1 Sussex County Council August 18, 2009 A Regional Planning Report to Assess a Joint Sussex County/City of Rehoboth Land Application Project

description

Sussex County Council. A Regional Planning Report to Assess a Joint Sussex County/City of Rehoboth Land Application Project. August 18, 2009. Design Criteria. Planning Period: Year 2009  2030 West Rehoboth Expansion Flows: 4.4 million gallons per day (mgd) (1.) - PowerPoint PPT Presentation

Transcript of Sussex County Council

  • *Sussex County Council

    August 18, 2009A Regional Planning Report to Assess a Joint Sussex County/City of Rehoboth Land Application Project

  • *Design CriteriaPlanning Period: Year 2009 2030West Rehoboth Expansion Flows: 4.4 million gallons per day (mgd) (1.)Inland Bays Service Area Flows: 2.9 mgdRehoboth Beach Flows: 2.5 mgd (2.)

    Total Treatment and Disposal Capacity Required: 9.8 mgd

    Note: (1.) All flows are maximum month average daily flows.(2.) Rehoboth Beach Flows include Dewey Beach, Henlopen Acres & North Shores.

  • *North Coastal Planning Area Treatment and Disposal AlternativesNorthern West RehobothGoslee Creek Planning AreaAngola Neck Planning AreaInland Bays Regional Wastewater FacilityExp. Area 1Exp. Area 2West Rehoboth Expansion Dewey Beach SSDLong Neck SSD SSD Wolfe Neck Regional Wastewater Treatment Facility (WNRWF)Oak OrchardWolfe Neck Regional Wastewater FacilityHerring Creek Planning AreaRehoboth BeachDewey BeachHenlopen Acres/North Shores Inland Bays Regional Wastewater Treatment Facility (IBRWF) City of Rehoboth Beach Wastewater Treatment Plant (RBWWTP)Rehoboth Beach WWTP3 miles13 miles15 miles3.5 miles

  • *Alternative #1A- Raw Wastewater to WNRWF with Treatment at the IBRWFWolfe Neck Service AreaCity of Rehoboth4.4 MGD2.5 MGD(Raw WW)Inland Bays Service Area2.9 MGD4.6 MGD (Excess)Includes:West RehobothGoslee CreekNorthern WR ExpIncludes:City of RehobothHenlopen AcresDewey BeachNorth ShoresIncludes:Long Neck SSDOak Orchard SSDOO Exp #1Angola Neck SSDNote: All flow rates refer to year 2030 Max Month treatment and disposal requirements.

  • *Alternative #1B- Raw Wastewater to WNRWF with Treatment at a Private ProviderWolfe Neck Service AreaCity of Rehoboth4.4 MGD2.5 MGD(Raw WW)Inland Bays Service Area2.9 MGDIncludes:West RehobothGoslee CreekNorthern WR ExpIncludes:City of RehobothHenlopen AcresDewey BeachNorth ShoresIncludes:Long Neck SSDOak Orchard SSDOO Exp #1Angola Neck SSD4.6 MGD (Excess)Note: All flow rates refer to year 2030 Max Month treatment and disposal requirements.

  • *Alternative #2A- Treated Effluent to WNRWF with Treatment at the IBRWFWolfe Neck Service AreaCity of Rehoboth4.4 MGD2.5 MGD(Raw WW)Inland Bays Service Area2.9 MGD3.6 MGD (Excess)Includes:West RehobothGoslee CreekNorthern WR ExpIncludes:City of RehobothHenlopen AcresDewey BeachNorth ShoresIncludes:Long Neck SSDOak Orchard SSDOO Exp #1Angola Neck SSDWNRWFCapacity Available= 3.1 MGDStorage Available for Max Month= 0.2 MGDNote: All flow rates refer to year 2030 Max Month treatment and disposal requirements.

  • *Alternative #2B- Treated Effluent to WNRWF with Treatment at a Private Service ProviderWolfe Neck Service AreaCity of Rehoboth4.4 MGD2.5 MGD(Raw WW)Inland Bays Service Area2.9 MGDIncludes:West RehobothGoslee CreekNorthern WR ExpIncludes:City of RehobothHenlopen AcresDewey BeachNorth ShoresIncludes:Long Neck SSDOak Orchard SSDOO Exp #1Angola Neck SSDWNRWFCapacity Available= 3.1 MGDStorage Available for Max Month= 0.2 MGD3.6 MGD (Excess)Note: All flow rates refer to year 2030 Max Month treatment and disposal requirements.

  • *Alternative #3- Separate Treatment and DisposalWolfe Neck Service AreaCity of Rehoboth4.4 MGDInland Bays Service Area2.9 MGDIncludes:West RehobothGoslee CreekNorthern WR ExpIncludes:City of RehobothHenlopen AcresDewey BeachNorth ShoresIncludes:Long Neck SSDOak Orchard SSDOO Exp #1Angola Neck SSDWNRWFCapacity Available= 2.3 MGD

    2.5 MGD(Treated WW)2.1 MGD (Excess)Ocean OutfallNote: All flow rates refer to year 2030 Max Month treatment and disposal requirements.

  • *Summary of Costs

    County Costs

    SUMMARY OF TOTAL COSTS AND REHOBETH USER COSTSDRAFT

    7/9/09

    Dewey Beach User RatesHenlopen Acres User RatesCity of Rehoboth Beach User Rates

    AlternativeDescriptionExisting RateNew RateExisting RateNew RateExisting RateNew Rate

    #2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$341$642$588$865$325$968

    #2BTreated Effluent Pumped to WNRWF with Disposal at Private Service Provider$341$1,082$588$1,314$325$1,370

    #3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$341$568$588$798$325$680

    &L&Z&F

    Presentation

    SUMMARY OF TOTAL COSTS AND REHOBETH USER COSTSDRAFT

    7/9/09

    AlternativeDescriptionTotal Capital CostSussex County Capital CostCity of Rehoboth Beach Capital CostCity of Rehoboth Beach Annual Capital CostsCity of Rehoboth Beach Annual O&M Costs

    #1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$112 M$44 M$68 M$2.9 M$1.5 M

    #1BRaw Wastewater Pumped to WNRWF with Disposal at Private Service Provider$99 M$50 M$49 M$2.1 M$3.3 M

    #2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$99 M$49 M$50 M$2.2 M$1.5 M

    #2BTreated Effluent Pumped to WNRWF with Disposal at Private Service Provider$99 M$67 M$32 M$1.4 M$3.8 M

    #3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$99 M$64 M$35 M$1.5 M$1.1 m

    &L&Z&F

    rounded

    SUMMARY OF TOTAL COSTS AND REHOBETH USER COSTSDRAFT

    7/9/09

    Annual Costs

    AlternativeDescrptionTotal CostCounty CostRehoboth CostCapital CostsOperation and Maintenance Costs

    #1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$112,000,000$44,000,000$68,000,000$1,200$1,000

    #1BRaw Wastewater Pumped to WNRWF with Disposal at Private Service Provider$99,000,000$50,000,000$49,000,000$1,400$1,300

    #2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$99,000,000$49,000,000$50,000,000$1,000$900

    #2BTreated Effluent Pumped to WNRWF with Disposal at Private Service Provider$99,000,000$67,000,000$32,000,000$1,400$1,300

    #3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$99,000,000$64,000,000$35,000,000$700$600

    #4Rehoboth and County Pump to Common Outfall with County Continuing to use IBRWF for Southern Service Area$92,000,000$75,000,000$17,000,000$500$400

    &L&Z&F

    User Cost Summary

    SUMMARY OF TOTAL COSTS AND REHOBETH USER COSTSDRAFT

    7/9/09

    Rehoboth User Rates

    AlternativeDescrptionTotal CostCounty CostRehoboth CostSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 yearsAnnual Capital CostsAnnual O & M Costs

    #1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$112,324,447$44,075,056$68,249,391$1,156$1,0362,929,4201,482,530

    #1BRaw Wastewater Pumped to WNRWF with Disposal at Private Service Provider$98,924,872$49,793,592$49,131,280$1,421$1,3352,108,8273,313,888

    #2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$98,722,310$48,603,086$50,119,224$968$8792,151,2321,541,103

    #2BTreated Effluent Pumped to WNRWF with Disposal at Private Service Provider$98,832,240$66,654,341$32,177,899$1,370$1,3131,381,1493,846,393

    #3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$99,429,900$64,065,500$35,364,400$691$6291,517,9211,118,703

    #4Rehoboth and County Pump to Common Outfall with County Continuing to use IBRWF for Southern Service Area$91,622,990$74,951,675$16,671,315$459$429715,5711,034,223

    &L&Z&F

    County Implementation Schedule

    SUMMARY OF TIMING, COSTS AND EDUSDRAFT

    7/9/09

    Overall Phase 1

    AlternativeDescrptionTotal County CostCost for Overall Phase 1Improvements RequiredYearIBRWF Treatment Capacity (MGD)WNRWF Treatment Capacity (MGD)Total Treatment Capacity (MGD)Allocation to Rehoboth Beach (2.)County Treatment Capacity (MGD)County Capacity (EDUs) (1.)Existing County EDUS (3.)Increased EDU Capacity (1.)

    #1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$44,075,056$18,775,057WNPS, FM and IBRWF through Phase 320125.202.307.502.505.0033,33325,3817,952

    #2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$48,603,086$34,303,086WNPS, FM and IBRWF through Phase 320125.203.108.302.505.8038,66725,38113,286

    #3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$64,065,500$43,518,217WNPS, FM and IBRWF through Phase 220123.702.306.000.006.0040,00025,38114,619

    #4Rehoboth and County Pump to Common Outfall with County Continuing to use IBRWF for Southern Service Area$74,951,675$56,886,812WNPS, WNRWF Upgrades, FM to Rehobeth, Ocean Outfall and IBRWF through Phase 120122.004.406.400.006.4042,66725,38117,286

    Notes

    (1.) Capacity/EDU150

    (2.) Allocated Capacity based on year 2030 RBSTP flow of 2.50 MGD

    (3.) Existing County EDUs in WRSSD, LNSSD, and OOSSD. Does not include existing EDUs in Angola and OOSSD Phase 1 Expansion.

