10/12/2010 1 Federal Aviation Administration Surveillance and Broadcast Services Surveillance Roadmap – Evolution Decisions To: By: Date: ICAO Surveillance Seminar Jim Linney, Program Manager December, 2010 NextGen: Improving Efficiency and Capacity Today’s National Airspace System NextGen Ground-based Navigation and Surveillance Air Traffic Control Communications By Voice Disconnected Information Systems Satellite-based Navigation and Surveillance Routine Information Sent Digitally Information More Readily Accessible Air Traffic “Control” Fragmented Weather Forecasting Airport Operations Limited By Visibility Conditions Forensic Safety Systems Focus on major airports Air Traffic “Management” Forecasts Embedded into Decisions Operations Continue Into Lower Visibility Conditions Prognostic Safety Systems Focus on metropolitan areas 2 Federal Aviation Administration Surveillance and Broadcast Services December 10, 2010 Delivering safety, capacity, efficiency & environmental stewardship

Transcript of Surveillance and Administration Broadcast Services · Focus on metropolitan areas Federal Aviation...

Page 1: Surveillance and Administration Broadcast Services · Focus on metropolitan areas Federal Aviation 2 Administration ... 78 2016 Q1 N Initial Investment Decision to implement a NextGen

•10/12/2010

•1

Federal AviationAdministrationSurveillance and

Broadcast ServicesSurveillance Roadmap –Evolution Decisions

To:

By:

Date:

ICAO Surveillance Seminar

Jim Linney, Program ManagerDecember, 2010

NextGen: Improving Efficiency and CapacityToday’s National Airspace System NextGen

Ground-based Navigation and Surveillance

Air Traffic Control Communications By Voice

Disconnected Information Systems

Satellite-based Navigation and Surveillance

Routine Information Sent Digitally

Information More Readily Accessible

Air Traffic “Control”

Fragmented Weather Forecasting

Airport Operations Limited By Visibility Conditions

Forensic Safety Systems

Focus on major airports

Air Traffic “Management”

Forecasts Embedded into Decisions

Operations Continue Into Lower Visibility Conditions

Prognostic Safety Systems

Focus on metropolitan areas

2Federal AviationAdministration

Surveillance and Broadcast ServicesDecember 10, 2010

Delivering safety, capacity, efficiency & environmental stewardship

Page 2: Surveillance and Administration Broadcast Services · Focus on metropolitan areas Federal Aviation 2 Administration ... 78 2016 Q1 N Initial Investment Decision to implement a NextGen

•10/12/2010

•2

3Federal AviationAdministration

Surveillance and Broadcast ServicesDecember 10, 2010

Surveillance Overview• Surveillance capabilities will be supported in all NAS

operating domains for NextGen (beyond 2020)– Oceanic, En Route, Terminal, SurfaceOceanic, En Route, Terminal, Surface

• Multiple technologies will be used to provide surveillance capabilities– Primary radar– Beacon systems– Multilateration

Automatic Dependent Surveillance Broadcast (ADS B)

4Federal AviationAdministration

Surveillance and Broadcast ServicesDecember 10, 2010

– Automatic Dependent Surveillance - Broadcast (ADS-B)• Both air-air and air-ground applications

Page 3: Surveillance and Administration Broadcast Services · Focus on metropolitan areas Federal Aviation 2 Administration ... 78 2016 Q1 N Initial Investment Decision to implement a NextGen

•10/12/2010

•3

Primary Radar - Current Status• En Route Primary

– Not required for providing en route air traffic separation services• However, if available, will be used to supplement beacon surveillance in en route

• Terminal (ASR-8, ASR-9, ASR-11)( , , )– Supports terminal separation services

• Provides a “safety net” in cases where aircraft transponder is not responding to beacon interrogations

• Also used as “gap fillers” for en route in many cases– Provides additional source of weather surveillance at most sites– ASR-9 undergoing Service Life Extension Program (SLEP); mobile ASR capability

being procured• Surface (ASDE-3 (w/AMASS), ASDE-X (SMR), LCGS)

5Federal AviationAdministration

Surveillance and Broadcast ServicesDecember 10, 2010

– Used at certain locations to provide surface situational awareness for ATC• Alerting also provided with most systems

