    AGRO-HYDROLOGIC STUDIES F0R

    SMALL WATER IMPOUNDING PROJECT

    Project : Maglambong SWIP (Default : BSWM SWIP)

    Location : Bgy. Maglambong, Monreal, Masbate (Default : Diliman, Quezon City)

    1. Project Data

    a. Drainage Area, D.A. : 75.00

    = 0.75

    = 0.29

    b. Mainstream Length from outlet to highest ridge, L : 1,100.00

    = 0.68

    c. Mainstream Length from outlet to point nearest

    Basin Centroid, Lc : 550.00

    = 0.34

    d. Total Fall from Highest Ridge to outlet, H : 230

    e. Watershed Gradient, Y : 20.91

    f. Soil Type of Watershed : Clay

    g. Soil Group for Watershed Index Determination (A, B, C, or D) : D

    2. Computation of Basin Lag Time(TL), Time of Concentration(Tc), Time-to-Peak (TP),

    and Peak Rate of Run-off(qp)

    a. Basin Lag Time, TL(unadjusted) = 0.93

    Drainage Area Coefficient: 1.2

    1.2 for mountainous drainage area

    0.72 for foothill drainage area

    0.35 for valley drainage area

    b. Adjusted Estimate of TL, INCR. D: 0.40 = 0.99

    c. Time of Concentration, Tc = 1.41

    d. Time to Peak, Tp = 1.19

    e. Peak Rate Run-off, qp = 0.15

    3. Determination of Precipitation Depth, P for Return Period of N yrs.

    Using Rainfall-Intensity-Duration-Frequency-Curve

    Station: Catbalogan Western, Samar

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    2/64

    a : 51.11 b : 0.10 c : 0.2

    d : 0.62 Return Period : 25 yrs.

    Rainfall Intensities and Depths for Multiples of

    Unit Duration( 25-year Return Period )

    Seq. No Duration,D Rainfall Intensity Precipitation Depth

    i Hr. mm/hr. Pi= ID, mm

    1 0.40 150.48 60.19

    2 0.80 104.52 83.62

    3 1.20 83.22 99.86

    4 1.60 70.46 112.74

    5 2.00 61.81 123.62

    6 2.40 55.48 133.15

    7 2.80 50.60 141.68

    8 3.20 46.71 149.469 3.60 43.51 156.63

    10 4.00 40.82 163.30

    11 4.40 38.54 169.55

    12 4.80 36.55 175.46

    13 5.20 34.82 181.05

    14 5.60 33.28 186.38

    15 6.00 31.91 191.47

    Calculation and Rearrangement of Rainfall Increments

    (2/3 Position)

    Seq. No. Rainfall Increments Rearranged Rainfall

    i (mm) Increments, 2/3 Position

    1 P1 = 60.19 P14 = 5.33

    2 P2 = 23.43 P13 = 5.59

    3 P3 = 16.24 P12 = 5.90

    4 P4 = 12.88 P10 = 6.67

    5 P5 = 10.88 P9 = 7.17

    6 P6 = 9.52 P7 = 8.53

    7 P7 = 8.53 P6 = 9.52

    8 P8 = 7.77 P5 = 10.889 P9 = 7.17 P3 = 16.24

    10 P10 = 6.67 P2 = 23.43

    11 P11 = 6.26 P1 = 60.19

    12 P12 = 5.90 P4 = 12.88

    13 P13 = 5.59 P8 = 7.77

    14 P14 = 5.33 P11 = 6.26

    15 P15 = 5.09 P15 = 5.09

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    3/64

    4. Hyrologic Abstraction and Unit Hydrograph Derivation

    a. Maximum Potential Difference, S = 84.67

    Watershed Index : 75

    b. Initial Abstraction, Ia = 16.93

    c. Retention Depth, f(INCR.D) = 0.41

    Retention Rate,mm/hr = 1.02

    Rainfall Excess Computation Using Hydrologic Abstraction and

    2/3 Position Maximization Pattern

    Seq. No. Rainfall Increments Abstraction Retention Rainfall Excess

    i (mm.) (mm.) (mm.) (mm.)

    1 5.33 5.33 0.00 0.00

    2 5.59 5.59 0.00 0.00

    3 5.90 5.90 0.00 0.00

    4 6.67 0.11 0.00 6.67

    5 7.17 0.00 0.41 6.76

    6 8.53 0.00 0.41 8.13

    7 9.52 0.41 9.12

    8 10.88 0.41 10.47

    9 16.24 0.41 15.83

    10 23.43 0.41 23.02

    11 60.19 0.41 59.78

    12 12.88 0.41 12.48

    13 7.77 0.41 7.37

    14 6.26 0.41 5.85

    15 5.09 0.41 4.68

    Derivation of Synthetic Unit Hydrograph

    Seq. No. Time Dimensionless Hydrograph Unit Hydrograph

    i Hrs. T/Tp (q/qp)i Ui Uu=Ui/K

    1 0.40 0.34 0.188 0.029 0.0252 0.80 0.67 0.735 0.112 0.096

    3 1.20 1.01 1.012 0.154 0.133

    4 1.60 1.35 0.788 0.120 0.103

    5 2.00 1.68 0.484 0.074 0.063

    6 2.40 2.02 0.298 0.045 0.039

    7 2.80 2.36 0.184 0.028 0.024

    8 3.20 2.70 0.113 0.017 0.015

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    4/64

    9 3.60 3.03 0.070 0.011 0.009

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    5/64

    10 4.00 3.37 0.043 0.007 0.006

    11 4.40 3.71 0.027 0.004 0.004

    12 4.80 4.04 0.017 0.003 0.002

    13 5.20 4.38 0.010 0.002 0.001

    14 5.60 4.72 0.006 0.001 0.001

    15 6.00 5.05 0.000 0.000 0.000

    Total >>> 0.604 0.521

    Correction Factor, K = 1.160

    To check, K must be equal to 1

    Factor, K = 1.00 THEN, OK

    |::

