINEERINGWarren Smith Partners / David Bolt

KITCHEN CONSULTANTMack Group / Nisha Ghantwal

ACOUSTIC ENGINEERArup / Christopher Sims

HYDRAULIC ENGINEERWarren Smith Partners / Campbell Hazelton

COST PLANNING CONSULTANTAtlus Group / Jason Finn

AV CONSULTANTArup / Tom Brickhill

LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton

HERITAGE CONSULTANTDesign 5 / Alan Croker

SECURITY CONSULTANTArup / Shane Norton

MECHANICAL ENGINEERAecom / Kheng Ip

FIRE CONSULTANTArup / Alistair Morrison

ELECTRICAL ENGINEERSteensen Varming / Ivan Mira

STRUCTURAL ENGINEERAECOM / Jonathan Onslow

ACCESSIBILITY CONSULTANTI-Access / Richard Seidman

BCA/PCA CONSULTANTGroup DLA / Shane Berry

ESD CONSULTANTCundall / Iris Chan

1:100 @ A1

LEVEL 1 FLOOR PLAN

A101

FACADE CONSULTANTPrism / Toby Fuller & Heather Webster

LIFT 36

BX VA

FOR CONSTRUCTION

49 BR TZG03 EWRM, CE

TG, RM C0024.07.2017

Issued For ConstructionC00 VVS TG 12/07/17

XFHR

XFHR

XFHR

XFH

R

FHR

FFL 9,155XSSL 9,130

2A203

2A203

1A

200

1A

200

1A200

1A200

2A203

2A203

1A

053

4A

200

4A

200

1A

201

1A

201

18 A-7002

5

6

7

A301

DL1-26

DL1-24

DL1-10b

DB

(Future Retail byOthers)

1527F/1TOILET

1527F/2F2

1527GLOBBY

1527H/1TOILET

1527H/2STORE

1527K/2OFFICE

1527L/1STORE

1527L/2OFFICE

1527L/3OFFICE

R3

1527QSTORE

1528C.3ELEC

10A453

10A453

DL1-09

DL1-09

6

7

8

5 A304

1

2

3

4 A301

FFL 9,155XSSL 9,065

1

23 A300

MP3

ESCL

#7

ESCL

#8

1.10

2L1

CO

RR

IDO

R

1.101L1 LOBBY

1557KStore

GS.30UTZON ESCALATORS

VOIDJST SCENERY DOCK

1L.36LIFT 36

1.107LIFT 36 LOBBY

1.113EXISTING VIP / INFO COUNTER 1L16

ShaftL1S155

Stair

1557CFEMALE

1557DMALE

1527L/5OFFICE

1525/1ELECTRICAL CUPBOARD

1525

/3

1525/4LOBBY

1525/5STORE

1525A/1

1526CFEMALE

1526D

1526EMALE

1526F

1526HJDUCT

1526

K

1527DSERVERY

1527E/1GREEN ROOM KITCHEN

1527E/2STORE

1527E/3STORE

1527

F/3

F3

1527K/1PR#33

1527NDUCT

1527PCENTRE FOYERXPC1

1527TCORRIDOR

1528BDUCT

1528C.1

LOBBY

1551G.1STORE

1551

H

1551J

1557AWEST FOYERXPC1

1557GCORRIDOR

1557G/1CORRIDOR

1558AMAIN KITCHEN

1L.01LIFT 01

1L05LIFT SHAFT

1L17LIFT SHAFT

G573APLAYHOUSE

G573A/1PLAYHOUSE STAGE

G573U

GM573B

GM573CCONTROL ROOMXCPT

GM573D

GM573E

GM573FCONTROL ROOMXCPT

GM573H

GM573K

L1S154STAIR

L1S91STAIR

V29 V30

#14EXISTING PLANTROOMXC

1526GDUCT

GRS31JST STAIR

GS45CH STAIR

GS32GREEN RM STAIR

L1S64CH STAIRXPC1

L1S55JST STAIR

L15161

GM573GCORRIDOR

GM573VUPPER WINCH GRID

LIFT 15SHAFT

1527MBOX OFFICE

RETAIL SHOP

01 1 2 3 4 5m

N

Y10 Y20 Y30 Y40X

80X

70X

60X

50

1:200 @ A3,

NOTE:- AREA MARKED IN GREY NOT PART OF LIFT 36 EARLY WORKS PACKAGE- AREA MARKED IN GREY NOT PART OF THIS CERTIFICATE

C01 Lift Car Set-out, Project Boundary, Drawing List CE TG 21/05/18

C02

C02 Retail Shop Note CE TG 26/06/18

1

2

3

4

5

6

7

8

9

10

1 PROPOSED LEVEL 1 FLOOR PLAN (+30)1:100

SCOPE OF ARM ARCHITECTURE

SCOPE OF FIVE FOOT ONE

1:200 @ A3

5

4

6

8

Double escalatorReplace existing stairs with new doubleescalator. COS width of void

New Retail ShopShop fit-out designed <externally>New Accessible WC & AdultChangeroomscope of ARM Architecture

Accessible Seatingwith upholstered accessible banquetteseating

Lift Lobbyscope of ARM Architecture

Front of House Corridorscope of ARM Architecture

Box Office Officesscope of ARM Architecture

VIP Ticketing and Information counter

Cloak StorageFree standing joinery wall for coats

1L36New public lift to Corridor 2. Access toGround Floor and Southern Foyers

Page 6: SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWAL …

DRAWING TITLE

REV

SCALES

PROJECT NO : 15031DRAWING NO

DRAWN BY

CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS

EMAIL [email protected]

117 Reservoir Street

P: (02) 9215 4900

ARCHITECTPROJECT :

F: (02) 9215 4901

PHASE

SOH Trust

DA

Phone: 0452 527 490 John CollinsEmail: [email protected]

WEB www.tzg.com.au

DATE

MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES

ELECTRICAL ENGINEER

STRUCTURAL ENGINEER

BCA/PCA CONSULTANT

Steensen Varming / Ivan Mira

Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John

Group DLA / Shane Berry

VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne

LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton

Cundall / Iris ChanESD CONSULTANT

Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT

Design 5 / Alan CrokerHERITAGE CONSULTANT

Atlus Group / Jason FinnCOST PLANNING CONSULTANT

Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION

RM, TG

FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton

SECURITY CONSULTANT CLIENT:

A-1003

ABN: 46002722349

Sydney Opera House -Front of House Renewal

Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF

PROPOSED LEVEL 2 PLAN (+42)

1:100, 1:200 @ A1

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

02.08.2016 A ISSUED FOR DA MB, TS, RM, RL

TG

July 2021

B

21.07.2021 B ISSUED FOR DA

ENTRY FOYER

X70

X80

X90

FFL +13,100

XPC1

GLD

L2-01

3A

-600

4

GL1GL1

2

1

XGL

1

2

1 PROPOSED LEVEL 2 FLOOR PLAN (+42)1:100

1:200 @ A3

JOAN SUTHERLANDTHEATRE (JST)

2.106JST BOHRF 7 FW

2.103JST BRUSHBOX VOID

2.102JST BAR + MERCHANDISINGRF6

2.101JST SOUTHERN FOYERXPC1

PODIUMXPC1

2.105JST EASTERN FOYERXPC1

Relocate existing glazed bronze doorand re-align external glass facade toaccommodate new lift shaft

1L36New public lift to Corridor 2. Access toGround Floor and Southern Foyers

Page 7: SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWAL …

DRAWING TITLE

REV

SCALES

PROJECT NO : 15031DRAWING NO

DRAWN BY

CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS

EMAIL [email protected]

117 Reservoir Street

P: (02) 9215 4900

ARCHITECTPROJECT :

F: (02) 9215 4901

PHASE

SOH Trust

DA

Phone: 0452 527 490 John CollinsEmail: [email protected]

WEB www.tzg.com.au

DATE

MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES

ELECTRICAL ENGINEER

STRUCTURAL ENGINEER

BCA/PCA CONSULTANT

Steensen Varming / Ivan Mira

Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John

Group DLA / Shane Berry

VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne

LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton

Cundall / Iris ChanESD CONSULTANT

Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT

Design 5 / Alan CrokerHERITAGE CONSULTANT

Atlus Group / Jason FinnCOST PLANNING CONSULTANT

Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION

RM, TG

FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton

SECURITY CONSULTANT CLIENT:

A-2001

ABN: 46002722349

Sydney Opera House -Front of House Renewal

Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF

WALL ELEVATIONS 01

1:50 @ A1

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

02.08.2016 A ISSUED FOR DA MB, TS, RM, RL

TG

July 2021

B

21.07.2021 B ISSUED FOR DA

ENTRY FOYER

+9,140L1 +30

+12,800L2 +42

CO2

XPC1XPC1

XSC XSC XSC XC

XC

XC

XPC2 XPC2 XPC2 XPC2PC2PC2 XCPSXCPS

XCPS

DL1-01

XCPS

1.102CORRIDOR 1

1.101LIFT LOBBY

1.112ENTRY FOYER

LIFT TO SOUTHERNFOYERS

X60 X70X80

U/S SSL +2,640

XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC XCXC XC XC XC XC XC XC XC XC XC XC XC XC XC XCXCXC

Y30 4A-2101

+6,400GM +21

+9,140L1 +30

+12,800L2 +42

Existing Plant roombehind to remain

XCBLP

PC2

XC

CPT1

CPS

TPC1

XCPS

AP4

1.104UTZON BAR

1.102CORRIDORTO LIFT 1

GS32STAIR TO

GREEN ROOM

XCXC

XPC2 XPC2 XPC2 XPC2 XPC2 XPC2

XCPS AP4SC2 SC2 SC2 SC2 SC2 SC2 SC2 SC2 SC2

X70 X60TO UTZON

ROOM

1527E/1GREENROOM

KICTHEN REFER TO EASTELEVATIONS A-2002FOR EAST FOYER

1.112ENBTRY FOYER

JPB-01JPB-01JPB-01D.L1.59 D.L1.60

FOH

CORRIDOR

L1.CO.01

WTM-04WTM-04

CRN-01 CRN-01

XCPS

WTM-04

C4 WALL ELEVATION C41:50

C3 WALL ELEVATION C31:50

C2 WALL ELEVATION C21:50

SCOPE OF ARM ARCHITECTURE

SCOPE OF ARM ARCHITECTURE

SCOPE OF ARM ARCHITECTURE

1:100 @ A3

HOT DESKOPEN OFFICE

CASH-UP ROOMBEYOND

TRACEY'SOFFICE BEYOND

XC

WC FOYERBEYOND

1.102FOH CORRIDOR

1.102FOH CORRIDOR

1.101LIFT LOBBY

Page 8: SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWAL …

DRAWING TITLE

REV

SCALES

PROJECT NO : 15031DRAWING NO

DRAWN BY

CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS

EMAIL [email protected]

117 Reservoir Street

P: (02) 9215 4900

ARCHITECTPROJECT :

F: (02) 9215 4901

PHASE

SOH Trust

DA

Phone: 0452 527 490 John CollinsEmail: [email protected]

WEB www.tzg.com.au

DATE

MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES

ELECTRICAL ENGINEER

STRUCTURAL ENGINEER

BCA/PCA CONSULTANT

Steensen Varming / Ivan Mira

Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John

Group DLA / Shane Berry

VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne

LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton

Cundall / Iris ChanESD CONSULTANT

Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT

Design 5 / Alan CrokerHERITAGE CONSULTANT

Atlus Group / Jason FinnCOST PLANNING CONSULTANT

Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION

RM, TG

FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton

SECURITY CONSULTANT CLIENT:

A-2002

ABN: 46002722349

Sydney Opera House -Front of House Renewal

Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF

WALL ELEVATIONS 02

1:50 @ A1

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

02.08.2016 A ISSUED FOR DA MB, TS, RM, RL

TG

July 2021

B

21.07.2021 B ISSUED FOR DA

ENTRY FOYER

X70 X60

+9,1404 L1 +30

+12,8005 L2 +42

XPC1

BR4

TPC1

TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01

MT-01

TM-01TM-01

XPC2 XPC2XPC2XPC2XPC2 XPC2XPC2 XPC2XPC2XPC2PC2 PC2 TM-02 TM-02 FX-04 TM-02 TM-02

TM-01

MT-04

AC-01TM-01

TM-01

TM-01

TM-01

TM-01

TM-01

MT-04

LAM-02

TM-01

XSCXSC

PBP

XBR

XGL1

1.107CORRIDOR 2

1.108RETAIL STORE

1525A/1TO UTZON ROOM

L1S155STAIR

1526HJDUCT

1L.36LIFT 36

XC

Y30 Y40

+9,140L1 +30

+12,800L2 +42

2,64

0

PC2XPC2

FWC1

XSC XSC XSC XSC XSC XSC XSC XSC XSC TM-01

TM-01

TM-01 TM-01 TM-01MT-04

AC-01

TM-02

TM-02

TM-02

TM-02

TM-02

TM-02

TM-02

TM-02

TM-02

TM-02

TM-02

TM-02

TM-02TM-02

TM-02

TM-02

TM-02

TM-02

TM-02

TM-01TM-01

AC-02

TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01TM-01 XGL1XGL1XGL1XGL1XGL1XGL1

XGL1XGL1XGL1

XPC2 XPC2 XPC2 XPC2 XPC2 XPC2 XPC2

XC

XPC2PC2 PC2XPC2

EXISTING STAIRS TOTHE JOAN

SUTHERLAND THEATRESOUTHERN FOYER

LIFT TOSOUTHERN

FOYER

EXISTING BOX OFFICECOUNTER

REF

ER T

O W

ESTE

RN

WA

LL E

LEVA

TIO

NS

A-2

010

L1S55JST STAIR

CORRIDOR TOLIFT 01

XC XC XC XC XCXC XC XC XCXCXC XC XC XCXCXC XC XCXC

Y40 Y30

+9,140L1 +30

+12,800L2 +42

2,64

02,

200

XPC2

XGL1XGL1 GLBF1

XGL1XGL1XGL1

XGF

GLBF1 GLBF1 GLBF1 GLBF1 GLBF1 GLBF1

XGL1 XGL1 XGL1 XGL1XGL1

XCXSC XSC

XSC XSC XSC XSC XSC XSC

XBR

NEW ESCALATORSTO UNDER THE

STAIRS

TO UTZONROOM

TO MAINFORECOURT

1.110CLOAKING

EXISTING STAIRSTO UNDER THE

STAIRS

REF

ER T

O W

ESTE

RN

WA

LL E

LEVA

TIO

NS

A-2

010

XCXPC2XPC2XPC2

XTV1

XTV1

XCXPC2

XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC

New double escalators

SC3 SC3 SC3XSC XSC XSC XSC XSC XSC XSC

GRS31JST STAIR

ES#7ESCALATOR

ES#8ESCALATOR

Sydney Opera House Trust

Phone: +61 2 9250 7541email: [email protected]

Sydney Opera House Trust

A1

RevSheet:Drawing No:Location

Project

Title

Date

Status

Dwn

Contract

Ckd Scale

LocationDateApvdDrwnDescriptionIssue

©

NOTES1. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES.2. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY.3. INFORMATION INDICATED IN THIS DOCUMENT MAY BE CRUCIAL TO THESAFE AND PROPER FUNCTIONING OF THE SYDNEY OPERA HOUSE. DO NOTALTER ANY ASPECT WITHOUT WRITTEN PERMISSION.4. ALL NEW WORKS MUST COMPLY WITH THE SYDNEY OPERA HOUSEBUILDING SERVICES STANDARD SPECIFICIATION (BSSS) AND RELEVANTAUSTRALIAN STANDARDS. NEW WORKS MUST ALSO COMPLY WITH THEREQUIREMENTS OF THE BUILDING CODES OF AUSTRALIA.

COPYRIGHTTHIS DRAWING AND DESIGN ARESUBJECT TO COPYRIGHT AND SHALLNOT BE COPIED IN ANY FORMWITHOUT THE WRITTEN PERMISSIONOF THE SYDNEY OPERA HOUSETRUST

GPO Box 4274 Sydney NSW Australia 2001

ARCHITECTTONKIN ZULAIKHAGREER ARCHITECTS117 Reservoir StreetABN: 46002722349P: (02) 9215 4900F: (02) 9215 4901EMAIL [email protected] www.tzg.com.au

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

Size:SOH-513

BUILDING RENEWAL PROGRAMVERTICAL TRANSPORT CONSULTANTUDY / Brendan Byrne

FIRE ENGINEERINGWarren Smith Partners / David Bolt

KITCHEN CONSULTANTMack Group / Nisha Ghantwal

ACOUSTIC ENGINEERArup / Christopher Sims

HYDRAULIC ENGINEERWarren Smith Partners / Campbell Hazelton

COST PLANNING CONSULTANTAtlus Group / Jason Finn

AV CONSULTANTArup / Tom Brickhill

LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton

HERITAGE CONSULTANTDesign 5 / Alan Croker

SECURITY CONSULTANTArup / Shane Norton

MECHANICAL ENGINEERAecom / Kheng Ip

FIRE CONSULTANTArup / Alistair Morrison

ELECTRICAL ENGINEERSteensen Varming / Ivan Mira

STRUCTURAL ENGINEERAECOM / Jonathan Onslow

ACCESSIBILITY CONSULTANTI-Access / Richard Seidman

BCA/PCA CONSULTANTGroup DLA / Shane Berry

ESD CONSULTANTCundall / Iris Chan

1:50, 1:10, 1:71.43 @ A1

LIFT LOBBY WALL ELEVATION

A304

FACADE CONSULTANTPrism / Toby Fuller & Heather Webster

LIFT 36

BX VA

FOR CONSTRUCTION

49 BR TZG03 EWRM, CE

TG, RM C0024.07.2017

Issued For ConstructionC00 VVS TG 12/07/17

FFL 9,155LEVEL ONE

FCL 11,555U/S CENTRAL BEAM

FCL 12,227U/S SSL

3,072

PC2 PC2 BR1C

XMLF

XCS

XCS

1.107LIFT LOBBY 36

FHR

6

7

8

5 A304

MP3

1L.36LIFT 36

1.107LIFT 36 LOBBY

FFL 9,155LEVEL ONE

FCL11,555U/S CENTRAL BEAM

FCL 12,227U/S SSL

1,3002,2

1020

34

550

550

900

PC2

XMLF

C02F

BR1C

BR1C

PBP

PC2

XCS

1.107LIFT LOBBY 36

Allow block out in concrete wallfor lift call button.Confirm block out size with liftmanufacturer.

2,18

565

XCSXCS

CO2F

CO2F1.101

LIFT 36 LOBBY

GL6

3,07

2TO

U/S

OF

SLA

B

2140

TO U

/S O

F E

XIS

TIN

G B

EA

M

2,40

0TO

U/S

OF

CE

NTR

AL

BE

AM

2,23

034

XCS XCS

BR1C

OPE

NING

FFL 9,155LEVEL ONE

FCL 11,791U/S BEAM

FCL 12,375U/S SSL

2,21

0

RL 11,365EXISTING PANELS

100

700 160

1,40

0

OPE

NING

XC

PC2PC2

550

900

9090

2040

8 8830

8 88 88 8847

18

20

18

20

18

10

18

20

18

20

1850

18

20

18

10

18

20

18

10

18

20

18

10

1840

2070

7080

30

20 30 180 20

250

250

700

180

2038

20 1,170

125 125

50 50

XX

Card scannerLift call button

1.107LIFT LOBBY 36

SIGN TYPE D5: Engraved Bronze PlateDirectional Lift Sign parameters

Sign Length: 250mmSign Height: 180 + 695 + 250mmText border (T/R/B/L): 15mmText Height: 18mmText Thickness / Weight: Arial 55 RomanPictogram Height: 18mmAFFL: refer drawingFixing: Wall mounted on split bracket

1

Text content tobe confirmed

2 Joan Sutherland

Southern

Northern

Level 2 Podium

1 Box OfficeUtzon RoomBennelong

Cloaking

Theatre

Restaurant

Do not use liftif there is a fire

When this lift is busyplease give priority toour patrons with limitedmobility

Toilets

Foyer Bar

Foyer

Permanently illuminated perspex level indicator

Illuminated perspex arrow to light up when lift arrives

LIFT 36 LOBBY WEST1:50

5

LIFT 36 LOBBY DETAIL PLAN1:50

10

LIFT 36 LOBBY EAST1:50

7

LIFT 36 LOBBY NORTH1:50

6

LIFT 36 LOBBY SOUTH1:50

8

TICKETING/CLOAKING EAST ELEVATION1:50

9

LIFT SIGNAGE L11:10

1

1:100, 1:40 @ A3,

NOTE:- AREA MARKED IN GREY NOT PART OF LIFT 36 EARLY WORKS PACKAGE- AREA MARKED IN GREY NOT PART OF THIS CERTIFICATE

14/8/17Issued For ConstructionC01 VVS TGLift Car Set-out, Project Boundary, Drawing ListC02 CE TG 21/05/18

C07

Lift shaft set-outC03 RM TG 06/07/18Finishes UpdateC04 RM TG 01/08/18

RM 17/10/18Level 2 Western doors deletedC05 TGRM 15/05/19New lift signage and lift call buttonC06 TG

New Lift 36 signage to match Lift 31signage font, pictograms andconstruction details.