    Overall Phase 2

    AlternativeDescrptionTotal County CostCost for Overall Phase 2Improvements RequiredYearIBRWF Treatment Capacity (MGD)WNRWF Treatment Capacity (MGD)Total Treatment Capacity (MGD)Allocation to Rehoboth Beach (2.)County Treatment Capacity (MGD)County Capacity (EDUs) (1.)Previous Upgrade CapacityIncreased EDU Capacity (1.)

    #1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$44,075,056$25,300,000IBWRF Phase 420187.502.309.802.507.3048,66733,33315,333

    #2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$48,603,086$14,300,000IBWRF Phase 420236.503.109.602.507.3048,66738,66710,000

    #3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$64,065,500$15,773,400IBWRF Phase 320235.002.307.300.007.3048,66740,0008,667

    #4Rehoboth and County Pump to Common Outfall with County Continuing to use IBRWF for Southern Service Area$74,951,675$15,063,421IBWRF Phase 220152.904.407.300.007.3048,66742,6676,000

    &L&Z&F

    Capital Cost Summary

    SUMMARY OF TOTAL CAPITAL COSTSDRAFTSUMMARY OF TOTAL CAPITAL COSTSDRAFT

    ALTERNATIVES #1, #2 and Analysis of Private Wastewater Treatment Provider8/10/09ALTERNATIVES #3 & #48/10/09

    Alternative #1A - Raw Wastewater Pumped to WNRWFAlternative #1B Private Wastewater Treatment ProviderAlternative #2A - Treated Effluent Pumped to WNRWFAlternative #2B Private Wastewater Treatment ProviderAlt. 3 - Rehoboth Ocean Outfall Alternative (County Uses Inland Bays)Alt. 4 - Rehoboth Ocean Outfall Alternative (County Uses Rehoboth Ocean Outfall)Ocean Outfall Costs

    ItemDescriptionTableDesign CriteriaCapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostOption 3

    ItemCosts

    1RBSTP Pumping Station-3.4 MGD Max Month10.2 MGD Peak Hour$3,001,000-3.4 Max Month10.2 MGD Peak Hour$3,001,000N/A3.4 Max Month10.2 MGD Peak Hour$900,000N/A3.4 Max Month10.2 MGD Peak Hour$900,000X3.4 Max Month10.2 MGD Peak Hour$900,000X3.4 Max Month10.2 MGD Peak Hour$900,000Outfall$15,153,846

    2Force Main to WNRWF (Option #1)1-13.4 MGD Max Month10.2 MGD Peak Hour$3,123,0001-13.4 Max Month10.2 MGD Peak Hour$3,123,0002-13.4 Max Month10.2 MGD Peak Hour$3,500,0002-13.4 Max Month10.2 MGD Peak Hour$3,500,0002-13-22.1 Max Month4.2 MGD Peak Hour$2,088,000Pump Station$900,000

    2ARehoboth FM, Ocean Outfall & Treatment Improvements-----------------3.4 Max Month10.2 MGD Peak Hour$20,688,000-8.3 Max Month8.3 Max Month$26,088,000Forcemain$2,688,000

    3WNRWF Headworks Upgrades1-210 MGD Max Month27.5 MGD Peak Hour$1,527,5711-210 MGD Max Month27.5 MGD Peak Hour$1,527,5711-210.0 MGD Max Month27.5 MGD Peak Hour$1,527,5711-210.0 MGD Max Month27.5 MGD Peak Hour$1,527,5712-26.6 MGD Max Month17.5 MGD Peak Hour$1,296,5722-26.6 MGD Max Month17.5 MGD Peak Hour$1,296,572RB Treatment Improvements$2,846,154

    4WNRWF to IBRWF/ANSWERF P.S.1-34.6 MGD Max Month6.9 MGD Peak Hour$2,485,0001-34.6 MGD Max Month6.9 MGD Peak Hour$2,485,0002-33.6 MGD Max Month5.4 MGD Peak Hour$2,270,0002-33.6 MGD Max Month5.4 MGD Peak Hour$2,270,0003-22.1 MGD Max Month3.2 MGD Peak Hour$2,000,000X2.1 MGD Max Month4.2 MGD Peak Hour$1,400,000Subtotal$21,588,000

    5Force Main to IBRWF (Option #3)1-44.6 MGD Max Month6.9 MGD Peak Hour$13,027,250----1-43.6 MGD Max Month5.4 MGD Peak Hour$13,027,250----3-12.1 MGD Max Month3.2 MGD Peak Hour$11,142,2501-4N/AN/AContingency$6,476,400

    6IBRWF Phase 1 Upgrades---$0---$0---$0---$0---$0---$0Project Costs$7,300,000

    6AWNRWF Upgrades4.4 MGD Max Month4.4 MGD Max Month$21,000,000Total$35,364,400

    7IBRWF Phase 2 Upgrades1-63.7 MGD Max Month3.7 MGD Max Month$20,600,0001-62.9 MGD Max Month2.9 MGD Max Month$10,905,8821-63.7 MGD Max Month3.7 MGD Max Month$20,600,000-3.7 MGD Max Month3.7 MGD Max Month$20,600,0001-63.7 MGD Max Month3.7 MGD Max Month$20,600,0001-62.9 MGD Max Month2.9 MGD Max Month$10,905,882

    8IBRWF Phase 3 Upgrades1-75.2 MGD Max Month5.2 MGD Max Month$12,700,0001-7N/AN/AN/A1-75.2 MGD Max Month5.2 MGD Max Month$12,700,0001-7---1-75.0 MGD Max Month5.0 MGD Max Month$12,700,0001-7---Option 4

    9IBRWF Phase 4 Upgrades-7.5 MGD Max Month7.5 MGD Max Month$18,852,459N/AN/AN/A-6.5 MGD Max Month6.5 MGD Max Month$10,655,738------------Outfall$16,953,846

    10A24" PVC Force Main to Cave Neck Road----1-84.6 MGD Max Month6.9 MGD Peak Hour$6,967,511---N/A1-83.6 MGD Max Month5.4 MGD Peak Hour$6,967,511--------Pump Station$900,000

    10B24" PVC Force Main to ANSRWRF----1-94.6 MGD Max Month6.9 MGD Peak Hour$8,736,587---N/A1-9--$8,736,587--------Forcemain$6,288,000

    11ANSRWRF Treatment Capacity-----4.6 MGD Max Month4.6 MGD Max Month$48,300,000---N/A-3.6 MGD Max Month3.6 MGD Max Month$37,800,000--------RB Treatment Improvements$2,846,154

    12Land/Easements---$11,250,000---$500,000---$11,250,000---$500,000---$0---Subtotal$26,988,000

    13A10% Contingency---$7,531,628---$3,724,655---$6,518,056---$4,500,167---$4,773,882---$3,669,045Contingency$8,096,400

    13B30% Contingency Ocean Outfall Items Only-------------------$6,476,400---$8,096,400Project Costs$7,300,000

    14Engineering and Administration---$18,226,540---$9,653,665---$15,773,695---$11,530,404---$18,852,795---$16,179,090Total$42,384,400

    Total Project Cost$112,324,447$98,924,872$98,722,310$98,832,240$99,429,900$91,622,990

    Notes:

    Flow Split

    Year 2030Max Month Flow (MGD)Notes

    Sussex County

    WNRWF4.4

    IBRWF2.9

    Henlopen/Dewey0.938% of flow from RBSTP

    Subtotal8.2Sussex County Flow

    City of Rehoboth1.662% of flow from RBSTP

    Total9.8

    % Flow Contributed by Sussex County84%

    % Flow Contributed by City of Rehoboth16%

    &L&Z&F

    Thor Young:This cost is for 3.6 mgd, need to revise for 2.1 mgd. Change Made for 2.1 (WFH)

    Thor Young:this is for 3.6 mgd, change for 2.1 mgd. Change made for 2.1 mgd (3.2 mgd peak)

    Thor Young:Cost is for 5.2 mgd, assume no real change for 5.0 mgd facility

    Thor Young:Total Rehoboth Beach Capital Cost inc. engineering for PS and outfall. Modification made by WFH

    whinz:4.9 (SC)+3.4 (RB)

    whinz:9.8 MGD Sussex+10.2 MGD RB

    whinz:Assumes 300/l.f. increase for going from 24" to 42". Based on recent bids

    whinz:Cost similar to MPS#1

    whinz:This is actually FM from WN to Rehoboth for Alt 4

    whinz:Per updated section from Rehoboth Report

    whinz:Per updated section from Rehoboth Report

    whinz:Updated per revised Rehoboth Chapter

    whinz:Updated per revised Rehoboth Chapter

    whinz:Removed Land from Contingency Calculation to be consitent with #1A

    whinz:Changed to original number presented at July progress meeting per MAI

    whinz:Need to approximate land cost associated with .9 MGD of treatment at IBRWF

    whinz:Reduced to account for only additional 0.9 MGD of capacity in Phase 2

    whinz:Changed to original number presented at July progress meeting per MAI

    whinz:Land cost not required per MAI

    Alt #1A

    Rehoboth Capital CostsDRAFT

    Alternative #1A - RAW WASTEWATER FROM REHOBOTH WITH EXCESS PUMPED TO IBWRF8/10/09

    Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty Costs ShareRehoboth Cost ShareRehoboth CostNotes2012 Implementation Year2017 Implementation Year

    1RBSTP Pumping Station-3.4 MGD Max Month10.2 MGD Peak Hour$3,001,000$0100%$3,001,000All Rehoboth Cost$0