– LCGS in evaluation stage

Primary Radar - Future Plans• En Route

– If available, will continue to use primary radar to supplement ADS-B and beacon surveillance in the future, but it is not required

• Terminal– Current roadmaps assume all terminal primary radar capabilities will remain in the

NAS beyond 2020• Based on combined “safety net” and weather requirements, and an assumption of

defense/security requirements• NextGen Surveillance and Weather Capability to be implemented starting 2023

– Absent requirements from other agencies, terminal primary radar capabilities may be required by FAA only at certain locations in the future (see key issues)

• “Safety net” may only be required in high and medium density terminal areas• Weather surveillance (from ATC primary radar) may only be required at certain locations• FAA (safety) study will be needed to validate future primary radar needs

• Surface

6Federal AviationAdministration

Surveillance and Broadcast ServicesDecember 10, 2010

Surface– May no longer be required to support surface surveillance (see key issues)

• Study to be conducted to determine future requirements• All Domains

– All radar/automation interfaces to be transitioned to IP/ASTERIX by 2018

Page 4: Surveillance and Administration Broadcast Services · Focus on metropolitan areas Federal Aviation 2 Administration ... 78 2016 Q1 N Initial Investment Decision to implement a NextGen

•10/12/2010

•4

Beacon Systems - Current Status• En Route (Mode S, ATCBI-6)

– Primary means (and in many cases sole means) of surveillance in en route

• Also used as backup surveillance for many terminal locationsC Di iti (CD 2) d t M d S it t id i t f t ATC• Common Digitizer (CD-2) used at Mode S sites to provide interface to ATC automation if system reverts to “IBI” mode

– Mode S undergoing SLEP• Terminal (ATCBI-5, Mode S, ASR-11)

– With collocated primary radar, supports safe terminal area operations• Required by FAA Order 7110.65 for many operations• Also used as “gap fillers” for en route in many cases

M d S d i SLEP

7Federal AviationAdministration

Surveillance and Broadcast ServicesDecember 10, 2010

– Mode S undergoing SLEP• Parallel Approaches (PRM)

– Required for certain (closely spaced) parallel approaches– PRM undergoing replacement (with Multilateration)

Beacon Systems - Future Plans• En Route

– All existing en route beacons to be retained as backup surveillance (to ADS-B) after 2020

• NextGen Backup Surveillance Capability to be implemented (terminal and en route) starting 2023

– CD-2 to be removed• Need to verify that “IBI” mode is no longer required for ATC (see key issues)

• Terminal– Terminal beacons at the busiest 43 airports to be retained as backup to ADS-B

after 2020• Includes 35 “OEP” airports + additional 8 airports (per 2009 FAA study)• Remaining terminal beacons to be decommissioned after 2020

• Parallel Approaches– Support for parallel approaches to be transitioned to ADS-B

8Federal AviationAdministration

Surveillance and Broadcast ServicesDecember 10, 2010

pp p pp• Multilateration to be used as backup surveillance at certain locations

• All Domains– All beacon/automation interfaces to be transitioned to IP/ASTERIX by 2018– Potential congestion on 1090 MHz beyond 2020 needs to be mitigated (see key

issues)

Page 5: Surveillance and Administration Broadcast Services · Focus on metropolitan areas Federal Aviation 2 Administration ... 78 2016 Q1 N Initial Investment Decision to implement a NextGen

•10/12/2010

•5

Multilateration• Current Status

– En Route (e.g., WAM)• Wide Area Multilateration implemented in Colorado and Southeast Alaska• Additional work planned in Colorado, future additional sites TBD• Supports 5NM separation

– Surface (e.g., ASDE-X)• Surface Multilateration is or will soon be implemented at all ASDE-3 and ASDE-X

locations

• Future Plans– En Route

• WAM can be implemented in other locations if it can be supported by a positive business case; no specific plans at this time

• May serve as a possible alternative for the NextGen Backup Surveillance Capability acquisition (en route and/or terminal areas)

9Federal AviationAdministration

Surveillance and Broadcast ServicesDecember 10, 2010

– Surface• Surface Multilateration will continue to be used beyond 2020 as backup surveillance (to

