SurveyMonkey Analyze - Export · 2020-05-18 · (5-12) (2-5) A B C A B C (Choose 1) ^ 'NGIKT ^...

29
COMPLETE Answers Entered Manually Collector: TOTAL ONLINE & ONSITE (Web Link) Started: Monday, July 10, 2017 9:38:29 AM Last Modified: Monday, July 10, 2017 9:40:16 AM Time Spent: 00:01:47 IP Address: 208.87.233.201 PAGE 2: 5-12 Large Play Structure Q1: Which 5-12 Large Play Structure do you prefer? Option A (light green and yellow) 79 Option B (dark brown and green) 61 Option C (light blue and grey) 59 PAGE 3: 2-5 Play Structure Q2: Which 2-5 play structure do you prefer overall? Option A (light green and yellow) 56 Option B (dark brown and green) 28 Option C (light blue and grey) 57 PAGE 4: Climbing Structure Q3: Which climbing structure do you prefer overall? Option A (warped climbing wall) 54 Option B (spherical climbing structure) 69 Option C (pyramid climbing structure) 61 PAGE 5: Moving Structures Q4: Which 2 moving structures do you prefer overall? Option A (double free swinger) 41 Option B (surf swing) 40 Option C (large see-saw) 24 Option D (zip line with accessible seat) 100 Option E (small see-saw) 8 PAGE 6: Path Patterns 8 / 9 #4 Peavey Park Phase 2 Improvements Survey - On-Site Engagement

Transcript of SurveyMonkey Analyze - Export · 2020-05-18 · (5-12) (2-5) A B C A B C (Choose 1) ^ 'NGIKT ^...

CCOOMMPPLLEETTEEAAnnsswweerrss EEnntteerreedd MMaannuuaallllyy

CCoolllleeccttoorr:: TTOOTTAALL OONNLLIINNEE && OONNSSIITTEE ((WWeebb LLiinnkk))SSttaarrtteedd:: MMoonnddaayy,, JJuullyy 1100,, 22001177 99::3388::2299 AAMMLLaasstt MMooddiiffiieedd:: MMoonnddaayy,, JJuullyy 1100,, 22001177 99::4400::1166 AAMMTTiimmee SSppeenntt:: 0000::0011::4477IIPP AAddddrreessss:: 220088..8877..223333..220011

PAGE 2: 5-12 Large Play Structure

Q1: Which 5-12 Large Play Structure do you prefer?Option A (light green and yellow) 79Option B (dark brown and green) 61Option C (light blue and grey) 59

PAGE 3: 2-5 Play Structure

Q2: Which 2-5 play structure do you prefer overall?Option A (light green and yellow) 56Option B (dark brown and green) 28Option C (light blue and grey) 57

PAGE 4: Climbing Structure

Q3: Which climbing structure do you prefer overall?Option A (warped climbing wall) 54Option B (spherical climbing structure) 69Option C (pyramid climbing structure) 61

PAGE 5: Moving Structures

Q4: Which 2 moving structures do you prefer overall?Option A (double free swinger) 41Option B (surf swing) 40Option C (large see-saw) 24Option D (zip line with accessible seat) 100Option E (small see-saw) 8

PAGE 6: Path Patterns

8 / 9

#4

Peavey Park Phase 2 Improvements Survey - On-Site Engagement

eliasdy0
Text Box
TOTAL ONLINE & ONSITE SURVEY RESULTS THROUGH JULY 10th, 2017

Q5: Which path pattern do you prefer overall?Option A (Banding) 17Option B (Rectangular, irregular treatment) 7Option C (Rectangular, perpendicular, E/W bands) 5Option D (Rectangular, treatment within panel) 11Option E (Honeycomb) 16

PAGE 7: Path Surface Treatment

Q6: Which surface treatment do you prefer overall?Option A (Banding) 10Option B (Colored) 12Option C (Exposed Aggregate) 5Option D (Patterned) 27Option E (Text Stamp) 17Option F (Shape Stamp) 13

