Information for international students Bergische Universität Wuppertal University of Wuppertal.
Susanne Kersten, Wuppertal University November 21/22, 2013.
-
Upload
millicent-carr -
Category
Documents
-
view
213 -
download
0
Transcript of Susanne Kersten, Wuppertal University November 21/22, 2013.
AIDA DCS
Susanne Kersten, Wuppertal University November 21/22, 2013
Environmental Monitoring
HViseg
beam
Sensor cables
HV cables
ca. 5 m
Control room
CANbus cable
Ethernet cable
ca. 70 mDCS PC
DUT + Telescope
DCS OVERVIEW
DCS COMPONENTS
Since spring 2012
HV EHS 8220n-F (8 channels, 2 kV, 4mA) EHS 8205n-F (8 channels, 500V, 10 mA)
Monitoring 12 NTC for temperature measurement 2 Honeywell humidity sensors 1 four wire measurement e.g.
Precise measurement of resistors PT100 etc.
DCS PC Windows XP PVSS 3.8
DCS CONTROL PANEL
TO DO LIST
Operating system must be upgraded! Windows XP not supported anymore
Migration from PVSS 3.8 to WinCC 3.11 recommended.
Request by users: Change the reaction to over currents
currently channels are switched off ‘current source’ behaviour possible (max current is kept, voltage is reduced) possible by changing the iseg settings
Improve manual e.g. restart of archiving
DERIVATIVES FOR OTHER APPLICATIONS ATLAS IBL DCS uses
Iseg EHS HV modules DCS monitoring crate
Quality Assurance of cooling pipes Pressure transmitter Flow transmitter Active and passive current loops (4-20 mA) Based on DCS monitoring crate
ATLAS testbeam setup@SLAC Copy of AIDA DCS + LV modules integrated into DCS as well MPOD modules (8 channels, 0..8V, 5A, sense wires) requires a different crate: MPOD Mini Crate
Crate houses HV and LV modules spring 2014