Switch/Update to Team Foundation Server 2012
description
Transcript of Switch/Update to Team Foundation Server 2012
28. Januar, Zürich-Oerlikon
Switch/Update to Team Foundation Server 2012
André HofmannSoftware Engineerbbv Software Services AG
Agenda
Agenda
• Hardware and Software Requirements
• Supported Upgrade Paths• Walktrough Migration Upgrade• Post Configuration• Reports• Builds
• TFS 2012 Features Activation
Hardware and Software Requirements
Chapter 1 of 6
OS Requirements for TFS
Supported Versions:• 64-bit version of Windows Server 2008 with SP2• 64-bit version of Windows Server 2008 R2 with SP1• 64-bit versions of Windows Server 2012
http://msdn.microsoft.com/en-us/library/vstudio/dd578592.aspx
SQL Server Requirements for TFSSupported Editions:• SQL Server 2008, R2 Express• SQL Server 2008, R2 Standard Edition• SQL Server 2008, R2 Enterprise Edition with SP1 CU1 (25.
August 2011)• SQL Server 2012, Express• SQL Server 2012, Standard Edition• SQL Server 2012, Enterprise Edition
http://msdn.microsoft.com/en-us/library/vstudio/dd631889.aspx
SharePoint Products Requirements for TFSSupported Editions:• SharePoint 15 Technical Preview• SharePoint Foundation 2010• SharePoint Server 2010, Enterprise Edition• SharePoint Server 2010, Standard Edition• Office SharePoint Server 2007, Enterprise Edition• Office SharePoint Server 2007, Standard Edition• Windows SharePoint Services 3.0
http://msdn.microsoft.com/en-us/library/vstudio/hh667648.aspx
Hardware Recommendations
If you install SharePoint 2010, you will need 1 quad core and a base minimum of 4 GB or better 10 GB of system memory and additionally hard disk memory.
Number of Users
Configuration CPU Memory Hard Disk
Fewer than 250 users
Single-server (Team Foundation Server and the Database Engine on the same server).
1 single core processor at 2.13 GHz
2 GB 1 disk at 7.2k rpm (125 GB)
250 to 500 users Single-server. 1 dual core processor at 2.13 GHz
4 GB 1 disk at 10k rpm (300 GB)
500 to 2,200 users Dual-server (Team Foundation Server and the Database Engine on different servers). This row is for Team Foundation Server.
1 dual core Intel Xeon processor at 2.13 GHz
4 GB 1 disk at 7.2k rpm (500 GB)
This row is for the Database Engine with 500 to 2,200 users.
1 quad core Intel Xeon processor at 2.33 GHz
8 GB SAS disk array at 10k rpm (2 TB)
2,200 to 3,600 users
Dual-server. This row is for Team Foundation Server.
1 quad core Intel Xeon processor at 2.13 GHz
8 GB 1 disk at 7.2k rpm (500 GB)
This row is for the Database Engine with 2,200 to 3,600 users.
2 quad core Intel Xeon processors at 2.33 GHz
16 GB SAS disk array at 10k rpm (3 TB)http://msdn.microsoft.com/en-us/library/vstudio/dd578592.aspx
Supported Upgrade PathsChapter 2 of 6
Upgrade TFS 2012 from the following Releases:
http://msdn.microsoft.com/en-us/library/vstudio/dd631912.aspx
• Team Foundation Server 2012 RTM, Developer Preview, Beta or RC Release
• Team Foundation Server 2010 with or without SP1• Team Foundation Server 2008 with SP1
• TFS 2005?=> TFS 2008/2010 => TFS 2012
Basic or Express Upgrade
http://msdn.microsoft.com/en-us/library/vstudio/jj620928.aspx
Standard (In-Place) Upgrade
http://msdn.microsoft.com/en-us/library/vstudio/jj620925.aspx
Advanced (Migration) Upgrade
http://msdn.microsoft.com/en-us/library/vstudio/jj620930.aspx
Walktrough Migration Upgrade
Chapter 3 of 6
Migration TFS 2010 to TFS 2012
Scenario:
• TFS 2010• Windows Server
2008 R2 SP1• Microsoft SQL
Server 2008 R2• SharePoint 2010
• TFS 2012• Windows Server
2008 R2 SP1• Microsoft SQL
Server 2012• SharePoint 2010
Backup TFS 2010
1. Download and install TFS Server 2010 Power Tools (creates the node «Team Foundation Backups» in the Team Foundation Server Administration Console).