    FLOOD HYDROGRAPH FOR THE DESIGN FLOOD

    Seq. No. Time, Hrs Discharge, Q cms

    0 0.00 0.00

    1 0.40 0.00

    2 0.80 0.00

    3 1.20 0.00

    4 1.60 0.16

    5 2.00 0.81

    6 2.40 1.74

    7 2.80 2.59

    8 3.20 3.33

    9 3.60 4.13

    10 4.00 5.36

    11 4.40 8.02

    12 4.80 12.13

    13 5.20 13.54

    14 5.60 11.28

    15 6.00 8.34

    16 6.40 6.10

    17 6.80 4.23

    18 7.20 2.70

    19 7.60 1.67

    20 8.00 1.0321 8.40 0.63

    22 8.80 0.38

    23 9.20 0.23

    24 9.60 0.13

    25 10.00 0.05

    26 10.40 0.02

    27 10.80 0.01

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    6/64

    28 11.20 0.00

    29 11.60 0.00

    30 12.00 0.00

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    7/64

    0 .0 0

    0 .8

    0

    1 .6 0

    2 .4

    0

    3 .2 0

    4 .0

    0

    4 .8 0

    5 .6

    0

    6 .4

    0

    7 .2

    0

    8 .0 0

    8 .8

    0

    9 .6 0

    0.00

    2.00

    4.00

    6.00

    8.00

    10.00

    12.00

    14.00

    16.00

    FLOOD HYDROGRAPH

    Time, Hrs.

    Q,cms.

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    8/64

    10 .4 0

    1 1 .2 0

    1 2 .0 0

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    9/64

    Computation of Mean and 80 % Dependable Rainfall

    Project: Maglambong SWIP Data Entries OK (Yes or No): Yes

    Location: Bgy. Maglambong, Monre

    R-Station: Catbalogan, Samar

    Month Decade Mean 80% Dep Isohyetal Adjusted Rain

    Rain Rain Reading Mean 80% Dep

    Catbalogan, Samar At Project Site

    Jan 1 12.10 9.98 200.00 49.59 40.90

    2 16.50 10.30 67.62 42.21

    3 20.20 10.61 82.79 43.48

    Feb 4 12.30 17.48 95.00 29.66 42.15

    5 13.80 14.65 33.27 35.32

    6 13.30 15.72 32.07 37.90

    Mar 7 11.00 8.98 95.00 25.36 20.718 13.60 10.10 31.36 23.29

    9 16.60 3.62 38.28 8.35

    Apr 10 20.00 5.62 80.00 16.99 4.77

    11 34.90 6.27 29.64 5.32

    12 39.30 6.58 33.38 5.59

    May 13 30.90 11.45 125.00 25.05 9.28

    14 49.40 22.97 40.05 18.62

    15 73.90 16.95 59.91 13.74

    Jun 16 48.40 16.03 160.00 53.22 17.63

    17 43.60 28.50 47.95 31.34

    18 53.50 49.54 58.83 54.48

    Jul 19 56.80 43.74 175.00 50.92 39.21

    20 70.60 28.07 63.29 25.17

    21 67.80 24.27 60.78 21.76

    Aug 22 98.90 20.12 200.00 80.64 16.40

    23 82.60 17.36 67.35 14.15

    24 63.80 35.93 52.02 29.29

    Sep 25 76.80 17.93 190.00 86.04 20.09

    26 58.10 24.35 65.09 27.28

    27 34.70 35.65 38.87 39.94

    Oct 28 54.20 11.42 260.00 52.66 11.10

    29 94.60 32.08 91.91 31.17

    30 118.80 18.87 115.43 18.33

    Nov 31 39.00 26.42 300.00 87.31 59.15

    32 53.80 22.01 120.45 49.28

    33 41.20 19.30 92.24 43.21

    Dec 34 32.90 18.29 300.00 110.90 61.65

    35 24.20 25.24 81.57 85.08

    (Pls put yes after filing-up the

    table below)

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    10/64

    36 31.90 20.18 107.53 68.02

    Total 1624.00 706.58 2180.00 1115.37

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    11/64

    FIELD WATER BALANCE COMPUTATION

    Project Name: Maglambong SWIP

    Bgy. Maglambong, Monreal, Masbate

    Percolation: 1.75 mm/day Irrigation Eff.= 51 %(for Rice)

    S.W.H.C.: 20 % 54 %(for Upland Crops)

    PET Stn : Catbalogan, Samar

    Aver.PET: Jan Feb Mar Apr May Jun Jul Aug Sep

    3.40 3.50 3.90 4.70 5.20 5.00 4.80 3.90 3.70

    Entries on Parameters OK: (Yes or NO) Yes

    Starting Month (May-Jun, Jul-Aug, Nov-Dec): Jul-Aug Starting Decade: ( 15-18 ):

    FIRST CROP: Paddy Rice ( 1 )