Precast Wall Panel set-outC07 RM TG 24/07/19

XCS

E02 WALL ELEVATION E21:50

E1 WALL ELEVATION E11:50

E03 WALL ELEVATION E31:50

SCOPE OF ARM ARCHITECTURE

SCOPE OF FIVE FOOT ONE

SCOPE OF FIVE FOOT ONE

1:100 @ A3

Page 9: SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWAL …

DRAWING TITLE

REV

SCALES

PROJECT NO : 15031DRAWING NO

DRAWN BY

CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS

EMAIL [email protected]

117 Reservoir Street

P: (02) 9215 4900

ARCHITECTPROJECT :

F: (02) 9215 4901

PHASE

SOH Trust

DA

Phone: 0452 527 490 John CollinsEmail: [email protected]

WEB www.tzg.com.au

DATE

MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES

ELECTRICAL ENGINEER

STRUCTURAL ENGINEER

BCA/PCA CONSULTANT

Steensen Varming / Ivan Mira

Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John

Group DLA / Shane Berry

VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne

LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton

Cundall / Iris ChanESD CONSULTANT

Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT

Design 5 / Alan CrokerHERITAGE CONSULTANT

Atlus Group / Jason FinnCOST PLANNING CONSULTANT

Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION

RM, TG

FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton

SECURITY CONSULTANT CLIENT:

A-6001

ABN: 46002722349

Sydney Opera House -Front of House Renewal

Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF

UTZON ESCALATOR DETAILPLANS

1:100 @ A1

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

02.08.2016 A ISSUED FOR DA MB, TS, RM, RL

TG

July 2021

B

21.07.2021 B ISSUED FOR DA

ENTRY FOYER

ESCALATORS TOUTZON ROOM

1A-

6002

1A-

6002

2A-6002

2A-6002

CORRIDORGM523A

MALE LOCKERGM523B

GM524F

GM

524GG

M52

4H

GM524J

CH

AN

GE

RO

OM

GM

530

STOREGM530/1

STAIRGRS54

ENTRY FOYER

ESCL

#7

ESCL

#81

A-60

021

A-60

02

2A-6002

2A-6002

1525

/3U

TZO

N R

OO

M

1525/5STORE

1525A/1XPC1

1.109WC ENTRY 1XPC1

1526F1526K

1L16Shaft

L1S155Stair

GS.30UTZON ESCALATORS

CORRIDORCORRIDOR STOREB530D

OFF

ICE

B53

2OFFICEB533

OFF

ICE

B53

4

1A-

6002

1A-

6002

2A-6002

2A-6002

NEW STRUCTURALASSEMBLY BELOW

TO ENABLEESCALATOR PIT

XPC2

1A-

6002

1A-

6002

2A-6002

2A-6002

Reduced ceilingheight. Refer to 02/A4501 Section

G523CMALE

G523JCORRIDOR

G524B

G528AOFFICE

G528A/1

G528BMEETING ROOM

G530LOCKER ROOM

G533CORRIDOR

GS.205ESCALATOR

G522FOFFICE 1

1

3 UTZON ESCALATORS (GM +21)1:100

4 UTZON ESCALATORS (L1 +30)1:100

1 UTZON ESCALATORS (B1 +01)1:100

2 UTZON ESCALATORS (GR +12)1:100

1:200 @ A3

Double escalatorDemolish Utzon stairs and install two800mm wide up and down escalatorsbetween existing precast granite wallpanels.

Page 10: SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWAL …

DRAWING TITLE

REV

SCALES

PROJECT NO : 15031DRAWING NO

DRAWN BY

CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS

EMAIL [email protected]

117 Reservoir Street

P: (02) 9215 4900

ARCHITECTPROJECT :

F: (02) 9215 4901

PHASE

SOH Trust

DA

Phone: 0452 527 490 John CollinsEmail: [email protected]

WEB www.tzg.com.au

DATE

MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES

ELECTRICAL ENGINEER

STRUCTURAL ENGINEER

BCA/PCA CONSULTANT

Steensen Varming / Ivan Mira

Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John

Group DLA / Shane Berry

VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne

LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton

Cundall / Iris ChanESD CONSULTANT

Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT

Design 5 / Alan CrokerHERITAGE CONSULTANT

Atlus Group / Jason FinnCOST PLANNING CONSULTANT

Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION

RM, TG

FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton

SECURITY CONSULTANT CLIENT:

A-6002

ABN: 46002722349

Sydney Opera House -Front of House Renewal

Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF

UTZON ESCALATOR DETAILSECTIONS

1:50 @ A1

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

02.08.2016 A ISSUED FOR DA MB, TS, RM, RL

TG

July 2021

B

21.07.2021 B ISSUED FOR DA

ENTRY FOYER

Sydney Opera House Trust

Phone: +61 2 9250 7541email: [email protected]

Sydney Opera House Trust

A1

RevSheet:Drawing No:Location

Project

Title

Date

Status

Dwn

Contract

Ckd Scale

Location

©

NOTES1. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES.2. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY.3. INFORMATION INDICATED IN THIS DOCUMENT MAY BE CRUCIAL TO THE SAFE ANDPROPER FUNCTIONING OF THE SYDNEY OPERA HOUSE. DO NOT ALTER ANY ASPECTWITHOUT WRITTEN PERMISSION.4. ALL NEW WORKS MUST COMPLY WITH THE SYDNEY OPERA HOUSE BUILDINGSERVICES STANDARD SPECIFICIATION (BSSS) AND RELEVANT AUSTRALIANSTANDARDS. NEW WORKS MUST ALSO COMPLY WITH THE REQUIREMENTS OF THEBUILDING CODES OF AUSTRALIA.5. BACKGROUNDS OUTSIDE THE WORKZONE MIGHT NOT BE ACCURATE AND NEED TOBE VERIFIED BY THE CONTRACTOR ON SITE.

COPYRIGHTTHIS DRAWING AND DESIGN ARESUBJECT TO COPYRIGHT AND SHALLNOT BE COPIED IN ANY FORMWITHOUT THE WRITTEN PERMISSIONOF THE SYDNEY OPERA HOUSETRUST

GPO Box 4274 Sydney NSW Australia 2001

ARCHITECTTONKIN ZULAIKHAGREER ARCHITECTS117 Reservoir StreetABN: 46002722349P: (02) 9215 4900F: (02) 9215 4901EMAIL [email protected] www.tzg.com.au

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

Size:SOH-513

BUILDING RENEWAL PROGRAMVERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne

FIRE ENGINEERINGWarren Smith Partners / Manu John

HYDRAULIC ENGINEERWarren Smith Partners / Stuart Sullivan

LIGHTING DESIGNERSteensen Varming / Ashleigh Bretherton

HERITAGE CONSULTANTDesign 5 / Alan Croker

MECHANICAL ENGINEERAecom / Kheng Ip

FIRE ENGINEERArup / Alistair Morrison

ELECTRICAL ENGINEERSteensen Varming / Ivan Mira

STRUCTURAL ENGINEERARUP / Xavier Nuttal

ACCESSIBILITY CONSULTANTGroup DLA / Elisa Moechtar

BCA/PCA CONSULTANTGroup DLA / Shane Berry

ESD CONSULTANTCundall / Iris Chan 1:50 @ A1

ESCALATOR PLANS AND N-SSECTION

A45012/7/21

C00

ENTRY FOYER ESCALATORS

Issue Description Drwn Apvd DateC00 ISSUED FOR CONSTRUCTION RM TG 12.07.21

BX VA 49 BR TZG09TG, RM

FOR TENDER

TS, RM

Y41

Y42

Y44

Y45

2A

450

XFFL 9,155

XS

SL 8,975

PC

8

PC

8

X57

X56

X55

X54

X53

X52

X51

Y43

FFL +9,155

3A-450

XP

C8

XP

C8M

P2

GS.30

UTZO

N ESC

ALATO

RS

1L16Shaft

L1S155Stair

1525A/1

1526AEA

ST FOYER

1526EM

ALE

1526F

3,2607A451

XG

L2

XG

LBF

XM

P3

X50

X49

X48

X47

X46

X45

X44

X43

X42

X41

X40

XP

C8

PC

8

XP

C8

PC

8

XP

C8

PC

8

3,022

2,763 (Precast to P

recast)

2,720 Escalator (tbc)

5A

4515

A451

6A

4516

A451

MP

2

ESCALATOR 07

ESCALATOR 08

GS.205

ESCA

LATOR

G528B

MEETIN

G R

OO

M

G528A

OFFIC

E

G528A

/1

G529A

STOR

E

G530

LOC

KER

RO

OM

3A-450

X50 X51 X52 X53 X54 X55 X56 X57X40 X41 X42 X43 X44 X45 X46 X47 X48 X49

2A451

-300B1 +01

-300B1 +01

+3,658GR +12

+3,658GR +12

+6,400GM +21

+6,400GM +21

+9,140L1 +30

+9,140L1 +30

+12,800L2 +42

+12,800L2 +42

~2,2

40M

aint

ain

heig

ht to

exi

stin

g se

rvic

es2,210 (2,239 max)

RL +11,375

RL +7,104

2,990

15,822 (overall length of escalator tbc)

FFL +9,155

2,918 13,056

550

1,080

580

+11,791

+3,660

+9,140 +9,155

+3,658

SSL +2,563 (tbc)

2,45

674

045

0

2,66

3

30.0°

6A

451

XPC2

XGL2

XPC8XPC1

XMP3

MP2

XGLBF

Install new sections of precast wall panels toStructural Engineer's detail. For scope ofworks for precast wall panels refer toPrecast Wall Panel Schedule on A452.

Extend of glassfacade and door

Extend of aluminiumlanding plate

Extend of handrail

Extend of handrailExtend of aluminiumlanding plate

PC8

2hr fire-rated lightweight wall and ceiling suspended of concretewalls. Gyprock shaft wall system CSR7715 (or similar). PBF2lining (3 x 16mm Fyrcheck plasterboard). Paint Finish.

CO2PF Concrete pit (refer Structural Engineer'sdocuments). XCP Paint Finish to all exposed new concrete.

Protect existing stormwater pipeduring construction. For invertlevels refer to Utility Survey,

New southern assembly withconcrete encasing (referStructural Engineer's documents).

Concrete encased northern assembly (refer Structural Engineer'sdocuments).

Reinstate existing precast floorpavers (refer note F2).

WST

New waterproofing membrane tounderside of slab and around newsteel cable penetration. Provide aminimum of 300mm overlap ofexisting and new membrane.

XWST

Signage box

Existing servicesconduit pipe

PC2PC2

PC2

Temporary hitch and fixing beams (to beremoved after escalator installation). Shouldpatching be required to the concrete, asample and methodology for approval isrequired before proceeding.

XPC8PC8

MP2PC8

1.112ENRTY FOYER

G523CMALE AMENITIES

GM523ACORRIDOR

G533CORRIDOR

G529ASTORE

GRS54STAIR

WP

GM523BMALE LOCKER

XPC2

XPC2

XC

XC

XC

XCP

XCP

Reinstate ceiling services to Office B533 after installation ofescalator (refer Mechanical, Electrical and Fire servicesConsultant's documents).

CO2PF

CO2PF

XPC2

XPC2

XPC2

XPC2

XPC2

XPC2

XPC2

XPC2

XPC2

XPC2

XPC2 XPC2 XPC2 XPC2 XPC2 XPC2

PC2

PC2

GRS30 STAIR

1A451

4A451

9,521(9,495 min)

2,62

5

95250

872

3,022(2500 min)

5A

451

New slab and edgebeam refer to StructuralEngineers details.

GF09UNDER THE

STEPS

-300B1 +01

B533OFFICE

B530BCORRIDOR

WP

PROPOSED DETAIL PLAN - LEVEL 11:50

2PROPOSED DETAIL PLAN - GROUND1:50

1

PROPOSED SECTION NS1:50

5

Sydney Opera House Trust

Phone: +61 2 9250 7541email: [email protected]

Sydney Opera House Trust

A1

RevSheet:Drawing No:Location

Project

Title

Date

Status

Dwn

Contract

Ckd Scale

Location

©

NOTES1. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES.2. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY.3. INFORMATION INDICATED IN THIS DOCUMENT MAY BE CRUCIAL TO THE SAFE ANDPROPER FUNCTIONING OF THE SYDNEY OPERA HOUSE. DO NOT ALTER ANY ASPECTWITHOUT WRITTEN PERMISSION.4. ALL NEW WORKS MUST COMPLY WITH THE SYDNEY OPERA HOUSE BUILDINGSERVICES STANDARD SPECIFICIATION (BSSS) AND RELEVANT AUSTRALIANSTANDARDS. NEW WORKS MUST ALSO COMPLY WITH THE REQUIREMENTS OF THEBUILDING CODES OF AUSTRALIA.5. BACKGROUNDS OUTSIDE THE WORKZONE MIGHT NOT BE ACCURATE AND NEED TOBE VERIFIED BY THE CONTRACTOR ON SITE.

