41
Survey Operations – Pipeline Inspection HydroFest 16 th April 2014 Kevin Donald

Transcript of Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and...

Page 1: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

Survey Operations – Pipeline Inspection

HydroFest 16th April 2014

Kevin Donald

Page 2: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

2 Page 17-Apr-14

Agenda

Why Inspect? Definition of a Pipeline Types of Survey Positioning Data Processing The Future Conclusions

Page 3: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

3 Page 17-Apr-14

Why Inspect?

Legislation Inspection Plan Cost of Failure

Page 4: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

4 Page 17-Apr-14

Why Inspect?

• Pre 1996 – prescriptive regime

• Pipelines Safety Regulations 1996

– To apply a common approach

to the control of risks from pipelines, both on and offshore

– To replace existing pipeline safety regimes with a single goal-setting group of regulations reflecting the general policy of the HASAWA 1974

‘‘The operator shall ensure that a pipeline is maintained in an efficient state, in efficient working order and in good repair.”

Page 5: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

5 Page 17-Apr-14

Why Inspect?

• Regulation 13 addresses pipeline maintenance and inspection requirements

– “The pipeline operator needs to consider both how and when the pipeline should be surveyed and examined to validate and maintain it is in a safe condition.”

Page 6: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

6 Page 17-Apr-14

Why Inspect – Inspection Plan

Page 7: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

7 Page 17-Apr-14

Why Inspect?

• Cost of Failure

– Environmental

– Loss of Production

– Repair / Replacement cost

• It is in operators best interest to maintain and inspect pipelines

Page 8: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

8 Page 17-Apr-14

Pipeline Definition Riser / Spoolpiece Sealine Landfall

Page 9: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

9 Page 17-Apr-14

Pipeline Definition

• The Riser – connects production facility to subsea field

• The Spoolpiece – connects riser to sealine

• The Sealine – main export pipeline

• The Landfall – connects sealine and landfall terminal

Page 10: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

10 Page 17-Apr-14

Pipeline Definition - Riser/Spoolpiece

• Most vulnerable in Splash Zone and can degrade rapidly due to

– Instability – Current – Wave Action – Corrosion - electrical & chemical – Movement – Impact - Collision

• Inspection options

– Above sea level – RAT – Splash Zone - RAT / divers – Subsea - DP Vessel & ROVs – Subsea - Platform based ROVs

Page 11: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

11 Page 17-Apr-14

Pipeline Definition - Sealine

North Sea • 20,000+km “pipeline” • Pipelines: gas & oil & water • Umbilicals - electric, hydraulic, chemical

elements. • Cables - electrical & fibre optic • Multifunction pipeline bundles

At risk from • Anchors & Trawl gear • Instability • Current & Wave Action • Corrosion - electrical & chemical • Buckling (upheaval & lateral) • Munitions

Main Types of Inspection • GI = Acoustic sensors • GVI = Visual sensors

Page 12: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

12 Page 17-Apr-14

Pipeline Definition - Landfall The part of the export pipeline in the inshore zone •TOB to approx. 3km offshore •Through the inter-tidal zone •Buried, rock-dumped or in conduit •Protected At Risk From: •Anchors & Trawl gear •Munitions •Very Strong Currents •Wave Action - to seabed •Erosion / Deposition •Beach activities •Corrosion - chemical & electrical

Main types of Inspection Conventional Inshore and Land Survey Methods

Page 13: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

13 Page 17-Apr-14

Types of Survey

General Imaging (Acoustic) General Visual Inspection Landfall RAT Diver

Page 14: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

14 Page 17-Apr-14

Types of Survey

Inspection Survey Platform Type / Method Component Notes / Restrictions

RATS Platform based Visual - camerasNDT techniques Riser

Down to splash zoneWeather

DiverPlatform orDP vessel based

Visual - camerasNDT techniques

RiserPipelinePoint structuresLandfalls

Depth, CurrentWeather, Sea stateHSE

Landfall GI Inshore survey vesselHull mountedAcousticCP snake

Pipelines

Inshore onlyWeather, tidesSeastate @ 1mFishing gear

Structural GVIOil platform orDP survey vessel3 X Eyeball ROV’s

Visual – camerasNDT techniquesFMD

LegsStructural membersRisers

WeatherSea state @ 2mCurrent, Visibility

Pipeline GI Survey vesselROTV

Towed SSSAcoustic

PipelinesStructures

Seafloor structures onlyCannot stopCurrent restrictionsSeastate @ 2m

Pipeline GVIDP survey vesselWROV

DP follow subVisual – camerasCP

RiserPipelineStructures

Current restrictionsVisibilitySeastate @ 4.5 – 5 m

Page 15: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

15 Page 17-Apr-14

Types of Survey – General Imaging (GI)

