S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

24
S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003

Transcript of S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

Page 1: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

CMA LVL1 Barrel status

ATLAS TDAQ weekJuly 2003

Page 2: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

History

• CMA ASIC submitted 20th November 2001• 49 dies packaged by March 15th with

four-pin bonding following preliminary specs (package 0208).New wafers had to selected for packaging with final Bonding.

• Loadboard arrived 10th March to test site (Milano), following specifications (package 0219), had to be fixed to package 0208.

• Industry tests started 21st March on 49 packages 0208 with scan tests.

Page 3: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

History 2

• 7th April functional tests sent by Rome to industry

• 15th April 5 0208 tested devices (no RAM tests) and loadboard sent to Rome.

• 20th April RAM test vectors sent by Rome to industry.

• 29th April 44 fully tested 0208 package devices at Microtech.

• 23rd May 37 devices with package 0219 tested at Microtech.

Page 4: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

CM ASIC layout and architecture

• 430 kgates UMC 0.18 m, 320 MHz PLL (X8), 24 double-port RAMs.

Page 5: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

CMA ASIC pinout

• Package 0208 and 0219 differ only on the position of PLL signals and supplies. Both of them are working correctly

Page 6: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

CMA Loadboard

• Loadboard developped for Teradyne tester, has been designed with additional connectors for PLL test and lab tests in Rome.

Page 7: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

Test patterns

• Scan and functional tests were performed on Teradyne machine at 1 Mhz, 40 Mhz, at room and at 125C temperatures. PLL lock was also tested.– SCAN tests: 32 scan chains, maximum of 900

cells, generated with Synopsys Test Compiler.– RAM tests: using single dedicated scan chain

(23,743,440 cycles), generated from RTL model adn converted to compressed ATP format.

– Functional tests 105576 vectors, to test I2C interface and start PLL, generated from full netlist+timing simulation, converted to ATP format.

Page 8: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

Industrial test results• 49 0208 packages tested:

– 7 failing on GND– 1 RAM fail– 1 SCAN fail– 40 OK (81.6% yield)

• 37 1219 packages tested:– No GND fails (already discarded?)– 4 RAM fails– 3 SCAN fails– 30 OK (81.1% yield)

• 70 ASICs good, to be used for further tests and irradiation.

Page 9: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

LAB setup36x64K T=6.125nsPattern generator

Clock jitter

WaveformAnalyser T=10ns

GeneratorPODs

GPIBLAN

loadboard

I2C on RJ45

Page 10: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

Tests done in Rome

• LAB setup with limited capability has been used to do preliminary tests.– I2C on parallel port interface and C++

linux application has been used to initialize ASIC on all tests shown here.

• Four CM ASICs mounted on CM boards will be used for further tests.

Page 11: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

PLL tests

• 160 MHz derived clock output has been used to check PLL stability (320 MHz)

40 MHz input

160 MHz on dedicated IO

Page 12: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

PLL tests 2

• PLL has been characterized vs V and vs input Frequency.

• PLL is working to specifications

Page 13: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

PLL vs Voltage

PLL jitter

020406080

100120140160180

1.5 1.6 1.7 1.8 1.9

Vdd [V]

Jitt

er

[ps]

Pk-Pkstd. dev.

Page 14: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

PLL vs frequency

PLL jitter

0

100

200

300

400

500

600

10 20 30 40 50

Input clock [MHz]

Jitt

er

[ps]

Pk-Pkstd. dev.

Page 15: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

Trigger tests

• Trigger tests have been done so far on a limited number of input channels, due to limitations on the laboratory setup.– Minimum pulse width measurement

• Twmin > 6.126 ns (12 ns in specs)

• Dead timer, pulse shaping and pipeline delay working according to specs.

Page 16: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

Trigger output latency

• Input to K-pattern delay– Tlatkpat = 59 +- 1 ns

• Input to THReshold/OVerLap delay– Tlatthr = 63-88 +-1 ns

• Skew between THR and OVL signals – Toutskew = 2 +- 0.5 ns.

Page 17: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

Readout tests• Readout link is a two-wire Dslink protocol

working at 80-40-20-10-5-2.5-1.125 Mbit/s• Readout tests done at 40 Mbit/s using:

– 10ns period sampling with waveform analyser– GPIB LAN box connected to waveform analyser

CMID L1ID

… BCID + 16-bit hits …

8-bitCRC

Page 18: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

Readout tests 2

• VISA-GPIB library (linux) in deserializer program has been used to convert waveform vectors to readout data fragments.

c151 -- CMID 0 FEL1ID 33787d8 -- FEBCID 20080700 -- BC 0 TIME 7 IJK 0 STRIP 00745 -- BC 0 TIME 7 IJK 2 STRIP 50685 -- BC 0 TIME 6 IJK 4 STRIP 507c0 -- BC 0 TIME 7 IJK 6 STRIP 007e3 -- BC 0 TIME 7 OVL 0 THR 34075 -- CRC 75

Page 19: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

Time interpolator linearity

• Hits on four channels have been generated, in 1 ns steps, within a range of 4 BCs (CH 1-4), also trigger output time is measured (K).

10

18

26

34

42

50

0 25 50 75 100

delay [ns]

tim

e s

lot

CH 0

CH 1

CH 2

CH 3

K

Very preliminary

Page 20: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

0.00

100.00

200.00

300.00

400.00

500.00

600.00

700.00

800.00

0 2 4 6 8 10 12 14 16 18hits

ma

x L

VL

1 f

req

ue

nc

y (

kH

z) LVl1 max f (kHz) 40Mbit/s

LVl1 max f (kHz) 80Mbit/s

Readout latency

• Max LVL1 input frequency.

1% RPC occupancy1-BC window

Page 21: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

Power vs voltage

Power consumption vs. voltage

0.55

0.60

0.65

0.70

0.75

0.80

1.50 1.60 1.70 1.80 1.90

Vdd [V]

I [m

A]

Page 22: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

Power vs frequency

Power consumption vs. clock frequency

0

100

200

300

400

500

600

700

800

900

2.5 12.5 22.5 32.5 42.5

freq. [MHz]

I [m

A]

Page 23: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

CM board Eta

• PCBs to be mounted on PAD prototype are ready

RJ45(from splitters)

PAD Motherboardconnections

LVDSreceivers

CMA

Page 24: S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.

S.Veneziano – INFN Roma July 2003 TDAQ week

CM board Phi

• Four ASICs mounted on two eta and two phi boards by June 21st.

FE receivers

RN connectors(from wired-OR)

CMA