COPYRIGHTTHIS DRAWING AND DESIGN ARESUBJECT TO COPYRIGHT AND SHALLNOT BE COPIED IN ANY FORMWITHOUT THE WRITTEN PERMISSIONOF THE SYDNEY OPERA HOUSETRUST

GPO Box 4274 Sydney NSW Australia 2001

ARCHITECTTONKIN ZULAIKHAGREER ARCHITECTS117 Reservoir StreetABN: 46002722349P: (02) 9215 4900F: (02) 9215 4901EMAIL [email protected] www.tzg.com.au

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

Size:SOH-513

BUILDING RENEWAL PROGRAMVERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne

FIRE ENGINEERINGWarren Smith Partners / Manu John

HYDRAULIC ENGINEERWarren Smith Partners / Stuart Sullivan

LIGHTING DESIGNERSteensen Varming / Ashleigh Bretherton

HERITAGE CONSULTANTDesign 5 / Alan Croker

MECHANICAL ENGINEERAecom / Kheng Ip

FIRE ENGINEERArup / Alistair Morrison

ELECTRICAL ENGINEERSteensen Varming / Ivan Mira

STRUCTURAL ENGINEERARUP / Xavier Nuttal

ACCESSIBILITY CONSULTANTGroup DLA / Elisa Moechtar

BCA/PCA CONSULTANTGroup DLA / Shane Berry

ESD CONSULTANTCundall / Iris Chan 1:5, 1:10, 1:50 @ A1

ESCALATOR DETAILS AND E-WSECTIONS

A45112/7/21

C00

ENTRY FOYER ESCALATORS

Issue Description Drwn Apvd DateC00 ISSUED FOR CONSTRUCTION RM TG 12.07.21

BX VA 49 BR TZG09TG, RM

FOR TENDER

TS, RM

align

EX SSL

FFL 3,663

MP2: Escalatorthreshold plate tomatch Escalator 5

PC8: Reinstate existingprecast granite paver

Sub-floor to be detailedby escalator contractor.

New concrete slab asper structuralengineers details.

Smooth transition,grout to match existingin Entry Foyer.

align

+8,975

FFL +9,155 PC8: New precastgranite paver

Support and levellingfor PC8 to matchexisting detail.

Sub-floor to be detailedby escalator contractor.

MP2: Ribbed aluminiumlanding plate, to matchEscalator 5.

Smooth transition,grout to match existing.

New concrete slab asper structuralengineers details.

2hr fire-rated (fromboth sides)lightweight wall andceiling suspended ofconcrete side walls.Gyprock shaft wallsystem CSR7715 (orsimilar). PBF2 lining(3 x 16mm Fyrcheckplasterboard). PaintFinish.

Existing concretewall. 2 hr fire rated.

Escalator

150

Backing rod

Continuously fillgap with FireMastic to 13mmmin depth

Y42 Y43 Y44

-300B1 +01

+3,658GR +12

+6,400GM +21

+9,140L1 +30

3,259

XPC2XPC2

G529ASTORE

ES#7 ES#8

3A451

102 2,768

Refer to precast panelschedule on A452 for changescope and to StructuralEngineer's drawings for fixingdetails.

CO2PF Concrete encasing tonorthern structural assembly(refer Structural Engineer'sdocuments). Paint Finish.

PBPF2

B533OFFICE

FFL +3,663GROUND

FFL +6,400MEZZANINE

FFL +9,155LEVEL 1

2,969

FFL -300BASEMENT B1

2,720

269 2,720 (escalator width tbc) 270

294 800 544 800 281

XCXC

ES#7 ES#8

Y42 Y43 Y44

3A451

3,259 (wall to wall)2,763 (precast to precast)

Refer to Granite precastpanels schdule fortreatment.

XL XL

Carefully remove, storeand reinstate existingconcealed uplights. refer toElectrical Engineer's detail.

XPC2 Precast wallpanels supported byconcrete hob below

Concrete shear wall

CO2PF Concrete floor slab(refer Structural Engineer'sdocuments). Paint Finish.

PC2 Precast wall panelconcealed fixed to steelbracket fixed to concretewall (refer to StructuralEngineer's documents).

B533OFFICE

Y41 Y42 Y43 Y44 Y45

ExistingSignage box

Remove, retain and re-installfacade section, incl. bronzedoor, door hardware, thresholdfloor box, signage box, downlights and glazing wall (refernote F2).

Remove, retain and re-installprecast wall panels (refer noteF2).

XGL2 XPC2 XPC2 XPC2 XPC2XPC2XPC2XPC2XPC2

XGLBF XGLBFXGLBF

XCXC

XGL2

XGLBF

ESCALATOR BASE THRESHOLD DETAIL1:5

1 ESCALATOR TOP THRESHOLD DETAIL1:5

2

SOFFIT LINING DETAIL1:5

4

PROPOSED SECTION EW11:50

5 PROPOSED SECTION EW21:50

6

PROPOSED EXTERNAL ELEVATION1:50

7

250

30

Existing precast panels on newwall brackets. Refer to structuralEngineer's drawings for fixingdetails.

141 100

5015

050

See Structural Engineers drawings for PC2 fixing details.

Existing wall

New precast wall panel conceal fixed tosteel brackets. Refer to structuralEngineer's drawings for fixing details.

All fixings in gap betweenexisting panel and new PC2panel to be painted black.

PRECAST WALL PANEL DETAIL1:10

3

UTZON ESCALATOR LONG SECTION1:501 UTZON ESCALATOR CROSS SECTION

1:502

1:100 @ A3 1:50 @ A1

Page 11: SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWAL …

DRAWING TITLE

REV

SCALES

PROJECT NO : 15031DRAWING NO

DRAWN BY

CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS

EMAIL [email protected]

117 Reservoir Street

P: (02) 9215 4900

ARCHITECTPROJECT :

F: (02) 9215 4901

PHASE

SOH Trust

DA

Phone: 0452 527 490 John CollinsEmail: [email protected]

WEB www.tzg.com.au

DATE

MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES

ELECTRICAL ENGINEER

STRUCTURAL ENGINEER

BCA/PCA CONSULTANT

Steensen Varming / Ivan Mira

Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John

Group DLA / Shane Berry

VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne

LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton

Cundall / Iris ChanESD CONSULTANT

Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT

Design 5 / Alan CrokerHERITAGE CONSULTANT

Atlus Group / Jason FinnCOST PLANNING CONSULTANT

Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION

RM, TG

FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton

SECURITY CONSULTANT CLIENT:

A-6003

ABN: 46002722349

Sydney Opera House -Front of House Renewal

Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF

PROPOSED LIFT 36 PLANS GR+21 AND L1 +30

1:50 @ A1

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

02.08.2016 A ISSUED FOR DA MB, TS, RM, RL

TG

July 2021

B

21.07.2021 B ISSUED FOR DA

ENTRY FOYER

FFL +9,140

DL1-13

PC2

XPC2 PC2

3A

-600

4

3A

-600

4

1526AEAST FOYER

1526HJDUCT

XC

1L15LIFT SHAFT

VOIDJST SCENERY ROOMXC

1.106M

AC

HIN

E RO

OM

XC

1L.36LIFT 36

L1S55JST STAIRXPC1

1.107L36 CORRIDORTPC1

FFL +3,658

DGR-02

G522BTTS STAGING STORE

GL.36LIFT 365.14 m2

2A

-210

1

Relocate Workshop door

G522CCORRIDOR

G522GSTAIR

G525AEPRG

G525BEPRG

G525C/1

LIFT 15SHAFT

G521A/T1WORKSHOP

G521BLIFT SHAFT

G522BTTS STAGING STORE

3A

-600

4

3A

-600

4

Sydney Opera House Trust

Phone: +61 2 9250 7541email: [email protected]

Sydney Opera House Trust

A1

RevSheet:Drawing No:Location

Project

Title

Date

Status

Dwn

Contract

Ckd Scale

LocationDateApvdDrwnDescriptionIssue

©

NOTES1. ALL DIMENSIONS AND SIZES ARE IN MILLIMETRES.2. DO NOT SCALE DRAWINGS. USE FIGURED DIMENSIONS ONLY.3. INFORMATION INDICATED IN THIS DOCUMENT MAY BE CRUCIAL TO THESAFE AND PROPER FUNCTIONING OF THE SYDNEY OPERA HOUSE. DO NOTALTER ANY ASPECT WITHOUT WRITTEN PERMISSION.4. ALL NEW WORKS MUST COMPLY WITH THE SYDNEY OPERA HOUSEBUILDING SERVICES STANDARD SPECIFICIATION (BSSS) AND RELEVANTAUSTRALIAN STANDARDS. NEW WORKS MUST ALSO COMPLY WITH THEREQUIREMENTS OF THE BUILDING CODES OF AUSTRALIA.

COPYRIGHTTHIS DRAWING AND DESIGN ARESUBJECT TO COPYRIGHT AND SHALLNOT BE COPIED IN ANY FORMWITHOUT THE WRITTEN PERMISSIONOF THE SYDNEY OPERA HOUSETRUST

GPO Box 4274 Sydney NSW Australia 2001

ARCHITECTTONKIN ZULAIKHAGREER ARCHITECTS117 Reservoir StreetABN: 46002722349P: (02) 9215 4900F: (02) 9215 4901EMAIL [email protected] www.tzg.com.au

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

Size:SOH-513

BUILDING RENEWAL PROGRAMVERTICAL TRANSPORT CONSULTANTUDY / Brendan Byrne

FIRE ENGINEERINGWarren Smith Partners / David Bolt

KITCHEN CONSULTANTMack Group / Nisha Ghantwal

ACOUSTIC ENGINEERArup / Christopher Sims

HYDRAULIC ENGINEERWarren Smith Partners / Campbell Hazelton

COST PLANNING CONSULTANTAtlus Group / Jason Finn

AV CONSULTANTArup / Tom Brickhill

LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton

HERITAGE CONSULTANTDesign 5 / Alan Croker

SECURITY CONSULTANTArup / Shane Norton

MECHANICAL ENGINEERAecom / Kheng Ip

FIRE CONSULTANTArup / Alistair Morrison

ELECTRICAL ENGINEERSteensen Varming / Ivan Mira

STRUCTURAL ENGINEERAECOM / Jonathan Onslow

ACCESSIBILITY CONSULTANTI-Access / Richard Seidman

BCA/PCA CONSULTANTGroup DLA / Shane Berry

ESD CONSULTANTCundall / Iris Chan

1:100 @ A1

LEVEL 1 FLOOR PLAN

A101

FACADE CONSULTANTPrism / Toby Fuller & Heather Webster

LIFT 36

BX VA

FOR CONSTRUCTION

49 BR TZG03 EWRM, CE

TG, RM C0024.07.2017

Issued For ConstructionC00 VVS TG 12/07/17

XFHR

XFHR

XFHR

XFH

R

FHR

FFL 9,155XSSL 9,130

2A203

2A203

1A

200

1A

200

1A200

1A200

2A203

2A203

1A

053

4A

200

4A

200

1A

201

1A

201

18 A-7002

5

6

7

A301

DL1-26

DL1-24

DL1-10b

DB

(Future Retail byOthers)