ADS-B) at selected locations• Some locations will no longer require collocated surface primary radar

– Potential congestion on 1090 MHz beyond 2020 needs to be mitigated

ADS-B - Current Status• Details coming in Session 4• ADS-B “Out”

– Airspace rule published in 2010• UAT, 1090 links,• Avionics standards updated, equipage starting

– Approved for use by ATC (for properly equipped aircraft)

• ADS-B “In”– Traffic / Flight Information Services - Broadcast (TIS-B / FIS-B) approved for

airborne advisory/situational awareness applications late 2008– Additional airborne ADS-B applications in development

• All Modes

10Federal AviationAdministration

Surveillance and Broadcast ServicesDecember 10, 2010

– Ground infrastructure being implemented, full rollout expected by 2013• Supports “Critical Services” (e.g., separation services) and “Essential Services” (e.g., TIS-

B, FIS-B)

Page 6: Surveillance and Administration Broadcast Services · Focus on metropolitan areas Federal Aviation 2 Administration ... 78 2016 Q1 N Initial Investment Decision to implement a NextGen

•10/12/2010

•6

ADS-B - Future Plans• ADS-B “Out”

– Will become primary means (and in many cases sole means) of surveillance for ATC beyond 2020

• Airspace rule compliance required by 2020

– All en route and a limited set of terminal beacon systems will be retained to provide backup surveillance

• In the event of an interruption of ADS-B services

• ADS-B “In”– More advanced airborne ADS-B applications will be developed and approved for

use (e.g., interval management, 3NM separation in en route, etc.)– Airspace for ADS-B “In” capabilities being developed and prioritized with industry

• All Modes

11Federal AviationAdministration

Surveillance and Broadcast ServicesDecember 10, 2010

All Modes– Potential congestion on 1090 MHz beyond 2020 needs to be mitigated

En Rou

te

CY 2009 2010 2011 2013 2014 20152012 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

Surveillance Roadmap (1 of 3)

FID105

IARD100

DoD funded/FAA maintained

FID390

ARSR‐1/2/3, FPS

MODE S

CD‐2

Common ARSR

X

X

ARSR‐4

FID

DoD funded/FAA maintained

DoD funded/FAA maintained

FID102

E 105

FID103

100

FID96

FID104

FID104

FID669

IARD97

ISD255

FID102

FID392

IARD409

FID102

IID395

NextGen BackupSurveillance Capability

WAM

ATCBI‐6

ASR‐8

ASR‐9

NextGen Surveillance andWeather Radar Capability

IID77

FID104

IARD407

ISD408

CRDR666

CRDR667

FID102 ISD

410IID78

FID105

FID105

FID102

12Federal AviationAdministration

Surveillance and Broadcast ServicesDecember 10, 2010

Term

inal

X

FID105

IID78

NextGen BackupSurveillance Capability

FID105

260

260Limited ReplacementFID

390

IARD409

ISD410

FID102

IARD100

IID517

CRDR515

IARD516

FID518

ISD519

MODE S

ATCBI‐5

ASR‐11

MASR

FID256FID

102

CRDR666

FID95

FID102

IARD719

Page 7: Surveillance and Administration Broadcast Services · Focus on metropolitan areas Federal Aviation 2 Administration ... 78 2016 Q1 N Initial Investment Decision to implement a NextGen

•10/12/2010

•7

rface & App

roach

CY 2009 2010 2011 2013 2014 20152012 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

ASDE‐X/3X

ASSC

Surface primary radars removedfrom selected ASDE sites

Surveillance Roadmap (2 of 3)

X

PRM‐RFID36

ISD398

IARD396

IID397

FID36

PRM E‐SCAN

ASDE‐3/AMASS

IARD399

IID400

FID76

ISD668

X

CRDR670

Cross‐Dom

ain

Sur

RWSL

FID180

IARD258

FID259

LCGSFID179

ADS‐B

TIS‐B/FIS‐B

260ISD254

SWIM Segment 3SIM

ISD402

ISD401

52

IID406

FID102

IARD405

FID403

CRDR506

ISD604

668

FID403

230

13Federal AviationAdministration

Surveillance and Broadcast ServicesDecember 10, 2010

CY 2009 2010 2011 2013 2014 20152012 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