    (Paddy Rice, Corn, Tobacco, Vegetables, Garlic, Onion) Previous/Initial STOR =

    DECADE RAIN, @ AVE. PET CROP CROP ROOT AET PERCO- CHANGE INITIAL STOR

    80 % COEFF. DEPTH LATION IN STOR STOR

    20 25.17 48.00 1.00 0 48.00 17.50 -40.33 25.25 25.25

    21 21.76 52.80 1.00 0 52.80 19.25 -50.29 -25.04 65.00

    22 16.40 39.00 1.00 0 39.00 17.50 -40.10 24.90 24.90

    23 14.15 39.00 1.00 0 39.00 17.50 -42.35 -17.44 50.00

    24 29.29 42.90 1.00 0 42.90 19.25 -32.86 17.14 50.00

    25 20.09 37.00 1.00 0 37.00 17.50 -34.41 15.59 50.00

    26 27.28 37.00 1.00 0 37.00 17.50 -27.22 22.78 22.78

    27 39.94 37.00 1.00 0 37.00 17.50 -14.56 8.22 50.00

    28 11.10 33.00 1.00 0 33.00 17.50 -39.40 10.60 45.00

    29 31.17 33.00 1.00 0 33.00 17.50 -19.33 25.67 25.67

    30 18.33 36.30 1.00 0 36.30 19.25 -37.22 -11.55 45.00

    31 59.15 24.00 1.00 0 24.00 17.50 17.65 62.65 10.00

    32 49.28 24.00 1.00 0 24.00 17.50 7.78 17.78 0.00

    Sub-Total 363.10 483.00 232.75

    SECOND CROP: Paddy Rice ( 1 )

    (Paddy Rice, Corn, Tobacco, Tomato, Peanut,Garlic, Onion) Previous/Initial STOR =

    DECADE RAIN, @ AVE. PET CROP CROP ROOT AET PERCO- CHANGE INITIAL STOR

    80 % COEFF. DEPTH LATION IN STOR STOR

    33 43.21 24.00 1.00 0 24.00 17.50 1.71 107.85 107.85

    34 61.65 22.00 1.00 0 22.00 17.50 22.15 130.00 80.00 35 85.08 22.00 1.00 0 22.00 17.50 45.58 125.58 80.00

    36 68.02 24.20 1.00 0 24.20 19.25 24.57 104.57 80.00

    1 40.90 34.00 1.00 0 34.00 17.50 -10.60 69.40 69.40

    2 42.21 34.00 1.00 0 34.00 17.50 -9.29 60.11 60.11

    3 43.48 37.40 1.00 0 37.40 19.25 -13.17 46.95 46.95

    4 42.15 35.00 1.00 0 35.00 17.50 -10.35 36.60 36.60

    5 35.32 35.00 1.00 0 35.00 17.50 -17.18 19.42 45.00

    6 37.90 28.00 1.00 0 28.00 14.00 -4.10 40.90 40.90

    7 20.71 39.00 1.00 0 39.00 17.50 -35.79 5.11 45.00

    8 23.29 39.00 1.00 0 39.00 17.50 -33.21 11.79 10.00

    9 8.35 42.90 1.00 0 42.90 19.25 -53.80 -43.80 0.00

    Sub-Total 552.28 416.50 229.25

    |::

    THIRD CROP: Peanut ( 2 )

    (Tomato Garlic Onion Garlic Peanut Fallow) Previous/Initial STOR =

    (Pls enter Yes only when entries have no typing errors)

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    12/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    13/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    14/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    15/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    16/64

    DERIVATION OF RESERVOIR INFLOW

    PROJECT: Maglambong SWIP WATERSHED AREA: 75.00 HAS.

    Bgy. Maglambong, Monreal, Masbate

    RNGROUP (1 or 2): 2 ISLAND (Luzon, Visayas,Mindanao): VisayasREGION NO(6-8): 8 (Make sure that all entries are correct)

    DATA ENTRIES OK?: Yes (Please enter YES when no errors are noted in the sheet)

    RAINFALL RUNOFF DIRECT BASEFLOW RESERVOIR INFLOW

    DECADE Mean COEFFICIENTS RUNOFF

    (mm.) RC (mm.) (mm.) (mm.) (m^3)

    Jan 1 49.59 0.38 18.84 0.70 19.54 14,658

    2 67.62 0.38 25.70 0.70 26.40 19,797

    3 82.79 0.38 31.46 0.70 32.16 24,119

    Feb 4 29.66 0.28 8.30 0.68 8.98 6,735

    5 33.27 0.28 9.32 0.68 9.99 7,495

    6 32.07 0.28 8.98 0.68 9.66 7,242

    Mar 7 25.36 0.25 6.34 0.66 7.00 5,252

    8 31.36 0.25 7.84 0.66 8.50 6,376

    9 38.28 0.25 9.57 0.66 10.23 7,673

    Apr 10 16.99 0.00 0.00 0.64 0.64 478

    11 29.64 0.00 0.00 0.64 0.64 478

    12 33.38 0.00 0.00 0.64 0.64 478

    May 13 25.05 0.14 3.51 0.62 4.13 3,097

    14 40.05 0.14 5.61 0.62 6.23 4,672

    15 59.91 0.14 8.39 0.62 9.01 6,757

    Jun 16 53.22 0.22 11.71 0.61 12.32 9,237

    17 47.95 0.22 10.55 0.61 11.16 8,366

    18 58.83 0.22 12.94 0.61 13.55 10,163

    Jul 19 50.92 0.30 15.28 0.59 15.87 11,901

    20 63.29 0.30 18.99 0.59 19.58 14,685

    21 60.78 0.30 18.24 0.59 18.83 14,120

    Aug 22 80.64 0.34 27.42 0.58 28.00 21,000

    23 67.35 0.34 22.90 0.58 23.48 17,611

    24 52.02 0.34 17.69 0.58 18.27 13,703

    Sep 25 86.04 0.34 29.25 0.59 29.84 22,383

    26 65.09 0.34 22.13 0.59 22.72 17,041

    27 38.87 0.34 13.22 0.59 13.81 10,357

    Oct 28 52.66 0.51 26.86 0.61 27.46 20,598

    29 91.91 0.51 46.88 0.61 47.48 35,612

    30 115.43 0.51 58.87 0.61 59.47 44,606

    Nov 31 87.31 0.70 61.12 0.65 61.77 46,324

    32 120.45 0.70 84.31 0.65 84.96 63,719

    33 92.24 0.70 64.57 0.65 65.21 48,910

    Dec 34 110.90 0.70 77.63 0.69 78.32 58,741

    35 81.57 0.70 57.10 0.69 57.79 43,345

    36 107.53 0.70 75.27 0.69 75.96 56,971

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    17/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    18/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    19/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    20/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    21/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    22/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    23/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    24/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    25/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    26/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    27/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    28/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    29/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    30/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    31/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    32/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    33/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    34/64

