Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero...

19
Sur IPP

Transcript of Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero...

Page 1: Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero lost time injury throughout the whole operation plan. Safety Objective To ensure.

Sur IPP

Page 2: Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero lost time injury throughout the whole operation plan. Safety Objective To ensure.

Nothing is so urgent or important that it cannot be done safely !

إذا وعاجل مهم عمل البأمان ينجز لم

Page 3: Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero lost time injury throughout the whole operation plan. Safety Objective To ensure.

Safety Goals• To achieve zero lost time injury throughout the whole operation plan.

Safety Objective• To ensure safety is always the first priority for all activities and work

carried out at site. This will be achieved by adherence to all the safety regulations, requirements, guidelines, PPE requirements and best practices. POMCO will actively support and generate an environment where a proactive safety culture championed by everyone at site will grow and help us achieve our safety goal.

Page 4: Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero lost time injury throughout the whole operation plan. Safety Objective To ensure.

Near Miss Statistic 2015

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Contractor 0 1 0 0 0 0 0 0 0 0 0

POMCo 31 65 204 0 0 0 0 0 0 0 0

31

65

204

0 0 0 0 0 0 0 0

RNM

2015

Page 5: Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero lost time injury throughout the whole operation plan. Safety Objective To ensure.

POMCo ValuesTeamwork

Belief in the power of the TEAM

Use each other’s strengths and diversity to achieve best result

Requires respect and participation encouraged

Learn from every experience, not to find a guilty party

Accountability

Keep our promises to each other and our team

Do what you say you will (think through before committing)

Accept personal accountability actions and results

Requires confronting non-performers

Communication

Open and honest communication where all team members are encouraged to share thoughts and ideas

Respectful to each other always; even if our opinions are different

Once we agree on a direction we will all act as one team and mover forward in that direction

Transparency

Establishing clear and objective processes without hidden agendas

Using facts to support arguments or in decision making

When there are issues, bring them forward immediately

Integrity

Do the right thing!

Honesty

Fairness in all interactions and business dealings

Customer focus

Always do the right thing for the customer

From their success, we too will grow and flourish

Page 6: Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero lost time injury throughout the whole operation plan. Safety Objective To ensure.

Project Information•Name : Sur Independent Power Project

•Overview: Building, owning, and operation (BOO) of a gas fired combined cycle power generation facility with a Power Purchase Agreement of 15 years.

•Site: At the Sur Industrial Estate between the Oman LNG Terminal and Oman India Fertilizer Plant. Approximately 150km south-east of Muscat.

•Capacity: 2,000MW, no desalination

•Project USD 1.6 billion Cost:

•Owner Phoenix Power Company (SAOC)

•Investors: Marubeni (Japan) 50%Chubu Electric Power Co., Inc. (Japan) 30%Qatar Electricity & Water Company (Qatar) 15%Multitech (Member of Suhail Bahwan Group) 5%

•Buyer: OPWP (Oman Power and Water Procurement Company SAOC)

•Fuel The Ministry of Oil and Gas of the government of the   Supplier: Sultanate of Oman

•Schedule: Winter 2014: Commercial Operation (2,000MW)

SUR IPP

Page 7: Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero lost time injury throughout the whole operation plan. Safety Objective To ensure.

ShareholdersMarubeni (Japan)

Chubu Electric Power Co., Inc. (Japan)Qatar Electricity & Water Company(Qatar)

Multitech (Oman)

OwnerPhoenix Power Company (SAOC)

LendersJapan Bank for International Cooperation (JBIC)

Bank of Tokyo- Mitsubishi UFJMizuho Bank

Sumitomo Mitsui Banking CorporationSumitomo Mitsui Trust Bank

Mitsubishi UFJ Trust and Banking CorporationKfW IPEX-Bank GmbH

Standard Chartered Bank

Insurance BrokerWillis

BuyerOman Power and

Water Procurement Company SAOC

Fuel supplierMin. of Oil and Gas

EPC ContractorDaewoo E&C

( GT: Siemens/ ST: Fuji Electric/ HRSG: Nooter Eriksen)

O&M CompanyPhoenix O&M Company LLC

Owner‘s EngineerMott MacDonald

Project Framework

RegulatorAuthority for Electricity

Regulation, Oman

Long Term Service Agreement

Siemens

Page 8: Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero lost time injury throughout the whole operation plan. Safety Objective To ensure.

