Sussex County Council
description
Transcript of Sussex County Council
-
*Sussex County Council
August 18, 2009A Regional Planning Report to Assess a Joint Sussex County/City of Rehoboth Land Application Project
-
*Design CriteriaPlanning Period: Year 2009 2030West Rehoboth Expansion Flows: 4.4 million gallons per day (mgd) (1.)Inland Bays Service Area Flows: 2.9 mgdRehoboth Beach Flows: 2.5 mgd (2.)
Total Treatment and Disposal Capacity Required: 9.8 mgd
Note: (1.) All flows are maximum month average daily flows.(2.) Rehoboth Beach Flows include Dewey Beach, Henlopen Acres & North Shores.
-
*North Coastal Planning Area Treatment and Disposal AlternativesNorthern West RehobothGoslee Creek Planning AreaAngola Neck Planning AreaInland Bays Regional Wastewater FacilityExp. Area 1Exp. Area 2West Rehoboth Expansion Dewey Beach SSDLong Neck SSD SSD Wolfe Neck Regional Wastewater Treatment Facility (WNRWF)Oak OrchardWolfe Neck Regional Wastewater FacilityHerring Creek Planning AreaRehoboth BeachDewey BeachHenlopen Acres/North Shores Inland Bays Regional Wastewater Treatment Facility (IBRWF) City of Rehoboth Beach Wastewater Treatment Plant (RBWWTP)Rehoboth Beach WWTP3 miles13 miles15 miles3.5 miles
-
*Alternative #1A- Raw Wastewater to WNRWF with Treatment at the IBRWFWolfe Neck Service AreaCity of Rehoboth4.4 MGD2.5 MGD(Raw WW)Inland Bays Service Area2.9 MGD4.6 MGD (Excess)Includes:West RehobothGoslee CreekNorthern WR ExpIncludes:City of RehobothHenlopen AcresDewey BeachNorth ShoresIncludes:Long Neck SSDOak Orchard SSDOO Exp #1Angola Neck SSDNote: All flow rates refer to year 2030 Max Month treatment and disposal requirements.
-
*Alternative #1B- Raw Wastewater to WNRWF with Treatment at a Private ProviderWolfe Neck Service AreaCity of Rehoboth4.4 MGD2.5 MGD(Raw WW)Inland Bays Service Area2.9 MGDIncludes:West RehobothGoslee CreekNorthern WR ExpIncludes:City of RehobothHenlopen AcresDewey BeachNorth ShoresIncludes:Long Neck SSDOak Orchard SSDOO Exp #1Angola Neck SSD4.6 MGD (Excess)Note: All flow rates refer to year 2030 Max Month treatment and disposal requirements.
-
*Alternative #2A- Treated Effluent to WNRWF with Treatment at the IBRWFWolfe Neck Service AreaCity of Rehoboth4.4 MGD2.5 MGD(Raw WW)Inland Bays Service Area2.9 MGD3.6 MGD (Excess)Includes:West RehobothGoslee CreekNorthern WR ExpIncludes:City of RehobothHenlopen AcresDewey BeachNorth ShoresIncludes:Long Neck SSDOak Orchard SSDOO Exp #1Angola Neck SSDWNRWFCapacity Available= 3.1 MGDStorage Available for Max Month= 0.2 MGDNote: All flow rates refer to year 2030 Max Month treatment and disposal requirements.
-
*Alternative #2B- Treated Effluent to WNRWF with Treatment at a Private Service ProviderWolfe Neck Service AreaCity of Rehoboth4.4 MGD2.5 MGD(Raw WW)Inland Bays Service Area2.9 MGDIncludes:West RehobothGoslee CreekNorthern WR ExpIncludes:City of RehobothHenlopen AcresDewey BeachNorth ShoresIncludes:Long Neck SSDOak Orchard SSDOO Exp #1Angola Neck SSDWNRWFCapacity Available= 3.1 MGDStorage Available for Max Month= 0.2 MGD3.6 MGD (Excess)Note: All flow rates refer to year 2030 Max Month treatment and disposal requirements.
-
*Alternative #3- Separate Treatment and DisposalWolfe Neck Service AreaCity of Rehoboth4.4 MGDInland Bays Service Area2.9 MGDIncludes:West RehobothGoslee CreekNorthern WR ExpIncludes:City of RehobothHenlopen AcresDewey BeachNorth ShoresIncludes:Long Neck SSDOak Orchard SSDOO Exp #1Angola Neck SSDWNRWFCapacity Available= 2.3 MGD
2.5 MGD(Treated WW)2.1 MGD (Excess)Ocean OutfallNote: All flow rates refer to year 2030 Max Month treatment and disposal requirements.
-
*Summary of Costs
County Costs
SUMMARY OF TOTAL COSTS AND REHOBETH USER COSTSDRAFT
7/9/09
Dewey Beach User RatesHenlopen Acres User RatesCity of Rehoboth Beach User Rates
AlternativeDescriptionExisting RateNew RateExisting RateNew RateExisting RateNew Rate
#2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$341$642$588$865$325$968
#2BTreated Effluent Pumped to WNRWF with Disposal at Private Service Provider$341$1,082$588$1,314$325$1,370
#3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$341$568$588$798$325$680
&L&Z&F
Presentation
SUMMARY OF TOTAL COSTS AND REHOBETH USER COSTSDRAFT
7/9/09
AlternativeDescriptionTotal Capital CostSussex County Capital CostCity of Rehoboth Beach Capital CostCity of Rehoboth Beach Annual Capital CostsCity of Rehoboth Beach Annual O&M Costs
#1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$112 M$44 M$68 M$2.9 M$1.5 M
#1BRaw Wastewater Pumped to WNRWF with Disposal at Private Service Provider$99 M$50 M$49 M$2.1 M$3.3 M
#2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$99 M$49 M$50 M$2.2 M$1.5 M
#2BTreated Effluent Pumped to WNRWF with Disposal at Private Service Provider$99 M$67 M$32 M$1.4 M$3.8 M
#3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$99 M$64 M$35 M$1.5 M$1.1 m
&L&Z&F
rounded
SUMMARY OF TOTAL COSTS AND REHOBETH USER COSTSDRAFT
7/9/09
Annual Costs
AlternativeDescrptionTotal CostCounty CostRehoboth CostCapital CostsOperation and Maintenance Costs
#1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$112,000,000$44,000,000$68,000,000$1,200$1,000
#1BRaw Wastewater Pumped to WNRWF with Disposal at Private Service Provider$99,000,000$50,000,000$49,000,000$1,400$1,300
#2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$99,000,000$49,000,000$50,000,000$1,000$900
#2BTreated Effluent Pumped to WNRWF with Disposal at Private Service Provider$99,000,000$67,000,000$32,000,000$1,400$1,300
#3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$99,000,000$64,000,000$35,000,000$700$600
#4Rehoboth and County Pump to Common Outfall with County Continuing to use IBRWF for Southern Service Area$92,000,000$75,000,000$17,000,000$500$400
&L&Z&F
User Cost Summary
SUMMARY OF TOTAL COSTS AND REHOBETH USER COSTSDRAFT
7/9/09
Rehoboth User Rates
AlternativeDescrptionTotal CostCounty CostRehoboth CostSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 yearsAnnual Capital CostsAnnual O & M Costs
#1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$112,324,447$44,075,056$68,249,391$1,156$1,0362,929,4201,482,530
#1BRaw Wastewater Pumped to WNRWF with Disposal at Private Service Provider$98,924,872$49,793,592$49,131,280$1,421$1,3352,108,8273,313,888
#2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$98,722,310$48,603,086$50,119,224$968$8792,151,2321,541,103
#2BTreated Effluent Pumped to WNRWF with Disposal at Private Service Provider$98,832,240$66,654,341$32,177,899$1,370$1,3131,381,1493,846,393
#3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$99,429,900$64,065,500$35,364,400$691$6291,517,9211,118,703
#4Rehoboth and County Pump to Common Outfall with County Continuing to use IBRWF for Southern Service Area$91,622,990$74,951,675$16,671,315$459$429715,5711,034,223
&L&Z&F
County Implementation Schedule
SUMMARY OF TIMING, COSTS AND EDUSDRAFT
7/9/09
Overall Phase 1
AlternativeDescrptionTotal County CostCost for Overall Phase 1Improvements RequiredYearIBRWF Treatment Capacity (MGD)WNRWF Treatment Capacity (MGD)Total Treatment Capacity (MGD)Allocation to Rehoboth Beach (2.)County Treatment Capacity (MGD)County Capacity (EDUs) (1.)Existing County EDUS (3.)Increased EDU Capacity (1.)
#1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$44,075,056$18,775,057WNPS, FM and IBRWF through Phase 320125.202.307.502.505.0033,33325,3817,952
#2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$48,603,086$34,303,086WNPS, FM and IBRWF through Phase 320125.203.108.302.505.8038,66725,38113,286
#3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$64,065,500$43,518,217WNPS, FM and IBRWF through Phase 220123.702.306.000.006.0040,00025,38114,619
#4Rehoboth and County Pump to Common Outfall with County Continuing to use IBRWF for Southern Service Area$74,951,675$56,886,812WNPS, WNRWF Upgrades, FM to Rehobeth, Ocean Outfall and IBRWF through Phase 120122.004.406.400.006.4042,66725,38117,286
Notes
(1.) Capacity/EDU150
(2.) Allocated Capacity based on year 2030 RBSTP flow of 2.50 MGD
(3.) Existing County EDUs in WRSSD, LNSSD, and OOSSD. Does not include existing EDUs in Angola and OOSSD Phase 1 Expansion.
