![Page 1: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/1.jpg)
MARYLAND SOCIETY OF SURVEYORS
Presents
A SEMINAR BYBILL BEARDSLEE, P.L.S., P.E., P.P.
SURVEY COST ANALYSIS
![Page 2: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/2.jpg)
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
Outline
1. Introduction & Overview2. Legal Responsibilities
Rules of Professional ConductMisconductStandards of Practice
3. Cost Analysis4. Group Project5. Summary/Q & A
![Page 3: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/3.jpg)
Survey Cost Analysis© copyright 2011 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
Rules Of Professional Conduct
A. Obligation to Society.
B. Obligation to Employers, Clients and Customers
C. Obligation to The Profession
![Page 4: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/4.jpg)
Survey Cost Analysis© copyright 2011 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
Professional Misconduct
• Failing to return or provide copies of records on request.• Practicing under the influence of alcohol or drugs.• Performing unnecessary work or unauthorized services.• Charging for work not done.• Practicing beyond the scope of the profession.• Engaging in acts of incompetence or negligence.• Not reporting known violations.
![Page 5: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/5.jpg)
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
![Page 6: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/6.jpg)
Survey Cost Analysis© copyright 2011 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
Type & Purpose of Survey
Each surveyor should confer with the client to determine the purpose of any surveying service. The specific purpose of a survey may determine the category of services needed, the information required and the work to be done.
Receive clear explanations of the services being offered or provided and how much they cost.
![Page 7: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/7.jpg)
© copyright 2011 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
Evaluate using SWOT Analysis
STRENGTHS WEAKNESSES
OPPORTUNITIES THREATSor OBJECTIVES
Jeff Salmon, Professional Surveyor, January, 2008
![Page 8: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/8.jpg)
Survey Cost Analysis© copyright 2011 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
You have to know your costs to
properly bill your costs
![Page 9: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/9.jpg)
Survey Cost Analysis© copyright 2011 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
How often do you do a cost analysis?
Once every yearTwice a yearOnce every never
![Page 10: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/10.jpg)
Survey Cost Analysis© copyright 2011 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
Areas of Cost
Direct FieldThose items that are or fit in the truck for the project
Direct OfficeThose items that are directly associated with a project
Overhead CostAll the other stuff
![Page 11: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/11.jpg)
Survey Cost Analysis© copyright 2011 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
Choose your weapons wisely !!!
![Page 12: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/12.jpg)
Survey Cost Analysis© copyright 2011 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
FIELD COST ANALYSIS
* * ** * ** * ** * ** * ** * *
![Page 13: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/13.jpg)
Survey Cost Analysis© copyright 2011 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
FIELD COST ANALYSIS
* Truck * Gas * Maintenance* Instruments * Confer * Legs* Prisms * Supplies * Radios* Cell phones * Salaries + 7.48% * Tolls* Car Insurance * Registrations * Rentals* Subcontracts * Travel * Licenses* Traffic or Safety Control
![Page 14: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/14.jpg)
Survey Cost Analysis10© copyright 2011 William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
OFFICE COST ANALYSIS
* * ** * ** * ** * ** * ** * *
![Page 15: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/15.jpg)
Survey Cost Analysis10© copyright 2011 William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
OFFICE COST ANALYSIS
* Salaries + 7.48%* Supplies (Copies)* Computers *Software and licenses* Access/Permits* Reproduction Time* Learning Curve
![Page 16: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/16.jpg)
Survey Cost Analysis© copyright 2011 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
OVERHEAD COST ANALYSIS
* * ** * ** * ** * ** * ** * *
![Page 17: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/17.jpg)
Survey Cost Analysis© copyright 2011 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
OVERHEAD COST ANALYSIS* Rent/Mortgage * Utilities* Health Insurance * General Liability* Professional Liability * Replacement Costs* Advertising * Marketing* Professional dues & registrations* Continuing Education * Professional Services* Non productive time * Furniture * Administration + 7.48% * Training* Cost of Money* PROFIT
![Page 18: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/18.jpg)
Survey Cost Analysis© copyright 2011 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
Creation of a multiplier for your firm.Billable Days Per Year
Total days = 260Less holidays 10 daysLess vacation 10 daysLess sickness 5 daysLess weather 6 daysLess maintenance 4 days Other purposes 5 days
TOTAL NET DAYS 220
![Page 19: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/19.jpg)
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
Billing CalculationGross income : $950,000Less Profit @ 12% $114,000Total Expenses $836,000
$836,000/220 days = $3,800/day Cost$950,000/220 days = $4,318/day ($540/Hr)
Gross Billing Required
![Page 20: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/20.jpg)
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
Payroll Costs (6 person firm – administrator not billable)
Party Chief $25/Hr $52,000Instrument Person $18/Hr $37,440CAD Operator $20/Hr $41,600Survey Manager $30/Hr $62,400Principal $55/Hr $114,400TOTAL $307,840
![Page 21: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/21.jpg)
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
Multiplier Calculation
Gross Billing desired $950,000 =Billable Payroll $307,840
3.09
![Page 22: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/22.jpg)
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
Multiplier Calculation
Total Business Days 260 = 1.1818Billable Days 220
3.09 X 1.1818
3.65
![Page 23: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/23.jpg)
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
Hourly Rates
Party Chief $25/Hr $91.25Instrument Person $18/Hr $65.70CAD Operator $20/Hr $73.00Survey Manager $30/Hr $109.50Principal $55/Hr $200.75
![Page 24: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/24.jpg)
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
How is most of your billing done?