    RESERVOIR CURVE FITTING

    Project Name : Maglambong SWIP

    Bgy. Maglambong, Monreal, Masbate

    Countour Interval 1

    CONTOUR AREA AVERAGE INCREMENTAL ACCUMULATED

    ELEV. WITHIN AREA VOLUME STORAGE

    CONTOUR (sq.m.) (cu.m.) (cu.m.)

    97 520.00 0.00 0.00 0

    98 1,400.00 960.00 960.00 960

    99 2,800.00 2,100.00 2,100.00 3,060

    100 4,920.00 3,860.00 3,860.00 6,920

    101 7,380.00 6,150.00 6,150.00 13,070

    102 11,040.00 9,210.00 9,210.00 22,280

    103 15,040.00 13,040.00 13,040.00 35,320

    104 19,080.00 17,060.00 17,060.00 52,380

    105 27,600.00 23,340.00 23,340.00 75,720

    106 34,640.00 31,120.00 31,120.00 106,840

    107 42,880.00 38,760.00 38,760.00 145,600

    108 47,520.00 45,200.00 45,200.00 190,800

    C1 = 15,000.00 C2 = 12,000.00

    A1 = 49.637910 A2 = 70.536920

    B1 = 0.070428 B2 = 0.034985

    R1 = 99.18 R2 = 99.34

    Drainage Area = 0.75 SQ.KM

    Sediment Volume = 17,151.94 6,860.78 (10 years)

    Elev. of Sediment 101.07 99.54 (10 years)

    DESIGNER'S OPTION Settings: storage

    MIN. ELEV: 93.00 , (9,297) cu. m.

    MAX Elev: 100.00 , 9,517 cu. m.

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    35/64

    Active Storage: 18,814 cu. m.

    COMPARISON OF ACTUAL AND FITTED VALUES

    A C T U A L F I T T E D

    AREA CAPACITY Fit AREA fit Capa

    98 1,400 960 652 78

    99 2,800 3,060 3,079 4,145

    100 4,920 6,920 5,852 9,517

    101 7,380 13,070 9,016 16,596

    102 11,040 22,280 12,622 25,898

    103 15,040 35,320 16,726 38,087

    104 19,080 52,380 21,392 54,018

    105 27,600 75,720 26,688 74,787

    106 34,640 106,840 32,694 101,794

    107 42,880 145,600 39,496 136,826

    108 47,520 190,800 47,191 182,158

    0 0 (15,000) (12,000)

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    36/64

    Area-Elevation

    C 1 = 15,000.00

    R1 sq. = 99.18

    A1 = 49.64

    B1 = 0.07043

    Capacity - Elevation

    C2 = 12,000.00

    R2 sq. = 99.34

    A2 = 70.54

    B2 = 0.03499

    Final Values? (Yes or No): Yes

    are obtained)

    (Pls put Yes when final C-values

    0 10,000 20,000 30,000 40,000 50,000

    90

    92

    94

    96

    98

    100

    102

    104

    106

    108

    110

    Area - Elevation Curve

    Area, sq. meter

    Elev.,meter

    0 2 4 6 8 10 12 14 16 18 20

    90

    92

    94

    96

    98

    100

    102

    104

    106

    108

    110

    Capacity - Elevation Curve

    Capacity, cu. meter

    Elev.,meter

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    37/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    38/64

    RESERVOIR OPERATION STUDIES

    PROJECT : Maglambong SWIP

    LOCATION: Bgy. Maglambong, Monreal, Masbate

    MAKE SURE THAT ALL DEFAULTS IN RAIN, W-BAL, INFLOW & C-FIT IS "YES"

    CPATTERN: Paddy Rice - Paddy Rice - Peanut

    ( 30.00 50.00 10.00 )

    NWS ELEV= 106.50 NWS STOR= 118,177 A1= 49.64 A2=

    Min ELEV= 104.00 Min STOR= 54,018 B1= 0.07 B2=

    Strt ELEV 105.25 Strt STOR 80,891 C1= 15,000.00 C2=

    Data Entries OK? Yes (Please enter "Yes" when no errors are noted in the above entries in red)

    First Crop: Paddy Rice Area: 30.00 ha

    DECADE INFLOW SYSTEM EVAP RATE DEMAND EVAP LOSS TOTAL STORAGE ELEV SPILL

    REQMT RELEASE

    i (m.^3) (m.) (m.) (m.^3) (m.^3) (m.^3) (m.^3) (m.) (m.^3

    20 14,685 0.000 0.048 0 1,421 1,421 94,226 105.75 0

    21 14,120 0.177 0.053 52,965 #VALUE! #VALUE! #VALUE! #VALUE! #VA

    22 21,000 0.000 0.039 0 #VALUE! #VALUE! #VALUE! #VALUE! #VA

    23 17,611 0.132 0.039 39,672 #VALUE! #VALUE! #VALUE! #VALUE! #VA24 13,703 0.064 0.043 19,326 #VALUE! #VALUE! #VALUE! #VALUE! #VA