1527F/1TOILET

1527F/2F2

1527GLOBBY

1527H/1TOILET

1527H/2STORE

1527K/2OFFICE

1527L/1STORE

1527L/2OFFICE

1527L/3OFFICE

R3

1527QSTORE

1528C.3ELEC

10A453

10A453

DL1-09

DL1-09

6

7

8

5 A304

1

2

3

4 A301

FFL 9,155XSSL 9,065

1

23 A300

MP3

ESCL

#7

ESCL

#8

1.10

2L1

CO

RR

IDO

R

1.101L1 LOBBY

1557KStore

GS.30UTZON ESCALATORS

VOIDJST SCENERY DOCK

1L.36LIFT 36

1.107LIFT 36 LOBBY

1.113EXISTING VIP / INFO COUNTER 1L16

ShaftL1S155

Stair

1557CFEMALE

1557DMALE

1527L/5OFFICE

1525/1ELECTRICAL CUPBOARD

1525

/3

1525/4LOBBY

1525/5STORE

1525A/1

1526CFEMALE

1526D

1526EMALE

1526F

1526HJDUCT

1526

K

1527DSERVERY

1527E/1GREEN ROOM KITCHEN

1527E/2STORE

1527E/3STORE

1527

F/3

F3

1527K/1PR#33

1527NDUCT

1527PCENTRE FOYERXPC1

1527TCORRIDOR

1528BDUCT

1528C.1

LOBBY

1551G.1STORE

1551

H

1551J

1557AWEST FOYERXPC1

1557GCORRIDOR

1557G/1CORRIDOR

1558AMAIN KITCHEN

1L.01LIFT 01

1L05LIFT SHAFT

1L17LIFT SHAFT

G573APLAYHOUSE

G573A/1PLAYHOUSE STAGE

G573U

GM573B

GM573CCONTROL ROOMXCPT

GM573D

GM573E

GM573FCONTROL ROOMXCPT

GM573H

GM573K

L1S154STAIR

L1S91STAIR

V29 V30

#14EXISTING PLANTROOMXC

1526GDUCT

GRS31JST STAIR

GS45CH STAIR

GS32GREEN RM STAIR

L1S64CH STAIRXPC1

L1S55JST STAIR

L15161

GM573GCORRIDOR

GM573VUPPER WINCH GRID

LIFT 15SHAFT

1527MBOX OFFICE

RETAIL SHOP

01 1 2 3 4 5m

N

Y10 Y20 Y30 Y40

X80

X70

X60

X50

1:200 @ A3,

NOTE:- AREA MARKED IN GREY NOT PART OF LIFT 36 EARLY WORKS PACKAGE- AREA MARKED IN GREY NOT PART OF THIS CERTIFICATE

C01 Lift Car Set-out, Project Boundary, Drawing List CE TG 21/05/18

C02

C02 Retail Shop Note CE TG 26/06/18

1

2

1

2

1 PROPPOSED LIFT 36 LEVEL 1 PLAN1:50

2 PROPPOSED LIFT 36 GROUND FLOOR PLAN1:50

SCOPE OF FIVE FOOT ONE

1:100 @ A3

1L36LIFT 36

MP3

1.107LIFT 36 LOBBY

Lift 36 Pit only at Ground FloorLift service from L1 to L2 only

Reduced Workshop Areawith new access doors

Page 12: SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWAL …

DRAWING TITLE

REV

SCALES

PROJECT NO : 15031DRAWING NO

DRAWN BY

CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS

EMAIL [email protected]

117 Reservoir Street

P: (02) 9215 4900

ARCHITECTPROJECT :

F: (02) 9215 4901

PHASE

SOH Trust

DA

Phone: 0452 527 490 John CollinsEmail: [email protected]

WEB www.tzg.com.au

DATE

MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES

ELECTRICAL ENGINEER

STRUCTURAL ENGINEER

BCA/PCA CONSULTANT

Steensen Varming / Ivan Mira

Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John

Group DLA / Shane Berry

VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne

LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton

Cundall / Iris ChanESD CONSULTANT

Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT

Design 5 / Alan CrokerHERITAGE CONSULTANT

Atlus Group / Jason FinnCOST PLANNING CONSULTANT

Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION

RM, TG

FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton

SECURITY CONSULTANT CLIENT:

A-6004

ABN: 46002722349

Sydney Opera House -Front of House Renewal

Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF

LIFT 36 PLANS L2 (+42), ROOF(+51) AND SECTION

1:50 @ A1

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

02.08.2016 A ISSUED FOR DA MB, TS, RM, RL

TG

July 2021

B

21.07.2021 B ISSUED FOR DA

ENTRY FOYER

X70

-300B1 +01

±0AHD

+600LC

+3,658GR +12

+6,400GM +21

+9,140L1 +30

+12,800L2 +42

+13,450L2A (Computation Level)

+15,540L3 +51

+17,440L3A (Computation Level)

+18,590L4 +61

FFL +13,100

2,43

944

03,

310

CO

RR

IDO

R 2

ENTRYFOYER

No brass lid to lift shaft.Subject to further advice

No ceiling to lift carRetain existing bronze canopy fascia

STOP L1

STOP L2

Structural concrete lift walls

PC2 PC2

Existing A/C duct. Indicative only

TPC1

PBP

New slab to JST Dock

Lift carriage

LIFT36

1.107CORRIDOR 2

JST SOUTHERNFOYER

2,40

0LI

FT C

AR

LIFT 36

3A

-600

4

NO BRONZE LID TO LIFTSHAFT SUBJECT TOFURTHER ADVICE

BR4XCPC1

LINE OF GLASS

RETAIN EXTERNAL FASCIA OFEXISTING BRONZE CANOPY

NEW BRONZE CANOPY TOMATCH EXISTING CANOPYDETAILS

NO CEILING TO LIFT CAR

EXISTING CONCRETESTRUCTURE OVER STAIRS

JST SOUTHERN FOYER

PODIUM

FFL +13,100

XPC1

GL

DL2-01

3A

-600

4

3A

-600

4

GL1GL1

XGL

2L.36LIFT 36

JST SOUTHERN FOYER

PODIUM

3 LIFT 36 SECTION1:50

2 PROPPOSED LIFT 36 LEVEL 3 PLAN1:50

1 PROPPOSED LIFT 36 LEVEL 2 PLAN1:50

1:100 @ A3

Page 13: SYDNEY OPERA HOUSE I FRONT OF HOUSE RENEWAL …

DRAWING TITLE

REV

SCALES

PROJECT NO : 15031DRAWING NO

DRAWN BY

CHECKEDTONKIN ZULAIKHA GREER ARCHITECTS

EMAIL [email protected]

117 Reservoir Street

P: (02) 9215 4900

ARCHITECTPROJECT :

F: (02) 9215 4901

PHASE

SOH Trust

DA

Phone: 0452 527 490 John CollinsEmail: [email protected]

WEB www.tzg.com.au

DATE

MECHANICAL ENGINEERHYDRAULIC ENGINEERFIRE SERVICES

ELECTRICAL ENGINEER

STRUCTURAL ENGINEER

BCA/PCA CONSULTANT

Steensen Varming / Ivan Mira

Aecom / Kheng Ip AECOM / Jonathan OnslowWarren Smith Partners / Stuart SullivanWarren Smith Partners / Manu John

Group DLA / Shane Berry

VERTICAL TRANSPORT CONSULTANTNDY / Brendan Byrne

LIGHTING ARCHITECTSteensen Varming / Ashleigh Bretherton

Cundall / Iris ChanESD CONSULTANT

Group DLA / Elisa MoechtarACCESSIBILITY CONSULTANT

Design 5 / Alan CrokerHERITAGE CONSULTANT

Atlus Group / Jason FinnCOST PLANNING CONSULTANT

Arup / Shane NortonSECURITY CONSULTANTDATE REV DESCRIPTION

RM, TG

FIRE ENGINEERArup / Alistair Morrison Arup / Shane Norton

SECURITY CONSULTANT CLIENT:

A-9001

ABN: 46002722349

Sydney Opera House -Front of House Renewal

Plot date:26/7/21 File: BIMcloud: tzg-bimcloud.local - BIMcloud/ARCHICAD 23/15031 SOH - FRONT OF HOUSE/SOH_EF

FINISHES + PRODUCTINFORMATION

@ A3

NOTES:Do not scale off drawings. Use figureddimensions only. Report any discrepencies tothe architect. These designs, plans,specifications and the copyright therein are theproperty of Tonkin Zulaikha Greer Architects PtyLtd, and must not be reproduced or copiedwholly or in part without written permission ofTonkin Zulaikha Greer Architects Pty Ltd.

MB, TS, RM, RL

B

July 2021

02.08.2016 A ISSUED FOR DA21.07.2021 B ISSUED FOR DA

0999 ENTRY CORRIDOR A0306 INTERNAL MATERIALS FINISHES SCHEDULE

Ref.Code

General Description Detailed / Proprietary Description Indicative Location Rev

WTI TILINGWTI-01 Wall Tile Academy Unglazed straight edge KK 47 OP

Code: 11151Tile size: 50 x 50 including joint spacingColour: off whiteLay: gridJoint Spacing: 3mmPattern lay: refer to plansGrout: Ardex (epoxy) Colour to be advisedSubstrate: Levelling screed as required. Grade to waste.

WTM TIMBERWTM-02 Timber - Brush Box Existing Brush Box timber panels.

New panel breakup constructed from existing Nom. 20mm x 20mm thick laminated strip.Seal Coat: PST-01

Box Office

WTM-04 Timber - Brush Box to match existing

New brush box panels. 20mm thk laminations of Brushbox in 3 different panel sizes, some with 20mm gaps. Black Mesh backing and timber finish all to match existing.Seal coat: PST-01Refer A5216 for details for panel types

Entry Corridor

CEX EXISTING CEILINGCEX-01 Existing exposed painted concrete ceiling.

Finish: Refer to Applied Finishes section - PPF-04

CNC No Ceiling

eCNC Existing No Ceiling

CPB-02 Plasterboard - Standard Gyprock or similar approved Flush Plasterboard - standard paperfaced - 13mm thick square set unless noted otherwise.Suspension: Rondo to suitPaint finish: Refer to Applied Finishes section

CPB-12 Plasterboard - Acoustic Perforated

Gyprock or similar approved Flush Plasterboard - Rigitone Galaxy acoustic perforated - 13mm thick square set unless noted otherwise.Suspension: Rondo to suitPaint finish: Refer to Applied Finishes section

CPB-13 Plasterboard - Moisture Resistant

Gyprock or similar approved Flush Plasterboard - 13mm thick square set unless noted otherwise.Suspension: Rondo to suitPaint finish: Refer to Applied Finishes section

CTV-01A Timber Veneer - New custom formed perforated to match existing

Straight and curved plywood panels with veneer overlay to seen face.Veneer: select grade white birch rotary cut Size: size, radius, perforation & thickness to match existing 'wobbly' panels.Backing: black metal flywire to match existingAcoustic batts: black - density & thickness to Acoustic Specification) Finish: Refer to Applied Finishes Section - PST-01 Fixing: concealed suspension

Office

CRN RENDER

armarchitecture.com.auL:\0999 SOH Concert Hall\0999 Filing\10 ARM\13 Schedules\A0306_Internal Materials & Finishes Schedule - Additional Works\A0306(-)-A4~INTERNAL MATERIALS & FINISHES LEGEND -

ENTRY CORRIDOR.xlsx4 OF 8

0999 ENTRY CORRIDOR A0306 INTERNAL MATERIALS FINISHES SCHEDULE

Ref.Code

General Description Detailed / Proprietary Description Indicative Location Rev

WTI TILINGWTI-01 Wall Tile Academy Unglazed straight edge KK 47 OP

Code: 11151Tile size: 50 x 50 including joint spacingColour: off whiteLay: gridJoint Spacing: 3mmPattern lay: refer to plansGrout: Ardex (epoxy) Colour to be advisedSubstrate: Levelling screed as required. Grade to waste.