EvaluateRemoval

Surveillance Roadmap (3 of 3)

IARD

Evaluate Multi‐Function PhasedArray  Radar (MPAR) Technology

Develop Requirements for Inter‐agency Air Domain Surveillance

IARD407

IARD407IARD409

IID78

CRDR

IID77

IID78IID77

Supp

orting

 Activities

of SurfaceRadars

Evaluate LCGSIARD258

399

DevelopSurveillanceRequirements forIntegrating Arrival/Departure

IID406

FID107

Inventory Time and Frequency Requirements and Assess GPS Outage Impact

344345

511

670

14Federal AviationAdministration

Surveillance and Broadcast ServicesDecember 10, 2010

Identify GNSS Alternate Strategy 511

Assess 1090 Spectrum Mitigation  Alternatives 

FID403

Determine requirements for ADS‐B In Rulemaking

FID403

Page 8: Surveillance and Administration Broadcast Services · Focus on metropolitan areas Federal Aviation 2 Administration ... 78 2016 Q1 N Initial Investment Decision to implement a NextGen

•10/12/2010

•8

Key Issues• Requirements for interagency Air Domain Awareness need to be

defined– Needed for approval of NextGen Surveillance System business case for

ALL users (FAA, DoD, DHS, etc.)( )• Preliminary requirements needed by mid-2013, final by 2015

• Requirements for surface primary radars need to be revisited– Roadmap assumes that these systems can be retired in the future

• Potential congestion on 1090 MHz beyond 2020 needs to be mitigated– Impacts beacon systems, Multilateration, ADS-B and TCAS

Alternati es anal sis to be completed b 2012

15Federal AviationAdministration

Surveillance and Broadcast ServicesNovember 8, 2010

– Alternatives analysis to be completed by 2012 • Requirements for potential “ADS-B In” rule need to be identified

– Capabilities will be required to support certain NextGen improvements

Jim LinneyProgram Manager - International,

Surveillance & Broadcast ServicesServices

(W) 817-222-5655(W) 202-385-6284 - HQ support

(schedule, link to Program Office & data management)

[email protected]

16Federal AviationAdministration

Surveillance and Broadcast ServicesNovember 8, 2010

www.adsb.gov

Page 9: Surveillance and Administration Broadcast Services · Focus on metropolitan areas Federal Aviation 2 Administration ... 78 2016 Q1 N Initial Investment Decision to implement a NextGen

•10/12/2010

•9

Surveillance Roadmap: Decision Points (1 of 2)DP #

Target Date CY

High Priority Domain Name

36 2013 Q1 N Final Investment Decision for migration of PRM to PRM-R (based on multilateration)52 2010 Q2 N Final Decision for Avionics Mandate/Rulemaking for ADS-B (out)/MODE-S/UAT (Completed)

76 2014 N Final Investment Decision for removal or SLEP/replace ASDE surface primary radars (evolving requirements for safety and security may impact decision)

77 2016 Q1 N Initial Investment Decision to implement a NextGen Surveillance and Weather Radar Capability for ATC78 2016 Q1 N Initial Investment Decision to implement a NextGen beacon/backup radar system for ATC95 2024 N Decision for replacement of terminal primary radars (ASR-11 PSR) and removal of terminal beacons

(ASR-11 MSSR)96 2024 N Decision for replacement of en route beacons (ATCBI-6)97 2011 Q1 N Investment Analysis Readiness Decision for legacy radar (ASR-9) SLEP, through 2025100 2011 Q1 N Investment Analysis Readiness Decision for legacy beacon (Mode S) SLEP through 2025102 2012 Q3 N Final Investment Decision to implement SIM in terminal and en route legacy radar systems103 2014 N Final Investment Decision for technology refresh of beacons (ATCBI-6)104 2017 N Final Investment Decision to implement a NextGen Surveillance and Weather Radar Capability for ATC105 2017 N Final Investment Decision to implement a NextGen beacon/backup radar system for ATC107 2010 Q4 Y Automation TAMR Phase 3 Final Investment Decision 179 2013 N Combined Initial Investment Decision and Final Investment Decision for LCGS 180 2018 N Final Investment Decision for ADS-B to assume LCGS function, or approve a Technology Refresh for