Overall Phase 2
AlternativeDescrptionTotal County CostCost for Overall Phase 2Improvements RequiredYearIBRWF Treatment Capacity (MGD)WNRWF Treatment Capacity (MGD)Total Treatment Capacity (MGD)Allocation to Rehoboth Beach (2.)County Treatment Capacity (MGD)County Capacity (EDUs) (1.)Previous Upgrade CapacityIncreased EDU Capacity (1.)
#1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$44,075,056$25,300,000IBWRF Phase 420187.502.309.802.507.3048,66733,33315,333
#2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$48,603,086$14,300,000IBWRF Phase 420236.503.109.602.507.3048,66738,66710,000
#3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$64,065,500$15,773,400IBWRF Phase 320235.002.307.300.007.3048,66740,0008,667
#4Rehoboth and County Pump to Common Outfall with County Continuing to use IBRWF for Southern Service Area$74,951,675$15,063,421IBWRF Phase 220152.904.407.300.007.3048,66742,6676,000
&L&Z&F
Capital Cost Summary
SUMMARY OF TOTAL CAPITAL COSTSDRAFTSUMMARY OF TOTAL CAPITAL COSTSDRAFT
ALTERNATIVES #1, #2 and Analysis of Private Wastewater Treatment Provider8/10/09ALTERNATIVES #3 & #48/10/09
Alternative #1A - Raw Wastewater Pumped to WNRWFAlternative #1B Private Wastewater Treatment ProviderAlternative #2A - Treated Effluent Pumped to WNRWFAlternative #2B Private Wastewater Treatment ProviderAlt. 3 - Rehoboth Ocean Outfall Alternative (County Uses Inland Bays)Alt. 4 - Rehoboth Ocean Outfall Alternative (County Uses Rehoboth Ocean Outfall)Ocean Outfall Costs
ItemDescriptionTableDesign CriteriaCapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostOption 3
ItemCosts
1RBSTP Pumping Station-3.4 MGD Max Month10.2 MGD Peak Hour$3,001,000-3.4 Max Month10.2 MGD Peak Hour$3,001,000N/A3.4 Max Month10.2 MGD Peak Hour$900,000N/A3.4 Max Month10.2 MGD Peak Hour$900,000X3.4 Max Month10.2 MGD Peak Hour$900,000X3.4 Max Month10.2 MGD Peak Hour$900,000Outfall$15,153,846
2Force Main to WNRWF (Option #1)1-13.4 MGD Max Month10.2 MGD Peak Hour$3,123,0001-13.4 Max Month10.2 MGD Peak Hour$3,123,0002-13.4 Max Month10.2 MGD Peak Hour$3,500,0002-13.4 Max Month10.2 MGD Peak Hour$3,500,0002-13-22.1 Max Month4.2 MGD Peak Hour$2,088,000Pump Station$900,000
2ARehoboth FM, Ocean Outfall & Treatment Improvements-----------------3.4 Max Month10.2 MGD Peak Hour$20,688,000-8.3 Max Month8.3 Max Month$26,088,000Forcemain$2,688,000
3WNRWF Headworks Upgrades1-210 MGD Max Month27.5 MGD Peak Hour$1,527,5711-210 MGD Max Month27.5 MGD Peak Hour$1,527,5711-210.0 MGD Max Month27.5 MGD Peak Hour$1,527,5711-210.0 MGD Max Month27.5 MGD Peak Hour$1,527,5712-26.6 MGD Max Month17.5 MGD Peak Hour$1,296,5722-26.6 MGD Max Month17.5 MGD Peak Hour$1,296,572RB Treatment Improvements$2,846,154
4WNRWF to IBRWF/ANSWERF P.S.1-34.6 MGD Max Month6.9 MGD Peak Hour$2,485,0001-34.6 MGD Max Month6.9 MGD Peak Hour$2,485,0002-33.6 MGD Max Month5.4 MGD Peak Hour$2,270,0002-33.6 MGD Max Month5.4 MGD Peak Hour$2,270,0003-22.1 MGD Max Month3.2 MGD Peak Hour$2,000,000X2.1 MGD Max Month4.2 MGD Peak Hour$1,400,000Subtotal$21,588,000
5Force Main to IBRWF (Option #3)1-44.6 MGD Max Month6.9 MGD Peak Hour$13,027,250----1-43.6 MGD Max Month5.4 MGD Peak Hour$13,027,250----3-12.1 MGD Max Month3.2 MGD Peak Hour$11,142,2501-4N/AN/AContingency$6,476,400
6IBRWF Phase 1 Upgrades---$0---$0---$0---$0---$0---$0Project Costs$7,300,000
6AWNRWF Upgrades4.4 MGD Max Month4.4 MGD Max Month$21,000,000Total$35,364,400
7IBRWF Phase 2 Upgrades1-63.7 MGD Max Month3.7 MGD Max Month$20,600,0001-62.9 MGD Max Month2.9 MGD Max Month$10,905,8821-63.7 MGD Max Month3.7 MGD Max Month$20,600,000-3.7 MGD Max Month3.7 MGD Max Month$20,600,0001-63.7 MGD Max Month3.7 MGD Max Month$20,600,0001-62.9 MGD Max Month2.9 MGD Max Month$10,905,882
8IBRWF Phase 3 Upgrades1-75.2 MGD Max Month5.2 MGD Max Month$12,700,0001-7N/AN/AN/A1-75.2 MGD Max Month5.2 MGD Max Month$12,700,0001-7---1-75.0 MGD Max Month5.0 MGD Max Month$12,700,0001-7---Option 4
9IBRWF Phase 4 Upgrades-7.5 MGD Max Month7.5 MGD Max Month$18,852,459N/AN/AN/A-6.5 MGD Max Month6.5 MGD Max Month$10,655,738------------Outfall$16,953,846
10A24" PVC Force Main to Cave Neck Road----1-84.6 MGD Max Month6.9 MGD Peak Hour$6,967,511---N/A1-83.6 MGD Max Month5.4 MGD Peak Hour$6,967,511--------Pump Station$900,000
10B24" PVC Force Main to ANSRWRF----1-94.6 MGD Max Month6.9 MGD Peak Hour$8,736,587---N/A1-9--$8,736,587--------Forcemain$6,288,000
11ANSRWRF Treatment Capacity-----4.6 MGD Max Month4.6 MGD Max Month$48,300,000---N/A-3.6 MGD Max Month3.6 MGD Max Month$37,800,000--------RB Treatment Improvements$2,846,154
12Land/Easements---$11,250,000---$500,000---$11,250,000---$500,000---$0---Subtotal$26,988,000
13A10% Contingency---$7,531,628---$3,724,655---$6,518,056---$4,500,167---$4,773,882---$3,669,045Contingency$8,096,400
13B30% Contingency Ocean Outfall Items Only-------------------$6,476,400---$8,096,400Project Costs$7,300,000
14Engineering and Administration---$18,226,540---$9,653,665---$15,773,695---$11,530,404---$18,852,795---$16,179,090Total$42,384,400
Total Project Cost$112,324,447$98,924,872$98,722,310$98,832,240$99,429,900$91,622,990
Notes:
Flow Split
Year 2030Max Month Flow (MGD)Notes
Sussex County
WNRWF4.4
IBRWF2.9
Henlopen/Dewey0.938% of flow from RBSTP
Subtotal8.2Sussex County Flow
City of Rehoboth1.662% of flow from RBSTP
Total9.8
% Flow Contributed by Sussex County84%
% Flow Contributed by City of Rehoboth16%
&L&Z&F
Thor Young:This cost is for 3.6 mgd, need to revise for 2.1 mgd. Change Made for 2.1 (WFH)
Thor Young:this is for 3.6 mgd, change for 2.1 mgd. Change made for 2.1 mgd (3.2 mgd peak)
Thor Young:Cost is for 5.2 mgd, assume no real change for 5.0 mgd facility
Thor Young:Total Rehoboth Beach Capital Cost inc. engineering for PS and outfall. Modification made by WFH
whinz:4.9 (SC)+3.4 (RB)
whinz:9.8 MGD Sussex+10.2 MGD RB
whinz:Assumes 300/l.f. increase for going from 24" to 42". Based on recent bids
whinz:Cost similar to MPS#1
whinz:This is actually FM from WN to Rehoboth for Alt 4
whinz:Per updated section from Rehoboth Report
whinz:Per updated section from Rehoboth Report
whinz:Updated per revised Rehoboth Chapter
whinz:Updated per revised Rehoboth Chapter
whinz:Removed Land from Contingency Calculation to be consitent with #1A
whinz:Changed to original number presented at July progress meeting per MAI
whinz:Need to approximate land cost associated with .9 MGD of treatment at IBRWF
whinz:Reduced to account for only additional 0.9 MGD of capacity in Phase 2
whinz:Changed to original number presented at July progress meeting per MAI
whinz:Land cost not required per MAI
Alt #1A
Rehoboth Capital CostsDRAFT
Alternative #1A - RAW WASTEWATER FROM REHOBOTH WITH EXCESS PUMPED TO IBWRF8/10/09
Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty Costs ShareRehoboth Cost ShareRehoboth CostNotes2012 Implementation Year2017 Implementation Year
1RBSTP Pumping Station-3.4 MGD Max Month10.2 MGD Peak Hour$3,001,000$0100%$3,001,000All Rehoboth Cost$0
230" PVC Force Main to WNRWF (Option #1)1-13.4 MGD Max Month10.2 MGD Peak Hour$3,123,000$0100%$3,123,000All Rehoboth Cost$0
3WNRWF Headworks Upgrades1-210 MGD Max Month27.5 MGD Peak Hour$1,527,571$974,59036.2%$552,981WR vs Rehoboth Cost Split$974,590
4WNRWF to IBRWF Transfer Pumping Station1-34.6 MGD Max Month6.9 MGD Peak Hour$2,485,000$1,135,64554.3%$1,349,355WR vs Rehoboth Cost Split$1,135,645