8

Site Location

Sur IPP

OmanLNGPlant

OMIFCOFertiliserPlant

SurIPP

Page 9: Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero lost time injury throughout the whole operation plan. Safety Objective To ensure.

Plant Layout

Security office

GT 11

GT12

GT 21

GT 22

GT 31

Diesel fuel

tanks

H2 Gas

Control Room

Admin building

Workshop & Warehouse Buffer storage

Gas

Water treatment building

BSDG

Company Access

ST building

1

2

3

Page 10: Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero lost time injury throughout the whole operation plan. Safety Objective To ensure.

Gas Turbine Building Water Treatment Building

Steam Turbine BuildingHRSG

Page 11: Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero lost time injury throughout the whole operation plan. Safety Objective To ensure.

Basic CCGT Cycle

Page 12: Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero lost time injury throughout the whole operation plan. Safety Objective To ensure.

Sur IPP CCGT Cycle

Page 13: Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero lost time injury throughout the whole operation plan. Safety Objective To ensure.

• Station Capacity 2000MW• Block 10 – 800MW• Block 20 – 800MW• Block 30 – 400MW

• 5 Siemens GT 4000F A7 Gas Turbines - Duel Fuel• Evaporative cooling• Water injection for power augmentation

• 8 Siemens Electrical Generators• High Voltage switchgear• HV transformers

• 5 Nooter Eriksen HRSG with Supplementary firing• Supplementary burners duel fuel

• 3 Fuji Steam Turbines

• Distributed Control System (DCS) Emerson Ovation system high level of automation and remote control.

• Direct sea water cooling 500M sub sea pipelines

• Water Treatment plan RO and demineralization

• Black Start capability

Main Plant Systems

Page 14: Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero lost time injury throughout the whole operation plan. Safety Objective To ensure.

The Team

Page 15: Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero lost time injury throughout the whole operation plan. Safety Objective To ensure.

1

1

1

5

1

1

1

1

Sur IPP Staff Structure

2015 V1

Plant Manager

Operations Manager

1

Maintenance Manager

Lead Finance

1

Performance & Efficiency

Engineer

HR & Administrative

Manager

Training Engineer

Accountant

Lead PRO

1

3

Admin

5

10

10

Shift Charge Engineer

Assistant Shift Charge

Engineer

CCR Operator

Senior Filed Operator

Field Operator(Trainees)

1

Senior Chemist &

Environmental Engineer

1

Assistant Chemist

1

1

4

3

Drivers

1

Staff Numbers:• Omani 61• Non Omani 47• Total Staff 108• Omani Staff Ratio 56%

5

Operations Super

1

8

Health Safety and Security

Manager

Gatehouse Controllers

Security Guards

Security SupervisorAccountant

1

1

Skilled Labour

Storeman &Material Handling

1 1

1

1

5 4

1 1 1

1

1 111

Lead Mechanical

Engineer

Lead C&IEngineer

Lead ElectricalEngineer

IT Engineer

PlanningEngineer

Senior MechanicalTechnician

Senior C&I Technician

Senior Electrical

Technician

Warehouse Controller

Electrical Technician

C&I Technician

7

MechanicalTechnician

Skilled Labour

Skilled Labour

Projects & Warranty

Coordinator

1

Electrical Protection Engineer

1

IT Support

1

TSM On Secondment

at PPC

Warehouse Assistant

1

Lead Supply Chain

11

Safety Coordinator

Senior HR & Admin1

Page 16: Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero lost time injury throughout the whole operation plan. Safety Objective To ensure.

