Sustainable and Green Engine ITD
2010 Annual Implementation Plan
Page 1 of 31
1 / 31 AIP 2009 SAGE 0 27.01.2010
European Commission Research Directorates
SAGE0 ITD Coordination
WP No. SAGE0 WP Title ITD Coordination
Leader Snecma Contact Arnaud Lebrun
Statement of Work (Tasks) Description Leading
partner Start End
• Coordinate ITD draft budgeting Snecma Jan. 2010 Feb. 2010 • Coordinate ITD reporting for 2009 Snecma Jan. 2010 Feb. 2010 • Manage ITD interfaces to Joint Undertaking Snecma Jan. 2010 Dec. 2010 • Organisation and management of Consortium
Management Committee Snecma Jan. 2010 Dec. 2010
• Administer JU financial contributions and maintain records and financial accounts
Snecma Jan. 2010 Dec. 2010
• Coordinate preparation of 2011 Annual Implementation Plan
Snecma Jan. 2010 Mar. 2010
• Coordinate 2011 Grant Agreement Annex 1b preparation.
Snecma Feb. 2010 May. 2010
Milestones No. Title Leading
partner Due Date
0.1 Deliver reports for 2009 Grant Agreement. Snecma Feb. 2010
0.2 Deliver draft ITD budget for 2011. Snecma Feb. 2010
0.3 Deliver Annual Implementation Plan for 2011 Snecma Mar. 2010
0.4 Deliver 2011 SAGE Grant Agreement Annex 1b Snecma May 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 2 of 31
2 / 31 AIP 2009 SAGE 1.1 27.01.2010
European Commission Research Directorates
SAGE1.1 Open Rotor Assembly
WP No. SAGE1.1 WP Title Open Rotor Assembly
Leader Rolls-Royce Contact Mark Pacey
Statement of Work (Tasks) Description Leading
partner Start End
• Integration and management of open rotor assembly development.
Rolls-Royce Jan. 2010 Dec. 2010
• Propeller system concept selection, preparation and management of Call for Proposal topic
Rolls-Royce Jan. 2010 June 2010
• Preliminary design, analysis and lifing of front rotating structure. Initial manufacturing trials and procurement of long lead forgings and manufacturing tooling.
Rolls-Royce Jan. 2010 Oct. 2010
• Preliminary design, analysis and lifing of rear rotating structure.
VAC Jan. 2010 Oct. 2010
• Development of near field and en route noise prediction methods.
Rolls-Royce Jan. 2010 Dec. 2010
• Complete strip and inspection of open rotor aerodynamic rig.
Rolls-Royce Sep. 2010 Dec. 2010
• PCM (Pitch Control Mechanism) rig concept design
Rolls-Royce Jan 2010 June 2010
Subcontract Tasks No. Title Responsible
Partner
1.1.1 Analytical methods development to predict open rotor noise Rolls-Royce
1.1.2 Strip and inspection of open rotor blade aerodynamic rig Rolls-Royce
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 3 of 31
3 / 31 AIP 2009 SAGE 1.1 27.01.2010
European Commission Research Directorates
Indicative Excluded Tasks (for call for proposals) No Description SAGE-01-001 CROR Rotor blade and hub system development
SAGE-01-002 Open rotor assembly bearings manufacture
SAGE-01-003 Thin-walled and shell structures
SAGE-01-004 Cold rotating structures
SAGE-01-005 Communications components for dynamic interfaces in harsh high altitude environments
SAGE-01-006 Sensor and effector components for harsh high altitude environments
SAGE-01-007 Integrated multi-function sensors
Milestones No. Title Leading
partner Due Date
1.1.1 Preliminary Design Review Rolls-Royce Oct. 2010
1.1.2 Open rotor near field source assessment Rolls-Royce May 2010
1.1.3 Open rotor duct path validation rig Rolls-Royce June 2010
1.1.4 Blade aero rig strip complete Rolls-Royce Dec. 2010
1.1.5 Pitch Control Mechanism rig concept defined Rolls-Royce July 2010
1.1.6 Deliver and machine forgings for trial manufacture (FRS) Rolls-Royce July 2010
Inputs needed (Deliverables from other WP/Tasks) No. Title From
(WP/Task) Due date
1.1.1 Preliminary flight cycle loads, local proof / ultimate loads, fatigue loads, component deflections, component stiffness.