PAGE 8: Other Amenities

Q7: What 2 additional amenities do you want to see more of in Peavey Park? (Choose 2)Option A (Drinking Fountain) 63Option B (Bench) 18Option C (Grill/BBQ) 34Option D (Picnic Table) 36Option E (Bike Fix-It Station) 53Option F (Shade Structure) 39

PAGE 9: Other Comments

Q8: Do you have any other comments about the Phase 2 Respondent skipped thisImprovements project? question

9 / 9

Peavey Park Phase 2 Improvements Survey - On-Site Engagement

(5-12)

(2-5)

A B C

A B C

(Choose 1)

Peavey ParkPlease place a dot by your preference. Por favor, ponga un punto junto a su preferencia. Fadhlan dibic saar meesha aad jeceshahay. Iddoo fedhii kee chinaa tuqaa tokko kaa’ii

PLAYGROUND TYPE | Tipo de patio de juegos | Nooca gobta ciyaarta | Goosa Iddo Baashanana

(Choose 1)

Peavey ParkPlease place a dot by your preference. Por favor, ponga un punto junto a su preferencia. Fadhlan dibic saar meesha aad jeceshahay. Iddoo fedhii kee chinaa tuqaa tokko kaa’ii

CLIMBING + MOVING |

(Choose 1)

(Choose 2)

A B C

A B C D E

A B

$ $ $ $

C D E

$ $ $ $A B D E FC

A F GEDCB

other | otros | kale | biraa

Peavey ParkPlease place a dot by your preference. Por favor, ponga un punto junto a su preferencia. Fadhlan dibic saar meesha aad jeceshahay. Iddoo fedhii kee chinaa tuqaa tokko kaa’ii

CCOOMMPPLLEETTEEAAnnsswweerrss EEnntteerreedd MMaannuuaallllyy

CCoolllleeccttoorr:: 66//1111//1177 -- OOnn--ssiittee eennggaaggeemmeenntt ((WWeebb LLiinnkk))SSttaarrtteedd:: FFrriiddaayy,, JJuunnee 3300,, 22001177 33::5533::5599 PPMMLLaasstt MMooddiiffiieedd:: FFrriiddaayy,, JJuunnee 3300,, 22001177 33::5577::4499 PPMMTTiimmee SSppeenntt:: 0000::0033::4499IIPP AAddddrreessss:: 220088..8877..223333..220011

PAGE 2: 5-12 Large Play Structure

Q1: Which 5-12 Large Play Structure do you prefer?Option A (light green and yellow) 2Option B (dark brown and green) 3Option C (light blue and grey) 1

PAGE 3: 2-5 Play Structure

Q2: Which 2-5 play structure do you prefer overall?Option A (light green and yellow) 3Option B (dark brown and green) 0Option C (light blue and grey) 1

PAGE 4: Climbing Structure

Q3: Which climbing structure do you prefer overall?Option A (warped climbing wall) 3Option B (spherical climbing structure) 2Option C (pyramid climbing structure) 2

PAGE 5: Moving Structures

Q4: Which 2 moving structures do you prefer overall?Option A (double free swinger) 2Option B (surf swing) 3Option C (large see-saw) 2Option D (zip line with accessible seat) 4Option E (small see-saw) 1

PAGE 6: Path Patterns

#1

1 / 9

Peavey Park Phase 2 Improvements Survey - On-Site Engagement

Q5: Which path pattern do you prefer overall?Option A (Banding) 3Option B (Rectangular, irregular treatment) 0Option C (Rectangular, perpendicular, E/W bands) 0Option D (Rectangular, treatment within panel) 0Option E (Honeycomb) 2

PAGE 7: Path Surface Treatment

Q6: Which surface treatment do you prefer overall?Option A (Banding) 0Option B (Colored) 0Option C (Exposed Aggregate) 0Option D (Patterned) 4Option E (Text Stamp) 1Option F (Shape Stamp) 0

PAGE 8: Other Amenities

Q7: What 2 additional amenities do you want to see more of in Peavey Park? (Choose 2)Option A (Drinking Fountain) 5Option B (Bench) 1Option C (Grill/BBQ) 3Option D (Picnic Table) 2Option E (Bike Fix-It Station) 4Option F (Shade Structure) 3

PAGE 9: Other Comments

Q8: Do you have any other comments about the Phase 2 Improvements project?