WTM TIMBERWTM-02 Timber - Brush Box Existing Brush Box timber panels.

New panel breakup constructed from existing Nom. 20mm x 20mm thick laminated strip.Seal Coat: PST-01

Box Office

WTM-04 Timber - Brush Box to match existing

New brush box panels. 20mm thk laminations of Brushbox in 3 different panel sizes, some with 20mm gaps. Black Mesh backing and timber finish all to match existing.Seal coat: PST-01Refer A5216 for details for panel types

Entry Corridor

CEX EXISTING CEILINGCEX-01 Existing exposed painted concrete ceiling.

Finish: Refer to Applied Finishes section - PPF-04

CNC No Ceiling

eCNC Existing No Ceiling

CPB-02 Plasterboard - Standard Gyprock or similar approved Flush Plasterboard - standard paperfaced - 13mm thick square set unless noted otherwise.Suspension: Rondo to suitPaint finish: Refer to Applied Finishes section

CPB-12 Plasterboard - Acoustic Perforated

Gyprock or similar approved Flush Plasterboard - Rigitone Galaxy acoustic perforated - 13mm thick square set unless noted otherwise.Suspension: Rondo to suitPaint finish: Refer to Applied Finishes section

CPB-13 Plasterboard - Moisture Resistant

Gyprock or similar approved Flush Plasterboard - 13mm thick square set unless noted otherwise.Suspension: Rondo to suitPaint finish: Refer to Applied Finishes section

CTV-01A Timber Veneer - New custom formed perforated to match existing

Straight and curved plywood panels with veneer overlay to seen face.Veneer: select grade white birch rotary cut Size: size, radius, perforation & thickness to match existing 'wobbly' panels.Backing: black metal flywire to match existingAcoustic batts: black - density & thickness to Acoustic Specification) Finish: Refer to Applied Finishes Section - PST-01 Fixing: concealed suspension

Office

CRN RENDER

armarchitecture.com.auL:\0999 SOH Concert Hall\0999 Filing\10 ARM\13 Schedules\A0306_Internal Materials & Finishes Schedule - Additional Works\A0306(-)-A4~INTERNAL MATERIALS & FINISHES LEGEND -

ENTRY CORRIDOR.xlsx4 OF 8

0999 ENTRY CORRIDOR A0306 INTERNAL MATERIALS FINISHES SCHEDULE

Ref.Code

General Description Detailed / Proprietary Description Indicative Location Rev

WTI TILINGWTI-01 Wall Tile Academy Unglazed straight edge KK 47 OP

Code: 11151Tile size: 50 x 50 including joint spacingColour: off whiteLay: gridJoint Spacing: 3mmPattern lay: refer to plansGrout: Ardex (epoxy) Colour to be advisedSubstrate: Levelling screed as required. Grade to waste.

WTM TIMBERWTM-02 Timber - Brush Box Existing Brush Box timber panels.

New panel breakup constructed from existing Nom. 20mm x 20mm thick laminated strip.Seal Coat: PST-01

Box Office

WTM-04 Timber - Brush Box to match existing

New brush box panels. 20mm thk laminations of Brushbox in 3 different panel sizes, some with 20mm gaps. Black Mesh backing and timber finish all to match existing.Seal coat: PST-01Refer A5216 for details for panel types

Entry Corridor

CEX EXISTING CEILINGCEX-01 Existing exposed painted concrete ceiling.

Finish: Refer to Applied Finishes section - PPF-04

CNC No Ceiling

eCNC Existing No Ceiling

CPB-02 Plasterboard - Standard Gyprock or similar approved Flush Plasterboard - standard paperfaced - 13mm thick square set unless noted otherwise.Suspension: Rondo to suitPaint finish: Refer to Applied Finishes section

CPB-12 Plasterboard - Acoustic Perforated

Gyprock or similar approved Flush Plasterboard - Rigitone Galaxy acoustic perforated - 13mm thick square set unless noted otherwise.Suspension: Rondo to suitPaint finish: Refer to Applied Finishes section

CPB-13 Plasterboard - Moisture Resistant

Gyprock or similar approved Flush Plasterboard - 13mm thick square set unless noted otherwise.Suspension: Rondo to suitPaint finish: Refer to Applied Finishes section

CTV-01A Timber Veneer - New custom formed perforated to match existing

Straight and curved plywood panels with veneer overlay to seen face.Veneer: select grade white birch rotary cut Size: size, radius, perforation & thickness to match existing 'wobbly' panels.Backing: black metal flywire to match existingAcoustic batts: black - density & thickness to Acoustic Specification) Finish: Refer to Applied Finishes Section - PST-01 Fixing: concealed suspension

Office

CRN RENDER

armarchitecture.com.auL:\0999 SOH Concert Hall\0999 Filing\10 ARM\13 Schedules\A0306_Internal Materials & Finishes Schedule - Additional Works\A0306(-)-A4~INTERNAL MATERIALS & FINISHES LEGEND -

ENTRY CORRIDOR.xlsx4 OF 8

0999 ENTRY CORRIDOR A0306 INTERNAL MATERIALS FINISHES SCHEDULE

Ref.Code

General Description Detailed / Proprietary Description Indicative Location Rev

CRN-01 Render - Concrete Parchem Construction Products Renderoc FCFinish coat: clear water based sealer Durafloor HD System.

Corridor, lobbies

JBS-01 Banquet Seat Joinery Banquet Seat- finishes to match bench seat in Box Office Foyerseat - refer MMA-01- refer also WMC-01

Amenities Lobby

JBT-01 Timber Benchtop Brush-box timber benchtop 30mm thickness, nom. 20mm x 20mm thick laminated stripsPencil-round lead-edges at top and bottom. Seal Coat: PST-01Note: 10mm shadow-gap to underbench joinery

Office

JTV-01 Navlam Sand Blasted Beechwood compact veneer laminate seen faces. White melamine all internal faces.Edge Trim: Nav Diverso ABS Edgebanding - Lamora Oak Ply

Office overhead joinery

JTV-01a Navlam Sand Blasted Black Pearl compact veneer laminate seen faces. Black melamine all internal faces.Edge Trim: Nav Diverso ABS Edgebanding - Black PearlNavlam Sandblasted Black Pearl

Office underbench joinery & skirting

Unless otherwise noted- carcass construction 20mm MDF- end-panels 30mm MDF- benchtop construction 30mm Brush-box timber, 10mm shadowline detail to underbench joinery- overhead joinery; white melamine finish to all internal surfaces both faces- underbench joinery; black melamine finish to all internal surfaces both faces- 20mm shadowline detail to wall junctions & ceiling junctions

JMI MIRROR

JMI-10 Mirror Silver backed mirror with polished edges, frameless. Size: 600 wide x 1000 high Mounting board : Astral Marine Plywood A-C grade 12mm thick

Adult Change

J. JOINERY

JIT Joinery Item

GENERAL NOTE

armarchitecture.com.auL:\0999 SOH Concert Hall\0999 Filing\10 ARM\13 Schedules\A0306_Internal Materials & Finishes Schedule - Additional Works\A0306(-)-A4~INTERNAL MATERIALS & FINISHES LEGEND -

ENTRY CORRIDOR.xlsx5 OF 8

0999 ENTRY CORRIDOR A0306 INTERNAL MATERIALS FINISHES SCHEDULE

Ref.Code

General Description Detailed / Proprietary Description Indicative Location Rev

JPB PINBOARD

JPB-01 Pinboard Forbo Bulletin Board Size: 600w x 2000h x 6mm thickColour: 2209 black oliveNOTE: mount to 8mm MDF backing board with thin profile black anodised aluminium L section. Float mount 6mm

Office

MMA MISCELLANEOUS MATERIAL

MMA-01 Miscellaneous Material - Seating Fabric

Macquarie Textiles 100% Wool Custom commertial upholstery SOH Colour: Purple & JetBasecloth Number: 7689

Amenities Lobby

BFH Fire Hydrant Refer to Fire Consultants drawingsBFR Fire Hose Reel Refer to Fire Consultants drawings

PPF-02 Paint - Acrylic Low Sheen for Plasterboard Walls

Dulux Wash n Wear Advance Low Sheen on plasterboard New InteriorSpec Sheet Code: AUSD0002

PPF-02a Colour Code: (light)PPF-02b Colour Code: (dark)

PPF-03 Paint - Acrylic Semi Gloss for plasterboard walls & ceiling

Dulux Wash n Wear Kitchen & Bathroom Semi Gloss on Plasterboard New InteriorSpec Sheet Code: AUSD4848

PPF-03a Colour Code: (light)PPF-03b Colour Code: (dark)

PPF-04 Paint - Acrylic Low Sheen for Concrete Blockwork Walls, Insitu & Precast Concrete & Fibre Cement Sheet

Dulux Low Sheen Acrylic PremiumSpec Sheet Code: AUSD3284

PPF-04a Colour Code: (light)PPF-04b Colour Code: (dark)

PPF-10 Paint - Acrylic Flat Plasterboard Ceilings

Dulux Professional Enviro02 Tintable Ceiling Flat on Plasterboard New InteriorSpec Sheet Code: AUSD4308

PPF-10a Colour Code: (light)PPF-10b Colour Code: (dark)

INTERIORP. APPLIED FINISHES

B. BUILDING SERVICES

M. MISCELLANEOUS FIXTURES & FITTINGS

armarchitecture.com.auL:\0999 SOH Concert Hall\0999 Filing\10 ARM\13 Schedules\A0306_Internal Materials & Finishes Schedule - Additional Works\A0306(-)-A4~INTERNAL MATERIALS & FINISHES LEGEND -

ENTRY CORRIDOR.xlsx6 OF 8

0999 ENTRY CORRIDOR A0306 INTERNAL MATERIALS FINISHES SCHEDULE

Ref.Code

General Description Detailed / Proprietary Description Indicative Location Rev

PPF-15 Paint - Wash & Wear Matt on New Plywood

Dulux Wash & Wear Matt on New Plywood New InteriorSpec Sheet Code: AUSD12531

PPF-15a Colour Code: (light)PPF-15b Colour Code: (dark)

PPF-20 Paint - Enamel Gloss Timber Doors/Windows/Trim

Dulux Super Enamel Gloss/Professional oil undercoat for Timber New InteriorSpecification Sheet Code: AUSD4603

PPF-20a Colour Code: (light)PPF-20b Colour Code: (dark)

PPF-30 Paint - Enamel Gloss New Metal Pre-primed Metal Doors & Pressed Metal Frames

Dulux Super Enamel Gloss/Professional oil undercoat for Metal New InteriorSpecification Sheet Code: AUSD4603

PPF-30a Colour Code: (light)PPF-30b Colour Code: (dark)PPF-31 Paint - Enamel Gloss

New Metal Canopy & Column Trim

Akzonobel International Paints Semi Gloss Paint SystemIntercure 200 with Interthane 990 topcoatData Sheet Code: 130614-BMUTIM-17C1/4