1.3 Aug. 2010
1.1.2 Open rotor duct path definition 1.3 Mar. 2010
Deliverables (Outputs to other WP/Tasks) No. Title Leading
partner To (WP/Task)
Due date
1.2.1 Open rotor assembly preliminary design Rolls-Royce 1.3 May 2010
1.2.2 Preliminary propeller system control requirements
Rolls-Royce 1.2 May 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 4 of 31
4 / 31 AIP 2009 SAGE1.2 27.01.2010
European Commission Research Directorates
SAGE1.2 Core Engine
WP No. SAGE1.2 WP Title Core Engine
Leader Rolls-Royce Contact Mark Pacey
Statement of Work (Tasks) Description Leading
partner Start End
• Procure and assess condition of donor core engine. Develop repair and refurbishment plan.
Rolls-Royce Jan. 2010 June 2010
• Preliminary design of core engine modifications and procurement of long lead materials.
Rolls-Royce, Volvo
Jan. 2010 Sep. 2010
• Preliminary design and analysis of core engine booster. Planning for procurement and manufacture.
ITP Jan. 2010 Oct. 2010
• Control system architecture definition, modelling and preliminary safety case assessment.
Rolls-Royce Jan. 2010 Oct. 2010
Milestones No. Title Leading
partner Due Date
1.2.1 Core engine procurement Rolls-Royce June 2010
1.2.2 Preliminary Design Review Rolls-Royce Oct. 2010
Inputs needed (Deliverables from other WP/Tasks) No. Title From
(WP/Task) Due date
1.2.1 Preliminary propeller system control requirements 1.1 May 2010 1.2.2 Preliminary core engine interface loads and temperature
predictions 1.3 Aug. 2010
Deliverables (Outputs to other WP/Tasks) No. Title Leading
partner To (WP/Task)
Due date
1.2.1 Core engine preliminary design including initial modification definitions
Rolls-Royce 1.3 May 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 5 of 31
5 / 31 AIP 2009 SAGE1.2 27.01.2010
European Commission Research Directorates
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 6 of 31
6 / 31 AIP 2009 SAGE1.3 27.01.2010
European Commission Research Directorates
SAGE1.3 Integration and Test
WP No. SAGE1.3 WP Title Integration and Test
Leader Rolls-Royce Contact Mark Pacey
Statement of Work (Tasks) Description Leading
partner Start End
• Integrate and manage the demonstrator project Rolls-Royce Jan. 2010 Dec. 2010 • Definition of ground test requirements to support
future flight clearance, including interface load limits, slave system interfaces and flight test instrumentation requirements.
Airbus Operations
Jan. 2010 June 2010
• Preliminary performance cycle and whole engine mechanical modelling and behaviour prediction
Rolls-Royce Jan. 2010 June. 2010
• Engine installation vibration studies and suppression system concepts
Alenia Jan. 2010 Dec. 2010
• Refinement of test and instrumentation requirements and demonstrator test strategy
Rolls-Royce Jan. 2010 Oct. 2010
Milestones No. Title Leading
partner Due Date
1.3.1 Preliminary load cycle predictions Rolls-Royce April 2010
1.3.2 Complete definition of ground test requirements to support flight clearance
Airbus Operations
June 2010
1.3.3 Preliminary Design Review Rolls-Royce Oct. 2010
1.3.4 Complete initial open rotor engine mount studies Alenia Dec. 2010
Inputs needed (Deliverables from other WP/Tasks) No. Title From
(WP/Task) Due date
1.3.1 Preliminary open rotor assembly and core engine designs 1.1, 1.2 May 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 7 of 31
7 / 31 AIP 2009 SAGE1.3 27.01.2010
European Commission Research Directorates
Deliverables (Outputs to other WP/Tasks) No. Title Leading
partner To (WP/Task)
Due date
1.3.1 Preliminary flight cycle loads, local proof / ultimate loads, fatigue loads, component deflections, component stiffness
Rolls-Royce 1.1, 1.2 Aug. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 8 of 31
8 / 31 AIP SAGE2.0 27.01.2010
European Commission Research Directorates
SAGE2.0 Project Management
WP No. SAGE2.0 WP Title Project Management
Leader Snecma Contact Arnaud Lebrun
Statement of Work (Tasks) Description Leading
partner Start End
• Project Planning
○ Conceptual design phase steering
○ Preliminary design phase detailed planning
○ Subsequent phase planning
○ Reviews set-up