    25 22,383 0.067 0.037 20,244 #VALUE! #VALUE! #VALUE! #VALUE! #VA

    26 17,041 0.000 0.037 0 #VALUE! #VALUE! #VALUE! #VALUE! #VA

    27 10,357 0.082 0.037 24,579 #VALUE! #VALUE! #VALUE! #VALUE! #VA

    28 20,598 0.067 0.033 20,238 #VALUE! #VALUE! #VALUE! #VALUE! #VA

    29 35,612 0.000 0.033 0 #VALUE! #VALUE! #VALUE! #VALUE! #VA

    30 44,606 0.111 0.036 33,264 #VALUE! #VALUE! #VALUE! #VALUE! #VA

    31 46,324 0.000 0.024 0 #VALUE! #VALUE! #VALUE! #VALUE! #VA

    32 63,719 0.000 0.024 0 #VALUE! #VALUE! #VALUE! #VALUE! #VA

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    39/64

    Pre. ELEV= #VALUE! Pre. STOR= #VALUE!

    Second Crop: Paddy Rice Area: 50.00

    DECADE INFLOW SYSTEM EVAP DEMAND EVAP LOSS TOTAL STORAGE ELEV

    REQMT RATE RELEASE

    i (m.^3) (m.) (m.) (m.^3) (m.^3) (m.^3) (m.^3) (m.)

    33 48,910 0.000 0.024 0 #VALUE! #VALUE! #VALUE! #VALUE!

    34 58,741 0.000 0.022 0 #VALUE! #VALUE! #VALUE! #VALUE!

    35 43,345 0.000 0.022 0 #VALUE! #VALUE! #VALUE! #VALUE!36 56,971 0.000 0.024 0 #VALUE! #VALUE! #VALUE! #VALUE!

    1 14,658 0.000 0.034 0 #VALUE! #VALUE! #VALUE! #VALUE!

    2 19,797 0.000 0.034 0 #VALUE! #VALUE! #VALUE! #VALUE!

    3 24,119 0.000 0.037 0 #VALUE! #VALUE! #VALUE! #VALUE!

    4 6,735 0.000 0.035 0 #VALUE! #VALUE! #VALUE! #VALUE!

    5 7,495 0.050 0.035 25,080 #VALUE! #VALUE! #VALUE! #VALUE!

    6 7,242 0.000 0.028 0 #VALUE! #VALUE! #VALUE! #VALUE!

    7 5,252 0.078 0.039 39,110 #VALUE! #VALUE! #VALUE! #VALUE!

    8 6,376 0.000 0.039 0 #VALUE! #VALUE! #VALUE! #VALUE!

    9 7,673 0.000 0.043 0 #VALUE! #VALUE! #VALUE! #VALUE!

    Third Crop: Peanut Area: 10.00 ha

    Pre. ELEV= #VALUE! Pre. STOR= #VALUE!

    DECADE INFLOW SYSTEM EVAP RATE DEMAND EVAP LOSS TOTAL STORAGE ELEV

    REQMT RELEASE

    i (m.^3) (m.) (m.) (m.^3) (m.^3) (m.^3) (m.^3) (m.)

    10 478 0.000 0.047 0 #VALUE! #VALUE! #VALUE! #VALUE!

    11 478 0.050 0.047 5,016 #VALUE! #VALUE! #VALUE! #VALUE!

    12 478 0.077 0.047 7,650 #VALUE! #VALUE! #VALUE! #VALUE!

    13 3,097 0.069 0.052 6,874 #VALUE! #VALUE! #VALUE! #VALUE!

    14 4,672 0.076 0.052 7,552 #VALUE! #VALUE! #VALUE! #VALUE!

    15 6,757 0.094 0.057 9,370 #VALUE! #VALUE! #VALUE! #VALUE!

    16 9,237 0.092 0.050 9,236 #VALUE! #VALUE! #VALUE! #VALUE!

    17 8,366 0.000 0.050 0 #VALUE! #VALUE! #VALUE! #VALUE!

    18 10,163 0.000 0.050 0 #VALUE! #VALUE! #VALUE! #VALUE!

    19 11,901 0.000 0.048 0 #VALUE! #VALUE! #VALUE! #VALUE!

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    40/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    41/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    42/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    43/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    44/64

    RESERVOIR FLOOD ROUTING

    TIME INCR: 0.40 SPILLWAY

    PROJ : Maglambong SWIP RCF WIDTH: 6.00

    Location: Bgy. Maglambong, Monreal, Masbate A2 = 70.54 CREST EL: 106.50

    B2 = 0.03 NWS STO: 118,177

    C2 = 12,000.00 NWS+1 STO: 158,040

    TIME INFLOW TRIAL EL OUTFLOW CHANGE IN STORAGE COMP EL

    Iq Ivol ELt Oq Ovol STORAGE

    hr cms. m^3 m. cms. m^3 m^3 m^3 m.