524" PVC Force Main to IBRWF (Option #3)1-44.6 MGD Max Month6.9 MGD Peak Hour$13,027,250$5,953,45354.3%$7,073,797WR vs Rehoboth Cost Split$5,953,453
6IBRWF Phase 1 Upgrades---$0$00.0%$0First 2.5 MGD are Rehoboth Costs per DBB$0
7IBRWF Phase 2 Upgrades1-63.7 MGD Max Month3.7 MGD Max Month$20,600,000$0100.0%$20,600,000First 2.5 MGD are Rehoboth Costs per DBB$0
8IBRWF Phase 3 Upgrades1-75.2 MGD Max Month5.2 MGD Max Month$12,700,000$5,926,66753.3%$6,773,333$5,926,667
9IBRWF Phase 4 Upgrades-7.5 MGD Max Month7.5 MGD Max Month$18,852,459$18,852,4590.0%$0$18,852,459
12Land/Easements---$11,250,000$0100.0%$11,250,000450 Ac Required to accommodate Rehoboth Flows$13,990,355$18,852,459
13A10% Contingency---$7,531,628$3,284,28156.4%$4,247,347Contingency is a Proportional Share (except land)$1,399,036$1,885,246
14Engineering/Administration---$18,226,540$7,947,96156.4%$10,278,579Administrative Costs Proportional Share (except land)$3,385,666$4,562,295
Total Project Cost$112,324,447$44,075,056$68,249,391Total$18,775,057$25,300,000
SUSSEX COUNTY COST$44,075,056
Flow Split
Flow SplitMax Month Flow (MGD)Notes
WNRWF4.4
IBRWF2.9
Subtotal7.3
Henlopen/Dewey0.938% of flow from RBSTP
City of Rehoboth/North Shores1.662% of flow from RBSTP
Total9.8
OCEAN OUTFALL OPTION
SPRAY IRRIGATION OPTIONSPRAY IRRIGATION OPTIONwith Better Financing Option
User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years
COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth OnlyRehoboth + DB, NS & HARehoboth OnlyRehoboth + DB, NS & HARehoboth Only
Annual Capital Cost$5,201,385$2,929,420$4,385,428$2,469,873$2,272,372$1,279,800
Plant Operations (From Rehoboth March 2009 Report)$0$0$0$0$1,590,000$895,488
Pump Station Maintenance$100,000$56,320$100,000$56,320$0$0
Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735
Sussex County Operations and Maintenance ($5.08/1000 gal)$2,286,000$1,287,475$2,286,000$1,287,475$150,000$84,480
Subtotal$4,411,950$3,952,403$2,398,503
Projected User Rate for City of Rehoboth$1,156$1,036$629
Annual Capital Costs$5,201,385$2,929,420
O&M Costs$2,536,000$1,482,530
$5,201,385
&L&8&Z&F&R&8&D
At #1B
Rehoboth Capital CostsDRAFT
Alternative #1B- RAW WASTEWATER FROM REHOBOTH WITH EXCESS PUMPED TO PRIVATE ANSWERF8/10/09
Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty ShareRehoboth Cost ShareRehoboth CostNotes
$6,967,511FM to Cave neck
1RBSTP Pumping Station-3.4 Max Month10.2 MGD Peak Hour$3,001,000$0100%$3,001,000All Rehoboth Cost$8,736,587FM to ANSWERF
230" PVC Force Main to WNRWF (Option #1)1-13.4 Max Month10.2 MGD Peak Hour$3,123,000$0100%$3,123,000All Rehoboth Cost$15,704,098Subtotal
3WNRWF Headworks Upgrades1-210 MGD Max Month27.5 MGD Peak Hour$1,527,571$974,10336.2%$553,468WR vs Rehoboth Cost Split
4WNRWF to ANSWERF Transfer Pumping Station1-34.6 MGD Max Month6.9 MGD Peak Hour$2,485,000$1,134,45754.3%$1,350,543WR vs Rehoboth Cost Split
6IBRWF Phase 1 Upgrades---$0$00.0%$0First 2.5 MGD are Rehoboth Costs per DBB
7IBRWF Phase 2 Upgrades1-62.9 MGD Max Month2.9 MGD Max Month10,905,88210,905,8820.0%$0First 2.5 MGD are Rehoboth Costs per DBB
1024" PVC Force Main to ANSRWF1-84.6 MGD Max Month6.9 MGD Peak Hour$15,704,098$7,169,26254.3%$8,534,836
11ANSWRF Treatment Capacity1-94.6 MGD Max Month4.6 MGD Max Month$48,300,000$22,050,00054.3%$26,250,000
12Land/Easements---$500,000$228,26154.3%$271,739From Artesian Proposal
13AContingency---$3,724,655$2,041,19745.2%$1,683,459Contingency is a Proportional Share
14Engineering & Administration---$9,653,665$5,290,43045.2%$4,363,235Administrative Costs Proportional Share
Total Project Cost$98,924,872$49,793,592$49,131,280
SUSSEX COUNTY COST$49,793,592
Flow Split
Flow Split to ANSWERFMax Month Flow (MGD)Notes
WNRWF (4.4-2.3)2.145.7%
Rehoboth2.554.3%
Subtotal4.6
Henlopen/Dewey0.938% of flow from RBSTP
City of Rehoboth/North Shores1.662% of flow from RBSTP
Total7.1
OCEAN OUTFALL OPTION
Private OptionPrivate Optionwith Better Financing Option
User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years
COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%
Annual Capital Cost$3,744,366$2,108,827$3,156,976$1,778,009$2,223,255$1,252,137
Pump Station O&M$100,000$56,320$100,000$56,320$2,272,372$1,279,800
Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735
Artesian Disposal @ 2 MGD Minimum ($6.84/1000 gal)$4,993,200$2,812,170$4,993,200$2,812,170$150,000$84,480Outfall O&M
Sussex County O&M ($1.21/1000 gal)$544,500$306,662$544,500$306,662$0$0
Subtotal$5,422,715$5,091,896$2,755,152
Projected User Rate for City of Rehoboth$1,421$1,335$722
Annual Capital Costs$3,744,366$2,108,827
O&M Costs$5,787,700$3,313,888
&L&Z&F
Alt #2A
Capital CostsDRAFT
Alternative #2A - Treated Effluent FROM Rehoboth Pumped to WNRWF with Excess to IBRWF8/10/09
Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty ShareRehoboth Cost ShareRehoboth CostNotes2012 Implementation Year2023 Implementation Year
1RBSTP Pumping StationN/A3.4 Max Month10.2 MGD Peak Hour$900,000$0100%$900,000All Rehoboth Cost$0
230" PVC Force Main to WNRWF (Option #1)2-13.4 Max Month10.2 MGD Peak Hour$3,500,000$0100%$3,500,000All Rehoboth Cost$0
3WNRWF Headworks Upgrades1-210.0 MGD Max Month27.5 MGD Peak Hour$1,527,571$1,527,5710.0%$0WR vs Rehoboth Cost Split$1,527,571
4WNRWF to IBRWF Transfer Pumping Station2-33.6 MGD Max Month5.4 MGD Peak Hour$2,270,000$1,324,16741.7%$945,833WR vs Rehoboth Cost Split$1,324,167
524" PVC Force Main to IBRWF (Option #3)1-43.6 MGD Max Month5.4 MGD Peak Hour$13,027,250$7,599,22941.7%$5,428,021WR vs Rehoboth Cost Split$7,599,229
6IBRWF Phase 1 Upgrades---$0$00.0%$0$0
7IBRWF Phase 2 Upgrades1-63.7 MGD Max Month3.7 MGD Max Month$20,600,000$2,410,20088.3%$18,189,800First 1.5 MGD are Rehoboth Costs per DBB$2,410,200
8IBRWF Phase 3 Upgrades1-75.2 MGD Max Month5.2 MGD Max Month$12,700,000$12,700,0000.0%$0$12,700,000
9IBRWF Phase 4 Upgrades-6.5 MGD Max Month6.5 MGD Max Month$10,655,738$10,655,7380.0%$0$10,655,738
12Land/Easements---$11,250,000$0100.0%$11,250,000450 Ac Required to accommodate Rehoboth Flows$25,561,167$10,655,738
13AContingency---$6,518,056$3,621,69044.4%$2,896,365Contingency is a Proportional Share (except land)$2,556,117$1,065,574
14Engineering/Administration---$15,773,695$8,764,49144.4%$7,009,204Administrative Costs Proportional Share (except land)$6,185,802$2,578,689
Total Project Cost$98,722,310$48,603,086$50,119,224Total$34,303,086$14,300,000
SUSSEX COUNTY COST$48,603,086
Flow Split
Flow SplitNotes
WNRWF4.4
IBRWF2.9
Subtotal7.3
Henlopen/Dewey0.938% of flow from RBSTP
City of Rehoboth/North Shores1.662% of flow from RBSTP
Total9.8
OCEAN OUTFALL OPTION
SPRAY IRRIGATION OPTIONSPRAY IRRIGATION OPTIONwith Better Financing Option
User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years
COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth OnlyRehoboth + DB, NS & HARehoboth OnlyRehoboth + DB, NS & HARehoboth Only
Annual Capital Cost$3,819,659$2,151,232$3,220,457$1,813,761$2,272,372$1,279,800
Plant Operations (From Rehoboth March 2009 Report)$1,590,000$895,488$1,590,000$895,488$1,590,000$895,488
Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735
Sussex County Operations and Maintenance ($2.00/1000 gal)$900,000$506,880$900,000$506,880$150,000$84,480
Subtotal$3,692,335$3,354,864$2,398,503
Projected User Rate for City of Rehoboth$968$879$629
Annual Capital Costs$3,819,659$2,151,232
O&M Costs$2,640,000$1,541,103