    230" PVC Force Main to WNRWF (Option #1)1-13.4 MGD Max Month10.2 MGD Peak Hour$3,123,000$0100%$3,123,000All Rehoboth Cost$0

    3WNRWF Headworks Upgrades1-210 MGD Max Month27.5 MGD Peak Hour$1,527,571$974,59036.2%$552,981WR vs Rehoboth Cost Split$974,590

    4WNRWF to IBRWF Transfer Pumping Station1-34.6 MGD Max Month6.9 MGD Peak Hour$2,485,000$1,135,64554.3%$1,349,355WR vs Rehoboth Cost Split$1,135,645

    524" PVC Force Main to IBRWF (Option #3)1-44.6 MGD Max Month6.9 MGD Peak Hour$13,027,250$5,953,45354.3%$7,073,797WR vs Rehoboth Cost Split$5,953,453

    6IBRWF Phase 1 Upgrades---$0$00.0%$0First 2.5 MGD are Rehoboth Costs per DBB$0

    7IBRWF Phase 2 Upgrades1-63.7 MGD Max Month3.7 MGD Max Month$20,600,000$0100.0%$20,600,000First 2.5 MGD are Rehoboth Costs per DBB$0

    8IBRWF Phase 3 Upgrades1-75.2 MGD Max Month5.2 MGD Max Month$12,700,000$5,926,66753.3%$6,773,333$5,926,667

    9IBRWF Phase 4 Upgrades-7.5 MGD Max Month7.5 MGD Max Month$18,852,459$18,852,4590.0%$0$18,852,459

    12Land/Easements---$11,250,000$0100.0%$11,250,000450 Ac Required to accommodate Rehoboth Flows$13,990,355$18,852,459

    13A10% Contingency---$7,531,628$3,284,28156.4%$4,247,347Contingency is a Proportional Share (except land)$1,399,036$1,885,246

    14Engineering/Administration---$18,226,540$7,947,96156.4%$10,278,579Administrative Costs Proportional Share (except land)$3,385,666$4,562,295

    Total Project Cost$112,324,447$44,075,056$68,249,391Total$18,775,057$25,300,000

    SUSSEX COUNTY COST$44,075,056

    Flow Split

    Flow SplitMax Month Flow (MGD)Notes

    WNRWF4.4

    IBRWF2.9

    Subtotal7.3

    Henlopen/Dewey0.938% of flow from RBSTP

    City of Rehoboth/North Shores1.662% of flow from RBSTP

    Total9.8

    OCEAN OUTFALL OPTION

    SPRAY IRRIGATION OPTIONSPRAY IRRIGATION OPTIONwith Better Financing Option

    User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years

    COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth OnlyRehoboth + DB, NS & HARehoboth OnlyRehoboth + DB, NS & HARehoboth Only

    Annual Capital Cost$5,201,385$2,929,420$4,385,428$2,469,873$2,272,372$1,279,800

    Plant Operations (From Rehoboth March 2009 Report)$0$0$0$0$1,590,000$895,488

    Pump Station Maintenance$100,000$56,320$100,000$56,320$0$0

    Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735

    Sussex County Operations and Maintenance ($5.08/1000 gal)$2,286,000$1,287,475$2,286,000$1,287,475$150,000$84,480

    Subtotal$4,411,950$3,952,403$2,398,503

    Projected User Rate for City of Rehoboth$1,156$1,036$629

    Annual Capital Costs$5,201,385$2,929,420

    O&M Costs$2,536,000$1,482,530

    $5,201,385

    &L&8&Z&F&R&8&D

    At #1B

    Rehoboth Capital CostsDRAFT

    Alternative #1B- RAW WASTEWATER FROM REHOBOTH WITH EXCESS PUMPED TO PRIVATE ANSWERF8/10/09

    Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty ShareRehoboth Cost ShareRehoboth CostNotes

    $6,967,511FM to Cave neck

    1RBSTP Pumping Station-3.4 Max Month10.2 MGD Peak Hour$3,001,000$0100%$3,001,000All Rehoboth Cost$8,736,587FM to ANSWERF

    230" PVC Force Main to WNRWF (Option #1)1-13.4 Max Month10.2 MGD Peak Hour$3,123,000$0100%$3,123,000All Rehoboth Cost$15,704,098Subtotal

    3WNRWF Headworks Upgrades1-210 MGD Max Month27.5 MGD Peak Hour$1,527,571$974,10336.2%$553,468WR vs Rehoboth Cost Split

    4WNRWF to ANSWERF Transfer Pumping Station1-34.6 MGD Max Month6.9 MGD Peak Hour$2,485,000$1,134,45754.3%$1,350,543WR vs Rehoboth Cost Split

    6IBRWF Phase 1 Upgrades---$0$00.0%$0First 2.5 MGD are Rehoboth Costs per DBB

    7IBRWF Phase 2 Upgrades1-62.9 MGD Max Month2.9 MGD Max Month10,905,88210,905,8820.0%$0First 2.5 MGD are Rehoboth Costs per DBB

    1024" PVC Force Main to ANSRWF1-84.6 MGD Max Month6.9 MGD Peak Hour$15,704,098$7,169,26254.3%$8,534,836

    11ANSWRF Treatment Capacity1-94.6 MGD Max Month4.6 MGD Max Month$48,300,000$22,050,00054.3%$26,250,000

    12Land/Easements---$500,000$228,26154.3%$271,739From Artesian Proposal

    13AContingency---$3,724,655$2,041,19745.2%$1,683,459Contingency is a Proportional Share

    14Engineering & Administration---$9,653,665$5,290,43045.2%$4,363,235Administrative Costs Proportional Share

    Total Project Cost$98,924,872$49,793,592$49,131,280

    SUSSEX COUNTY COST$49,793,592

    Flow Split

    Flow Split to ANSWERFMax Month Flow (MGD)Notes

    WNRWF (4.4-2.3)2.145.7%

    Rehoboth2.554.3%

    Subtotal4.6

    Henlopen/Dewey0.938% of flow from RBSTP

    City of Rehoboth/North Shores1.662% of flow from RBSTP

    Total7.1

    OCEAN OUTFALL OPTION

    Private OptionPrivate Optionwith Better Financing Option

    User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years

    COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%

    Annual Capital Cost$3,744,366$2,108,827$3,156,976$1,778,009$2,223,255$1,252,137

    Pump Station O&M$100,000$56,320$100,000$56,320$2,272,372$1,279,800

    Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735

    Artesian Disposal @ 2 MGD Minimum ($6.84/1000 gal)$4,993,200$2,812,170$4,993,200$2,812,170$150,000$84,480Outfall O&M

    Sussex County O&M ($1.21/1000 gal)$544,500$306,662$544,500$306,662$0$0

    Subtotal$5,422,715$5,091,896$2,755,152

    Projected User Rate for City of Rehoboth$1,421$1,335$722

    Annual Capital Costs$3,744,366$2,108,827

    O&M Costs$5,787,700$3,313,888

    &L&Z&F

    Alt #2A

    Capital CostsDRAFT

    Alternative #2A - Treated Effluent FROM Rehoboth Pumped to WNRWF with Excess to IBRWF8/10/09

    Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty ShareRehoboth Cost ShareRehoboth CostNotes2012 Implementation Year2023 Implementation Year

    1RBSTP Pumping StationN/A3.4 Max Month10.2 MGD Peak Hour$900,000$0100%$900,000All Rehoboth Cost$0

    230" PVC Force Main to WNRWF (Option #1)2-13.4 Max Month10.2 MGD Peak Hour$3,500,000$0100%$3,500,000All Rehoboth Cost$0

    3WNRWF Headworks Upgrades1-210.0 MGD Max Month27.5 MGD Peak Hour$1,527,571$1,527,5710.0%$0WR vs Rehoboth Cost Split$1,527,571

    4WNRWF to IBRWF Transfer Pumping Station2-33.6 MGD Max Month5.4 MGD Peak Hour$2,270,000$1,324,16741.7%$945,833WR vs Rehoboth Cost Split$1,324,167

    524" PVC Force Main to IBRWF (Option #3)1-43.6 MGD Max Month5.4 MGD Peak Hour$13,027,250$7,599,22941.7%$5,428,021WR vs Rehoboth Cost Split$7,599,229

    6IBRWF Phase 1 Upgrades---$0$00.0%$0$0

    7IBRWF Phase 2 Upgrades1-63.7 MGD Max Month3.7 MGD Max Month$20,600,000$2,410,20088.3%$18,189,800First 1.5 MGD are Rehoboth Costs per DBB$2,410,200

    8IBRWF Phase 3 Upgrades1-75.2 MGD Max Month5.2 MGD Max Month$12,700,000$12,700,0000.0%$0$12,700,000

    9IBRWF Phase 4 Upgrades-6.5 MGD Max Month6.5 MGD Max Month$10,655,738$10,655,7380.0%$0$10,655,738

    12Land/Easements---$11,250,000$0100.0%$11,250,000450 Ac Required to accommodate Rehoboth Flows$25,561,167$10,655,738

    13AContingency---$6,518,056$3,621,69044.4%$2,896,365Contingency is a Proportional Share (except land)$2,556,117$1,065,574

    14Engineering/Administration---$15,773,695$8,764,49144.4%$7,009,204Administrative Costs Proportional Share (except land)$6,185,802$2,578,689

    Total Project Cost$98,722,310$48,603,086$50,119,224Total$34,303,086$14,300,000

    SUSSEX COUNTY COST$48,603,086

    Flow Split

    Flow SplitNotes

    WNRWF4.4

    IBRWF2.9

    Subtotal7.3

    Henlopen/Dewey0.938% of flow from RBSTP

    City of Rehoboth/North Shores1.662% of flow from RBSTP

    Total9.8

    OCEAN OUTFALL OPTION

    SPRAY IRRIGATION OPTIONSPRAY IRRIGATION OPTIONwith Better Financing Option

    User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years

    COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth OnlyRehoboth + DB, NS & HARehoboth OnlyRehoboth + DB, NS & HARehoboth Only