Comment #1: The existing drinking fountain sprays too far.Comment #2: Fee bikes (2)Comment #3: More policeComment #4: Add security camerasComment #5: Make ballfields betterComment #6: Upgrade the park, don't change

2 / 9

Peavey Park Phase 2 Improvements Survey - On-Site Engagement

CCOOMMPPLLEETTEEAAnnsswweerrss EEnntteerreedd MMaannuuaallllyy

CCoolllleeccttoorr:: 77//11//1177 -- SSoommaall......eeppeennddeennccee DDaayy ((WWeebb LLiinnkk))SSttaarrtteedd:: WWeeddnneessddaayy,, JJuullyy 0055,, 22001177 1122::3377::0055 PPMMLLaasstt MMooddiiffiieedd:: WWeeddnneessddaayy,, JJuullyy 0055,, 22001177 1122::4433::1144 PPMMTTiimmee SSppeenntt:: 0000::0066::0099IIPP AAddddrreessss:: 220088..8877..223333..220011

PAGE 2: 5-12 Large Play Structure

Q1: Which 5-12 Large Play Structure do you prefer?Option A (light green and yellow) 43Option B (dark brown and green) 32Option C (light blue and grey) 32

PAGE 3: 2-5 Play Structure

Q2: Which 2-5 play structure do you prefer overall?Option A (light green and yellow) 18Option B (dark brown and green) 8Option C (light blue and grey) 27

PAGE 4: Climbing Structure

Q3: Which climbing structure do you prefer overall?Option A (warped climbing wall) 23Option B (spherical climbing structure) 43Option C (pyramid climbing structure) 34

PAGE 5: Moving Structures

Q4: Which 2 moving structures do you prefer overall?Option A (double free swinger) 12Option B (surf swing) 13Option C (large see-saw) 7Option D (zip line with accessible seat) 33Option E (small see-saw) 5

PAGE 6: Path Patterns

#2

3 / 9

Peavey Park Phase 2 Improvements Survey - On-Site Engagement

Q5: Which path pattern do you prefer overall?Option A (Banding) 0Option B (Rectangular, irregular treatment) 0Option C (Rectangular, perpendicular, E/W bands) 0Option D (Rectangular, treatment within panel) 0Option E (Honeycomb) 1

PAGE 7: Path Surface Treatment

Q6: Which surface treatment do you prefer overall?Option A (Banding) 1Option B (Colored) 0Option C (Exposed Aggregate) 0Option D (Patterned) 2Option E (Text Stamp) 8Option F (Shape Stamp) 1

PAGE 8: Other Amenities

Q7: What 2 additional amenities do you want to see more of in Peavey Park? (Choose 2)Option A (Drinking Fountain) 16Option B (Bench) 5Option C (Grill/BBQ) 7Option D (Picnic Table) 4Option E (Bike Fix-It Station) 17Option F (Shade Structure) 6

PAGE 9: Other Comments

Q8: Do you have any other comments about the Phase 2 Respondent skipped thisImprovements project? question

4 / 9

Peavey Park Phase 2 Improvements Survey - On-Site Engagement

CCOOMMPPLLEETTEEAAnnsswweerrss EEnntteerreedd MMaannuuaallllyy

CCoolllleeccttoorr:: 77//88//1177 -- OOnn--SSiittee EEnnggaaggeemmeenntt ((WWeebb LLiinnkk))SSttaarrtteedd:: MMoonnddaayy,, JJuullyy 1100,, 22001177 99::0066::3300 AAMMLLaasstt MMooddiiffiieedd:: MMoonnddaayy,, JJuullyy 1100,, 22001177 99::1111::5599 AAMMTTiimmee SSppeenntt:: 0000::0055::2288IIPP AAddddrreessss:: 220088..8877..223333..220011