Snecma Jan. 2010 Dec. 2010
• Project Steering
○ Contracts management
○ Project coordination
○ Deliveries management
○ Milestones management
○ Risk management
○ Technical requirements management
○ Technical design management
○ Reporting
Snecma Jan. 2010 Dec. 2010
Subcontract Tasks No. Title Responsible
Partner
SC2.0.1 Support to steering, planning and steering activities Snecma
Milestones No. Title Leading
partner Due Date
M2.0C SAGE2 Concept Reviews Snecma Sep. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 9 of 31
9 / 31 AIP SAGE2.0 27.01.2010
European Commission Research Directorates
Inputs needed (Deliverables from other WP/Tasks) No. Title From
(WP/Task) Due date
2.0C&D SAGE2 WPs reports 2.i.j Dec. 2010
Deliverables (Outputs to other WP/Tasks) No. Title Leading
partner To (WP/Task)
Due date
D2.0I SAGE2 Demonstration Requirements Document (update)
Snecma SAGE2 Mar. 2010
D2.0J SAGE2 Development Plan (update) Snecma SAGE2 Sep. 2010
D2.0H SAGE 2 Annual report Snecma SAGE Coordinator
Dec. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 10 of 31
10 / 31 AIP SAGE2.1 27.01.2010
European Commission Research Directorates
SAGE2.1 Demonstrator Integration & Systems Development
WP No. SAGE2.1 WP Title Demonstrator Integration & Systems Development
Leader Snecma Contact Alain Mazelet
Statement of Work (Tasks) Description Leading
partner Start End
• Work Package management Snecma Jan. 2010 Dec. 2010 • Prosecution of Demonstrator models construction
(Performance model, WEM, …) Snecma Jan. 2010 Dec. 2010
• Demonstrator requirements specification Snecma, Airbus Operations
Jan. 2010 Nov. 2010
• FTB – Demonstrator integration Snecma, Airbus Operations
Jan. 2010 Dec. 2010
• Prosecution of Demonstrator conceptual design Snecma Jan. 2010 Sep. 2010
• Initiation of Demonstrator preliminary design Snecma Sep. 2010 Dec. 2010
• Demonstrator sub-systems & modules requirements specification
Snecma Jan. 2010 Nov. 2010
• Prosecution of sub-systems conceptual design Snecma, Hispano-Suiza, Techspace Aero
Jan. 2010 Sep. 2010
• Initiation of sub-systems preliminary design Snecma, Hispano-Suiza, Techspace Aero
Sep. 2010 Dec. 2010
• Prosecution of sub-systems equipment requirements specification
Snecma, Hispano-Suiza, Techspace Aero
Jan. 2010 Nov. 2010
• Regional aircraft - CROR integration Snecma, Alenia Aeronautica
Jan. 2010 Dec. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 11 of 31
11 / 31 AIP SAGE2.1 27.01.2010
European Commission Research Directorates
Subcontract Tasks No. Title Responsible
Partner
SC2.1.1 Support to design activities Snecma
SC2.1.2 Support to design activities Hispano-Suiza
Milestones No. Title Leading
partner Due Date
M2.1E Concept Reviews Snecma Sep. 2010
Inputs needed (Deliverables from other WP/Tasks) No. Title From
(WP/Task) Due date
2.1A SAGE2 Demonstration Requirements Document 2.0 Mar. 2010
Deliverables (Outputs to other WP/Tasks) No. Title Leading
partner To (WP/Task)
Due date
D2.1C WP’s Annual Reports Snecma 2.0 Dec. 2010
D2.1H Demonstrator SDD (v1 version) Snecma 2.0 Sep. 2010
D2.1I Demonstrator sub-systems URDs (v1 versions)
Snecma 2.0, 2.1 & 2.2 Sep. 2010
D2.1J Demonstrator CPMS SDD (v1 version) Snecma 2.0 & 2.1 Sep. 2010
D2.1K Demonstrator CPMS Equipments URDs (v1 versions)
Snecma 2.0 & 2.1 Sep. 2010
D2.1L Demonstrator LCS SDD (v1 version) Techspace Aero
2.0 & 2.1 Sep. 2010
D2.1M Demonstrator LCS Equipments URDs (v1 versions)
Techspace Aero
2.0 & 2.1 Sep. 2010
D2.1N Demonstrator PAS SDD (v1 version) Hispano-Suiza 2.0 & 2.1 Sep. 2010
D2.1O Demonstrator PAS Equipments URDs (v1 versions)
Hispano-Suiza 2.0 & 2.1 Sep. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 12 of 31
12 / 31 AIP SAGE2.2 27.01.2010
European Commission Research Directorates
SAGE2.2 Engine Modules & Nacelle Development
WP No. SAGE2.2 WP Title Engine Modules & Nacelle Development
Leader Snecma Contact Jean-Marc Cailleau
Statement of Work (Tasks) Description Leading
partner Start End
• Work package management Snecma Jan. 2010 Dec. 2010 • Prosecution of Demonstrator modules & nacelle
design processes & tools implementation Snecma, Aircelle, Avio, Volvo Aero, Alenia Aermacchi, CfP Partners