    0.00 0.00 0.00 106.5000 0.00 0.00 0.00 118,177 106.5000

    0.40 0.00 0.00 106.5000 0.00 0.00 0.00 118,177 106.5000

    0.80 0.00 0.00 106.5000 0.00 0.00 0.00 118,177 106.5000

    1.20 0.00 0.00 106.5000 0.00 0.00 0.00 118,177 106.5000

    1.60 0.16 118.20 106.5032 0.00 1.33 116.87 118,294 106.5033

    2.00 0.81 700.42 106.5226 0.03 26.34 674.08 118,968 106.5226

    2.40 1.74 1,831.53 106.5699 0.19 161.05 1,670.48 120,639 106.5698

    2.80 2.59 3,115.28 106.6417 0.55 528.69 2,586.58 123,225 106.6418

    3.20 3.33 4,266.26 106.7260 1.10 1,183.54 3,082.72 126,308 106.7260

    3.60 4.13 5,377.08 106.8139 1.80 2,085.50 3,291.58 129,600 106.8138

    4.00 5.36 6,835.75 106.9082 2.67 3,214.44 3,621.30 133,221 106.9082

    4.40 8.02 9,636.10 107.0315 3.96 4,772.22 4,863.89 138,085 107.0315

    4.80 12.13 14,507.31 107.2087 6.10 7,244.23 7,263.08 145,348 107.2086

    5.20 13.54 18,476.28 107.3921 8.61 10,594.44 7,881.84 153,230 107.3921

    5.60 11.28 17,868.51 107.4910 10.09 13,464.72 4,403.79 157,634 107.4910

    6.00 8.34 14,125.76 107.4839 9.98 14,446.35 (320.59) 157,313 107.4839

    6.40 6.10 10,395.85 107.4120 8.90 13,595.52 (3,199.67) 154,113 107.4122

    6.80 4.23 7,436.90 107.3122 7.48 11,799.54 (4,362.65) 149,751 107.3122

    7.20 2.70 4,991.95 107.2010 6.00 9,708.71 (4,716.77) 145,034 107.2011

    7.60 1.67 3,146.79 107.0916 4.65 7,670.08 (4,523.29) 140,511 107.0916

    8.00 1.03 1,937.41 106.9931 3.54 5,898.54 (3,961.13) 136,550 106.9930

    8.40 0.63 1,191.60 106.9093 2.68 4,476.51 (3,284.91) 133,265 106.9094

    8.80 0.38 730.59 106.8400 2.03 3,386.99 (2,656.40) 130,608 106.8404

    9.20 0.23 443.16 106.7840 1.55 2,573.51 (2,130.35) 128,478 106.7841

    9.60 0.13 260.46 106.7381 1.19 1,969.37 (1,708.90) 126,769 106.7384

    10.00 0.05 130.41 106.6900 0.85 1,464.90 (1,334.49) 125,435 106.7023

    10.40 0.02 53.60 106.6728 0.73 1,138.43 (1,084.83) 124,350 106.6727

    10.80 0.01 25.80 106.6400 0.54 914.38 (888.58) 123,461 106.648311.20 0.00 11.03 106.6289 0.47 726.28 (715.24) 122,746 106.6286

    11.60 0.00 2.86 106.6100 0.37 609.23 (606.37) 122,140 106.6118

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    45/64

    12.00 0.00 0.00 106.5800 0.23 435.13 (435.13) 121,704 106.5996

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    46/64

    0.00 0.00 0

    0.40 0.00 0.00

    0.80 0.00 0.00

    1.20 0.00 0.00

    1.60 0.16 0.00

    2.00 0.81 0.03

    2.40 1.74 0.19

    2.80 2.59 0.55

    3.20 3.33 1.10

    3.60 4.13 1.80

    4.00 5.36 2.67

    4.40 8.02 3.96

    4.80 12.13 6.10

    5.20 13.54 8.61

    5.60 11.28 10.09

    6.00 8.34 9.98

    6.40 6.10 8.90

    6.80 4.23 7.48

    7.20 2.70 6.00

    7.60 1.67 4.65

    8.00 1.03 3.54

    8.40 0.63 2.68

    8.80 0.38 2.03

    9.20 0.23 1.55

    9.60 0.13 1.19

    10.00 0.05 0.85

    10.40 0.02 0.73

    10.80 0.01 0.54

    11.20 0.00 0.47

    11.60 0.00 0.37

    12.00 0.00 0.23

    0.00

    0.80

    1.60

    2.

    40

    3.

    20

    4.00

    4.80

    5.60

    6.

    40

    7.

    20

    8.00

    8.80

    9.60

    10.

    40

    11

    .2

    0

    12

    .00

    0

    2

    4

    6

    8

    10

    12

    14

    16

    INFLOW-OUTFLOW HYDROGRAPH

    TIME, Hrs.

    DISCHARGEQ,cms.

