Surface Treatment
description
Transcript of Surface Treatment
![Page 1: Surface Treatment](https://reader035.fdocuments.in/reader035/viewer/2022062304/568145c2550346895db2cd41/html5/thumbnails/1.jpg)
Surface TreatmentSurface Treatment
Multi Agencies CollaborationMulti Agencies Collaboration
![Page 2: Surface Treatment](https://reader035.fdocuments.in/reader035/viewer/2022062304/568145c2550346895db2cd41/html5/thumbnails/2.jpg)
Participating AgenciesParticipating Agencies
Oregon Department of Transportation Ona Beach Maintenance Section
Rose Lodge Maintenance Section
Benton County Department of Transportation
Private Contractors
![Page 3: Surface Treatment](https://reader035.fdocuments.in/reader035/viewer/2022062304/568145c2550346895db2cd41/html5/thumbnails/3.jpg)
2010 Surface Treatment Projects2010 Surface Treatment Projects
Highway 34 From Milepost 7.0- Milepost 14.0
Highway 226 From Milepost 13.5-Milepost 16.0
![Page 4: Surface Treatment](https://reader035.fdocuments.in/reader035/viewer/2022062304/568145c2550346895db2cd41/html5/thumbnails/4.jpg)
Oregon Department of Oregon Department of Transportation Responsibilities Transportation Responsibilities
• Materials Contracts
• Iron Mountain Chip Seal Rock 3/8-1/4,
• Liquid Asphalt-HFRS-1P
• Testing of Materials
![Page 5: Surface Treatment](https://reader035.fdocuments.in/reader035/viewer/2022062304/568145c2550346895db2cd41/html5/thumbnails/5.jpg)
Oregon Department of Oregon Department of Transportation ResponsibilitiesTransportation Responsibilities
• Stockpile Site Preparation
• Stockpile Chip Seal Rock
• Monitor Stockpile Moisture Content
• Stockpile Location Cleanup
![Page 6: Surface Treatment](https://reader035.fdocuments.in/reader035/viewer/2022062304/568145c2550346895db2cd41/html5/thumbnails/6.jpg)
Oregon Department of Oregon Department of Transportation ResponsibilitiesTransportation Responsibilities
• Front End Loader and Operator
• Three Roller Operators
• One Pneumatic Roller (Rental/within ODOT)
• Six Ten Yard Trucks and Drivers
• 2000 gal. Water Truck
• Open Air Broom and Operator
• Broom Shadow Vehicle and Operator
![Page 7: Surface Treatment](https://reader035.fdocuments.in/reader035/viewer/2022062304/568145c2550346895db2cd41/html5/thumbnails/7.jpg)
Oregon Department of Oregon Department of Transportation ResponsibilitiesTransportation Responsibilities
• VMS Boards placed for advanced warning
• Stick and Stomps and Setter Prior to start of Project
• Work Zone Signage and Set up
• Pilot Cars and Operators
• Stick and Stomp Tab Cover Removal
![Page 8: Surface Treatment](https://reader035.fdocuments.in/reader035/viewer/2022062304/568145c2550346895db2cd41/html5/thumbnails/8.jpg)
Benton County Department of Benton County Department of Transportation Responsibilities Transportation Responsibilities
• Materials Contract (Freight/Distributors)
• Daily Ordering of Materials
• Material Samples for Testing
![Page 9: Surface Treatment](https://reader035.fdocuments.in/reader035/viewer/2022062304/568145c2550346895db2cd41/html5/thumbnails/9.jpg)
Benton County Department of Benton County Department of Transportation ResponsibilitiesTransportation Responsibilities
• 2000 Gallon Liquid Asphalt Distributor and Operator ( as needed for chip seal and fog seal)
• Chip Spreader with Operator and Dump Boss/Belt Operator
• Pneumatic Roller and Steel Wheel Single Drum• Ten Yard Dump Trucks( as needed)• Open Air Broom ( as needed)• Specialty Signs ( Loose Rock, Fresh Oil)
![Page 10: Surface Treatment](https://reader035.fdocuments.in/reader035/viewer/2022062304/568145c2550346895db2cd41/html5/thumbnails/10.jpg)
Contractor ResponsibilitiesContractor Responsibilities
• 4400 Gallon Liquid Asphalt Distributor (Chip Seal and Fog Seal, Albania)
• Traffic Control Flaggers ( St Vincent's )
![Page 11: Surface Treatment](https://reader035.fdocuments.in/reader035/viewer/2022062304/568145c2550346895db2cd41/html5/thumbnails/11.jpg)
Surface Treatment Multi Agency Surface Treatment Multi Agency CollaborationCollaboration
• Benton County Chip Spreader
• ODOT Ten Yard Truck
![Page 12: Surface Treatment](https://reader035.fdocuments.in/reader035/viewer/2022062304/568145c2550346895db2cd41/html5/thumbnails/12.jpg)
Surface Treatment Multi Agency Surface Treatment Multi Agency CollaborationCollaboration
Contractor 4400 Gallon Liquid Asphalt Distributor
![Page 13: Surface Treatment](https://reader035.fdocuments.in/reader035/viewer/2022062304/568145c2550346895db2cd41/html5/thumbnails/13.jpg)
Surface Treatment Multi Agency Surface Treatment Multi Agency CollaborationCollaboration
• Benton County Rollers
• ODOT Roller
• ODOT Operators
![Page 14: Surface Treatment](https://reader035.fdocuments.in/reader035/viewer/2022062304/568145c2550346895db2cd41/html5/thumbnails/14.jpg)
Surface Treatment Multi Agency Surface Treatment Multi Agency CollaborationCollaboration
• ODOT Pilot Vehicle
![Page 15: Surface Treatment](https://reader035.fdocuments.in/reader035/viewer/2022062304/568145c2550346895db2cd41/html5/thumbnails/15.jpg)
Surface Treatment Multi Agency Surface Treatment Multi Agency CollaborationCollaboration
• ODOT Pilot Vehicle controlling traffic speeds through the work zone.
![Page 16: Surface Treatment](https://reader035.fdocuments.in/reader035/viewer/2022062304/568145c2550346895db2cd41/html5/thumbnails/16.jpg)
Estimated Costs for Hwy 34Estimated Costs for Hwy 34
• Cost per mile $37,200
• Cost per sq yd $2.65