Jan. 2010 Dec. 2010
• Support to Demonstrator conceptual design Snecma, Aircelle, Avio, Volvo Aero, Alenia Aermacchi, CfP Partner
Jan. 2010 Sep. 2010
• Support to Demonstrator preliminary design Snecma, Aircelle, Avio, Volvo Aero, Alenia Aermacchi, CfP Partner
Sep. 2010 Dec. 2010
• Prosecution of PGB conceptual design for alternate demo architecture
Avio Jan. 2010 Sep. 2010
• PGB design follow-on to support technology development
Avio Sep. 2010 Dec. 2010
• Prosecution of Demonstrator modules & nacelle components conceptual design
Snecma, Aircelle, Avio, Volvo Aero, Alenia Aermacchi, CfP Partner
Jan. 2010 Sep. 2010
• Initiation of Demonstrator modules & nacelle components preliminary design
Snecma, Aircelle, Avio, Volvo Aero, Alenia Aermacchi, CfP Partner
Sep. 2010 Dec. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 13 of 31
13 / 31 AIP SAGE2.2 27.01.2010
European Commission Research Directorates
Description Leading partner
Start End
• Initiation of Propellers technology development Snecma Jan. 2010 Dec. 2010 • Development of improved tools for PGB gears
reliability and innovative materials application for fatigue limits enhancement
Avio, CfP Partner
Jan. 2010 Dec. 2010
Subcontract Tasks No. Title Responsible
Partner
SC2.2.5 Support to design activities Snecma
SC2.2.6 Support to design and technical assessment AVIO
Milestones No. Title Leading
partner Due Date
M2.2C Concept Reviews Snecma, Aircelle, Avio, Volvo Aero, Alenia Aermacchi, CfP Partners
Sep. 2010
Indicative Excluded Tasks (for call for proposals) No Description SAGE-02-003 PAS equipment, motor and sensor design activities
SAGE-02-004 PAS equipment reductor design activities
SAGE-02-005 Design, computation and drawing of LCS equipment
SAGE-02-006 Performance and qualification tests of LCS equipment
SAGE-02-007 Test bench for heat exchanger
SAGE-02-008 Demonstrator module development
SAGE-02-009 Development of propellers technology
Inputs needed (Deliverables from other WP/Tasks) No. Title From
(WP/Task) Due date
2.2C Demonstrator sub-systems URD’s (v1 versions) 2.1 Sep. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 14 of 31
14 / 31 AIP SAGE2.2 27.01.2010
European Commission Research Directorates
Deliverables (Outputs to other WP/Tasks) No. Title Leading
partner To (WP/Task)
Due date
D2.2G Demonstrator sub-systems SRD & sub-systems parts CRD’s (v1 versions)
Snecma, Aircelle, Avio, Volvo Aero, Alenia Aermacchi, CfP Partners
2.0 & 2.1 Sep. 2010
D2.2E Demonstrator sub-systems SDD & sub-systems parts CDD’s (v1 versions)
Snecma, Aircelle, Avio, Volvo Aero, Alenia Aermacchi, CfP Partners
2.0 & 2.1 Sep. 2010
D2.2F WP’s annual reports Snecma, Aircelle, Avio, Volvo Aero, Alenia Aermacchi, CfP Partners
2.0 Dec. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 15 of 31
15 / 31 AIP 2009 SAGE2.3 27.01.2010
European Commission Research Directorates
SAGE2.3 Ground Tests
WP No. SAGE2.3 WP Title Ground Tests
Leader Snecma Contact Alain Mazelet
Statement of Work (Tasks) Description Leading
partner Start End
• Work package management Snecma Sep. 2010 Dec. 2010 • Initiation of GTB conceptual design Snecma Sep. 2010 Dec. 2010
Subcontract Tasks No. Title Responsible
Partner
SC2.3.1 Support to design activities Snecma
Milestones No. Title Leading
partner Due Date
M2.3A GTB Concept Review Snecma Nov. 2010
Inputs needed (Deliverables from other WP/Tasks) No. Title From
(WP/Task) Due date
2.3A SAGE2 Demonstration Requirements Document 2.0 Mar. 2010
2.3B Demonstrator SDD (v1 version) 2.1 Sep. 2010
Deliverables (Outputs to other WP/Tasks) No. Title Leading
partner To (WP/Task)
Due date
D2.3A GTB SRD (v0 version) Snecma 2.0 Nov. 2010
D2.3B GTB SDD (v0 version) Snecma 2.0 Nov. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 16 of 31
16 / 31 AIP 2009 SAGE3.1 27.01.2010
European Commission Research Directorates
SAGE3.1 Turbomachinery
WP No. SAGE3.1 WP Title Turbomachinery
Leader Rolls-Royce Contact Mark Pacey
Statement of Work (Tasks) Description Leading
partner Start End
• Concept design and studies of composite fancase, including structural and acoustic design.