PAGE 2: 5-12 Large Play Structure

Q1: Which 5-12 Large Play Structure do you prefer?Option A (light green and yellow) 17Option B (dark brown and green) 16Option C (light blue and grey) 8

PAGE 3: 2-5 Play Structure

Q2: Which 2-5 play structure do you prefer overall?Option A (light green and yellow) 23Option B (dark brown and green) 5Option C (light blue and grey) 12

PAGE 4: Climbing Structure

Q3: Which climbing structure do you prefer overall?Option A (warped climbing wall) 8Option B (spherical climbing structure) 19Option C (pyramid climbing structure) 7

PAGE 5: Moving Structures

Q4: Which 2 moving structures do you prefer overall?Option A (double free swinger) 13Option B (surf swing) 11Option C (large see-saw) 4Option D (zip line with accessible seat) 29Option E (small see-saw) 2

PAGE 6: Path Patterns

#3

5 / 9

Peavey Park Phase 2 Improvements Survey - On-Site Engagement

Q5: Which path pattern do you prefer overall?Option A (Banding) 0Option B (Rectangular, irregular treatment) 1Option C (Rectangular, perpendicular, E/W bands) 1Option D (Rectangular, treatment within panel) 6Option E (Honeycomb) 8

PAGE 7: Path Surface Treatment

Q6: Which surface treatment do you prefer overall?Option A (Banding) 2Option B (Colored) 8Option C (Exposed Aggregate) 1Option D (Patterned) 7Option E (Text Stamp) 1Option F (Shape Stamp) 9

PAGE 8: Other Amenities

Q7: What 2 additional amenities do you want to see more of in Peavey Park? (Choose 2)Option A (Drinking Fountain) 15Option B (Bench) 6Option C (Grill/BBQ) 15Option D (Picnic Table) 9Option E (Bike Fix-It Station) 21Option F (Shade Structure) 14

PAGE 9: Other Comments

6 / 9

Peavey Park Phase 2 Improvements Survey - On-Site Engagement

Q8: Do you have any other comments about the Phase 2 Improvements project?

-Clean water to drink-More police presence-Better bathroom-Colder water to drink-Clean bathrooms-Clean bathroom-Pool (a long side, 3-5' deep)-Can you clean the bathroom?-A big kids pool-Clean water to pool and drink-More shade-I want it so so cool-Bigger swimming pool and more deeper-Colder water to drink

7 / 9

Peavey Park Phase 2 Improvements Survey - On-Site Engagement

Q1 Which 5-12 Large Play Structure do youprefer?

Answered: 49 Skipped: 0

Option A(light green...

Option B (darkbrown and...

Option C(Light blue ...

No Preference

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Answer Choices Responses

Option A (light green and yellow) 34.69% 17

Option B (dark brown and green) 20.41% 10

Option C (Light blue and grey) 36.73% 18

No Preference 8.16% 4

Total 49

1 / 33

Peavey Park Phase 2 Improvements Survey

eliasdy0
Text Box
On-line Survey Results

Q4 Which 2-5 play structure do you preferoverall?

Answered: 46 Skipped: 3

Option A(light green...

Option B (darkbrown and...

Option C(light blue ...

No Preference

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Answer Choices Responses

Option A (light green and yellow) 26.09% 12

Option B (dark brown and green) 32.61% 15

Option C (light blue and grey) 36.96% 17

No Preference 4.35% 2

Total 46

4 / 33

Peavey Park Phase 2 Improvements Survey

Q7 Which climbing structure do you preferoverall?

Answered: 46 Skipped: 3

Option A(warped...

Option B(spherical...

Option C(pyramid...