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    47/64

    ENGINEERING DESIGN STUDIES

    PROJECT: Maglambong SWIP

    LOCATION: Bgy. Maglambong, Monreal, Masbate

    A. COMPUTATION OF DAM HEIGHT

    1. Creek Bed Elevation, m : 96.00

    2. 25 - year Sediment Volume, m^3 : 17,151.00

    3. Minimum Storage Elevation, m = 104.00

    4. Maximum Active Storage Elevation, m = 106.50

    5. Peak Flood Inflow, cms. = 13.54

    6. Peak OutFlow, cms. = 10.09

    7. Maximum Surcharge Elevation, m = 107.49

    8. Wave Run-up, m = 1.00

    Fetch Length, km. : 0.30

    Wind Velocity, kph : 30.00

    9. Preliminary Dam Crest Elevation, m = 108.49

    10. Preliminary Dam Height, m. = 12.49

    11. Embakment Settlement(5 % of 10) = 0.60

    12. Final Dam Crest Elevation, m = 109.09

    13. Final Dam Height, m = 13.09

    say, 13.00

    B. COMPUTATION OF DAM CREST WIDTH

    1. Minimum Width for Maintenance, Wo, m. = 4.00

    2. W1, m. = 6.03

    3. W2, m. = 5.67

    4. Final Width, W, m. = 6.00

    C. SPILLWAY HYDRAULICS AND DESIGN COMPUTATION

    1. Tail Water Elevation (Use Natural

    Ground Elevation at End of Basin), m. : 96.00

    2. H, m. = 10.50

    3. Spillway Width, b, m. : 6.00

    4. Jump Height, d2(From Nomograph)

    Chute Length, C : 100.00

    q, cfs/ft = 18.08

    C/H = 9.52

    a,(Referring to the Nomograph) = 0.20

    d2(From Nomograph), m. : 1.22

    5. Depth Before jump, d1, m. = 0.30

    6. Froude Number, F = 3.27

    7. Use Type IV USBR Stilling Basin

    8. Length of Basin, L, m. = 6.00

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    48/64

    9. Other Basin Dimension

    Chute Blocks

    Height, d1, m. = 0.30

    Width, w1, m. = 0.30

    Spacing, s1, m. = 0.75

    No. of Blocks = 6

    Baffle Blocks

    Height, h3, m. = 0.00

    Width, w3, m. = 0.00

    Spacing, s3, m. = 0.00

    End Sill

    Height, h4, m. = 0.38

    |::

    Distance Between Baffle Blocks and

    Chute Blocks = 1.00

    10. Channel Freeboard, fc, m. = 0.60

    11. Basin Freeboard, fb, m. = 0.60

    ( For Cantilever Retaining Wall Parameters, refer to Table 5 )

    C. DESIGN OF OUTLET WORKS

    From Reservoir Operation Studies, select a critical

    Demand(Qd) - Head(H) combination. A critical combination would be

    a large demand under low head.

    1. Demand from ROS, m^3/Decade : 19,836

    2. Designed Q, m^3/sec. = 0.023

    3. Elevation @ the Outlet : 104.00

    4. WS Elev. from ROS, m. : 104.97

    5. Available Head, H, m. = 0.97

    5. Determine Pipe Diameter using Formula,

    Q = (2gH/KL)^1/2

    Trial Pipe Diameter, d, m. : 0.20

    Pipe Length, L, m. : 36.00

    Roughness Coefficient, n : 0.015

    Total Coefficient of Loss, KL = 11.42

    Qtheoritical, m^3/sec. = 0.041

    Qd, m^3/sec. = 0.023

    Final Pipe Diameter, d, m. = 0.20

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    49/64

    To determine at what head and water level where the designed

    Q can still be supplied, we have:

    HT(m) WS Elev.(m.) Q(cms.)

    2.50 106.50 0.065 ,Qd can be supplied

    2.00 106.00 0.058 ,Qd can be supplied

    1.50 105.50 0.050 ,Qd can be supplied

    1.00 105.00 0.041 ,Qd can be supplied

    0.50 104.50 0.029 ,Qd can be supplied

    0.00 104.00 0.000 ,Qd can't be supplied

    D. DESIGN OF IMPACT TYPE ENERGY DISSIPATOR

    1. Hydraulic Head, H, m. = 2.50

    2. Pipe Diameter, dt, m. = 0.20

    3. Equivalent Opening, ds, m. = 0.18

    4. Velocity, Vs, mps. = 7.00

    5. Froude Number, F = 5.31

    6. Basin Width, W, m. = 1.30

    7. Other Basin Dimensions(Refer to

    Standard sheet )

    H, m. = 1.03

    a, m. = 0.22

    b, m. = 0.49

    e, m. = 0.65

    L, m. = 2.40

    E. SEEPAGE ANALYSIS AND DESIGN OF TOE DRAIN

    1. Trial Height of Toe Drain, ht, m. : 2.00

    2. Dam Crest Length, Ldam, m. : 191.00

    3. Upstream Slope(Horizontal Component) : 2.75

    4. Downstream Slope(Horizontal Component) : 2.50

    5. Seepage Length, Lw/o drain, m. = 49

    6. Seepage Length, Lw/ drain, m. = 43

    7. Yo = 1.11

    8. Seepage through embankment, Qe, cms. = 0.000170

    9. For Safety, Qdrain must be = 5*Qe = 0.000850

    10. Computed Length of drain, Ldrain, m. = 40.80

    11. Actual Length of Drain, m.(From Site

    Development Plan) : 48.00

    13. Yo(with drain) = 1.26

    14. Seepage through embankment with drain,

    Qew/drain, cms. = 0.000193

    15. Seepage through the Drain, Qdrain, cms. = 0.000640

    16. Qdrain/Qembankment = 3.32

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    50/64

    Therefore, Use 2.00

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    51/64

    F. DESIGN OF ANTI-SEEP COLLAR

    1. Creep Ratio for Soft Clay = 3.00

    2. Length of Pipe, Lt, m. : 36.00

    3. Difference in Water Levels, Ht, m. = 2.50

    4. Number of Anti-seep Collars, N = 5

    5. Depth of Anti-seep Collars, y, m. = 0.40

    G. DESIGN OF UPSTREAM SLOPE PROTECTION

    1. Diameter of Boulders, dm, m. = 16.00

    2. Average Boulder Diameter, dav, m. = 0.20

    3. Average Weight of Boulder, Wav. lbs. = 24.00

    Note:

    40 % of Riprap(Hand-laid) layers should consist of smaller

    sizes than the 24 -lb boulders.