Rolls-Royce Jan. 2010 May 2010
• Preparation of a Call for Proposal topic description for the delivery of a composite fancase
Rolls-Royce Jan. 2010 March 2010
• Aerodynamic and structural design and analysis of composite fan annulus fillers
Rolls-Royce Jan. 2010 May 2010
• Develop a specification for composite fan annulus fillers and prepare a CfP topic description.
Rolls-Royce Jan. 2010 March 2010
• Develop instrumentation concepts for composite fan system
Rolls-Royce Aug. 2010 Dec. 2010
• Support to Call for Proposal evaluations Rolls-Royce Oct. 2010 Oct. 2010 • Develop LPT concept selected for the
demonstrator to support stage 1 exit.. ITP Jan. 2010 Nov. 2010
• Select LPT final concept for demonstrator engine. ITP/Rolls-Royec
Nov. 2010 Nov. 2010
• Strategic planning for the technologies to be validated through rig testing.
ITP Jan. 2010 Dec. 2010
• Develop an improved blade-row interaction criteria to improve turbine efficiency through rig testing.
ITP Jan. 2010 Dec. 2010
Subcontract Tasks No. Title Responsible
Partner
3.1.1 Manufacturing of the rig parts ITP
3.1.2 Assembly and rig testing to develop a blade-row interaction criteria ITP
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 17 of 31
17 / 31 AIP 2009 SAGE3.1 27.01.2010
European Commission Research Directorates
Indicative Excluded Tasks (for call for proposals) No Description SAGE-03-001 Manufacture of complex composite fan annulus fillers
SAGE-03-002 Manufacture of a composite fancase incorporating acoustic treatment
Inputs needed (Deliverables from other WP/Tasks) No. Title From
(WP/Task) Due date
3.1.1 Initial demonstrator interface definitions 3.3 Jan. 2010
Deliverables (Outputs to other WP/Tasks) No. Title Leading
partner To (WP/Task)
Due date
3.1.1 Composite fan system performance and weight predictions
Rolls-Royce 3.3 May 2010
3.1.2 Composite fan system instrumentation requirements
Rolls-Royce 3.3 Nov. 2010
3.1.3 Fan system initial interface definition to inlet Rolls-Royce 3.2 July 2010
3.1.4 Initial LPT performance and weight predictions
ITP 3.3 May 2010
3.1.5 LPT instrumentation requirements ITP 3.3 Nov. 2010
Milestones No. Title Leading
partner Due Date
3.1.1 Launch of composite fancase manufacture CfP topic Rolls-Royce March 2010
3.1.2 Launch of composite fan annulus filler manufacture CfP topic Rolls-Royce March 2010
3.1.3 Provide LPT concept for demonstrator engine ITP July 2010
3.1.4 Multistage rig Pass to Test for improved blade-row interaction ITP July 2010
3.1.5 Selection of fancase and annulus filler Partners Rolls-Royce Sept. 2010
3.1.6 Concept Design Review Rolls-Royce Nov. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 18 of 31
18 / 31 AIP 2009 SAGE3.2 27.01.2010
European Commission Research Directorates
SAGE3.2 Structures and Systems
WP No. SAGE3.2 WP Title Structures and Systems
Leader Rolls-Royce Contact Mark Pacey
Statement of Work (Tasks) Description Leading
partner Start End
• Aerodynamic, acoustic and structural design of integrated inlet optimised to composite fan system.