LCGS230 2020 Y Navigation Cut-over to dual frequency operations 254 2010 Q3 N In-Service Decision for SBS Critical Services (ADS-B) NAS wide implementation, including backup

strategy

17Federal AviationAdministration

Surveillance and Broadcast ServicesDecember 10, 2010

255 2010 Q3 N In-Service Decision for WAM (Alaska and Colorado)256 2013 N Final Investment Decision for ASR-11 Technology Refresh Segment 2 (through 2025)258 2012 Q4 N Investment Analysis Readiness Decision for LCGS259 2018 N Final Investment Decision for RWSL Technology Refresh260 2020 N Decision on ADS-B Rule Compliance344 2010 Q4 N Enterprise

ServicesEstablish Requirements for a Backup Timing Source

345 2012 Q3 N Enterprise Services

Implementation strategy decision for GPS timing backup

390 2012 Q2 N Final Investment Decision for legacy beacon (Mode S) SLEP through 2025392 2012 Q2 N Final Investment Decision for legacy radar (ASR-9) SLEP through 2025395 2013 N Initial Investment Decision for Technology Refresh of ATCBI-6 beacon system396 2011 Q2 N Investment Analysis Readiness Decision for Precision Runway Monitor-Replacement

DP #Target

Date CYHigh

Priority Domain Name400 2013 Q4 N Initial Investment Decision for removal or SLEP/replace ASDE surface primary radars401 2015 N In-Service Decision for Low Cost Ground Surveillance system402 2011 Q3 N In-Service Decision for Runway Status Light system403 2012 Q1 N Final Investment Decision for SBS Implementation of Advanced ADS-B Applications405 2011 Q1 N Investment Analysis Readiness Decision for SIM in terminal and en route legacy radar systems406 2011 Q4 N Initial Investment Decision for SIM in terminal and en route legacy radar systems407 2013 Q4 N Investment Analysis Readiness Decision for NextGen Surveillance and Weather Radar Capability 408 2023 N In-Service Decision for NextGen Surveillance and Weather Radar Capability

Surveillance Roadmap: Decision Points (2 of 3)

409 2013 Q4 N Investment Analysis Readiness Decision for New Beacon/Backup System 410 2023 N In-Service Decision for New Beacon/Backup System506 2010 Q1 N Concept and Requirements Definition Readiness (CRDR) Decision for SIM in Terminal and En Route

Legacy Radar Systems (Complete)511 2014 Y Navigation Decision on GNSS Alternate Strategy515 2010 Q2 N Concept and Requirements Definition Readiness (CRDR) Decision for a Mobile/Transportable Airport

Surveillance Radar (MASR) (Complete)516 2011 Q1 N Investment Analysis Readiness Decision (IARD) for a Mobile/Transportable Airport Surveillance Radar

(MASR)517 2011 Q4 N Initial Investment Decision (IID) for a Mobile/Transportable Airport Surveillance Radar (MASR)518 2012 Q2 N Final Investment Decision (FID) for a Mobile/Transportable Airport Surveillance Radar (MASR)519 2014 Q4 N In-Service Decision (ISD) for a Mobile/Transportable Airport Surveillance Radar (MASR)604 2014 Q2 N In-Service Decision (ISD) for SIM in Terminal and En Route Legacy Radar Systems

18Federal AviationAdministration

Surveillance and Broadcast ServicesDecember 10, 2010

604 2014 Q2 N In Service Decision (ISD) for SIM in Terminal and En Route Legacy Radar Systems666 2012 Q4 N Concept and Requirements Definition Readiness (CRDR) Decision for New Beacon/Backup System 667 2012 Q4 N Concept and Requirements Definition Readiness (CRDR) Decision for NextGen Surveillance and

Weather Radar Capability 668 2011 Q4 N In Service Decision for Airport Surface Surveillance Capability669 2011 Q1 N Final Investment Decision for legacy radar (ASR-8) facility improvements670 2012 Q2 N Concept and Requirements Definition Readiness (CRDR) Decision for removal or SLEP/replace ASDE

surface primary radars719 2012 N Investment Analysis Readiness Decision (IARD) for ASR-11 Technology Refresh Segment 2 (through

2025)