HourlyBy the itemLump sum
![Page 25: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/25.jpg)
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
How often do you bill?
WeeklyBi-weeklyMonthlyAt the end of the task
![Page 26: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/26.jpg)
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
PRICE
TIME QUALITY
Pick any two
![Page 27: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/27.jpg)
Survey Cost Analysis© copyright 2011 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
V A L U E & S E R V I C E
Work to the needs of the client rather than the services available
Do not be a hostage of your brochure !!
![Page 28: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/28.jpg)
Survey Cost Analysis© copyright 2011 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
Arkansas Standards of Practice
Section 1.1 B
A survey shall be deemed to be complete when the
survey plat has been dated sealed, signed, and
the surveyor has been paid.
![Page 29: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/29.jpg)
You are a PLS PROFESSIONAL LAND SURVEYOR
You are NOT a PSLPROFESSIONAL SAVINGS AND LOAN !!
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
![Page 30: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/30.jpg)
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
Analysis 1You have been asked to provide a residential urban
area lot survey, including topography, for a 1 acre tract adjacent to a recorded subdivision map. The rear portion of the lot is heavily wooded with deciduous undergrowth. There is no specific deed for the tract in question, as it is the remainder of a large parcel which had numerous subdivisions over an extended period of time.
Concrete monuments are requested at the property corners (6). There are freshwater wetlands on the site. The site is 15 miles from your office in another county. The month is July.
![Page 31: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/31.jpg)
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
What’s Missing ?
Size of original tract.30 Acres
Time requirement14 days
![Page 32: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/32.jpg)
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
Analysis 2
You have been asked to provide a suburban boundary survey in January for a 212 acre tract, which is 30 miles from your office. The site is forested with 30 year old pine trees, but has some logging roads throughout the parcel. There’s a difference in elevation of 260 feet across the tract. There are 36 corners, which are to be set. Road frontage is 2,000 feet, and 1,000 feet of the rear boundary is along the center of a river. There are no recorded subdivision maps within 1 mile of the parcel.
![Page 33: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/33.jpg)
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
What’s Missing ?
Is there a current deed?Yes, dated 1867
Level of accuracyUrban
Time requirement90 days
![Page 34: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/34.jpg)
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
Analysis 3
You have been asked to provide an ALTA/ACSM Survey on a 56 acre industrial site, which fronts on a heavily traveled state highway. The tract is 95% developed with parking, trucking areas, buildings, and significant overhead and underground utilities. There is a common access with an adjoining property. There are 16 property corners and virtually no trees on the site. In addition to the statutory requirements, the usual items are required from Schedule A, including setting of the property corners.
![Page 35: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/35.jpg)
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
What’s Missing ?Schedule A
![Page 36: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/36.jpg)
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
Agencies you apply to:
Building Department Health Department
Corp of Engineers Planning offices
Dept. of Agriculture
Environmental Agencies DOT
![Page 37: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/37.jpg)
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
Agency Cost AnalysisAlways use agency checklists when preparing proposals.
1. Note differences in Scope2. Note differences in Detail3. Note differences in Packaging
All present significant cost differences
Survey Cost Analysis
![Page 38: SURVEY COST ANALYSIS · 2019. 4. 8. · Less maintenance 4 days . Other purposes 5 days. TOTAL NET DAYS 220. Survey ... Gross income : $950,000. Less Profit @ 12% $114,000 Total Expenses](https://reader036.fdocuments.in/reader036/viewer/2022090811/611caeb02c2643782f376fd3/html5/thumbnails/38.jpg)
Survey Cost Analysis© copyright 2010 by William E. Beardslee, P.L.S., P.E., P.P.
Survey Cost Analysis
Seminars and in-house staff instruction available through