PPF-31a Colour Code: (light)PPF-31b Colour Code: (dark)

PPO-01 Powdercoat Dulux Duralloy (select colour)PPO-02 Powdercoat Dulux Duralloy (select colour)

PSR-10 Slip Resistant Coating - concrete

Sika Sikaflor 264T - 3 COAT SYSTEM 45 MESH FINISHRefer to Sika Data SheetSlip rating: R11 Colour: window grey

PST-01 Seal System - timber Mirotone Clear Coat Seal Sealer: Mirotec WB 8022 Clear SealerTopcoat: Mirotec WB 8052/30 Clear Satin (2 coats)Refer to Mirotone Data Sheet for full preparation & application detail Builder to supply samples of both Matt & Satin finishes to Architect for approval

timber panelling

armarchitecture.com.auL:\0999 SOH Concert Hall\0999 Filing\10 ARM\13 Schedules\A0306_Internal Materials & Finishes Schedule - Additional Works\A0306(-)-A4~INTERNAL MATERIALS & FINISHES LEGEND -

ENTRY CORRIDOR.xlsx7 OF 8

Schedule of FinishesProject name: SOH Box Office RetailProject number: 1905Revision: Date: Description:

A 14.10.2019 Issue for Tender

code opt. qty description indicative location supplier specification indicative image comments revFINISHES

AC-01 Acrylic POS counter / Fixed Spinner Units

All PlasticsVic KalloghlianT: 02 8038 2000

spec: Acrylic Cleardims: 2440 x1220 x 3mmcolour: clear

A

AC-02 Acrylic Low Table DisplaysAll PlasticsVic KalloghlianT: 02 8038 2000

spec: Acrylic Cleardims: 2440 x1220 x 6mmcolour: clear

A

CR-01 Corian Top shelf of low height table displays

CASFRachel Polidano T: 02 8869 6106

spec: Coriandims: 1828 x 760 x 12mm3658 x 760 x 12mm2745 x 760 x 12mm910 x 760 x 12mmcolour: Summit White (B)

A

GL-01 Toughened Glass Secured Storage cabinet Doors

CONTRACTOR spec: Toughened glassdims: TH 6mm

A

LAM-01 Laminate Internal drawers and cuboards

LAMINEXDoug WilsonT: 0408 331 006

colour: Greycode: TBCfinish: Absolute matte finish

A

LAM-02 Laminate Fixed Spinner UnitsLaminexDoug WilsonT: 0408 331 006

colour: Whitecode: 200 finish: absolute matte finish

A

MT-01 Specialty Bronze Patina Finish

BRONZEWORKSCREATIVE METALST: 02 9319 6331 [email protected]

spec: All brass finishes and fixtures to be finished in Sydney Opera House Bronze special finish by Creative Metals only.

NO SUBSTITUTE ACCEPTED

* Creative Metals to provide finished sample for SOH and designer approval.

A

Schedule of FinishesProject name: SOH Box Office RetailProject number: 1905Revision: Date: Description:

A 14.10.2019 Issue for Tender

code opt. qty description indicative location supplier specification indicative image comments revFINISHES

AC-01 Acrylic POS counter / Fixed Spinner Units

All PlasticsVic KalloghlianT: 02 8038 2000

spec: Acrylic Cleardims: 2440 x1220 x 3mmcolour: clear

A

AC-02 Acrylic Low Table DisplaysAll PlasticsVic KalloghlianT: 02 8038 2000

spec: Acrylic Cleardims: 2440 x1220 x 6mmcolour: clear

A

CR-01 Corian Top shelf of low height table displays

CASFRachel Polidano T: 02 8869 6106

spec: Coriandims: 1828 x 760 x 12mm3658 x 760 x 12mm2745 x 760 x 12mm910 x 760 x 12mmcolour: Summit White (B)

A

GL-01 Toughened Glass Secured Storage cabinet Doors

CONTRACTOR spec: Toughened glassdims: TH 6mm

A

LAM-01 Laminate Internal drawers and cuboards

LAMINEXDoug WilsonT: 0408 331 006

colour: Greycode: TBCfinish: Absolute matte finish

A

LAM-02 Laminate Fixed Spinner UnitsLaminexDoug WilsonT: 0408 331 006

colour: Whitecode: 200 finish: absolute matte finish

A

MT-01 Specialty Bronze Patina Finish

BRONZEWORKSCREATIVE METALST: 02 9319 6331 [email protected]

spec: All brass finishes and fixtures to be finished in Sydney Opera House Bronze special finish by Creative Metals only.

NO SUBSTITUTE ACCEPTED

* Creative Metals to provide finished sample for SOH and designer approval.

A

MT-02 Mesh Shopfront Door panels SPEC TBC - pending weight restrictions for panels A

MT-03 Brass Rod Display BoxesLow Display Tables

BRONZEWORKST: 03 9427 7157 [email protected]

spec: solid brass rodfinish: MT-01dims: DIA6 / 9 /4mm refer to drawingsinstall: Rod to be cleanly curved and spot welded where needed. Ensure clean finish. Refer to drawings.

A

MT-04 Brass Sheet POS Counter Pandor Display Skirtings

BRONZEWORKST: 03 9427 7157 [email protected]

spec: Brass sheetfinish: MT-01dims: various thicknesses Refer to drawingsfixing: Conceal fixed

A

Mt-05 Brass angle Watch DisplayTimber display boxes

BRONZEWORKST: 03 9427 7157 [email protected]

spec: Brass anglefinish: MT-01dims: various dims Refer to drawingsfixing: Conceal fixed

A

PC-01 Powdercoat - Bronze Folding Shopfront System

DULUXT: 03 8787 4500

range: Electrocode: 9068183Kcolour: medium bronzefinish: flat

A

PT-01 Magnetic paint Fixed Spinner Units RESENE

spec: Magnetic Magic application: must be spray appliedbase coat: Magnetic base coating, 2-3 coats for maximum magnetic strengthtop coat: Resene SpaceCote Low Sheen waterborne enamel, colour: TBC

A

TM-01 Solid Brushbox Timber ThroughoutBritton TimbersAnthony LongT: 02 8783 9900

spec: Solid Brushbox dims: Various thicknesses, refer to drawingsfinish: 2-pac clear PU coating 5%gloss, open grain.

* Joiner to provide finished sampl for SOH and designer approval.TM-01 & TM-02 to match

A

TM-02 Timber Veneer - Brushbox

Briggs VeneersHelen KerstensT: 02 9732 7888 or similar

spec: Brushbox veneercolour: medium dims: 2450mm x 1250mm x 0.6mmother lengths: 2750mm or 3010mmcut type: quarter cutmatching: slip matched

* Joiner to provide finished sampl for SOH and designer approval.TM-01 & TM-02 to match

A

MT-02 Mesh Shopfront Door panels SPEC TBC - pending weight restrictions for panels A

MT-03 Brass Rod Display BoxesLow Display Tables

BRONZEWORKST: 03 9427 7157 [email protected]

spec: solid brass rodfinish: MT-01dims: DIA6 / 9 /4mm refer to drawingsinstall: Rod to be cleanly curved and spot welded where needed. Ensure clean finish. Refer to drawings.

A

MT-04 Brass Sheet POS Counter Pandor Display Skirtings

BRONZEWORKST: 03 9427 7157 [email protected]

spec: Brass sheetfinish: MT-01dims: various thicknesses Refer to drawingsfixing: Conceal fixed

A

Mt-05 Brass angle Watch DisplayTimber display boxes

BRONZEWORKST: 03 9427 7157 [email protected]

spec: Brass anglefinish: MT-01dims: various dims Refer to drawingsfixing: Conceal fixed

A

PC-01 Powdercoat - Bronze Folding Shopfront System

DULUXT: 03 8787 4500

range: Electrocode: 9068183Kcolour: medium bronzefinish: flat

A

PT-01 Magnetic paint Fixed Spinner Units RESENE

spec: Magnetic Magic application: must be spray appliedbase coat: Magnetic base coating, 2-3 coats for maximum magnetic strengthtop coat: Resene SpaceCote Low Sheen waterborne enamel, colour: TBC

A

TM-01 Solid Brushbox Timber ThroughoutBritton TimbersAnthony LongT: 02 8783 9900

spec: Solid Brushbox dims: Various thicknesses, refer to drawingsfinish: 2-pac clear PU coating 5%gloss, open grain.

* Joiner to provide finished sampl for SOH and designer approval.TM-01 & TM-02 to match

A

TM-02 Timber Veneer - Brushbox

Briggs VeneersHelen KerstensT: 02 9732 7888 or similar

spec: Brushbox veneercolour: medium dims: 2450mm x 1250mm x 0.6mmother lengths: 2750mm or 3010mmcut type: quarter cutmatching: slip matched

* Joiner to provide finished sampl for SOH and designer approval.TM-01 & TM-02 to match

A

RETAIL FIXTURES / HARDWARE

FX-01 Xero L P/L profile Set - Electrified

Rear Wall adjustable shelving

MADE RETAIL SYSTEMSZoe LoughlinT: 0487 773 217

spec: Xero L P/L profile set - electrifieddims: Lengths - 1200/2400/3000mm cut down lengths to suit, refer to drawings.finish: Blackweight load: 100kg per 1000mm

A

FX-02 Xero L P/L Brackets for wooden shelf

Rear Wall adjustable shelving

MADE RETAIL SYSTEMSZoe LoughlinT: 0487 773 217

spec: Xero L P/L Brackets for wooden shelfwith single power adapter 24Vdims: D406mm - max display depth 380mfinish: .07 Khaki Bronceweight load: 25kg

A

FX-03 Brass rod T-Shirt DisplayPOS Wrapping

CONTRACTOR

spec: Brass tube finish: MT-01dims: refer to drawingsinstall: Rods fixed with recessed brass flange to side panels with flush small flat screws.

A

FX-04 Visplay Invisible Horizontal

Artwork Display Wall /Gondola & Fixed spinner units

MADE RETAIL SYSTEMSZoe LoughlinT: 0487 773 217

spec: Invisible 3 Profile for wooden panelsweight load: max weight load - 12kg per 625mm finish: natural anodised aluminium

A

FX-05 Castor Wheel Mobile cupboard unit TENTET: 1300 836 831

Joiner to advise best castor spec for weight of units

A

FX-06 Fixed adjustable foot Gondola and low display tables

CASTOR & INDUSTRIALT: 1800 074 633 or equal to

item: Fixed adjustable feetcode: AF41/40/M10/35finish: stainless steel / Black dims: dia40 x H55mm

A

FX-07 Shelf Bracket for Wooden shelf

Artwork Display WallBY JOINERDetails to be discussed with designer.

spec: Hanger Framedims: various sizes finish: Custom - Brushbox timber with solid hardware fixings Qty: Refer to Drawings

A

FX-08 Xero L P/L profile Set - Non Electrified

Gondola Adjustable shelving

MADE RETAIL SYSTEMSZoe LoughlinT: 0487 773 217

spec: Xero L P/L profile set - non-electrifieddims: Lengths - 1200/2400/3000mm cut down lengths to suit, refer to drawings.finish: .Blackweight load: 100kg per 1000mm

A

Schedule of FinishesProject name: SOH Box Office RetailProject number: 1905Revision: Date: Description:

A 14.10.2019 Issue for Tender

code opt. qty description indicative location supplier specification indicative image comments revFINISHES

AC-01 Acrylic POS counter / Fixed Spinner Units

All PlasticsVic KalloghlianT: 02 8038 2000

spec: Acrylic Cleardims: 2440 x1220 x 3mmcolour: clear

A

AC-02 Acrylic Low Table DisplaysAll PlasticsVic KalloghlianT: 02 8038 2000

spec: Acrylic Cleardims: 2440 x1220 x 6mmcolour: clear

A

CR-01 Corian Top shelf of low height table displays

CASFRachel Polidano T: 02 8869 6106

spec: Coriandims: 1828 x 760 x 12mm3658 x 760 x 12mm2745 x 760 x 12mm910 x 760 x 12mmcolour: Summit White (B)

A

GL-01 Toughened Glass Secured Storage cabinet Doors

CONTRACTOR spec: Toughened glassdims: TH 6mm

A

LAM-01 Laminate Internal drawers and cuboards

LAMINEXDoug WilsonT: 0408 331 006

colour: Greycode: TBCfinish: Absolute matte finish

A

LAM-02 Laminate Fixed Spinner UnitsLaminexDoug WilsonT: 0408 331 006

colour: Whitecode: 200 finish: absolute matte finish

A

MT-01 Specialty Bronze Patina Finish

BRONZEWORKSCREATIVE METALST: 02 9319 6331 [email protected]

spec: All brass finishes and fixtures to be finished in Sydney Opera House Bronze special finish by Creative Metals only.