    H. DESIGN OF MAIN CANAL

    1. Design Flow, Q, cms. = 0.023

    2. Roughness Coefficient, n : 0.015

    3. Bottom width, b, m. : 0.30

    4. Side Slope, m : 0.00

    5. Canal Bed Gradient, s

    Main Canal STA. 0+000 - STAT. 500 : 0.002

    :

    :

    :

    STA. 0+000 - STAT. 500

    Trial d, m. : 0.150

    Actual Qn/s^1/2 = 0.008

    Computed Qn/s^1/2 with reference to d = 0.008

    Final d, m. = 0.15

    Permissible V, mps. : 0.30

    Hence, Canal Hydraulic Elements are:

    Q, m. = 0.023

    n = 0.02

    m = 0.00

    s = 0

    b, m. = 0.30

    d, m. = 0.15

    D, m. = 0.45

    V, mps. = 0.51

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    52/64

    Lateral B concrete canal

    1. Design Flow, Q, cms. : 0.089

    2. Roughness Coefficient, n : 0.018

    3. Bottom width, b, m. : 0.40

    4. Side Slope, m : 0.00

    5. Canal Bed Gradient, s

    STA. 888 - STAT. 888 +800 : 0.003

    : end of mai

    :

    :

    STA. 888 - STAT. 888 +800

    Trial d, m. : 0.30

    Actual Qn/s^1/2 = 0.029

    Computed Qn/s^1/2 with reference to d = 0.029

    Final d, m. = 0.30

    Permissible V, mps. : 0.30

    Hence, Canal Hydraulic Elements are:

    Q, m. = 0.089

    n = 0.02

    m = 0.00

    s = 0.003

    b, m. = 0.40

    d, m. = 0.30

    D, m. = 0.60

    V, mps. = 0.74

    Farm Canal Right earth

    1. Design Flow, Q, cms. : 0.089

    2. Roughness Coefficient, n : 0.030

    3. Bottom width, b, m. : 0.30

    4. Side Slope, m : 1.00

    5. Canal Bed Gradient, s

    STA. 888+800 - STAT. 888+800+400 : 0.008

    :

    :

    :

    STA. 888+800 - STAT. 888+800+400

    Trial d, m. : 0.23

    Actual Qn/s^1/2 = 0.030

    Computed Qn/s^1/2 with reference to d = 0.030

    Final d, m. = 0.23

    Permissible V, mps. : 0.30

    Hence, Canal Hydraulic Elements are:

    Q, m. = 0.089

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    53/64

    n = 0.03

    m = 1.00

    s = 0.008

    b, m. = 0.30

    d, m. = 0.23

    D, m. = 0.53

    V, mps. = 0.75

    Lateral A concrete canal

    1. Design Flow, Q, cms. : 0.292

    2. Roughness Coefficient, n : 0.018

    3. Bottom width, b, m. : 0.70

    4. Side Slope, m : 0.00

    5. Canal Bed Gradient, s

    STA. 888 - STAT. 888+230 : 0.003

    :

    STA. 888 - STAT. 888+230

    Trial d, m. : 0.42

    Actual Qn/s^1/2 = 0.096

    Computed Qn/s^1/2 with reference to d = 0.097

    Final d, m. = 0.42

    Permissible V, mps. : 0.30

    Hence, Canal Hydraulic Elements are:

    Q, m. = 0.292

    n = 0.02

    m = 0.00

    s = 0.003

    b, m. = 0.70

    d, m. = 0.42

    D, m. = 0.72

    V, mps. = 1.00

    I. DESIGN OF DROP STRUCTURES

    Sta. 888+230 Sta 888 + 230 to 248 ( elev. 104.35 and elev. 96.84)

    1. Depth of Approach, do, m. : 0.45

    2. Velocity of Aproach, vo, mps. = 0.17

    3. Height of Drop, h, m. : 7.50

    4. Equivalent width @ rectangular section = 0.3

    5. Depth before jump, d1

    Trial d1, m. : 0.02

    Actual vo^2/2g + do + h value = 7.951

    Computed vo^2 + do + h w/ reference to d1 = 1.476

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    54/64

    Final d1, m. = Try Again

    Velocity, v1, mps. = #VALUE!

    6. Depth of Jump, d2, m. = #VALUE!

    7. Length of Apron, a, m. = #VALUE!

    Lateral A concrete canal

    1. Design Flow, Q, cms. : 0.292

    2. Roughness Coefficient, n : 0.018

    3. Bottom width, b, m. : 0.70

    4. Side Slope, m : 0.00

    5. Canal Bed Gradient, s

    STA. 888 - STAT. 888+230 : 0.002

    :

    STA. 888 - STAT. 888+230

    Trial d, m. : 0.49

    Actual Qn/s^1/2 = 0.118

    Computed Qn/s^1/2 with reference to d = 0.118

    Final d, m. = 0.49

    Permissible V, mps. : 0.30

    Hence, Canal Hydraulic Elements are:

    Q, m. = 0.292

    n = 0.02

    m = 0.00

    s = 0.002

    b, m. = 0.70

    d, m. = 0.49

    D, m. = 0.79

    V, mps. = 0.86

    Lateral A concrete canal

    1. Design Flow, Q, cms. : 0.292

    2. Roughness Coefficient, n : 0.018

    3. Bottom width, b, m. : 0.50

    4. Side Slope, m : 0.00

    5. Canal Bed Gradient, s

    STA. 888 - STAT. 888+230 : 0.003

    :

    STA. 888 - STAT. 888+230

    Trial d, m. : 0.40

    Actual Qn/s^1/2 = 0.096

    Computed Qn/s^1/2 with reference to d = 0.057

    Final d, m. = Try Again

    Permissible V, mps. : 0.30

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    55/64

    Hence, Canal Hydraulic Elements are:

    Q, m. = 0.292

    n = 0.02

    m = 0.00

    s = 0.003

    b, m. = 0.50

    d, m. = 0.40

    D, m. = 0.70

    V, mps. = 1.46

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    56/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    57/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    58/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    59/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    60/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    61/64

    canal

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    62/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    63/64

  • 8/9/2019 Swip Agrohydrology and Design Mag Lam Bong

    64/64