16

POMCo Employees Statistics

Expt42%

Omani58%

Omanisation

Suri82%

Non

Suri

18%

Omani By Location

Department British Filipino Indian Omani Pakistan Spanish Sri Lankan Grand TotalCommercial 2 1 1 4HR&Admin 5 5Maintenance 3 3 17 5 1 29Operation 3 9 10 11 1 34PGM 1 2Security 14 14Technical Service 4 4 8Trainee 3 3Safety and Quality 1 1Grand Total 4 12 13 58 11 1 1 100

Page 17: Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero lost time injury throughout the whole operation plan. Safety Objective To ensure.

Job Title: Assistant Shift Charge Engineer :مسـاعــد مـهـنـدس المـناوبــةالــوظـيـفــة- Qualification: A degree in Control Instrumentation, Mechanical, Electrical,

or Mechatronics is required for this role. - Experience: At least 3 - 5 years of operation experience in a CCGT power

plant.- Both technical knowledge excellent communication and leadership are

essential for success in this role. The role is a preparatory role for Shift Charge Engineer.

بكالوريوس في احدى التخصصات التالية: الشهادات العلمية: -األجهزة الدقيقة ، الميكانيكا ، الكهرباء و االلكترونيات او مايعادلها في

مجال الطاقة الكهربائية. سنوات خبرة في قسم 3: ال يقل عن الخبرات والمهارات -

التشغيل بمحطات الكهرباءلديه المهارات الفنية ، يتقن اللغة االنجلزية، مهارات القيادة.

المترشح لهذه الوظيف يتم تاهيلة ليصبح مهندس مسوؤل المناوبة.-

Job Title: Assistant Chemist :مسـاعــد كيميائــيالــوظـيـفــة- Qualification: An accredited degree in Chemistry or Chemical Engineering

is required for this role.- Experience: At least 2 Years relevant experience.- Developing and using a modern laboratory and applying associated

techniques to ensure that the chemical integrity of the power generating process is maintained within agreed limits.

بكالوريوس في الهندسة الكيميائية او ما الشهادات العلمية:-يعادلها

: يفضل من لديه خبرة من السنتين فاكثر، يعمل على الخبرات-تطوير واستخدام المختبرات الحديثة وتطبيق التقنيات المرتبطة

لضمان سالمة المواد الكيميائية في عملية توليد الطاقة .

Job Title: Information Technology (IT) Engineer :مـهـنـدس حــاسب آلــيالــوظـيـفــة- A degree in IT subject or in Computer and Instrumentation with relevant

experience in IT is required for this role. This role will be responsible for implementing Company IT polices and ensuring adequate support for business IT systems.

- Experience: 3-5 Years relevant experience.

بكالوريوس الهندسة الكهربائية والحاسب الشهادات العلمية:-اآللي او هندسة األجهزة الدقيقة

سنة، يكون المسؤول عن اعداد 5-3ان يكون لدية خبرة الخبرات: -سياسة نظم المعلومات بالشركة

Job Title: Central Control Room (CCR) Operator :مشغل غــرفــة التحكمالــوظـيـفــة- Qualification: A degree in instrumentation, Mechanical, Electrical &

Electronics Power or any utility in power generation.- Responsible for monitoring and controlling plant operations from the

Power Station main control room. This role requires both team working. Attention to detail and excellent communication skills. Successful CCR operators are also require dot qualify as field operators.

- Experience: 3-5 Years relevant experience.