Sensors

• Sidescan Sonar

• Multibeam Echosounder

• Single Beam Echosounder

• Sub-Bottom Profiler

• Magnetometer

Sensor Platforms • DP Vessel

• Towfish

• ROTV

• AUV

Page 16: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

17 Page 17-Apr-14

Types of Survey – GI

Pipe in area of shallow scour

Pipe with seabed buildup towards sonar

Pipe with seabed buildup away from sonar

Pipe in suspension in scour trench

Pipe clearly spanning

Pipe in contact with the seabed

F

E

D

C

B

ASide Scan Sonar Typical Pipeline Fingerprints

Page 17: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

18 Page 17-Apr-14

Types of Survey – GI

Page 18: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

19 Page 17-Apr-14

Types of Survey - GI

• Upheaval Buckling

Page 19: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

20 Page 17-Apr-14

Types of Survey – GI

Multibeam Bathymetry Point soundings used to create DTM Shaded Relief and or Contours created from DTM

Page 20: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

21 Page 17-Apr-14

Types of Survey – General Visual Inspection (GVI)

Typical Focus Areas

• Lay comfort

• Freespans

• Pipeline damage

• Debris

• Anodes and cathodic protection

• Seabed features and targets

• Pipeline and cable crossings

• Lateral movement

Page 21: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

22 Page 17-Apr-14

Types of Survey – GVI

Sensors •Cameras

•Depth

•Altitude

•Cross Profilers

•Pipetrackers

•MBE Bathymetry

•SSS

•Cathodic Protection

•Temperature

Page 22: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

23 Page 17-Apr-14

Types of Survey – GVI

• Cross Profilers

Page 23: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

24 Page 17-Apr-14

Types of Survey – GVI

• Dual Cross Profilers • ROV High Fly • ROV Low Fly

ROV Low Fly

ROV High Fly

Flowline

Pipetracker

MSBMBE

Page 24: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

25 Page 17-Apr-14

Types of Survey – GVI

• GVI of Upheaval Buckle • Estimated height 4m • Bottom left image taken from ROV sitting on seabed

Page 25: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

26 Page 17-Apr-14

Types of Survey – GVI

UXO • Air dropped mine • Ordnance adjacent to pipeline

Page 26: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

27 Page 17-Apr-14

Types of Survey – GVI

• Examples of damage to pipelines

Page 27: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

28 Page 17-Apr-14

Types of Survey – Landfall Sensors and Methods

•MBES

•Sidescan

•Sub bottom profiler

•Trailing Wire CP

•RTK GPS

•Small ROV

•Divers

Page 28: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

29 Page 17-Apr-14

Types of Survey – Risers and spools Sensors and Methods • Rope Access Teams above

splashzone

• Cameras on poles / divers in splash zone

• Eyeball ROV to the seabed - Vessel or platform deployed

Page 29: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

30 Page 17-Apr-14

Positioning Surface Sub Surface

Page 30: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

31 Page 17-Apr-14

Positioning Surface • GNSS

• RTK

• INS – IMU/Heading

• Range bearing systems

Sub Surface • USBL

• INS

• IMU

• Doppler Log

• Pressure Sensor

• CTD/SVP

Page 31: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

32 Page 17-Apr-14

Data Processing

Navigation Sensor Data Pipeline Events Data Formatting/Deliverables QC Data Storage

Page 32: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

33 Page 17-Apr-14

Data Processing • Process Navigation – remove

outliers, run filter

• Process Depth – apply tidal correction

• Clean Cross Profiler/MBE data

• Create 5 point files – TOP, TOC, BOP, MSB & BOT

• Review and Event Video

• SSS Target Interpretation – seabed features, boulders, scour

• Create Charts/Report

• Format data for client specified deliverable

Page 33: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

34 Page 17-Apr-14

Data Processing

Page 34: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

35 Page 17-Apr-14

Data Processing What the client wants: • Anomalies threatening

integrity of asset - immediate

• Significant features - 24hrs

• All observable anomalies - 7 days

• Survey report and charts - 4 weeks

Page 35: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

36 Page 17-Apr-14

Data Processing

Integrity Management: Pipeline Reporting Inspection System Multimedia • Interactive computer graphic

representation of pipeline

• Historical data allows trend analysis

• Drill down to detail – Charts, Video grabs, SSS

images

• Plan future Inspections

• Plan remedial works

Page 36: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

37 Page 17-Apr-14

Data Processing Anomalies Identify Pipeline features that:

•Fall outside given criteria

•Cause concern for the integrity of the pipe

Page 37: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

38 Page 17-Apr-14

The Future Video GIS

Page 38: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

39 Page 17-Apr-14

The Future

Video •HD

•Improved resolution & image/colour definition

Challenge

•Data volume

Page 39: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

40 Page 17-Apr-14

The Future

GIS

• Slow adoption in the Oil Industry

• Can be delivered across the internet

• Repository for all pipeline data with a spatial component

Page 40: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

41 Page 17-Apr-14

Summary

Pipeline inspection is a mature business

Methodologies for the use of the current tools are well established

New technology continues to deliver cost and efficiency benefits along with implementation challenges

The client in the office is getting closer and closer to the data

Page 41: Survey Operations – Pipeline Inspection · • Regulation 13 addresses pipeline maintenance and inspection requirements – “The pipeline operator needs to consider both how and

10.01.11 42 Page

seabed-to-surface www.subsea7.com