NO SUBSTITUTE ACCEPTED

* Creative Metals to provide finished sample for SOH and designer approval.

A

Schedule of FinishesProject name: SOH Box Office RetailProject number: 1905Revision: Date: Description:

A 14.10.2019 Issue for Tender

code opt. qty description indicative location supplier specification indicative image comments revFINISHES

AC-01 Acrylic POS counter / Fixed Spinner Units

All PlasticsVic KalloghlianT: 02 8038 2000

spec: Acrylic Cleardims: 2440 x1220 x 3mmcolour: clear

A

AC-02 Acrylic Low Table DisplaysAll PlasticsVic KalloghlianT: 02 8038 2000

spec: Acrylic Cleardims: 2440 x1220 x 6mmcolour: clear

A

CR-01 Corian Top shelf of low height table displays

CASFRachel Polidano T: 02 8869 6106

spec: Coriandims: 1828 x 760 x 12mm3658 x 760 x 12mm2745 x 760 x 12mm910 x 760 x 12mmcolour: Summit White (B)

A

GL-01 Toughened Glass Secured Storage cabinet Doors

CONTRACTOR spec: Toughened glassdims: TH 6mm

A

LAM-01 Laminate Internal drawers and cuboards

LAMINEXDoug WilsonT: 0408 331 006

colour: Greycode: TBCfinish: Absolute matte finish

A

LAM-02 Laminate Fixed Spinner UnitsLaminexDoug WilsonT: 0408 331 006

colour: Whitecode: 200 finish: absolute matte finish

A

MT-01 Specialty Bronze Patina Finish

BRONZEWORKSCREATIVE METALST: 02 9319 6331 [email protected]

spec: All brass finishes and fixtures to be finished in Sydney Opera House Bronze special finish by Creative Metals only.

NO SUBSTITUTE ACCEPTED

* Creative Metals to provide finished sample for SOH and designer approval.

A

MT-02 Mesh Shopfront Door panels SPEC TBC - pending weight restrictions for panels A

MT-03 Brass Rod Display BoxesLow Display Tables

BRONZEWORKST: 03 9427 7157 [email protected]

spec: solid brass rodfinish: MT-01dims: DIA6 / 9 /4mm refer to drawingsinstall: Rod to be cleanly curved and spot welded where needed. Ensure clean finish. Refer to drawings.

A

MT-04 Brass Sheet POS Counter Pandor Display Skirtings

BRONZEWORKST: 03 9427 7157 [email protected]

spec: Brass sheetfinish: MT-01dims: various thicknesses Refer to drawingsfixing: Conceal fixed

A

Mt-05 Brass angle Watch DisplayTimber display boxes

BRONZEWORKST: 03 9427 7157 [email protected]

spec: Brass anglefinish: MT-01dims: various dims Refer to drawingsfixing: Conceal fixed

A

PC-01 Powdercoat - Bronze Folding Shopfront System

DULUXT: 03 8787 4500

range: Electrocode: 9068183Kcolour: medium bronzefinish: flat

A

PT-01 Magnetic paint Fixed Spinner Units RESENE

spec: Magnetic Magic application: must be spray appliedbase coat: Magnetic base coating, 2-3 coats for maximum magnetic strengthtop coat: Resene SpaceCote Low Sheen waterborne enamel, colour: TBC

A

TM-01 Solid Brushbox Timber ThroughoutBritton TimbersAnthony LongT: 02 8783 9900

spec: Solid Brushbox dims: Various thicknesses, refer to drawingsfinish: 2-pac clear PU coating 5%gloss, open grain.

* Joiner to provide finished sampl for SOH and designer approval.TM-01 & TM-02 to match

A

TM-02 Timber Veneer - Brushbox

Briggs VeneersHelen KerstensT: 02 9732 7888 or similar

spec: Brushbox veneercolour: medium dims: 2450mm x 1250mm x 0.6mmother lengths: 2750mm or 3010mmcut type: quarter cutmatching: slip matched

* Joiner to provide finished sampl for SOH and designer approval.TM-01 & TM-02 to match

A

MT-02 Mesh Shopfront Door panels SPEC TBC - pending weight restrictions for panels A

MT-03 Brass Rod Display BoxesLow Display Tables

BRONZEWORKST: 03 9427 7157 [email protected]

spec: solid brass rodfinish: MT-01dims: DIA6 / 9 /4mm refer to drawingsinstall: Rod to be cleanly curved and spot welded where needed. Ensure clean finish. Refer to drawings.

A

MT-04 Brass Sheet POS Counter Pandor Display Skirtings

BRONZEWORKST: 03 9427 7157 [email protected]

spec: Brass sheetfinish: MT-01dims: various thicknesses Refer to drawingsfixing: Conceal fixed

A

Mt-05 Brass angle Watch DisplayTimber display boxes

BRONZEWORKST: 03 9427 7157 [email protected]

spec: Brass anglefinish: MT-01dims: various dims Refer to drawingsfixing: Conceal fixed

A

PC-01 Powdercoat - Bronze Folding Shopfront System

DULUXT: 03 8787 4500

range: Electrocode: 9068183Kcolour: medium bronzefinish: flat

A

PT-01 Magnetic paint Fixed Spinner Units RESENE

spec: Magnetic Magic application: must be spray appliedbase coat: Magnetic base coating, 2-3 coats for maximum magnetic strengthtop coat: Resene SpaceCote Low Sheen waterborne enamel, colour: TBC

A

TM-01 Solid Brushbox Timber ThroughoutBritton TimbersAnthony LongT: 02 8783 9900

spec: Solid Brushbox dims: Various thicknesses, refer to drawingsfinish: 2-pac clear PU coating 5%gloss, open grain.

* Joiner to provide finished sampl for SOH and designer approval.TM-01 & TM-02 to match

A

TM-02 Timber Veneer - Brushbox

Briggs VeneersHelen KerstensT: 02 9732 7888 or similar

spec: Brushbox veneercolour: medium dims: 2450mm x 1250mm x 0.6mmother lengths: 2750mm or 3010mmcut type: quarter cutmatching: slip matched

* Joiner to provide finished sampl for SOH and designer approval.TM-01 & TM-02 to match

A

RETAIL FIXTURES / HARDWARE

FX-01 Xero L P/L profile Set - Electrified

Rear Wall adjustable shelving

MADE RETAIL SYSTEMSZoe LoughlinT: 0487 773 217

spec: Xero L P/L profile set - electrifieddims: Lengths - 1200/2400/3000mm cut down lengths to suit, refer to drawings.finish: Blackweight load: 100kg per 1000mm

A

FX-02 Xero L P/L Brackets for wooden shelf

Rear Wall adjustable shelving

MADE RETAIL SYSTEMSZoe LoughlinT: 0487 773 217

spec: Xero L P/L Brackets for wooden shelfwith single power adapter 24Vdims: D406mm - max display depth 380mfinish: .07 Khaki Bronceweight load: 25kg

A

FX-03 Brass rod T-Shirt DisplayPOS Wrapping

CONTRACTOR

spec: Brass tube finish: MT-01dims: refer to drawingsinstall: Rods fixed with recessed brass flange to side panels with flush small flat screws.

A

FX-04 Visplay Invisible Horizontal

Artwork Display Wall /Gondola & Fixed spinner units

MADE RETAIL SYSTEMSZoe LoughlinT: 0487 773 217

spec: Invisible 3 Profile for wooden panelsweight load: max weight load - 12kg per 625mm finish: natural anodised aluminium

A

FX-05 Castor Wheel Mobile cupboard unit TENTET: 1300 836 831

Joiner to advise best castor spec for weight of units

A

FX-06 Fixed adjustable foot Gondola and low display tables

CASTOR & INDUSTRIALT: 1800 074 633 or equal to

item: Fixed adjustable feetcode: AF41/40/M10/35finish: stainless steel / Black dims: dia40 x H55mm

A

FX-07 Shelf Bracket for Wooden shelf

Artwork Display WallBY JOINERDetails to be discussed with designer.

spec: Hanger Framedims: various sizes finish: Custom - Brushbox timber with solid hardware fixings Qty: Refer to Drawings

A

FX-08 Xero L P/L profile Set - Non Electrified

Gondola Adjustable shelving

MADE RETAIL SYSTEMSZoe LoughlinT: 0487 773 217

spec: Xero L P/L profile set - non-electrifieddims: Lengths - 1200/2400/3000mm cut down lengths to suit, refer to drawings.finish: .Blackweight load: 100kg per 1000mm

A

CEILING FINISH

XC- Existing pre-form concrete columns and walls

XC - Existing pre-form concrete beams.BR1 -

Brass plate to counter fronts withgradually darkened patina. Top ofbrass counter to be natural/ off themill brass colour, bottom to be pre-aged/ burnished brass colour

FLOOR FINISHES

XPC2 - Existing precast granite wall Panels (Cleaned and lightened)

XPC1 - Precast granite pavers with grout infill and brass screws for levelling. Resilient slip resistant compliant for external use.

XCPS- Existing Boarded Precast Concrete Strutural Walls Painted

XGLBF - North Wall Bronze framed double door, hinged entry door XFGL - Existing frosted glazing. Bathroomhingeddoors

DOORS

JOINERY FINISHES

PRODUCT INFORMATION

FURNITURE

Morosso Serpentine Lounge by Tom Dixon, amended to suitAS1428.2, upholstery: 'UNIFORM' Blueberry

SERVICES

XSC - Existing suspended aluminium service carriage by Steensen Varming. Emergency fire, sprinkler, speakers, security cameras, rigging points and lighting elements incorporated.

SC1, - New suspended aluminium service carriages to SC3 match existing.

WALL FINISHES

BT1 -

Acrylic solid surface, equal toMarblo Opal series, colour Ariel(cream white)

BR4 -

Pre-aged/ burnished brass plate tocounter fronts skirting.

ARM ARCHITECTURE FINISHES taken from drawing 49-BR-ARM01-A0306(4) fromARM Architecture's Construction Drawing Set

FIVE FOOT ONE FINISHES taken from drawing SOH Box Office Retail Schedule ofFinishes Revision A from Five Foot One's Tender Drawing Set