Rolls-Royce Jan. 2010 May 2010
• Preparation of Call for Proposal topic description for inlet detail design and manufacture
Rolls-Royce June 2010 July 2010
• Initial design of leaf seal for application to donor core engine and integration with donor engine hardware
Rolls-Royce March 2010 June 2010
• Develop validation plan for low weight, aerodynamically efficient intercase
VAC Jan. 2010 May 2010
• Preliminary design of intercase incorporating technologies for validation.
VAC Jan. 2010 Dec. 2010
Indicative Excluded Tasks (for call for proposals) No Description SAGE-03-003 Development of inlet optimised to composite fancase
Inputs needed (Deliverables from other WP/Tasks) No. Title From
(WP/Task) Due date
3.2.1 Fan system initial interface definition 3.1 July 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 19 of 31
19 / 31 AIP 2009 SAGE3.2 27.01.2010
European Commission Research Directorates
Deliverables (Outputs to other WP/Tasks) No. Title Leading
partner To (WP/Task)
Due date
3.2.1 Leaf seal initial interface definition proposal Rolls-Royce 3.3 May 2010
3.2.2 Dynamic characteristics of leaf seal proposal
Rolls-Royce 3.3 May 2010
3.2.3 Predictions of inlet impact on performance and weight
Rolls-Royce 3.3 May 2010
3.2.4 Intercase performance and weight predictions
VAC 3.3 May 2010
Milestones No. Title Leading
partner Due Date
3.2.1 Launch of optimised inlet Call for Proposal topic Rolls-Royce March 2010
3.2.2 Selection of inlet Partner Rolls-Royce Sept. 2010
3.2.3 Concept Design Review Rolls-Royce/ VAC
Nov. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 20 of 31
20 / 31 AIP 2009 SAGE3.3 27.01.2010
European Commission Research Directorates
SAGE3.3 Integration and Test
WP No. SAGE3.3 WP Title Integration and Test
Leader Rolls-Royce Contact Mark Pacey
Statement of Work (Tasks) Description Leading
partner Start End
• Integrate and manage the demonstrator project, including planning, risk management and reporting
Rolls-Royce/ ITP/VAC
Jan. 2010 Dec. 2010
• Create General Assembly of demonstrator Rolls-Royce Jan. 2010 July 2010 • Whole engine performance and structural
modelling of demonstrator and initial assessments of change impact
Rolls-Royce May 2010 Nov. 2010
• Define top level demonstrator build and test bed plan, including instrumentation and tooling requirements
Rolls-Royce June 2010 Dec. 2010
• Project review and steering Rolls-Royce/ ITP/VAC
Jan. 2010 Dec. 2010
Inputs needed (Deliverables from other WP/Tasks) No. Title From
(WP/Task) Due date
3.3.1 Performance and structural characteristic predictions for all demonstrated technologies
3.1, 3.2 May 2010
Deliverables (Outputs to other WP/Tasks) No. Title Leading
partner To (WP/Task)
Due date
3.3.1 Donor core engine initial interface definitions
Rolls-Royce 3.1, 3.2 Jan. 2010
3.3.2 Demonstrator General Assembly Rolls-Royce 3.1, 3.2 Nov. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 21 of 31
21 / 31 AIP 2009 SAGE3.3 27.01.2010
European Commission Research Directorates
Milestones No. Title Leading
partner Due Date
3.3.1 Concept Design Review Rolls-Royce Nov. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 22 of 31
22 / 31 AIP 2009 SAGE4.3 27.01.2010
European Commission Research Directorates
SAGE4.1 Engine Modules
WP No. 4.1 WP Title Engine Modules
Leader MTU Contact Peter Taferner
Statement of work (Tasks) Description Leading
partner Start End
• Plan, manage and coordinate provision of new HPC, LPT and adaptation of the donor engine
MTU Jan. 2010 Dec. 2010
• Provide HPC concept definition and study MTU Jan. 2010 Dec. 2010 • Provide HS-LPT concept definition and study MTU Jan. 2010 Dec. 2010 • Provide Engine Modifications concept definition
and study MTU Jan. 2010 Dec. 2010
Indicative Excluded Tasks (for call for proposals) No Description SAGE-04-001 Turbine materials development
SAGE-04-002 Alternate Designs of Turbine components
Milestones No. Title Leading
partner Due Date
4.1.1 Initial Modules and Engine Modifications Concept Design Review
MTU March 2010
4.1.2 Modules and Engine Modifications Concept Definition and Study Review
MTU Nov. 2010