    Annual Capital Cost$3,819,659$2,151,232$3,220,457$1,813,761$2,272,372$1,279,800

    Plant Operations (From Rehoboth March 2009 Report)$1,590,000$895,488$1,590,000$895,488$1,590,000$895,488

    Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735

    Sussex County Operations and Maintenance ($2.00/1000 gal)$900,000$506,880$900,000$506,880$150,000$84,480

    Subtotal$3,692,335$3,354,864$2,398,503

    Projected User Rate for City of Rehoboth$968$879$629

    Annual Capital Costs$3,819,659$2,151,232

    O&M Costs$2,640,000$1,541,103

    &L&Z&F

    Alt 2B

    Rehoboth Capital CostsDRAFT

    Alternative #2B - TREATED WASTEWATER FROM REHOBOTH WITH EXCESS PUMPED TO PRIVATE ANSWERF8/10/09

    Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty CostsRehoboth Cost ShareRehoboth CostNotes

    $6,967,511FM to Cave Neck

    1RBSTP Pumping StationN/A3.4 Max Month10.2 MGD Peak Hour$900,000$0100%$900,000All Rehoboth Cost$8,736,587FM to ANSWERF

    230" PVC Force Main to WNRWF (Option #1)2-13.4 Max Month10.2 MGD Peak Hour$3,500,000$0100%$3,500,000All Rehoboth Cost$15,704,098

    3WNRWF Headworks Upgrades1-210.0 MGD Max Month27.5 MGD Peak Hour$1,527,571$1,527,5710.0%$0WR vs Rehoboth Cost Split

    4WNRWF to ANSWERF Transfer Pumping Station2-33.6 MGD Max Month5.4 MGD Peak Hour$2,270,000$1,323,41041.7%$946,590WR vs Rehoboth Cost Split

    6IBRWF Phase 1 Upgrades---$0$00.0%$0First 2.5 MGD are Rehoboth Costs per DBB

    7IBRWF Phase 2 Upgrades-3.7 MGD Max Month3.7 MGD Max Month$20,600,000$20,600,0000.0%$0First 2.5 MGD are Rehoboth Costs per DBB

    1024" PVC Force Main to ANSRWF1-83.6 MGD Max Month5.4 MGD Peak Hour$15,704,098$9,155,48941.7%$6,548,609

    11ANSWRF Treatment Capacity-3.6 MGD Max Month3.6 MGD Max Month$37,800,000$22,037,40041.7%$15,762,600

    12Land/Easements---$500,000$291,50041.7%$208,500From Artesian Proposal

    13AContingency @ 10%---$4,500,167$3,289,79726.9%$1,210,370Contingency is a Proportional Share

    14Engineering & Administration---$11,530,404$8,429,17426.9%$3,101,230Administrative Costs Proportional Share

    Total Project Cost$98,832,240$66,654,341$32,177,899

    SUSSEX COUNTY COST$66,654,341

    Flow Split

    Flow Split to ANSWERFMax Month Flow (MGD)Notes

    WNRWF (4.4-2.3)2.145.7%

    Rehoboth2.554.3%

    Subtotal4.6

    Henlopen/Dewey0.938% of flow from RBSTP

    City of Rehoboth/North Shores1.662% of flow from RBSTP

    Total7.1

    OCEAN OUTFALL OPTION

    Private OptionPrivate Optionwith Better Financing Option

    User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years

    COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%

    Annual Capital Cost$2,452,324$1,381,149$2,067,621$1,164,484$2,223,255$1,252,137

    Treatment Plant O&M From Rehoboth March 2009 Report)$1,590,000$895,488$1,590,000$895,488$2,272,372$1,279,800

    Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735

    Artesian Disposal @ 2 MGD Minimum ($6.84/1000 gal)$4,993,200$2,812,170$4,993,200$2,812,170$150,000$84,480Outfall O&M

    Sussex County O&M$0$0$0$0$0$0

    Subtotal$5,227,542$5,010,877$2,755,152

    Projected User Rate for City of Rehoboth$1,370$1,313$722

    Annual Capital Costs$2,452,324$1,381,149

    O&M Costs$6,733,200$3,846,393

    &L&Z&F

    Alt 3

    Rehoboth Capital CostsDRAFT

    Alternative #3 - REHOBETH OUTFALL ALTERNATIVE WITH COUNTY CONTINUING TO PUMP TO IBWRF8/10/09

    Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty CostRehoboth Cost ShareRehoboth CostNotes2012 Implementation Year2023 Implementation Year

    1RBSTP Pumping StationN/A3.4 Max Month10.2 MGD Peak Hour$900,000$0100%$900,000All Rehoboth Cost$0

    2ARehoboth FM, Ocean Outfall & Treatment Improvements-3.4 Max Month10.2 MGD Peak Hour$20,688,000$0100%$20,688,000All Rehoboth Cost$0

    3WNRWF Headworks Upgrades2-26.6 MGD Max Month17.5 MGD Peak Hour$1,296,572$1,296,5720.0%$0$1,296,572

    4WNRWF to IBRWF/ANSWERF P.S.3-22.1 MGD Max Month3.2 MGD Peak Hour$2,000,000$2,000,0000.0%$0$2,000,000

    5Force Main to IBRWF (Option #3)3-12.1 MGD Max Month3.2 MGD Peak Hour$11,142,250$11,142,2500.0%$0$11,142,250

    6IBRWF Phase 1 Upgrades---$0$00.0%$0$0

    7IBRWF Phase 2 Upgrades1-63.7 MGD Max Month3.7 MGD Max Month$20,600,000$20,600,0000.0%$0$20,600,000

    8IBRWF Phase 3 Upgrades1-75.0 MGD Max Month5.0 MGD Max Month$12,700,000$12,700,0000.0%$0$12,700,000

    12Land/Easements---$0$00.0%$0

    13A10% Contingency---$4,773,882$4,773,882$35,038,822$12,700,000

    13B30% Contingency Ocean Outfall Items Only$6,476,400$0100.0%$6,476,400$0$0

    14Engineering & Administration---$18,852,795$11,552,79538.7%$7,300,000Reboboth E&A is from Rehoboth Report$8,479,395$3,073,400

    Total Project Cost$99,429,900$64,065,500$35,364,400$43,518,217$15,773,400

    SUSSEX COUNTY COST$64,065,500

    Flow Split

    Flow Split to ANSWERFMax Month Flow (MGD)Notes

    WNRWF (4.4-2.3)2.145.7%

    Rehoboth2.554.3%

    Subtotal4.6

    Henlopen/Dewey0.938% of flow from RBSTP

    City of Rehoboth/North Shores1.662% of flow from RBSTP

    Total7.1

    OCEAN OUTFALL OPTION

    Outfall Option Rehoboth OnlyOutfall Option Rehoboth Onlywith Better Financing Option

    User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years

    COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%

    Annual Capital Cost$2,695,172$1,517,921$2,272,372$1,279,800$2,272,372$1,279,800

    Plant Operations (From Rehoboth March 2009 Report)$1,590,000$895,488$1,590,000$895,488$1,590,000$895,488

    Pump Station Maintenance$0$0$0$0$0$0

    Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735

    Sussex County Operations and Maintenance ($2.00/1000 gal)$150,000$84,480$150,000$84,480$150,000$84,480Outfall O&M

    Subtotal$2,636,624$2,398,503$2,398,503

    Projected User Rate for City of Rehoboth$691$629$629

    Annual Capital Costs$2,695,172$1,517,921

    O&M Costs$1,890,000$1,118,703

    &L&Z&F

    Alt 4

    Rehoboth Capital CostsDRAFT

    Alternative #4 - COMBINED REHOBOTH AND COUNTY OCEAN OUTFALL8/10/09

    Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty CostRehoboth Cost ShareRehoboth CostNotes2012 Implementation Year2015 Implementation Year

    1RBSTP Pumping StationX3.4 Max Month10.2 MGD Peak Hour$900,000$0100%$900,000All Rehoboth Cost$0

    2Force Main to WNRWF (Option #1)3-22.1 Max Month4.2 MGD Peak Hour$2,088,000$2,088,0000%$0All Rehoboth Cost$2,088,000

    2ARehoboth FM, Ocean Outfall & Treatment Improvements-8.3 Max Month8.3 Max Month$26,088,000$15,401,34941.0%$10,686,651WR vs Rehoboth Cost Split$15,401,349

    3WNRWF Headworks Upgrades2-26.6 MGD Max Month17.5 MGD Peak Hour$1,296,572$1,296,5720.0%$0WR vs Rehoboth Cost Split$1,296,572

    4WNRWF to IBRWF/ANSWERF P.S.X2.1 MGD Max Month4.2 MGD Peak Hour$1,400,000$1,400,0000.0%$0First 2.5 MGD are Rehoboth Costs per DBB$1,400,000

    6IBRWF Phase 1 Upgrades---$0$00.0%$0First 2.5 MGD are Rehoboth Costs per DBB$0

    6AWNRWF Upgrades04.4 MGD Max Month4.4 MGD Max Month$21,000,000$21,000,0000.0%$0$21,000,000

    7IBRWF Phase 2 Upgrades1-62.9 MGD Max Month2.9 MGD Max Month$10,905,882$10,905,8820.0%$0$10,905,882

    12Land/Easements---$0$00.0%$0From Artesian Proposal

    13A10% Contingency---$3,669,045$3,001,44218.2%$667,603Contingency Costs Proportional Share$41,185,922$10,905,882

    13B30% Contingency Ocean Outfall Items Only$8,096,400$6,623,21518.2%$1,473,185Contingency Costs Proportional Share$5,236,586$1,386,629

    14Engineering & Administration---$16,179,090$13,235,21418.2%$2,943,876Administrative Costs Proportional Share$10,464,304$2,770,910