2. Stop all of the services, application pools and operations of TFS with «TFSServiceControl quiesce» command:
Backup TFS 2010
3. Create Backup
Backup TFS 2010
4. Start all of the services, application pools and operations of TFS with «TFSServiceControl unquiesce» command:
Migration
1. Switch to target system and install TFS Server 2012 Power Tools (installs the Restore Databeses Wizard)
2. Start Restore Databases Wizard and follow instructions
Migration
Migration
Migration
Migration
Migration
3. Start Team Foundation Server Administration Console
Migration
Migration
Migration
Migration
Migration
Migration
Migration
Migration
Migration
Migration
Migration
Migration
Migration
Migration
Migration
Migration
Post Configuration ReportsChapter 4 of 6
Reporting Services Configuration1. Start Reporting Services Configuration Management Tool
Reporting Services Configuration2. Connect to Report Service
Reporting Services Configuration3. Change the database to the restored database
Reporting Services Configuration4. Restore Encryption Key
Reporting Services Configuration5. Open IIS go to Team Foundation Server site and enable
directory browsing for v3.0. After that browse to WarehouseControlService.asmx
Reporting Services Configuration6. Open WarehouseControlWebService in Internet Explorer
Reporting Services Configuration7. Invoke ProcessWarehouse with no parameters
8. Invoke ProcessAnalysisDatabase with parameter processingType and value Full
Reporting Services Configuration9. Update Reporting in TFS Administration Console
Post Configuration BuildsChapter 5 of 6
Build Configuration
Build Configuration
Build Configuration
Build Configuration
Build Configuration
Build Configuration
Build Configuration
Build Configuration
Build Configuration
Build Configuration
Build Configuration
Build ConfigurationDon´t forget to update the build drop
TFS 2012 Features ActivationChapter 5 of 6
TFS 2012 New Features Activation• Code Review• Feedback• My Work• Planning Tools• Storyboard Integration
TFS 2012 New Features ActivationRun the «configure features» wizard in Team Web Access for each Team Project.
TFS 2012 New Features Activation for customized Process Templates1. Download the latest Agile ProcessTemplate2. New work items must be imported manually
CodeReviewRequest CodeReviewResponseEtc.
witadmin importwitd /collection:CollectionURL /p:"ProjectName" /f:"DirectoryPath\FeedbackRequest.xml"
3. Update the workflow of User Story and Task (New and Removed states)
4. Import definitions of new categories witadmin importcategories /collection:CollectionURL /p:ProjectName /f:"DirectoryPath\categories.xml"
http://msdn.microsoft.com/en-us/library/hh500409.aspx#wit
TFS 2012 New Features Activation for customized Process Templates5. Import the process configuration files for new backlog and
board pages witadmin importagileprocessconfig /collection:CollectionURL /p:"ProjectName" /f:"DirectoryPath\AgileConfiguration.xml"
witadmin importcommonprocessconfig /collection:CollectionURL /p:"ProjectName" /f:"DirectoryPath\CommonConfiguration.xml"
http://msdn.microsoft.com/en-us/library/hh500409.aspx#wit
Finished
Additional Information• Installing/Upgrade TFS Server and Visua
l Studio ALM• TFS Server Upgrade Guide ALM Rangers
Thank you for your attention
Contact:André Hofmann
bbv Software Services AGUntermüli 5CH-6302 Zug+41 41 766 19 [email protected]
© 2012 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries.The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a
commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.