Inputs needed (Deliverables from other WP/Tasks) No. Title From
(WP/Task) Due Date
4.3.1 Initial Geared Fan Demonstrator Concept 4.3 Jan. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 23 of 31
23 / 31 AIP 2009 SAGE4.3 27.01.2010
European Commission Research Directorates
Deliverables (Outputs to other WP/Tasks) No. Title Leading
partner To (WP/Task)
Due Date
4.1.1 Initial Modules and Engine Modifications Concept Design
MTU 4.3 March 2010
4.1.2 Modules and Engine Modifications Concept Definition and Study
MTU 4.3 Nov. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 24 of 31
24 / 31 AIP 2009 SAGE4.3 27.01.2010
European Commission Research Directorates
SAGE 4.2 Structures & Systems
WP No. 4.2 WP Title Structures & Systems
Leader MTU Contact Peter Taferner
Statement of work (Tasks) Description Leading
partner Start End
• Plan, manage and coordinate provision of new fan drive gear system, mid turbine frame and controls and power system
MTU Jan. 2010 Dec. 2010
• Provide Demonstrator Concept Definition and Study to Structures & Systems
MTU Jan. 2010 Dec. 2010
• Provide Fan Drive Geared System Concept Definition and Study AVIO Jan. 2010 Dec. 2010
• Provide Mid Turbine Frame Concept Definition and Study
VAC Jan. 2010 Dec. 2010
Milestones No. Title Leading
partner Due Date
4.2.1 Structures & Systems Concept Definition and Study Review MTU Nov. 2010 4.2.2 Fan Drive Geared System Definition and Study Assessment AVIO Nov. 2010 4.2.3 Mid Turbine Frame Concept Definition and Study Review VAC Nov. 2010
Inputs needed (Deliverables from other WP/Tasks) No. Title From
(WP/Task) Due Date
4.3.1 Initial Geared Fan Demonstrator Concept 4.3 Jan. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 25 of 31
25 / 31 AIP 2009 SAGE4.3 27.01.2010
European Commission Research Directorates
Deliverables (Outputs to other WP/Tasks) No. Title Leading
partner To (WP/Task)
Due Date
4.2.1 Structures & Systems Concept Definition and Study
MTU 4.3 Nov. 2010
4.2.2 Fan Drive Geared System Definition, Study and Documentation
AVIO 4.3 Nov. 2010
4.2.3 Mid Turbine Frame Concept Definition, Study and Documentation
VAC 4.3 Nov. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 26 of 31
26 / 31 AIP 2009 SAGE4.3 27.01.2010
European Commission Research Directorates
SAGE 4.3 Integration & Test
WP No. 4.3 WP Title Integration & Test
Leader MTU Contact Peter Taferner
Statement of work (Tasks) Description Leading
partner Start End
• Plan, manage and coordinate whole engine design, geared fan demonstrator test and build & strip and test evaluation
MTU Jan. 2010 Dec. 2010
• Provide Initial Geared Fan Demonstrator Concept and Technology Development Plan
MTU Jan. 2010 March 2010
• Provide Geared Fan Demonstrator Concept Definition
MTU March 2010 Aug. 2010
• Provide Geared Fan Demonstrator Concept Study MTU Sep. 2010 Dec. 2010 • Provide Geared Fan Demonstrator Concept
Selection MTU Jan. 2010 Dec. 2010
Subcontract Tasks No. Title Responsible
Partner
4.3.1 Support to planning, steering and monitoring activities MTU
Milestones No. Title Leading
partner Due Date
4.3.1 Initial Geared Fan Demonstrator Concept Design Review MTU Jan. 2010
4.3.2 Geared Fan Demonstrator Concept Selection Assessment MTU Dec. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 27 of 31
27 / 31 AIP 2009 SAGE4.3 27.01.2010
European Commission Research Directorates
Deliverables (Outputs to other WP/Tasks) No. Title Leading
partner To (WP/Task)
Due Date
4.3.1 Initial Geared Fan Demonstrator Concept and Technology Development Plan
MTU 4.1, 4.2 March 2010
4.3.2 Geared Fan Demonstrator Concept Selection
MTU 4.1, 4.2 Dec. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 28 of 31
28 / 31 AIP SAGE5.2010
European Commission Research Directorates
SAGE 5.1 Core Study
WP No. SAGE 5.1 WP Title Core Study
Leader Turbomeca Contact Brigitte CHEFTEL
Statement of Work (Tasks) Description Leading
partner Start End
T5.1.1: Compressor, casing, IGV and air flow path design, rig test design. New coating characterisation
Turbomeca Jan. 2010 Dec. 2010
T5.1.2: Combustion chamber and injector (position and type) design. Rig test design study.