    Total Project Cost$91,622,990$74,951,675$16,671,315$56,886,812$15,063,421

    SUSSEX COUNTY COST$74,951,675

    Flow Split

    Flow Split to ANSWERFMax Month Flow (MGD)Notes

    WNRWF (4.4-2.3)2.145.7%

    Rehoboth2.554.3%

    Subtotal4.6

    Henlopen/Dewey0.938% of flow from RBSTP

    City of Rehoboth/North Shores1.662% of flow from RBSTP

    Total7.1

    OCEAN OUTFALL OPTION

    Outfall Option Rehoboth and SussexOutfall Option Rehoboth and Sussexwith Better Financing Option

    User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years

    COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%

    Annual Capital Cost$1,270,545$715,571$1,071,231$603,317$2,272,372$1,279,800

    Plant Operations (From Rehoboth March 2009 Report)$1,590,000$895,488$1,590,000$895,488$1,590,000$895,488

    Pump Station Maintenance$0$0$0$0$0$0

    Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735Outfall O&M

    Sussex County Operations and Maintenance ($2.00/1000 gal)$0$0$0$0$150,000$84,480

    Subtotal$1,749,794$1,637,540$2,398,503

    Projected User Rate for City of Rehoboth$459$429$629

    Annual Capital Costs$1,270,545$715,571

    O&M Costs$1,740,000$1,034,223

    &L&Z&F

    Scratch

    6.6

    8.4666666667

  • *Preliminary User Rates

    County Costs

    SUMMARY OF TOTAL COSTS AND REHOBETH USER COSTSDRAFT

    7/9/09

    Dewey Beach Estimated RatesHenlopen Acres Estimated RatesCity of Rehoboth Beach Estimated Rates

    AlternativeDescriptionExisting RateNew RateExisting RateNew RateExisting RateNew Rate

    #2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$350$745$588$1,398$325$968

    #2BTreated Effluent Pumped to WNRWF with Disposal at Private Service Provider$350$1,182$588$1,691$325$1,374

    #3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$350$565$588$1,096$325$680

    &L&Z&F

    Presentation

    SUMMARY OF TOTAL COSTS AND REHOBETH USER COSTSDRAFT

    7/9/09

    AlternativeDescriptionTotal Capital CostSussex County Capital CostCity of Rehoboth Capital CostCity of Rehoboth Annual Capital CostsCity of Rehoboth Annual O&M Costs

    #1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$112 M$44 M$68 M$2.9 M$1.5 M

    #1BRaw Wastewater Pumped to WNRWF with Disposal at Private Service Provider$99 M$50 M$49 M$2.1 M$3.3 M

    #2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$99 M$49 M$50 M$2.2 M$1.5 M

    #2BTreated Effluent Pumped to WNRWF with Disposal at Private Service Provider$99 M$67 M$32 M$1.4 M$3.8 M

    #3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$99 M$64 M$35 M$1.5 M$1.9 M

    &L&Z&F

    rounded

    SUMMARY OF TOTAL COSTS AND REHOBETH USER COSTSDRAFT

    7/9/09

    Annual Costs

    AlternativeDescrptionTotal CostCounty CostRehoboth CostCapital CostsOperation and Maintenance Costs

    #1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$112,000,000$44,000,000$68,000,000$1,200$1,000

    #1BRaw Wastewater Pumped to WNRWF with Disposal at Private Service Provider$99,000,000$50,000,000$49,000,000$1,400$1,300

    #2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$99,000,000$49,000,000$50,000,000$1,000$900

    #2BTreated Effluent Pumped to WNRWF with Disposal at Private Service Provider$99,000,000$67,000,000$32,000,000$1,400$1,300

    #3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$99,000,000$64,000,000$35,000,000$700$600

    #4Rehoboth and County Pump to Common Outfall with County Continuing to use IBRWF for Southern Service Area$92,000,000$75,000,000$17,000,000$500$400

    &L&Z&F

    User Cost Summary

    SUMMARY OF TOTAL COSTS AND REHOBETH USER COSTSDRAFT

    7/9/09

    Rehoboth User Rates

    AlternativeDescrptionTotal CostCounty CostRehoboth CostSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 yearsAnnual Capital CostsAnnual O & M Costs

    #1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$112,324,447$44,075,056$68,249,391$1,156$1,0362,929,4201,482,530

    #1BRaw Wastewater Pumped to WNRWF with Disposal at Private Service Provider$98,924,872$49,793,592$49,131,280$1,421$1,3352,108,8273,313,888

    #2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$98,722,310$48,603,086$50,119,224$968$8792,151,2321,541,103

    #2BTreated Effluent Pumped to WNRWF with Disposal at Private Service Provider$98,832,240$66,654,341$32,177,899$1,370$1,3131,381,1493,846,393

    #3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$99,429,900$64,065,500$35,364,400$691$6291,517,9211,118,703

    #4Rehoboth and County Pump to Common Outfall with County Continuing to use IBRWF for Southern Service Area$91,622,990$74,951,675$16,671,315$459$429715,5711,034,223

    &L&Z&F

    County Implementation Schedule

    SUMMARY OF TIMING, COSTS AND EDUSDRAFT

    7/9/09

    Overall Phase 1

    AlternativeDescrptionTotal County CostCost for Overall Phase 1Improvements RequiredYearIBRWF Treatment Capacity (MGD)WNRWF Treatment Capacity (MGD)Total Treatment Capacity (MGD)Allocation to Rehoboth Beach (2.)County Treatment Capacity (MGD)County Capacity (EDUs) (1.)Existing County EDUS (3.)Increased EDU Capacity (1.)

    #1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$44,075,056$18,775,057WNPS, FM and IBRWF through Phase 320125.202.307.502.505.0033,33325,3817,952

    #2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$48,603,086$34,303,086WNPS, FM and IBRWF through Phase 320125.203.108.302.505.8038,66725,38113,286

    #3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$64,065,500$43,518,217WNPS, FM and IBRWF through Phase 220123.702.306.000.006.0040,00025,38114,619

    #4Rehoboth and County Pump to Common Outfall with County Continuing to use IBRWF for Southern Service Area$74,951,675$56,886,812WNPS, WNRWF Upgrades, FM to Rehobeth, Ocean Outfall and IBRWF through Phase 120122.004.406.400.006.4042,66725,38117,286

    Notes

    (1.) Capacity/EDU150

    (2.) Allocated Capacity based on year 2030 RBSTP flow of 2.50 MGD

    (3.) Existing County EDUs in WRSSD, LNSSD, and OOSSD. Does not include existing EDUs in Angola and OOSSD Phase 1 Expansion.

    Overall Phase 2

    AlternativeDescrptionTotal County CostCost for Overall Phase 2Improvements RequiredYearIBRWF Treatment Capacity (MGD)WNRWF Treatment Capacity (MGD)Total Treatment Capacity (MGD)Allocation to Rehoboth Beach (2.)County Treatment Capacity (MGD)County Capacity (EDUs) (1.)Previous Upgrade CapacityIncreased EDU Capacity (1.)

    #1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$44,075,056$25,300,000IBWRF Phase 420187.502.309.802.507.3048,66733,33315,333

    #2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$48,603,086$14,300,000IBWRF Phase 420236.503.109.602.507.3048,66738,66710,000

    #3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$64,065,500$15,773,400IBWRF Phase 320235.002.307.300.007.3048,66740,0008,667

    #4Rehoboth and County Pump to Common Outfall with County Continuing to use IBRWF for Southern Service Area$74,951,675$15,063,421IBWRF Phase 220152.904.407.300.007.3048,66742,6676,000

    &L&Z&F

    Capital Cost Summary

    SUMMARY OF TOTAL CAPITAL COSTSDRAFTSUMMARY OF TOTAL CAPITAL COSTSDRAFT

    ALTERNATIVES #1, #2 and Analysis of Private Wastewater Treatment Provider8/10/09ALTERNATIVES #3 & #48/10/09

    Alternative #1A - Raw Wastewater Pumped to WNRWFAlternative #1B Private Wastewater Treatment ProviderAlternative #2A - Treated Effluent Pumped to WNRWFAlternative #2B Private Wastewater Treatment ProviderAlt. 3 - Rehoboth Ocean Outfall Alternative (County Uses Inland Bays)Alt. 4 - Rehoboth Ocean Outfall Alternative (County Uses Rehoboth Ocean Outfall)Ocean Outfall Costs

    ItemDescriptionTableDesign CriteriaCapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostOption 3

    ItemCosts

    1RBSTP Pumping Station-3.4 MGD Max Month10.2 MGD Peak Hour$3,001,000-3.4 Max Month10.2 MGD Peak Hour$3,001,000N/A3.4 Max Month10.2 MGD Peak Hour$900,000N/A3.4 Max Month10.2 MGD Peak Hour$900,000X3.4 Max Month10.2 MGD Peak Hour$900,000X3.4 Max Month10.2 MGD Peak Hour$900,000Outfall$15,153,846

    2Force Main to WNRWF (Option #1)1-13.4 MGD Max Month10.2 MGD Peak Hour$3,123,0001-13.4 Max Month10.2 MGD Peak Hour$3,123,0002-13.4 Max Month10.2 MGD Peak Hour$3,500,0002-13.4 Max Month10.2 MGD Peak Hour$3,500,0002-13-22.1 Max Month4.2 MGD Peak Hour$2,088,000Pump Station$900,000

    2ARehoboth FM, Ocean Outfall & Treatment Improvements-----------------3.4 Max Month10.2 MGD Peak Hour$20,688,000-8.3 Max Month8.3 Max Month$26,088,000Forcemain$2,688,000

