1. Secure instruments needed. 2. Project 1 to 4 meters from the edge of the building and mark starting point.
-
Upload
graziella-zette-palbusa -
Category
Documents
-
view
220 -
download
0
Transcript of Surveying procedures.docx
![Page 1: Surveying procedures.docx](https://reader033.fdocuments.in/reader033/viewer/2022051420/5695d1651a28ab9b02965d92/html5/thumbnails/1.jpg)
1. Secure instruments needed.
2. Project 1 to 4 meters from the edge of the building and mark starting point.
3. Have one observer hold the compass and stand at the starting point. Turn body around so that the needle in the compass points North while still standing at the starting point.
![Page 2: Surveying procedures.docx](https://reader033.fdocuments.in/reader033/viewer/2022051420/5695d1651a28ab9b02965d92/html5/thumbnails/2.jpg)
4. Let one of the rodmen stand