Turbomeca Jan. 2010 Dec. 2010
T5.1.3: HP turbine blades and disk design. Rig test design. New blade material characterisation
Turbomeca Jan. 2010 Dec. 2010
T5.1.4: LP turbine blades and disk design. Rig test design
Turbomeca Jan. 2010 Dec. 2010
T5.1.5: Management Turbomeca Jan. 2010 Dec. 2010
Indicative Excluded Tasks (for call for proposals) No Description SAGE-05-010 Oxidation/corrosion resistant coatings for titanium aluminides for using on low pressure
turbine blades between 650 and 850°C
Milestones No. Title Leading
partner Due Date
M 5.1b Design Review Turbomeca June 2010
Deliverables (Outputs to other WP/Tasks) No. Title Leading
partner To (WP/Task)
Due date
D5.1.1b Report on the selection of compressor Turbomeca T5.1.1 Dec. 2010
D5.1.2b Report on the selection of combustors Turbomeca T5.1.2 Dec. 2010
D5.1.3b Report on the selection of HP turbine Turbomeca T5.1.3 Dec. 2010
D5.1.4b Report on the selection of LP turbine Turbomeca T5.1.4 Dec. 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 29 of 31
29 / 31 AIP SAGE5.2010
European Commission Research Directorates
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 30 of 31
30 / 31 AIP SAGE5.2 27.01.2010
European Commission Research Directorates
SAGE 5.2 Whole engine study
WP No. SAGE 5.2 WP Title Whole engine study
Leader Turbomeca Contact Brigitte CHEFTEL
Statement of Work (Tasks) Description Leading
partner Start End
T5.2.1: Oil system - Parts study Turbomeca Jan. 2010 Dec. 2010
T5.2.2: Transmission - Parts study and material choice
Turbomeca Jan. 2010 Dec. 2010
T5.2.3: Low noise device - Parts study Turbomeca Jan. 2010 Dec. 2010
T5.2.4: More electrical AGB - Parts study Turbomeca Jan. 2010 Dec. 2010
T5.2.5: Control system - Parts study Turbomeca and partners
Jan. 2010 Dec. 2010
T5.2.6: Exhaust - Parts study Turbomeca Jan. 2010 Dec. 2010
T5.2.7: Contra rotative architecture - Parts design Turbomeca Jan. 2010 Dec. 2010
T5.2.8: Management Turbomeca Jan. 2010 Dec. 2010
Indicative Excluded Tasks (for call for proposals) No Description SAGE-05-011 Design and feasibility of air intake and gear box static parts made of organic matrix
composite
SAGE-05-012 Design and feasibility of a casing in organic composite materials
Milestones No. Title Leading
partner Due Date
M 5.2b Design review Turbomeca June 2010
Sustainable and Green Engine ITD
Annual Implementation Plan
Page 31 of 31
31 / 31 AIP SAGE5.2 27.01.2010
European Commission Research Directorates
Deliverables (Outputs to other WP/Tasks) No. Title Leading
partner To
(WP/Task) Due date
D5.2.1b Study report on the oil system Turbomeca T5.2.1 Dec. 2010
D5.2.2b Study report on the transmission Turbomeca T5.2.2 Dec. 2010
D5.2.3b Study report on the Low noise device Turbomeca T5.2.3 Dec. 2010
D5.2.4b Study report on the More electrical AGB Turbomeca T5.2.4 Dec. 2010
D5.2.5b Study report on the Control system Turbomeca T5.2.5 Dec. 2010
D5.2.6b Study report on the Exhaust Turbomeca T5.2.6 Dec. 2010
D5.2.7b Study report on the Contra rotative architecture
Turbomeca T5.2.7 Dec. 2010