    3WNRWF Headworks Upgrades1-210 MGD Max Month27.5 MGD Peak Hour$1,527,5711-210 MGD Max Month27.5 MGD Peak Hour$1,527,5711-210.0 MGD Max Month27.5 MGD Peak Hour$1,527,5711-210.0 MGD Max Month27.5 MGD Peak Hour$1,527,5712-26.6 MGD Max Month17.5 MGD Peak Hour$1,296,5722-26.6 MGD Max Month17.5 MGD Peak Hour$1,296,572RB Treatment Improvements$2,846,154

    4WNRWF to IBRWF/ANSWERF P.S.1-34.6 MGD Max Month6.9 MGD Peak Hour$2,485,0001-34.6 MGD Max Month6.9 MGD Peak Hour$2,485,0002-33.6 MGD Max Month5.4 MGD Peak Hour$2,270,0002-33.6 MGD Max Month5.4 MGD Peak Hour$2,270,0003-22.1 MGD Max Month3.2 MGD Peak Hour$2,000,000X2.1 MGD Max Month4.2 MGD Peak Hour$1,400,000Subtotal$21,588,000

    5Force Main to IBRWF (Option #3)1-44.6 MGD Max Month6.9 MGD Peak Hour$13,027,250----1-43.6 MGD Max Month5.4 MGD Peak Hour$13,027,250----3-12.1 MGD Max Month3.2 MGD Peak Hour$11,142,2501-4N/AN/AContingency$6,476,400

    6IBRWF Phase 1 Upgrades---$0---$0---$0---$0---$0---$0Project Costs$7,300,000

    6AWNRWF Upgrades4.4 MGD Max Month4.4 MGD Max Month$21,000,000Total$35,364,400

    7IBRWF Phase 2 Upgrades1-63.7 MGD Max Month3.7 MGD Max Month$20,600,0001-62.9 MGD Max Month2.9 MGD Max Month$10,905,8821-63.7 MGD Max Month3.7 MGD Max Month$20,600,000-3.7 MGD Max Month3.7 MGD Max Month$20,600,0001-63.7 MGD Max Month3.7 MGD Max Month$20,600,0001-62.9 MGD Max Month2.9 MGD Max Month$10,905,882

    8IBRWF Phase 3 Upgrades1-75.2 MGD Max Month5.2 MGD Max Month$12,700,0001-7N/AN/AN/A1-75.2 MGD Max Month5.2 MGD Max Month$12,700,0001-7---1-75.0 MGD Max Month5.0 MGD Max Month$12,700,0001-7---Option 4

    9IBRWF Phase 4 Upgrades-7.5 MGD Max Month7.5 MGD Max Month$18,852,459N/AN/AN/A-6.5 MGD Max Month6.5 MGD Max Month$10,655,738------------Outfall$16,953,846

    10A24" PVC Force Main to Cave Neck Road----1-84.6 MGD Max Month6.9 MGD Peak Hour$6,967,511---N/A1-83.6 MGD Max Month5.4 MGD Peak Hour$6,967,511--------Pump Station$900,000

    10B24" PVC Force Main to ANSRWRF----1-94.6 MGD Max Month6.9 MGD Peak Hour$8,736,587---N/A1-9--$8,736,587--------Forcemain$6,288,000

    11ANSRWRF Treatment Capacity-----4.6 MGD Max Month4.6 MGD Max Month$48,300,000---N/A-3.6 MGD Max Month3.6 MGD Max Month$37,800,000--------RB Treatment Improvements$2,846,154

    12Land/Easements---$11,250,000---$500,000---$11,250,000---$500,000---$0---Subtotal$26,988,000

    13A10% Contingency---$7,531,628---$3,724,655---$6,518,056---$4,500,167---$4,773,882---$3,669,045Contingency$8,096,400

    13B30% Contingency Ocean Outfall Items Only-------------------$6,476,400---$8,096,400Project Costs$7,300,000

    14Engineering and Administration---$18,226,540---$9,653,665---$15,773,695---$11,530,404---$18,852,795---$16,179,090Total$42,384,400

    Total Project Cost$112,324,447$98,924,872$98,722,310$98,832,240$99,429,900$91,622,990

    Notes:

    Flow Split

    Year 2030Max Month Flow (MGD)Notes

    Sussex County

    WNRWF4.4

    IBRWF2.9

    Henlopen/Dewey0.938% of flow from RBSTP

    Subtotal8.2Sussex County Flow

    City of Rehoboth1.662% of flow from RBSTP

    Total9.8

    % Flow Contributed by Sussex County84%

    % Flow Contributed by City of Rehoboth16%

    &L&Z&F

    Thor Young:This cost is for 3.6 mgd, need to revise for 2.1 mgd. Change Made for 2.1 (WFH)

    Thor Young:this is for 3.6 mgd, change for 2.1 mgd. Change made for 2.1 mgd (3.2 mgd peak)

    Thor Young:Cost is for 5.2 mgd, assume no real change for 5.0 mgd facility

    Thor Young:Total Rehoboth Beach Capital Cost inc. engineering for PS and outfall. Modification made by WFH

    whinz:4.9 (SC)+3.4 (RB)

    whinz:9.8 MGD Sussex+10.2 MGD RB

    whinz:Assumes 300/l.f. increase for going from 24" to 42". Based on recent bids

    whinz:Cost similar to MPS#1

    whinz:This is actually FM from WN to Rehoboth for Alt 4

    whinz:Per updated section from Rehoboth Report

    whinz:Per updated section from Rehoboth Report

    whinz:Updated per revised Rehoboth Chapter

    whinz:Updated per revised Rehoboth Chapter

    whinz:Removed Land from Contingency Calculation to be consitent with #1A

    whinz:Changed to original number presented at July progress meeting per MAI

    whinz:Need to approximate land cost associated with .9 MGD of treatment at IBRWF

    whinz:Reduced to account for only additional 0.9 MGD of capacity in Phase 2

    whinz:Changed to original number presented at July progress meeting per MAI

    whinz:Land cost not required per MAI

    Alt #1A

    Rehoboth Capital CostsDRAFT

    Alternative #1A - RAW WASTEWATER FROM REHOBOTH WITH EXCESS PUMPED TO IBWRF8/10/09

    Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty Costs ShareRehoboth Cost ShareRehoboth CostNotes2012 Implementation Year2017 Implementation Year

    1RBSTP Pumping Station-3.4 MGD Max Month10.2 MGD Peak Hour$3,001,000$0100%$3,001,000All Rehoboth Cost$0

    230" PVC Force Main to WNRWF (Option #1)1-13.4 MGD Max Month10.2 MGD Peak Hour$3,123,000$0100%$3,123,000All Rehoboth Cost$0

    3WNRWF Headworks Upgrades1-210 MGD Max Month27.5 MGD Peak Hour$1,527,571$974,59036.2%$552,981WR vs Rehoboth Cost Split$974,590

    4WNRWF to IBRWF Transfer Pumping Station1-34.6 MGD Max Month6.9 MGD Peak Hour$2,485,000$1,135,64554.3%$1,349,355WR vs Rehoboth Cost Split$1,135,645

    524" PVC Force Main to IBRWF (Option #3)1-44.6 MGD Max Month6.9 MGD Peak Hour$13,027,250$5,953,45354.3%$7,073,797WR vs Rehoboth Cost Split$5,953,453

    6IBRWF Phase 1 Upgrades---$0$00.0%$0First 2.5 MGD are Rehoboth Costs per DBB$0

    7IBRWF Phase 2 Upgrades1-63.7 MGD Max Month3.7 MGD Max Month$20,600,000$0100.0%$20,600,000First 2.5 MGD are Rehoboth Costs per DBB$0

    8IBRWF Phase 3 Upgrades1-75.2 MGD Max Month5.2 MGD Max Month$12,700,000$5,926,66753.3%$6,773,333$5,926,667

    9IBRWF Phase 4 Upgrades-7.5 MGD Max Month7.5 MGD Max Month$18,852,459$18,852,4590.0%$0$18,852,459

    12Land/Easements---$11,250,000$0100.0%$11,250,000450 Ac Required to accommodate Rehoboth Flows$13,990,355$18,852,459

    13A10% Contingency---$7,531,628$3,284,28156.4%$4,247,347Contingency is a Proportional Share (except land)$1,399,036$1,885,246

    14Engineering/Administration---$18,226,540$7,947,96156.4%$10,278,579Administrative Costs Proportional Share (except land)$3,385,666$4,562,295

    Total Project Cost$112,324,447$44,075,056$68,249,391Total$18,775,057$25,300,000

    SUSSEX COUNTY COST$44,075,056

    Flow Split

    Flow SplitMax Month Flow (MGD)Notes

    WNRWF4.4

    IBRWF2.9

    Subtotal7.3

    Henlopen/Dewey0.938% of flow from RBSTP

    City of Rehoboth/North Shores1.662% of flow from RBSTP

    Total9.8

    OCEAN OUTFALL OPTION

    SPRAY IRRIGATION OPTIONSPRAY IRRIGATION OPTIONwith Better Financing Option

    User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years

    COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth OnlyRehoboth + DB, NS & HARehoboth OnlyRehoboth + DB, NS & HARehoboth Only

    Annual Capital Cost$5,201,385$2,929,420$4,385,428$2,469,873$2,272,372$1,279,800

    Plant Operations (From Rehoboth March 2009 Report)$0$0$0$0$1,590,000$895,488

    Pump Station Maintenance$100,000$56,320$100,000$56,320$0$0

    Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735

    Sussex County Operations and Maintenance ($5.08/1000 gal)$2,286,000$1,287,475$2,286,000$1,287,475$150,000$84,480

    Subtotal$4,411,950$3,952,403$2,398,503

    Projected User Rate for City of Rehoboth$1,156$1,036$629

    Annual Capital Costs$5,201,385$2,929,420

    O&M Costs$2,536,000$1,482,530

    $5,201,385

    &L&8&Z&F&R&8&D

    At #1B

    Rehoboth Capital CostsDRAFT

    Alternative #1B- RAW WASTEWATER FROM REHOBOTH WITH EXCESS PUMPED TO PRIVATE ANSWERF8/10/09

    Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty ShareRehoboth Cost ShareRehoboth CostNotes