حاصل على الدبلوم العالي باحدى التخصصات الشهادات العلمية:-األجهزة الدقيقة ، الميكانيكا ، الكهرباء و االلكترونيات او التالية:

مايعادلها في مجال الطاقة الكهربائية سنة بذات المجال ، يعمل على 3-2لديه خبرة من الخبرات: -

التحكم في تشغيل المحطة عن طريق غرفة التحكم المركزية، لديه مهارت تواصل عالية

Page 18: Sur IPP. لا عمل مهم وعاجل إذا لم ينجز بأمان Safety Goals To achieve zero lost time injury throughout the whole operation plan. Safety Objective To ensure.

Job Title: Field Operator :مشغل محطات توليدالــوظـيـفــة- Qualification: Higher Diploma in Control Instrumentation, Mechanical,

Electrical, or Mechatronics is required for this role. This role is responsible for monitoring and controlling a wide range of Power Plant systems with direction from the Plant Control Centre The role holder will be required to understand key operating routines around the full plant and will work as part of a small team to ensure. Team working is an essential for success in this role.

- Experience: 3-5 Years relevant experience.

األجهزة دبلوم العالي باحدى التخصصات التالية:الشهادات العلمية: -الدقيقة ، الميكانيكا ، الكهرباء و االلكترونيات او مايعادلها في مجال

الطاقة الكهربائية بائية سنة بذات المجال، يعمل على تشغيل 3-2لديه خبرة من الخبرات: -

االنظمة ، لديه القابلية للعمل كفريق

Job Title: Graduate Electrical Engineer :مـهـنـدس كهربائيالــوظـيـفــة- Qualification: Graduates holding a degree in Electrical Engineering or a

related degree. - Experience: POMCo are looking for highly motivated graduates who will

work in both maintenance and operating teams gaining practical experience and applying their graduate knowledge to a wide range of operating and maintenance activities. This is an excellent opportunity for a graduate to develop a career in the Power Sector.

-

خريج بكالوريوس التخصصات التالية: األجهزة الشهادات العلمية: -الدقيقة ، الميكانيكا ، الكهرباء و االلكترونيات او مايعادلها في مجال

الطاقة الكهربائية نبحث عن خريج لديه دوافع التعلم في المجالين الصيانة الخبرات :-

والتشغيل والحصول على المعرفة المناسبة التي تواهله للتطور الوظيفي في مجال الطاقة الكهربائية

Job Title: Graduate Instrumentation & Control Engineer :مـهـنـدس أجهزة التحكمالــوظـيـفــة- Qualification: Graduates holding a degree in instrumentation, Control and

Instrumentation or a related degree. - Experience: POMCo are looking for highly motivated graduates who will

work in both maintenance and operating teams gaining practical experience and applying their graduate knowledge to a wide range of operating and maintenance activities. This is an excellent opportunity for a graduate to develop a career in the Power Sector.

األجهزة خريج بكالوريوس التخصصات التالية: الشهادات العلمية: -الدقيقة ، الميكانيكا ، الكهرباء و االلكترونيات او مايعادلها في مجال

الطاقة الكهربائية: نبحث عن خريج لديه دوافع التعلم في المجالين الصيانة الخبرات-

والتشغيل والحصول على المعرفة المناسبة التي تواهله للتطور الوظيفي في مجال الطاقة الكهربائية

Job Title: Graduate Mechanical Engineer :مهندس ميكانيكاالــوظـيـفــة- Qualification: Graduates holding a degree in Mechanical Engineering - Experience: POMCo are looking for highly motivated graduates who will

work in both maintenance and operating teams gaining practical experience and applying their graduate knowledge to a wide range of operating and maintenance activities. This is an excellent opportunity for a graduate to develop a career in the Power Sector

خريج بكالوريوس التخصصات الهندسية التالية: الشهادات العلمية: -الميكانيكا ، الكهرباء و االلكترونيات او مايعادلها في مجال الطاقة

الكهربائية نبحث عن خريج لديه دوافع التعلم في المجالين الصيانة الخبرات :-

والتشغيل والحصول على المعرفة المناسبة التي تواهله للتطور الوظيفي في مجال الطاقة الكهربائية