&L&Z&F
Alt 2B
Rehoboth Capital CostsDRAFT
Alternative #2B - TREATED WASTEWATER FROM REHOBOTH WITH EXCESS PUMPED TO PRIVATE ANSWERF8/10/09
Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty CostsRehoboth Cost ShareRehoboth CostNotes
$6,967,511FM to Cave Neck
1RBSTP Pumping StationN/A3.4 Max Month10.2 MGD Peak Hour$900,000$0100%$900,000All Rehoboth Cost$8,736,587FM to ANSWERF
230" PVC Force Main to WNRWF (Option #1)2-13.4 Max Month10.2 MGD Peak Hour$3,500,000$0100%$3,500,000All Rehoboth Cost$15,704,098
3WNRWF Headworks Upgrades1-210.0 MGD Max Month27.5 MGD Peak Hour$1,527,571$1,527,5710.0%$0WR vs Rehoboth Cost Split
4WNRWF to ANSWERF Transfer Pumping Station2-33.6 MGD Max Month5.4 MGD Peak Hour$2,270,000$1,323,41041.7%$946,590WR vs Rehoboth Cost Split
6IBRWF Phase 1 Upgrades---$0$00.0%$0First 2.5 MGD are Rehoboth Costs per DBB
7IBRWF Phase 2 Upgrades-3.7 MGD Max Month3.7 MGD Max Month$20,600,000$20,600,0000.0%$0First 2.5 MGD are Rehoboth Costs per DBB
1024" PVC Force Main to ANSRWF1-83.6 MGD Max Month5.4 MGD Peak Hour$15,704,098$9,155,48941.7%$6,548,609
11ANSWRF Treatment Capacity-3.6 MGD Max Month3.6 MGD Max Month$37,800,000$22,037,40041.7%$15,762,600
12Land/Easements---$500,000$291,50041.7%$208,500From Artesian Proposal
13AContingency @ 10%---$4,500,167$3,289,79726.9%$1,210,370Contingency is a Proportional Share
14Engineering & Administration---$11,530,404$8,429,17426.9%$3,101,230Administrative Costs Proportional Share
Total Project Cost$98,832,240$66,654,341$32,177,899
SUSSEX COUNTY COST$66,654,341
Flow Split
Flow Split to ANSWERFMax Month Flow (MGD)Notes
WNRWF (4.4-2.3)2.145.7%
Rehoboth2.554.3%
Subtotal4.6
Henlopen/Dewey0.938% of flow from RBSTP
City of Rehoboth/North Shores1.662% of flow from RBSTP
Total7.1
OCEAN OUTFALL OPTION
Private OptionPrivate Optionwith Better Financing Option
User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years
COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%
Annual Capital Cost$2,452,324$1,381,149$2,067,621$1,164,484$2,223,255$1,252,137
Treatment Plant O&M From Rehoboth March 2009 Report)$1,590,000$895,488$1,590,000$895,488$2,272,372$1,279,800
Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735
Artesian Disposal @ 2 MGD Minimum ($6.84/1000 gal)$4,993,200$2,812,170$4,993,200$2,812,170$150,000$84,480Outfall O&M
Sussex County O&M$0$0$0$0$0$0
Subtotal$5,227,542$5,010,877$2,755,152
Projected User Rate for City of Rehoboth$1,370$1,313$722
Annual Capital Costs$2,452,324$1,381,149
O&M Costs$6,733,200$3,846,393
&L&Z&F
Alt 3
Rehoboth Capital CostsDRAFT
Alternative #3 - REHOBETH OUTFALL ALTERNATIVE WITH COUNTY CONTINUING TO PUMP TO IBWRF8/10/09
Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty CostRehoboth Cost ShareRehoboth CostNotes2012 Implementation Year2023 Implementation Year
1RBSTP Pumping StationN/A3.4 Max Month10.2 MGD Peak Hour$900,000$0100%$900,000All Rehoboth Cost$0
2ARehoboth FM, Ocean Outfall & Treatment Improvements-3.4 Max Month10.2 MGD Peak Hour$20,688,000$0100%$20,688,000All Rehoboth Cost$0
3WNRWF Headworks Upgrades2-26.6 MGD Max Month17.5 MGD Peak Hour$1,296,572$1,296,5720.0%$0$1,296,572
4WNRWF to IBRWF/ANSWERF P.S.3-22.1 MGD Max Month3.2 MGD Peak Hour$2,000,000$2,000,0000.0%$0$2,000,000
5Force Main to IBRWF (Option #3)3-12.1 MGD Max Month3.2 MGD Peak Hour$11,142,250$11,142,2500.0%$0$11,142,250
6IBRWF Phase 1 Upgrades---$0$00.0%$0$0
7IBRWF Phase 2 Upgrades1-63.7 MGD Max Month3.7 MGD Max Month$20,600,000$20,600,0000.0%$0$20,600,000
8IBRWF Phase 3 Upgrades1-75.0 MGD Max Month5.0 MGD Max Month$12,700,000$12,700,0000.0%$0$12,700,000
12Land/Easements---$0$00.0%$0
13A10% Contingency---$4,773,882$4,773,882$35,038,822$12,700,000
13B30% Contingency Ocean Outfall Items Only$6,476,400$0100.0%$6,476,400$0$0
14Engineering & Administration---$18,852,795$11,552,79538.7%$7,300,000Reboboth E&A is from Rehoboth Report$8,479,395$3,073,400
Total Project Cost$99,429,900$64,065,500$35,364,400$43,518,217$15,773,400
SUSSEX COUNTY COST$64,065,500
Flow Split
Flow Split to ANSWERFMax Month Flow (MGD)Notes
WNRWF (4.4-2.3)2.145.7%
Rehoboth2.554.3%
Subtotal4.6
Henlopen/Dewey0.938% of flow from RBSTP
City of Rehoboth/North Shores1.662% of flow from RBSTP
Total7.1
OCEAN OUTFALL OPTION
Outfall Option Rehoboth OnlyOutfall Option Rehoboth Onlywith Better Financing Option
User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years
COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%
Annual Capital Cost$2,695,172$1,517,921$2,272,372$1,279,800$2,272,372$1,279,800
Plant Operations (From Rehoboth March 2009 Report)$1,590,000$895,488$1,590,000$895,488$1,590,000$895,488
Pump Station Maintenance$0$0$0$0$0$0
Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735
Sussex County Operations and Maintenance ($2.00/1000 gal)$150,000$84,480$150,000$84,480$150,000$84,480Outfall O&M
Subtotal$2,636,624$2,398,503$2,398,503
Projected User Rate for City of Rehoboth$691$629$629
Annual Capital Costs$2,695,172$1,517,921
O&M Costs$1,890,000$1,118,703
&L&Z&F
Alt 4
Rehoboth Capital CostsDRAFT
Alternative #4 - COMBINED REHOBOTH AND COUNTY OCEAN OUTFALL8/10/09
Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty CostRehoboth Cost ShareRehoboth CostNotes2012 Implementation Year2015 Implementation Year
1RBSTP Pumping StationX3.4 Max Month10.2 MGD Peak Hour$900,000$0100%$900,000All Rehoboth Cost$0
2Force Main to WNRWF (Option #1)3-22.1 Max Month4.2 MGD Peak Hour$2,088,000$2,088,0000%$0All Rehoboth Cost$2,088,000
2ARehoboth FM, Ocean Outfall & Treatment Improvements-8.3 Max Month8.3 Max Month$26,088,000$15,401,34941.0%$10,686,651WR vs Rehoboth Cost Split$15,401,349
3WNRWF Headworks Upgrades2-26.6 MGD Max Month17.5 MGD Peak Hour$1,296,572$1,296,5720.0%$0WR vs Rehoboth Cost Split$1,296,572
4WNRWF to IBRWF/ANSWERF P.S.X2.1 MGD Max Month4.2 MGD Peak Hour$1,400,000$1,400,0000.0%$0First 2.5 MGD are Rehoboth Costs per DBB$1,400,000
6IBRWF Phase 1 Upgrades---$0$00.0%$0First 2.5 MGD are Rehoboth Costs per DBB$0
6AWNRWF Upgrades04.4 MGD Max Month4.4 MGD Max Month$21,000,000$21,000,0000.0%$0$21,000,000
7IBRWF Phase 2 Upgrades1-62.9 MGD Max Month2.9 MGD Max Month$10,905,882$10,905,8820.0%$0$10,905,882
12Land/Easements---$0$00.0%$0From Artesian Proposal
13A10% Contingency---$3,669,045$3,001,44218.2%$667,603Contingency Costs Proportional Share$41,185,922$10,905,882
13B30% Contingency Ocean Outfall Items Only$8,096,400$6,623,21518.2%$1,473,185Contingency Costs Proportional Share$5,236,586$1,386,629
14Engineering & Administration---$16,179,090$13,235,21418.2%$2,943,876Administrative Costs Proportional Share$10,464,304$2,770,910
Total Project Cost$91,622,990$74,951,675$16,671,315$56,886,812$15,063,421
SUSSEX COUNTY COST$74,951,675
Flow Split
Flow Split to ANSWERFMax Month Flow (MGD)Notes
WNRWF (4.4-2.3)2.145.7%
Rehoboth2.554.3%
Subtotal4.6
Henlopen/Dewey0.938% of flow from RBSTP
City of Rehoboth/North Shores1.662% of flow from RBSTP
Total7.1
OCEAN OUTFALL OPTION
Outfall Option Rehoboth and SussexOutfall Option Rehoboth and Sussexwith Better Financing Option
User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years
COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%
Annual Capital Cost$1,270,545$715,571$1,071,231$603,317$2,272,372$1,279,800
Plant Operations (From Rehoboth March 2009 Report)$1,590,000$895,488$1,590,000$895,488$1,590,000$895,488
Pump Station Maintenance$0$0$0$0$0$0
Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735Outfall O&M
Sussex County Operations and Maintenance ($2.00/1000 gal)$0$0$0$0$150,000$84,480
Subtotal$1,749,794$1,637,540$2,398,503
Projected User Rate for City of Rehoboth$459$429$629
Annual Capital Costs$1,270,545$715,571
O&M Costs$1,740,000$1,034,223
&L&Z&F
Scratch
6.6
8.4666666667
-
*Preliminary User Rates
County Costs
SUMMARY OF TOTAL COSTS AND REHOBETH USER COSTSDRAFT
7/9/09
Dewey Beach Estimated RatesHenlopen Acres Estimated RatesCity of Rehoboth Beach Estimated Rates
AlternativeDescriptionExisting RateNew RateExisting RateNew RateExisting RateNew Rate
#2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$350$745$588$1,398$325$968
#2BTreated Effluent Pumped to WNRWF with Disposal at Private Service Provider$350$1,182$588$1,691$325$1,374
#3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$350$565$588$1,096$325$680
&L&Z&F
Presentation
SUMMARY OF TOTAL COSTS AND REHOBETH USER COSTSDRAFT
7/9/09
AlternativeDescriptionTotal Capital CostSussex County Capital CostCity of Rehoboth Capital CostCity of Rehoboth Annual Capital CostsCity of Rehoboth Annual O&M Costs
#1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$112 M$44 M$68 M$2.9 M$1.5 M
#1BRaw Wastewater Pumped to WNRWF with Disposal at Private Service Provider$99 M$50 M$49 M$2.1 M$3.3 M
#2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$99 M$49 M$50 M$2.2 M$1.5 M
#2BTreated Effluent Pumped to WNRWF with Disposal at Private Service Provider$99 M$67 M$32 M$1.4 M$3.8 M
#3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$99 M$64 M$35 M$1.5 M$1.9 M
&L&Z&F
rounded
SUMMARY OF TOTAL COSTS AND REHOBETH USER COSTSDRAFT
7/9/09
Annual Costs
AlternativeDescrptionTotal CostCounty CostRehoboth CostCapital CostsOperation and Maintenance Costs
#1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$112,000,000$44,000,000$68,000,000$1,200$1,000
#1BRaw Wastewater Pumped to WNRWF with Disposal at Private Service Provider$99,000,000$50,000,000$49,000,000$1,400$1,300
#2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$99,000,000$49,000,000$50,000,000$1,000$900
#2BTreated Effluent Pumped to WNRWF with Disposal at Private Service Provider$99,000,000$67,000,000$32,000,000$1,400$1,300
#3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$99,000,000$64,000,000$35,000,000$700$600
#4Rehoboth and County Pump to Common Outfall with County Continuing to use IBRWF for Southern Service Area$92,000,000$75,000,000$17,000,000$500$400
&L&Z&F
User Cost Summary
SUMMARY OF TOTAL COSTS AND REHOBETH USER COSTSDRAFT
7/9/09
Rehoboth User Rates
AlternativeDescrptionTotal CostCounty CostRehoboth CostSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 yearsAnnual Capital CostsAnnual O & M Costs
#1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$112,324,447$44,075,056$68,249,391$1,156$1,0362,929,4201,482,530
#1BRaw Wastewater Pumped to WNRWF with Disposal at Private Service Provider$98,924,872$49,793,592$49,131,280$1,421$1,3352,108,8273,313,888
#2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$98,722,310$48,603,086$50,119,224$968$8792,151,2321,541,103
#2BTreated Effluent Pumped to WNRWF with Disposal at Private Service Provider$98,832,240$66,654,341$32,177,899$1,370$1,3131,381,1493,846,393
#3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$99,429,900$64,065,500$35,364,400$691$6291,517,9211,118,703
#4Rehoboth and County Pump to Common Outfall with County Continuing to use IBRWF for Southern Service Area$91,622,990$74,951,675$16,671,315$459$429715,5711,034,223
&L&Z&F
County Implementation Schedule
SUMMARY OF TIMING, COSTS AND EDUSDRAFT
7/9/09
Overall Phase 1
AlternativeDescrptionTotal County CostCost for Overall Phase 1Improvements RequiredYearIBRWF Treatment Capacity (MGD)WNRWF Treatment Capacity (MGD)Total Treatment Capacity (MGD)Allocation to Rehoboth Beach (2.)County Treatment Capacity (MGD)County Capacity (EDUs) (1.)Existing County EDUS (3.)Increased EDU Capacity (1.)
#1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$44,075,056$18,775,057WNPS, FM and IBRWF through Phase 320125.202.307.502.505.0033,33325,3817,952
#2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$48,603,086$34,303,086WNPS, FM and IBRWF through Phase 320125.203.108.302.505.8038,66725,38113,286
#3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$64,065,500$43,518,217WNPS, FM and IBRWF through Phase 220123.702.306.000.006.0040,00025,38114,619
#4Rehoboth and County Pump to Common Outfall with County Continuing to use IBRWF for Southern Service Area$74,951,675$56,886,812WNPS, WNRWF Upgrades, FM to Rehobeth, Ocean Outfall and IBRWF through Phase 120122.004.406.400.006.4042,66725,38117,286
Notes
(1.) Capacity/EDU150
(2.) Allocated Capacity based on year 2030 RBSTP flow of 2.50 MGD
(3.) Existing County EDUs in WRSSD, LNSSD, and OOSSD. Does not include existing EDUs in Angola and OOSSD Phase 1 Expansion.
Overall Phase 2
AlternativeDescrptionTotal County CostCost for Overall Phase 2Improvements RequiredYearIBRWF Treatment Capacity (MGD)WNRWF Treatment Capacity (MGD)Total Treatment Capacity (MGD)Allocation to Rehoboth Beach (2.)County Treatment Capacity (MGD)County Capacity (EDUs) (1.)Previous Upgrade CapacityIncreased EDU Capacity (1.)
#1ARaw Wastewater Pumped to WNRWF with Disposal at IBRWF$44,075,056$25,300,000IBWRF Phase 420187.502.309.802.507.3048,66733,33315,333
#2ATreated Effluent Pumped to WNRWF with Disposal at IBRWF$48,603,086$14,300,000IBWRF Phase 420236.503.109.602.507.3048,66738,66710,000
#3Rehoboth Pumps to Ocean Outfall Alternative with County Pumping to IBRWF$64,065,500$15,773,400IBWRF Phase 320235.002.307.300.007.3048,66740,0008,667
#4Rehoboth and County Pump to Common Outfall with County Continuing to use IBRWF for Southern Service Area$74,951,675$15,063,421IBWRF Phase 220152.904.407.300.007.3048,66742,6676,000
&L&Z&F
Capital Cost Summary
SUMMARY OF TOTAL CAPITAL COSTSDRAFTSUMMARY OF TOTAL CAPITAL COSTSDRAFT
ALTERNATIVES #1, #2 and Analysis of Private Wastewater Treatment Provider8/10/09ALTERNATIVES #3 & #48/10/09
Alternative #1A - Raw Wastewater Pumped to WNRWFAlternative #1B Private Wastewater Treatment ProviderAlternative #2A - Treated Effluent Pumped to WNRWFAlternative #2B Private Wastewater Treatment ProviderAlt. 3 - Rehoboth Ocean Outfall Alternative (County Uses Inland Bays)Alt. 4 - Rehoboth Ocean Outfall Alternative (County Uses Rehoboth Ocean Outfall)Ocean Outfall Costs
ItemDescriptionTableDesign CriteriaCapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostTable2030 Design Criteria2030 CapacityTotal CostOption 3
ItemCosts
1RBSTP Pumping Station-3.4 MGD Max Month10.2 MGD Peak Hour$3,001,000-3.4 Max Month10.2 MGD Peak Hour$3,001,000N/A3.4 Max Month10.2 MGD Peak Hour$900,000N/A3.4 Max Month10.2 MGD Peak Hour$900,000X3.4 Max Month10.2 MGD Peak Hour$900,000X3.4 Max Month10.2 MGD Peak Hour$900,000Outfall$15,153,846
2Force Main to WNRWF (Option #1)1-13.4 MGD Max Month10.2 MGD Peak Hour$3,123,0001-13.4 Max Month10.2 MGD Peak Hour$3,123,0002-13.4 Max Month10.2 MGD Peak Hour$3,500,0002-13.4 Max Month10.2 MGD Peak Hour$3,500,0002-13-22.1 Max Month4.2 MGD Peak Hour$2,088,000Pump Station$900,000
2ARehoboth FM, Ocean Outfall & Treatment Improvements-----------------3.4 Max Month10.2 MGD Peak Hour$20,688,000-8.3 Max Month8.3 Max Month$26,088,000Forcemain$2,688,000