No Preference

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Answer Choices Responses

Option A (warped climbing wall) 43.48% 20

Option B (spherical climbing structure) 10.87% 5

Option C (pyramid climbing structure) 39.13% 18

No Preference 6.52% 3

Total 46

7 / 33

Peavey Park Phase 2 Improvements Survey

Answer Choices Responses

Option A (double free swinger) 31.82% 14

Option B (surf swing) 29.55% 13

Option C (large see-saw) 25.00% 11

Option D (zip line with accessible seat) 77.27% 34

Option E (small see-saw) 0.00% 0

No preference 4.55% 2

Total Respondents: 44

Q10 Which 2 moving structures do youprefer overall? (Choose 2)

Answered: 44 Skipped: 5

Option A(double free...

Option B (surfswing)

Option C(large see-saw)

Option D (zipline with...

Option E(small see-saw)

No preference

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

10 / 33

Peavey Park Phase 2 Improvements Survey

Answer Choices Responses

Option A (Banding) 31.82% 14

Option B (Rectangular, irregular treatment) 13.64% 6

Option C (Rectangular, perpendicular, E/W bands) 9.09% 4

Option D (Rectangular, treatment within panel) 11.36% 5

Option E (Honeycomb) 11.36% 5

No preference 22.73% 10

Total 44

Q13 Which path pattern do you preferoverall?

Answered: 44 Skipped: 5

Option A(Banding)

Option B(Rectangular...

Option C(Rectangular...

Option D(Rectangular...

Option E(Honeycomb)

No preference

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

13 / 33

Peavey Park Phase 2 Improvements Survey

Answer Choices Responses

Option A (Banding) 16.28% 7

Option B (Colored) 9.30% 4

Option C (Exposed Aggregate) 9.30% 4

Option D (Patterned) 32.56% 14

Option E (Text Stamp) 16.28% 7

Option F (Shape Stamp) 6.98% 3

No preference 9.30% 4

Total 43

Q16 Which surface treatment do you preferoverall?

Answered: 43 Skipped: 6

Option A(Banding)

Option B(Colored)

Option C(Exposed...

Option D(Patterned)

Option E (TextStamp)

Option F(Shape Stamp)

No preference

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

16 / 33

Peavey Park Phase 2 Improvements Survey

Answer Choices Responses

Option A (Drinking Fountain) 61.36% 27

Option B (Bench) 13.64% 6

Option C (Grill/BBQ) 20.45% 9

Option D (Picnic Table) 47.73% 21

Option E (Bike Fix-It Station) 25.00% 11

Option F (Shade Structure) 36.36% 16

No preference 0.00% 0

Total Respondents: 44

Q19 What 2 additional amenities do youwant to see more of in Peavey Park?

(Choose 2)Answered: 44 Skipped: 5

Option A(Drinking...

Option B(Bench)

Option C(Grill/BBQ)

Option D(Picnic Table)

Option E (BikeFix-It Station)

Option F(Shade...

No preference

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

19 / 33

Peavey Park Phase 2 Improvements Survey

Answer Choices Responses

Daily 20.93% 9

2-4 times/week 4.65% 2

Weekly 13.95% 6

Monthly 27.91% 12

Yearly 16.28% 7

Never 4.65% 2

Other (please specify) 11.63% 5

Total 43

Q23 How often to do you visit Peavey Park?Answered: 43 Skipped: 6

Daily

2-4 times/week

Weekly

Monthly

Yearly

Never

Other (pleasespecify)

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

23 / 33

Peavey Park Phase 2 Improvements Survey

Answer Choices Responses

Walk 64.10% 25

Bike 28.21% 11

Personal Vehicle 43.59% 17

Public Transit 17.95% 7

Total Respondents: 39

Q24 How do you travel to Peavey Park?(select all that apply)