    $6,967,511FM to Cave neck

    1RBSTP Pumping Station-3.4 Max Month10.2 MGD Peak Hour$3,001,000$0100%$3,001,000All Rehoboth Cost$8,736,587FM to ANSWERF

    230" PVC Force Main to WNRWF (Option #1)1-13.4 Max Month10.2 MGD Peak Hour$3,123,000$0100%$3,123,000All Rehoboth Cost$15,704,098Subtotal

    3WNRWF Headworks Upgrades1-210 MGD Max Month27.5 MGD Peak Hour$1,527,571$974,10336.2%$553,468WR vs Rehoboth Cost Split

    4WNRWF to ANSWERF Transfer Pumping Station1-34.6 MGD Max Month6.9 MGD Peak Hour$2,485,000$1,134,45754.3%$1,350,543WR vs Rehoboth Cost Split

    6IBRWF Phase 1 Upgrades---$0$00.0%$0First 2.5 MGD are Rehoboth Costs per DBB

    7IBRWF Phase 2 Upgrades1-62.9 MGD Max Month2.9 MGD Max Month10,905,88210,905,8820.0%$0First 2.5 MGD are Rehoboth Costs per DBB

    1024" PVC Force Main to ANSRWF1-84.6 MGD Max Month6.9 MGD Peak Hour$15,704,098$7,169,26254.3%$8,534,836

    11ANSWRF Treatment Capacity1-94.6 MGD Max Month4.6 MGD Max Month$48,300,000$22,050,00054.3%$26,250,000

    12Land/Easements---$500,000$228,26154.3%$271,739From Artesian Proposal

    13AContingency---$3,724,655$2,041,19745.2%$1,683,459Contingency is a Proportional Share

    14Engineering & Administration---$9,653,665$5,290,43045.2%$4,363,235Administrative Costs Proportional Share

    Total Project Cost$98,924,872$49,793,592$49,131,280

    SUSSEX COUNTY COST$49,793,592

    Flow Split

    Flow Split to ANSWERFMax Month Flow (MGD)Notes

    WNRWF (4.4-2.3)2.145.7%

    Rehoboth2.554.3%

    Subtotal4.6

    Henlopen/Dewey0.938% of flow from RBSTP

    City of Rehoboth/North Shores1.662% of flow from RBSTP

    Total7.1

    OCEAN OUTFALL OPTION

    Private OptionPrivate Optionwith Better Financing Option

    User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years

    COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%

    Annual Capital Cost$3,744,366$2,108,827$3,156,976$1,778,009$2,223,255$1,252,137

    Pump Station O&M$100,000$56,320$100,000$56,320$2,272,372$1,279,800

    Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735

    Artesian Disposal @ 2 MGD Minimum ($6.84/1000 gal)$4,993,200$2,812,170$4,993,200$2,812,170$150,000$84,480Outfall O&M

    Sussex County O&M ($1.21/1000 gal)$544,500$306,662$544,500$306,662$0$0

    Subtotal$5,422,715$5,091,896$2,755,152

    Projected User Rate for City of Rehoboth$1,421$1,335$722

    Annual Capital Costs$3,744,366$2,108,827

    O&M Costs$5,787,700$3,313,888

    &L&Z&F

    Alt #2A

    Capital CostsDRAFT

    Alternative #2A - Treated Effluent FROM Rehoboth Pumped to WNRWF with Excess to IBRWF8/10/09

    Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty ShareRehoboth Cost ShareRehoboth CostNotes2012 Implementation Year2023 Implementation Year

    1RBSTP Pumping StationN/A3.4 Max Month10.2 MGD Peak Hour$900,000$0100%$900,000All Rehoboth Cost$0

    230" PVC Force Main to WNRWF (Option #1)2-13.4 Max Month10.2 MGD Peak Hour$3,500,000$0100%$3,500,000All Rehoboth Cost$0

    3WNRWF Headworks Upgrades1-210.0 MGD Max Month27.5 MGD Peak Hour$1,527,571$1,527,5710.0%$0WR vs Rehoboth Cost Split$1,527,571

    4WNRWF to IBRWF Transfer Pumping Station2-33.6 MGD Max Month5.4 MGD Peak Hour$2,270,000$1,324,16741.7%$945,833WR vs Rehoboth Cost Split$1,324,167

    524" PVC Force Main to IBRWF (Option #3)1-43.6 MGD Max Month5.4 MGD Peak Hour$13,027,250$7,599,22941.7%$5,428,021WR vs Rehoboth Cost Split$7,599,229

    6IBRWF Phase 1 Upgrades---$0$00.0%$0$0

    7IBRWF Phase 2 Upgrades1-63.7 MGD Max Month3.7 MGD Max Month$20,600,000$2,410,20088.3%$18,189,800First 1.5 MGD are Rehoboth Costs per DBB$2,410,200

    8IBRWF Phase 3 Upgrades1-75.2 MGD Max Month5.2 MGD Max Month$12,700,000$12,700,0000.0%$0$12,700,000

    9IBRWF Phase 4 Upgrades-6.5 MGD Max Month6.5 MGD Max Month$10,655,738$10,655,7380.0%$0$10,655,738

    12Land/Easements---$11,250,000$0100.0%$11,250,000450 Ac Required to accommodate Rehoboth Flows$25,561,167$10,655,738

    13AContingency---$6,518,056$3,621,69044.4%$2,896,365Contingency is a Proportional Share (except land)$2,556,117$1,065,574

    14Engineering/Administration---$15,773,695$8,764,49144.4%$7,009,204Administrative Costs Proportional Share (except land)$6,185,802$2,578,689

    Total Project Cost$98,722,310$48,603,086$50,119,224Total$34,303,086$14,300,000

    SUSSEX COUNTY COST$48,603,086

    Flow Split

    Flow SplitNotes

    WNRWF4.4

    IBRWF2.9

    Subtotal7.3

    Henlopen/Dewey0.938% of flow from RBSTP

    City of Rehoboth/North Shores1.662% of flow from RBSTP

    Total9.8

    OCEAN OUTFALL OPTION

    SPRAY IRRIGATION OPTIONSPRAY IRRIGATION OPTIONwith Better Financing Option

    User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years

    COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth OnlyRehoboth + DB, NS & HARehoboth OnlyRehoboth + DB, NS & HARehoboth Only

    Annual Capital Cost$3,819,659$2,151,232$3,220,457$1,813,761$2,272,372$1,279,800

    Plant Operations (From Rehoboth March 2009 Report)$1,590,000$895,488$1,590,000$895,488$1,590,000$895,488

    Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735

    Sussex County Operations and Maintenance ($2.00/1000 gal)$900,000$506,880$900,000$506,880$150,000$84,480

    Subtotal$3,692,335$3,354,864$2,398,503

    Projected User Rate for City of Rehoboth$968$879$629

    Annual Capital Costs$3,819,659$2,151,232

    O&M Costs$2,640,000$1,541,103

    &L&Z&F

    Alt 2B

    Rehoboth Capital CostsDRAFT

    Alternative #2B - TREATED WASTEWATER FROM REHOBOTH WITH EXCESS PUMPED TO PRIVATE ANSWERF8/10/09

    Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty CostsRehoboth Cost ShareRehoboth CostNotes

    $6,967,511FM to Cave Neck

    1RBSTP Pumping StationN/A3.4 Max Month10.2 MGD Peak Hour$900,000$0100%$900,000All Rehoboth Cost$8,736,587FM to ANSWERF

    230" PVC Force Main to WNRWF (Option #1)2-13.4 Max Month10.2 MGD Peak Hour$3,500,000$0100%$3,500,000All Rehoboth Cost$15,704,098

    3WNRWF Headworks Upgrades1-210.0 MGD Max Month27.5 MGD Peak Hour$1,527,571$1,527,5710.0%$0WR vs Rehoboth Cost Split

    4WNRWF to ANSWERF Transfer Pumping Station2-33.6 MGD Max Month5.4 MGD Peak Hour$2,270,000$1,323,41041.7%$946,590WR vs Rehoboth Cost Split

    6IBRWF Phase 1 Upgrades---$0$00.0%$0First 2.5 MGD are Rehoboth Costs per DBB

    7IBRWF Phase 2 Upgrades-3.7 MGD Max Month3.7 MGD Max Month$20,600,000$20,600,0000.0%$0First 2.5 MGD are Rehoboth Costs per DBB

    1024" PVC Force Main to ANSRWF1-83.6 MGD Max Month5.4 MGD Peak Hour$15,704,098$9,155,48941.7%$6,548,609

    11ANSWRF Treatment Capacity-3.6 MGD Max Month3.6 MGD Max Month$37,800,000$22,037,40041.7%$15,762,600

    12Land/Easements---$500,000$291,50041.7%$208,500From Artesian Proposal

    13AContingency @ 10%---$4,500,167$3,289,79726.9%$1,210,370Contingency is a Proportional Share

    14Engineering & Administration---$11,530,404$8,429,17426.9%$3,101,230Administrative Costs Proportional Share

    Total Project Cost$98,832,240$66,654,341$32,177,899

    SUSSEX COUNTY COST$66,654,341

    Flow Split

    Flow Split to ANSWERFMax Month Flow (MGD)Notes

    WNRWF (4.4-2.3)2.145.7%

    Rehoboth2.554.3%

    Subtotal4.6

    Henlopen/Dewey0.938% of flow from RBSTP

    City of Rehoboth/North Shores1.662% of flow from RBSTP

    Total7.1

    OCEAN OUTFALL OPTION

    Private OptionPrivate Optionwith Better Financing Option

    User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years

    COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%

    Annual Capital Cost$2,452,324$1,381,149$2,067,621$1,164,484$2,223,255$1,252,137

    Treatment Plant O&M From Rehoboth March 2009 Report)$1,590,000$895,488$1,590,000$895,488$2,272,372$1,279,800

    Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735

    Artesian Disposal @ 2 MGD Minimum ($6.84/1000 gal)$4,993,200$2,812,170$4,993,200$2,812,170$150,000$84,480Outfall O&M

    Sussex County O&M$0$0$0$0$0$0

    Subtotal$5,227,542$5,010,877$2,755,152

    Projected User Rate for City of Rehoboth$1,370$1,313$722

    Annual Capital Costs$2,452,324$1,381,149

    O&M Costs$6,733,200$3,846,393

    &L&Z&F

    Alt 3

    Rehoboth Capital CostsDRAFT

    Alternative #3 - REHOBETH OUTFALL ALTERNATIVE WITH COUNTY CONTINUING TO PUMP TO IBWRF8/10/09

    Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty CostRehoboth Cost ShareRehoboth CostNotes2012 Implementation Year2023 Implementation Year

    1RBSTP Pumping StationN/A3.4 Max Month10.2 MGD Peak Hour$900,000$0100%$900,000All Rehoboth Cost$0

    2ARehoboth FM, Ocean Outfall & Treatment Improvements-3.4 Max Month10.2 MGD Peak Hour$20,688,000$0100%$20,688,000All Rehoboth Cost$0

    3WNRWF Headworks Upgrades2-26.6 MGD Max Month17.5 MGD Peak Hour$1,296,572$1,296,5720.0%$0$1,296,572

    4WNRWF to IBRWF/ANSWERF P.S.3-22.1 MGD Max Month3.2 MGD Peak Hour$2,000,000$2,000,0000.0%$0$2,000,000

    5Force Main to IBRWF (Option #3)3-12.1 MGD Max Month3.2 MGD Peak Hour$11,142,250$11,142,2500.0%$0$11,142,250

    6IBRWF Phase 1 Upgrades---$0$00.0%$0$0

    7IBRWF Phase 2 Upgrades1-63.7 MGD Max Month3.7 MGD Max Month$20,600,000$20,600,0000.0%$0$20,600,000

    8IBRWF Phase 3 Upgrades1-75.0 MGD Max Month5.0 MGD Max Month$12,700,000$12,700,0000.0%$0$12,700,000

    12Land/Easements---$0$00.0%$0

    13A10% Contingency---$4,773,882$4,773,882$35,038,822$12,700,000

    13B30% Contingency Ocean Outfall Items Only$6,476,400$0100.0%$6,476,400$0$0

    14Engineering & Administration---$18,852,795$11,552,79538.7%$7,300,000Reboboth E&A is from Rehoboth Report$8,479,395$3,073,400

    Total Project Cost$99,429,900$64,065,500$35,364,400$43,518,217$15,773,400

    SUSSEX COUNTY COST$64,065,500

    Flow Split

    Flow Split to ANSWERFMax Month Flow (MGD)Notes

    WNRWF (4.4-2.3)2.145.7%

    Rehoboth2.554.3%

    Subtotal4.6

    Henlopen/Dewey0.938% of flow from RBSTP

    City of Rehoboth/North Shores1.662% of flow from RBSTP

    Total7.1

    OCEAN OUTFALL OPTION

    Outfall Option Rehoboth OnlyOutfall Option Rehoboth Onlywith Better Financing Option

    User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years

    COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%

    Annual Capital Cost$2,695,172$1,517,921$2,272,372$1,279,800$2,272,372$1,279,800

    Plant Operations (From Rehoboth March 2009 Report)$1,590,000$895,488$1,590,000$895,488$1,590,000$895,488

    Pump Station Maintenance$0$0$0$0$0$0

    Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735

    Sussex County Operations and Maintenance ($2.00/1000 gal)$150,000$84,480$150,000$84,480$150,000$84,480Outfall O&M

    Subtotal$2,636,624$2,398,503$2,398,503

    Projected User Rate for City of Rehoboth$691$629$629

    Annual Capital Costs$2,695,172$1,517,921

    O&M Costs$1,890,000$1,118,703

    &L&Z&F

    Alt 4

    Rehoboth Capital CostsDRAFT

    Alternative #4 - COMBINED REHOBOTH AND COUNTY OCEAN OUTFALL8/10/09

    Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty CostRehoboth Cost ShareRehoboth CostNotes2012 Implementation Year2015 Implementation Year

    1RBSTP Pumping StationX3.4 Max Month10.2 MGD Peak Hour$900,000$0100%$900,000All Rehoboth Cost$0

    2Force Main to WNRWF (Option #1)3-22.1 Max Month4.2 MGD Peak Hour$2,088,000$2,088,0000%$0All Rehoboth Cost$2,088,000

    2ARehoboth FM, Ocean Outfall & Treatment Improvements-8.3 Max Month8.3 Max Month$26,088,000$15,401,34941.0%$10,686,651WR vs Rehoboth Cost Split$15,401,349

    3WNRWF Headworks Upgrades2-26.6 MGD Max Month17.5 MGD Peak Hour$1,296,572$1,296,5720.0%$0WR vs Rehoboth Cost Split$1,296,572

    4WNRWF to IBRWF/ANSWERF P.S.X2.1 MGD Max Month4.2 MGD Peak Hour$1,400,000$1,400,0000.0%$0First 2.5 MGD are Rehoboth Costs per DBB$1,400,000

    6IBRWF Phase 1 Upgrades---$0$00.0%$0First 2.5 MGD are Rehoboth Costs per DBB$0

    6AWNRWF Upgrades04.4 MGD Max Month4.4 MGD Max Month$21,000,000$21,000,0000.0%$0$21,000,000

    7IBRWF Phase 2 Upgrades1-62.9 MGD Max Month2.9 MGD Max Month$10,905,882$10,905,8820.0%$0$10,905,882

    12Land/Easements---$0$00.0%$0From Artesian Proposal

    13A10% Contingency---$3,669,045$3,001,44218.2%$667,603Contingency Costs Proportional Share$41,185,922$10,905,882

    13B30% Contingency Ocean Outfall Items Only$8,096,400$6,623,21518.2%$1,473,185Contingency Costs Proportional Share$5,236,586$1,386,629

    14Engineering & Administration---$16,179,090$13,235,21418.2%$2,943,876Administrative Costs Proportional Share$10,464,304$2,770,910

    Total Project Cost$91,622,990$74,951,675$16,671,315$56,886,812$15,063,421

    SUSSEX COUNTY COST$74,951,675

    Flow Split

    Flow Split to ANSWERFMax Month Flow (MGD)Notes

    WNRWF (4.4-2.3)2.145.7%

    Rehoboth2.554.3%

    Subtotal4.6

    Henlopen/Dewey0.938% of flow from RBSTP

    City of Rehoboth/North Shores1.662% of flow from RBSTP

    Total7.1

    OCEAN OUTFALL OPTION

    Outfall Option Rehoboth and SussexOutfall Option Rehoboth and Sussexwith Better Financing Option

    User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years

    COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%

    Annual Capital Cost$1,270,545$715,571$1,071,231$603,317$2,272,372$1,279,800

    Plant Operations (From Rehoboth March 2009 Report)$1,590,000$895,488$1,590,000$895,488$1,590,000$895,488

    Pump Station Maintenance$0$0$0$0$0$0

    Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735Outfall O&M

    Sussex County Operations and Maintenance ($2.00/1000 gal)$0$0$0$0$150,000$84,480

    Subtotal$1,749,794$1,637,540$2,398,503

    Projected User Rate for City of Rehoboth$459$429$629

    Annual Capital Costs$1,270,545$715,571

    O&M Costs$1,740,000$1,034,223

    &L&Z&F

    Scratch

    6.6

    8.4666666667

  • *Sussex County Council

    City of Rehoboth Beach Comments

  • *Sussex County Council

    Questions?August 18, 2009

  • *Sussex County Council

    Where do we go from here?August 18, 2009

  • *Alternative #4- Combined Ocean OutfallWolfe Neck Service AreaCity of Rehoboth4.4 MGDInland Bays Service Area2.9 MGDIncludes:West RehobothGoslee CreekNorthern WR ExpIncludes:City of RehobothHenlopen AcresDewey BeachIncludes:Long Neck SSDOak Orchard SSDOO Exp #1Angola Neck SSDWNRWFTreatment and Disposal Capacity Available= 2.3 MGDUpgrades for Additional Treatment to 4.4 MGD2.5 MGD(Treated WW)2.1 MGD (Excess Treated WW)Ocean OutfallNote: All flow rates refer to year 2030 Max Month treatment and disposal requirements.Total Cost: $92 MCounty Cost $75 MRehoboth Cost: $17 MRehoboth Rates: $400-500(Not part of August 2009 County/Rehoboth Study. Slide inserted for informational purposes for August 18, 2009 presentation to Sussex County Council. Slide was part of presentation to Sussex County Council in June 2008)

  • *Previous County Council MotionsCounty Council Motion, June 3, 2008A Motion was made by Mr. Dukes, seconded by Mr. Phillips, to support spray irrigation (Alternative No. 3 Joint Sussex County/Rehoboth Spray Irrigation). Motion Adopted: 4 Yeas, 1 Nay.

    County Council Motion, December 16, 2008A Motion was made by Mr. Dukes, seconded by Mr. Phillips, to authorize County staff to issue an RFP (for cost alternatives for wastewater treatment and disposal services for the Wolfe Neck Treatment Facility and City of Rehoboth).Motion Adopted: 4 Yeas, 1 Nay. (Not part of August 2009 County/Rehoboth Study. Slide inserted for informational purposes for August 18, 2009 presentation to Sussex County Council.Alternative #3 of June 3, 2008 does not refer to Alternative #3 of August 2009 Joint Study. Italics emphasis added.)

    *************