3WNRWF Headworks Upgrades1-210 MGD Max Month27.5 MGD Peak Hour$1,527,5711-210 MGD Max Month27.5 MGD Peak Hour$1,527,5711-210.0 MGD Max Month27.5 MGD Peak Hour$1,527,5711-210.0 MGD Max Month27.5 MGD Peak Hour$1,527,5712-26.6 MGD Max Month17.5 MGD Peak Hour$1,296,5722-26.6 MGD Max Month17.5 MGD Peak Hour$1,296,572RB Treatment Improvements$2,846,154
4WNRWF to IBRWF/ANSWERF P.S.1-34.6 MGD Max Month6.9 MGD Peak Hour$2,485,0001-34.6 MGD Max Month6.9 MGD Peak Hour$2,485,0002-33.6 MGD Max Month5.4 MGD Peak Hour$2,270,0002-33.6 MGD Max Month5.4 MGD Peak Hour$2,270,0003-22.1 MGD Max Month3.2 MGD Peak Hour$2,000,000X2.1 MGD Max Month4.2 MGD Peak Hour$1,400,000Subtotal$21,588,000
5Force Main to IBRWF (Option #3)1-44.6 MGD Max Month6.9 MGD Peak Hour$13,027,250----1-43.6 MGD Max Month5.4 MGD Peak Hour$13,027,250----3-12.1 MGD Max Month3.2 MGD Peak Hour$11,142,2501-4N/AN/AContingency$6,476,400
6IBRWF Phase 1 Upgrades---$0---$0---$0---$0---$0---$0Project Costs$7,300,000
6AWNRWF Upgrades4.4 MGD Max Month4.4 MGD Max Month$21,000,000Total$35,364,400
7IBRWF Phase 2 Upgrades1-63.7 MGD Max Month3.7 MGD Max Month$20,600,0001-62.9 MGD Max Month2.9 MGD Max Month$10,905,8821-63.7 MGD Max Month3.7 MGD Max Month$20,600,000-3.7 MGD Max Month3.7 MGD Max Month$20,600,0001-63.7 MGD Max Month3.7 MGD Max Month$20,600,0001-62.9 MGD Max Month2.9 MGD Max Month$10,905,882
8IBRWF Phase 3 Upgrades1-75.2 MGD Max Month5.2 MGD Max Month$12,700,0001-7N/AN/AN/A1-75.2 MGD Max Month5.2 MGD Max Month$12,700,0001-7---1-75.0 MGD Max Month5.0 MGD Max Month$12,700,0001-7---Option 4
9IBRWF Phase 4 Upgrades-7.5 MGD Max Month7.5 MGD Max Month$18,852,459N/AN/AN/A-6.5 MGD Max Month6.5 MGD Max Month$10,655,738------------Outfall$16,953,846
10A24" PVC Force Main to Cave Neck Road----1-84.6 MGD Max Month6.9 MGD Peak Hour$6,967,511---N/A1-83.6 MGD Max Month5.4 MGD Peak Hour$6,967,511--------Pump Station$900,000
10B24" PVC Force Main to ANSRWRF----1-94.6 MGD Max Month6.9 MGD Peak Hour$8,736,587---N/A1-9--$8,736,587--------Forcemain$6,288,000
11ANSRWRF Treatment Capacity-----4.6 MGD Max Month4.6 MGD Max Month$48,300,000---N/A-3.6 MGD Max Month3.6 MGD Max Month$37,800,000--------RB Treatment Improvements$2,846,154
12Land/Easements---$11,250,000---$500,000---$11,250,000---$500,000---$0---Subtotal$26,988,000
13A10% Contingency---$7,531,628---$3,724,655---$6,518,056---$4,500,167---$4,773,882---$3,669,045Contingency$8,096,400
13B30% Contingency Ocean Outfall Items Only-------------------$6,476,400---$8,096,400Project Costs$7,300,000
14Engineering and Administration---$18,226,540---$9,653,665---$15,773,695---$11,530,404---$18,852,795---$16,179,090Total$42,384,400
Total Project Cost$112,324,447$98,924,872$98,722,310$98,832,240$99,429,900$91,622,990
Notes:
Flow Split
Year 2030Max Month Flow (MGD)Notes
Sussex County
WNRWF4.4
IBRWF2.9
Henlopen/Dewey0.938% of flow from RBSTP
Subtotal8.2Sussex County Flow
City of Rehoboth1.662% of flow from RBSTP
Total9.8
% Flow Contributed by Sussex County84%
% Flow Contributed by City of Rehoboth16%
&L&Z&F
Thor Young:This cost is for 3.6 mgd, need to revise for 2.1 mgd. Change Made for 2.1 (WFH)
Thor Young:this is for 3.6 mgd, change for 2.1 mgd. Change made for 2.1 mgd (3.2 mgd peak)
Thor Young:Cost is for 5.2 mgd, assume no real change for 5.0 mgd facility
Thor Young:Total Rehoboth Beach Capital Cost inc. engineering for PS and outfall. Modification made by WFH
whinz:4.9 (SC)+3.4 (RB)
whinz:9.8 MGD Sussex+10.2 MGD RB
whinz:Assumes 300/l.f. increase for going from 24" to 42". Based on recent bids
whinz:Cost similar to MPS#1
whinz:This is actually FM from WN to Rehoboth for Alt 4
whinz:Per updated section from Rehoboth Report
whinz:Per updated section from Rehoboth Report
whinz:Updated per revised Rehoboth Chapter
whinz:Updated per revised Rehoboth Chapter
whinz:Removed Land from Contingency Calculation to be consitent with #1A
whinz:Changed to original number presented at July progress meeting per MAI
whinz:Need to approximate land cost associated with .9 MGD of treatment at IBRWF
whinz:Reduced to account for only additional 0.9 MGD of capacity in Phase 2
whinz:Changed to original number presented at July progress meeting per MAI
whinz:Land cost not required per MAI
Alt #1A
Rehoboth Capital CostsDRAFT
Alternative #1A - RAW WASTEWATER FROM REHOBOTH WITH EXCESS PUMPED TO IBWRF8/10/09
Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty Costs ShareRehoboth Cost ShareRehoboth CostNotes2012 Implementation Year2017 Implementation Year
1RBSTP Pumping Station-3.4 MGD Max Month10.2 MGD Peak Hour$3,001,000$0100%$3,001,000All Rehoboth Cost$0
230" PVC Force Main to WNRWF (Option #1)1-13.4 MGD Max Month10.2 MGD Peak Hour$3,123,000$0100%$3,123,000All Rehoboth Cost$0
3WNRWF Headworks Upgrades1-210 MGD Max Month27.5 MGD Peak Hour$1,527,571$974,59036.2%$552,981WR vs Rehoboth Cost Split$974,590
4WNRWF to IBRWF Transfer Pumping Station1-34.6 MGD Max Month6.9 MGD Peak Hour$2,485,000$1,135,64554.3%$1,349,355WR vs Rehoboth Cost Split$1,135,645
524" PVC Force Main to IBRWF (Option #3)1-44.6 MGD Max Month6.9 MGD Peak Hour$13,027,250$5,953,45354.3%$7,073,797WR vs Rehoboth Cost Split$5,953,453
6IBRWF Phase 1 Upgrades---$0$00.0%$0First 2.5 MGD are Rehoboth Costs per DBB$0
7IBRWF Phase 2 Upgrades1-63.7 MGD Max Month3.7 MGD Max Month$20,600,000$0100.0%$20,600,000First 2.5 MGD are Rehoboth Costs per DBB$0
8IBRWF Phase 3 Upgrades1-75.2 MGD Max Month5.2 MGD Max Month$12,700,000$5,926,66753.3%$6,773,333$5,926,667
9IBRWF Phase 4 Upgrades-7.5 MGD Max Month7.5 MGD Max Month$18,852,459$18,852,4590.0%$0$18,852,459
12Land/Easements---$11,250,000$0100.0%$11,250,000450 Ac Required to accommodate Rehoboth Flows$13,990,355$18,852,459
13A10% Contingency---$7,531,628$3,284,28156.4%$4,247,347Contingency is a Proportional Share (except land)$1,399,036$1,885,246
14Engineering/Administration---$18,226,540$7,947,96156.4%$10,278,579Administrative Costs Proportional Share (except land)$3,385,666$4,562,295
Total Project Cost$112,324,447$44,075,056$68,249,391Total$18,775,057$25,300,000
SUSSEX COUNTY COST$44,075,056
Flow Split
Flow SplitMax Month Flow (MGD)Notes
WNRWF4.4
IBRWF2.9
Subtotal7.3
Henlopen/Dewey0.938% of flow from RBSTP
City of Rehoboth/North Shores1.662% of flow from RBSTP
Total9.8
OCEAN OUTFALL OPTION
SPRAY IRRIGATION OPTIONSPRAY IRRIGATION OPTIONwith Better Financing Option
User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years
COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth OnlyRehoboth + DB, NS & HARehoboth OnlyRehoboth + DB, NS & HARehoboth Only
Annual Capital Cost$5,201,385$2,929,420$4,385,428$2,469,873$2,272,372$1,279,800
Plant Operations (From Rehoboth March 2009 Report)$0$0$0$0$1,590,000$895,488
Pump Station Maintenance$100,000$56,320$100,000$56,320$0$0
Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735
Sussex County Operations and Maintenance ($5.08/1000 gal)$2,286,000$1,287,475$2,286,000$1,287,475$150,000$84,480
Subtotal$4,411,950$3,952,403$2,398,503
Projected User Rate for City of Rehoboth$1,156$1,036$629
Annual Capital Costs$5,201,385$2,929,420
O&M Costs$2,536,000$1,482,530
$5,201,385
&L&8&Z&F&R&8&D
At #1B
Rehoboth Capital CostsDRAFT
Alternative #1B- RAW WASTEWATER FROM REHOBOTH WITH EXCESS PUMPED TO PRIVATE ANSWERF8/10/09
Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty ShareRehoboth Cost ShareRehoboth CostNotes
$6,967,511FM to Cave neck