Answered: 39 Skipped: 10

Walk

Bike

PersonalVehicle

Public Transit

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

24 / 33

Peavey Park Phase 2 Improvements Survey

Answer Choices Responses

under 17 13.95% 6

18 to 34 years 25.58% 11

35 to 54 years 51.16% 22

55 to 64 years 9.30% 4

65+ 0.00% 0

Total 43

Q26 Which category represents your age?Answered: 43 Skipped: 6

under 17

18 to 34 years

35 to 54 years

55 to 64 years

65+

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

26 / 33

Peavey Park Phase 2 Improvements Survey

Answer Choices Responses

Employed - full time 57.14% 24

Employed - part time 16.67% 7

Full time students 9.52% 4

Unemployed 7.14% 3

Self-employed 7.14% 3

Homemaker 7.14% 3

Retired 0.00% 0

Total Respondents: 42

Q27 What is your employment status?Please check all that apply.

Answered: 42 Skipped: 7

Employed -full time

Employed -part time

Full timestudents

Unemployed

Self-employed

Homemaker

Retired

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

27 / 33

Peavey Park Phase 2 Improvements Survey

Answer Choices Responses

Some high school 5.00% 2

High school or GED 5.00% 2

Some technical school 2.50% 1

Technical school graduate 2.50% 1

Some college 7.50% 3

College graduate 55.00% 22

Post graduate 22.50% 9

Total 40

Q28 What is the highest level of educationyou have completed?

Answered: 40 Skipped: 9

Some highschool

High school orGED

Some technicalschool

Technicalschool graduate

Some college

Collegegraduate

Post graduate

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

28 / 33

Peavey Park Phase 2 Improvements Survey

Answer Choices Responses

No 90.48% 38

Yes 9.52% 4

Total 42

Q29 Are you of Hispanic, Latin, or Spanishorigin? (Replicates question from 2010

census. As of the 2010 Census, Hispanicorigins are not races.)

Answered: 42 Skipped: 7

No

Yes

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

29 / 33

Peavey Park Phase 2 Improvements Survey

Answer Choices Responses

White/European American 90.00% 36

Q30 Which of the following racial/ethniccategories best describes you? (select all

that apply) (Replicates question from 2010Census.)

Answered: 40 Skipped: 9

White/EuropeanAmerican

Black/AfricanAmerican

African

AmericanIndian or...

Asian Indian

Chinese

Filipino

Japanese

Korean

Vietnamese

Other Asian -if marked,...

Native Hawaiian

Guamanium orChamorro

Samoan

Other PacificIslander

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

30 / 33

Peavey Park Phase 2 Improvements Survey

Black/African American 12.50% 5

African 10.00% 4

American Indian or Alaska Native - if marked, please indicate in comment box Tribe name 2.50% 1

Asian Indian 0.00% 0

Chinese 2.50% 1

Filipino 2.50% 1

Japanese 0.00% 0

Korean 0.00% 0

Vietnamese 0.00% 0

Other Asian - if marked, please indicate in comment box specific race 0.00% 0

Native Hawaiian 0.00% 0

Guamanium or Chamorro 0.00% 0

Samoan 0.00% 0

Other Pacific Islander 2.50% 1

Total Respondents: 40

31 / 33

Peavey Park Phase 2 Improvements Survey

Answer Choices Responses

Male 19.51% 8

Female 75.61% 31

Other (please specify) 4.88% 2

Total 41

Q31 How do you self-identify in terms ofgender?

Answered: 41 Skipped: 8

Male

Female

Other (pleasespecify)

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

32 / 33

Peavey Park Phase 2 Improvements Survey

Answer Choices Responses

Less than $25,000 13.16% 5

25,000 to 49,999 21.05% 8

50,000-74,999 26.32% 10

75,00-124,999 26.32% 10

125,000-199,999 10.53% 4

200,000+ 2.63% 1

Total 38

Q32 What was your total household incomein 2015 before taxes?

Answered: 38 Skipped: 11

Less than$25,000

25,000 to49,999

50,000-74,999

75,00-124,999

125,000-199,999

200,000+

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

33 / 33

Peavey Park Phase 2 Improvements Survey