1RBSTP Pumping Station-3.4 Max Month10.2 MGD Peak Hour$3,001,000$0100%$3,001,000All Rehoboth Cost$8,736,587FM to ANSWERF
230" PVC Force Main to WNRWF (Option #1)1-13.4 Max Month10.2 MGD Peak Hour$3,123,000$0100%$3,123,000All Rehoboth Cost$15,704,098Subtotal
3WNRWF Headworks Upgrades1-210 MGD Max Month27.5 MGD Peak Hour$1,527,571$974,10336.2%$553,468WR vs Rehoboth Cost Split
4WNRWF to ANSWERF Transfer Pumping Station1-34.6 MGD Max Month6.9 MGD Peak Hour$2,485,000$1,134,45754.3%$1,350,543WR vs Rehoboth Cost Split
6IBRWF Phase 1 Upgrades---$0$00.0%$0First 2.5 MGD are Rehoboth Costs per DBB
7IBRWF Phase 2 Upgrades1-62.9 MGD Max Month2.9 MGD Max Month10,905,88210,905,8820.0%$0First 2.5 MGD are Rehoboth Costs per DBB
1024" PVC Force Main to ANSRWF1-84.6 MGD Max Month6.9 MGD Peak Hour$15,704,098$7,169,26254.3%$8,534,836
11ANSWRF Treatment Capacity1-94.6 MGD Max Month4.6 MGD Max Month$48,300,000$22,050,00054.3%$26,250,000
12Land/Easements---$500,000$228,26154.3%$271,739From Artesian Proposal
13AContingency---$3,724,655$2,041,19745.2%$1,683,459Contingency is a Proportional Share
14Engineering & Administration---$9,653,665$5,290,43045.2%$4,363,235Administrative Costs Proportional Share
Total Project Cost$98,924,872$49,793,592$49,131,280
SUSSEX COUNTY COST$49,793,592
Flow Split
Flow Split to ANSWERFMax Month Flow (MGD)Notes
WNRWF (4.4-2.3)2.145.7%
Rehoboth2.554.3%
Subtotal4.6
Henlopen/Dewey0.938% of flow from RBSTP
City of Rehoboth/North Shores1.662% of flow from RBSTP
Total7.1
OCEAN OUTFALL OPTION
Private OptionPrivate Optionwith Better Financing Option
User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years
COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%
Annual Capital Cost$3,744,366$2,108,827$3,156,976$1,778,009$2,223,255$1,252,137
Pump Station O&M$100,000$56,320$100,000$56,320$2,272,372$1,279,800
Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735
Artesian Disposal @ 2 MGD Minimum ($6.84/1000 gal)$4,993,200$2,812,170$4,993,200$2,812,170$150,000$84,480Outfall O&M
Sussex County O&M ($1.21/1000 gal)$544,500$306,662$544,500$306,662$0$0
Subtotal$5,422,715$5,091,896$2,755,152
Projected User Rate for City of Rehoboth$1,421$1,335$722
Annual Capital Costs$3,744,366$2,108,827
O&M Costs$5,787,700$3,313,888
&L&Z&F
Alt #2A
Capital CostsDRAFT
Alternative #2A - Treated Effluent FROM Rehoboth Pumped to WNRWF with Excess to IBRWF8/10/09
Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty ShareRehoboth Cost ShareRehoboth CostNotes2012 Implementation Year2023 Implementation Year
1RBSTP Pumping StationN/A3.4 Max Month10.2 MGD Peak Hour$900,000$0100%$900,000All Rehoboth Cost$0
230" PVC Force Main to WNRWF (Option #1)2-13.4 Max Month10.2 MGD Peak Hour$3,500,000$0100%$3,500,000All Rehoboth Cost$0
3WNRWF Headworks Upgrades1-210.0 MGD Max Month27.5 MGD Peak Hour$1,527,571$1,527,5710.0%$0WR vs Rehoboth Cost Split$1,527,571
4WNRWF to IBRWF Transfer Pumping Station2-33.6 MGD Max Month5.4 MGD Peak Hour$2,270,000$1,324,16741.7%$945,833WR vs Rehoboth Cost Split$1,324,167
524" PVC Force Main to IBRWF (Option #3)1-43.6 MGD Max Month5.4 MGD Peak Hour$13,027,250$7,599,22941.7%$5,428,021WR vs Rehoboth Cost Split$7,599,229
6IBRWF Phase 1 Upgrades---$0$00.0%$0$0
7IBRWF Phase 2 Upgrades1-63.7 MGD Max Month3.7 MGD Max Month$20,600,000$2,410,20088.3%$18,189,800First 1.5 MGD are Rehoboth Costs per DBB$2,410,200
8IBRWF Phase 3 Upgrades1-75.2 MGD Max Month5.2 MGD Max Month$12,700,000$12,700,0000.0%$0$12,700,000
9IBRWF Phase 4 Upgrades-6.5 MGD Max Month6.5 MGD Max Month$10,655,738$10,655,7380.0%$0$10,655,738
12Land/Easements---$11,250,000$0100.0%$11,250,000450 Ac Required to accommodate Rehoboth Flows$25,561,167$10,655,738
13AContingency---$6,518,056$3,621,69044.4%$2,896,365Contingency is a Proportional Share (except land)$2,556,117$1,065,574
14Engineering/Administration---$15,773,695$8,764,49144.4%$7,009,204Administrative Costs Proportional Share (except land)$6,185,802$2,578,689
Total Project Cost$98,722,310$48,603,086$50,119,224Total$34,303,086$14,300,000
SUSSEX COUNTY COST$48,603,086
Flow Split
Flow SplitNotes
WNRWF4.4
IBRWF2.9
Subtotal7.3
Henlopen/Dewey0.938% of flow from RBSTP
City of Rehoboth/North Shores1.662% of flow from RBSTP
Total9.8
OCEAN OUTFALL OPTION
SPRAY IRRIGATION OPTIONSPRAY IRRIGATION OPTIONwith Better Financing Option
User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years
COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth OnlyRehoboth + DB, NS & HARehoboth OnlyRehoboth + DB, NS & HARehoboth Only
Annual Capital Cost$3,819,659$2,151,232$3,220,457$1,813,761$2,272,372$1,279,800
Plant Operations (From Rehoboth March 2009 Report)$1,590,000$895,488$1,590,000$895,488$1,590,000$895,488
Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735
Sussex County Operations and Maintenance ($2.00/1000 gal)$900,000$506,880$900,000$506,880$150,000$84,480
Subtotal$3,692,335$3,354,864$2,398,503
Projected User Rate for City of Rehoboth$968$879$629
Annual Capital Costs$3,819,659$2,151,232
O&M Costs$2,640,000$1,541,103
&L&Z&F
Alt 2B
Rehoboth Capital CostsDRAFT
Alternative #2B - TREATED WASTEWATER FROM REHOBOTH WITH EXCESS PUMPED TO PRIVATE ANSWERF8/10/09
Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty CostsRehoboth Cost ShareRehoboth CostNotes
$6,967,511FM to Cave Neck
1RBSTP Pumping StationN/A3.4 Max Month10.2 MGD Peak Hour$900,000$0100%$900,000All Rehoboth Cost$8,736,587FM to ANSWERF
230" PVC Force Main to WNRWF (Option #1)2-13.4 Max Month10.2 MGD Peak Hour$3,500,000$0100%$3,500,000All Rehoboth Cost$15,704,098
3WNRWF Headworks Upgrades1-210.0 MGD Max Month27.5 MGD Peak Hour$1,527,571$1,527,5710.0%$0WR vs Rehoboth Cost Split
4WNRWF to ANSWERF Transfer Pumping Station2-33.6 MGD Max Month5.4 MGD Peak Hour$2,270,000$1,323,41041.7%$946,590WR vs Rehoboth Cost Split
6IBRWF Phase 1 Upgrades---$0$00.0%$0First 2.5 MGD are Rehoboth Costs per DBB
7IBRWF Phase 2 Upgrades-3.7 MGD Max Month3.7 MGD Max Month$20,600,000$20,600,0000.0%$0First 2.5 MGD are Rehoboth Costs per DBB
1024" PVC Force Main to ANSRWF1-83.6 MGD Max Month5.4 MGD Peak Hour$15,704,098$9,155,48941.7%$6,548,609
11ANSWRF Treatment Capacity-3.6 MGD Max Month3.6 MGD Max Month$37,800,000$22,037,40041.7%$15,762,600
12Land/Easements---$500,000$291,50041.7%$208,500From Artesian Proposal
13AContingency @ 10%---$4,500,167$3,289,79726.9%$1,210,370Contingency is a Proportional Share
14Engineering & Administration---$11,530,404$8,429,17426.9%$3,101,230Administrative Costs Proportional Share
Total Project Cost$98,832,240$66,654,341$32,177,899
SUSSEX COUNTY COST$66,654,341
Flow Split
Flow Split to ANSWERFMax Month Flow (MGD)Notes
WNRWF (4.4-2.3)2.145.7%
Rehoboth2.554.3%
Subtotal4.6
Henlopen/Dewey0.938% of flow from RBSTP
City of Rehoboth/North Shores1.662% of flow from RBSTP
Total7.1
OCEAN OUTFALL OPTION
Private OptionPrivate Optionwith Better Financing Option
User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years
COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%
Annual Capital Cost$2,452,324$1,381,149$2,067,621$1,164,484$2,223,255$1,252,137
Treatment Plant O&M From Rehoboth March 2009 Report)$1,590,000$895,488$1,590,000$895,488$2,272,372$1,279,800
Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735
Artesian Disposal @ 2 MGD Minimum ($6.84/1000 gal)$4,993,200$2,812,170$4,993,200$2,812,170$150,000$84,480Outfall O&M
Sussex County O&M$0$0$0$0$0$0
Subtotal$5,227,542$5,010,877$2,755,152
Projected User Rate for City of Rehoboth$1,370$1,313$722
Annual Capital Costs$2,452,324$1,381,149
O&M Costs$6,733,200$3,846,393
&L&Z&F
Alt 3
Rehoboth Capital CostsDRAFT
Alternative #3 - REHOBETH OUTFALL ALTERNATIVE WITH COUNTY CONTINUING TO PUMP TO IBWRF8/10/09
Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty CostRehoboth Cost ShareRehoboth CostNotes2012 Implementation Year2023 Implementation Year
1RBSTP Pumping StationN/A3.4 Max Month10.2 MGD Peak Hour$900,000$0100%$900,000All Rehoboth Cost$0
2ARehoboth FM, Ocean Outfall & Treatment Improvements-3.4 Max Month10.2 MGD Peak Hour$20,688,000$0100%$20,688,000All Rehoboth Cost$0
3WNRWF Headworks Upgrades2-26.6 MGD Max Month17.5 MGD Peak Hour$1,296,572$1,296,5720.0%$0$1,296,572
4WNRWF to IBRWF/ANSWERF P.S.3-22.1 MGD Max Month3.2 MGD Peak Hour$2,000,000$2,000,0000.0%$0$2,000,000
5Force Main to IBRWF (Option #3)3-12.1 MGD Max Month3.2 MGD Peak Hour$11,142,250$11,142,2500.0%$0$11,142,250
6IBRWF Phase 1 Upgrades---$0$00.0%$0$0
7IBRWF Phase 2 Upgrades1-63.7 MGD Max Month3.7 MGD Max Month$20,600,000$20,600,0000.0%$0$20,600,000
8IBRWF Phase 3 Upgrades1-75.0 MGD Max Month5.0 MGD Max Month$12,700,000$12,700,0000.0%$0$12,700,000
12Land/Easements---$0$00.0%$0
13A10% Contingency---$4,773,882$4,773,882$35,038,822$12,700,000
13B30% Contingency Ocean Outfall Items Only$6,476,400$0100.0%$6,476,400$0$0
14Engineering & Administration---$18,852,795$11,552,79538.7%$7,300,000Reboboth E&A is from Rehoboth Report$8,479,395$3,073,400
Total Project Cost$99,429,900$64,065,500$35,364,400$43,518,217$15,773,400
SUSSEX COUNTY COST$64,065,500
Flow Split
Flow Split to ANSWERFMax Month Flow (MGD)Notes
WNRWF (4.4-2.3)2.145.7%
Rehoboth2.554.3%
Subtotal4.6
Henlopen/Dewey0.938% of flow from RBSTP
City of Rehoboth/North Shores1.662% of flow from RBSTP
Total7.1
OCEAN OUTFALL OPTION
Outfall Option Rehoboth OnlyOutfall Option Rehoboth Onlywith Better Financing Option
User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years
COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%
Annual Capital Cost$2,695,172$1,517,921$2,272,372$1,279,800$2,272,372$1,279,800
Plant Operations (From Rehoboth March 2009 Report)$1,590,000$895,488$1,590,000$895,488$1,590,000$895,488
Pump Station Maintenance$0$0$0$0$0$0
Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735
Sussex County Operations and Maintenance ($2.00/1000 gal)$150,000$84,480$150,000$84,480$150,000$84,480Outfall O&M
Subtotal$2,636,624$2,398,503$2,398,503
Projected User Rate for City of Rehoboth$691$629$629
Annual Capital Costs$2,695,172$1,517,921
O&M Costs$1,890,000$1,118,703
&L&Z&F
Alt 4
Rehoboth Capital CostsDRAFT
Alternative #4 - COMBINED REHOBOTH AND COUNTY OCEAN OUTFALL8/10/09
Item No.DescriptionTable #2030 Design Criteria2030 CapacityTotal CostCounty CostRehoboth Cost ShareRehoboth CostNotes2012 Implementation Year2015 Implementation Year
1RBSTP Pumping StationX3.4 Max Month10.2 MGD Peak Hour$900,000$0100%$900,000All Rehoboth Cost$0
2Force Main to WNRWF (Option #1)3-22.1 Max Month4.2 MGD Peak Hour$2,088,000$2,088,0000%$0All Rehoboth Cost$2,088,000
2ARehoboth FM, Ocean Outfall & Treatment Improvements-8.3 Max Month8.3 Max Month$26,088,000$15,401,34941.0%$10,686,651WR vs Rehoboth Cost Split$15,401,349
3WNRWF Headworks Upgrades2-26.6 MGD Max Month17.5 MGD Peak Hour$1,296,572$1,296,5720.0%$0WR vs Rehoboth Cost Split$1,296,572
4WNRWF to IBRWF/ANSWERF P.S.X2.1 MGD Max Month4.2 MGD Peak Hour$1,400,000$1,400,0000.0%$0First 2.5 MGD are Rehoboth Costs per DBB$1,400,000
6IBRWF Phase 1 Upgrades---$0$00.0%$0First 2.5 MGD are Rehoboth Costs per DBB$0
6AWNRWF Upgrades04.4 MGD Max Month4.4 MGD Max Month$21,000,000$21,000,0000.0%$0$21,000,000
7IBRWF Phase 2 Upgrades1-62.9 MGD Max Month2.9 MGD Max Month$10,905,882$10,905,8820.0%$0$10,905,882
12Land/Easements---$0$00.0%$0From Artesian Proposal
13A10% Contingency---$3,669,045$3,001,44218.2%$667,603Contingency Costs Proportional Share$41,185,922$10,905,882
13B30% Contingency Ocean Outfall Items Only$8,096,400$6,623,21518.2%$1,473,185Contingency Costs Proportional Share$5,236,586$1,386,629
14Engineering & Administration---$16,179,090$13,235,21418.2%$2,943,876Administrative Costs Proportional Share$10,464,304$2,770,910
Total Project Cost$91,622,990$74,951,675$16,671,315$56,886,812$15,063,421
SUSSEX COUNTY COST$74,951,675
Flow Split
Flow Split to ANSWERFMax Month Flow (MGD)Notes
WNRWF (4.4-2.3)2.145.7%
Rehoboth2.554.3%
Subtotal4.6
Henlopen/Dewey0.938% of flow from RBSTP
City of Rehoboth/North Shores1.662% of flow from RBSTP
Total7.1
OCEAN OUTFALL OPTION
Outfall Option Rehoboth and SussexOutfall Option Rehoboth and Sussexwith Better Financing Option
User Cost DeterminationSRF 4.4% for 20 years (from S&W March 2009 Report)1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years1/3 SRF @ 4.4% for 20 years & 2/3 RD @ 5% for 40 years
COSTS DESCRIPTIONRehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%Rehoboth + DB, NS & HARehoboth Only @ 56.32%
Annual Capital Cost$1,270,545$715,571$1,071,231$603,317$2,272,372$1,279,800
Plant Operations (From Rehoboth March 2009 Report)$1,590,000$895,488$1,590,000$895,488$1,590,000$895,488
Pump Station Maintenance$0$0$0$0$0$0
Collection System From Rehoboth March 2009 Report)$150,000$138,735$150,000$138,735$150,000$138,735Outfall O&M
Sussex County Operations and Maintenance ($2.00/1000 gal)$0$0$0$0$150,000$84,480
Subtotal$1,749,794$1,637,540$2,398,503
Projected User Rate for City of Rehoboth$459$429$629
Annual Capital Costs$1,270,545$715,571
O&M Costs$1,740,000$1,034,223
&L&Z&F
Scratch
6.6
8.4666666667
-
*Sussex County Council
City of Rehoboth Beach Comments
-
*Sussex County Council
Questions?August 18, 2009
-
*Sussex County Council
Where do we go from here?August 18, 2009
-
*Alternative #4- Combined Ocean OutfallWolfe Neck Service AreaCity of Rehoboth4.4 MGDInland Bays Service Area2.9 MGDIncludes:West RehobothGoslee CreekNorthern WR ExpIncludes:City of RehobothHenlopen AcresDewey BeachIncludes:Long Neck SSDOak Orchard SSDOO Exp #1Angola Neck SSDWNRWFTreatment and Disposal Capacity Available= 2.3 MGDUpgrades for Additional Treatment to 4.4 MGD2.5 MGD(Treated WW)2.1 MGD (Excess Treated WW)Ocean OutfallNote: All flow rates refer to year 2030 Max Month treatment and disposal requirements.Total Cost: $92 MCounty Cost $75 MRehoboth Cost: $17 MRehoboth Rates: $400-500(Not part of August 2009 County/Rehoboth Study. Slide inserted for informational purposes for August 18, 2009 presentation to Sussex County Council. Slide was part of presentation to Sussex County Council in June 2008)
-
*Previous County Council MotionsCounty Council Motion, June 3, 2008A Motion was made by Mr. Dukes, seconded by Mr. Phillips, to support spray irrigation (Alternative No. 3 Joint Sussex County/Rehoboth Spray Irrigation). Motion Adopted: 4 Yeas, 1 Nay.
County Council Motion, December 16, 2008A Motion was made by Mr. Dukes, seconded by Mr. Phillips, to authorize County staff to issue an RFP (for cost alternatives for wastewater treatment and disposal services for the Wolfe Neck Treatment Facility and City of Rehoboth).Motion Adopted: 4 Yeas, 1 Nay. (Not part of August 2009 County/Rehoboth Study. Slide inserted for informational purposes for August 18, 2009 presentation to Sussex County Council.Alternative #3 of June 3, 2008 does not refer to Alternative #3 of August 2009 Joint Study. Italics emphasis added.)
*************