SUPPLIER QUALITY MANUAL - Lotus Cars · The purpose of the Lotus Supplier Quality Manual is to...

26
© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 SUPPLIER QUALITY MANUAL Approval: N Leeming Head of Quality I Snary Supplier Quality Assurance Manager Supplier Detail: Revision Level: R2 Supplier Name: Print: Sign: Position: Date:

Transcript of SUPPLIER QUALITY MANUAL - Lotus Cars · The purpose of the Lotus Supplier Quality Manual is to...

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55

 

 

 

 

 

SUPPLIER QUALITY MANUAL 

 

Approval:  

N Leeming Head of Quality 

  I Snary Supplier Quality 

Assurance Manager   

   

 

  Supplier Detail: 

  

Revision Level: R2Supplier Name: 

Print:  Sign:  Position:  Date: 

SUPPLIER QUALITY MANUAL 

Section 0  Page 2 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

0.1  Copyright Notice 

The contents of  this manual and all associated processes, systems and documentation are 

owned by Lotus Cars Limited and must be handled in strictest confidence by suppliers using 

this manual. 

 

© 2013 Lotus Cars Limited 

 

Lotus Cars  Limited  all  rights  reserved owns  the  copyright  for  this manual  and  all  content 

within.   No part of  this manual may be copied,  transmitted or  shared  in any way without 

prior written permission of Lotus Cars Limited. 

 

SUPPLIER QUALITY MANUAL 

Section 0  Page 3 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

0.2  Revision Record 

 

Rev  Date Issued  Details of Change 

R1  09‐09‐2013  First Issue ‐ Replaces Supplier Handbook 

R2  24‐10‐2013  Second Issue. Updated in line with A3‐A‐6.148 LPAP R1 Part Approval Section 3.0 Text updated to bring in line 

     

     

     

     

 

 

Important Note: 

This Supplier Quality Manual supersedes the Lotus Supplier Handbook which is now obsolete 

and should not be used for suppliers to Lotus Cars Limited. 

SUPPLIER QUALITY MANUAL 

Section 0  Page 4 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

0.3  Table of Contents 

0.1  Copyright Notice  2 

0.2  Revision Record  3 

0.3  Table of Contents  4 

0.4  Standard Forms  5 

1.0 Introduction  6

2.0 Supplier Assessment  7

2.1  Supplier Sourcing  7 

2.2  Site Assessment  7 

2.3  Surveillance Audit  8 

3.0 Part Approval  9

3.1  Process Overview  9 

3.2  Submission Requirements  11 

3.3  Part Approval  12 

4.0 Part Control  13

4.1  Key Characteristics  13 

4.2  Batch Control and Traceability  14 

4.3  Documentation  15 

4.4  Supplier Request for Process Change (SRPC)  16 

5.0 Non Conforming Product  17

5.1  Supplier Corrective Action Request  17 

5.2  Stock Swap  19 

5.3  Rejects  20 

5.4  Supplier Request for Concession (SRC)  22 

6.0 Materials Handling  23

7.0 Metrics and Reporting  24

7.1  Q‐Sheet  24 

7.2  Visit Report  24 

8.0 Glossary  25

SUPPLIER QUALITY MANUAL 

Section 2: Supplier Assessment  Page 5 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

0.4  Standard Forms 

Doc Ref  Description 

A4‐A‐6512  Supplier Waiver  

A4‐A‐6592  Supplier Audit Questionnaire  

A3‐A‐6148  Lotus Part Approval Process (LPAP) 

A4‐A‐614817.1  Final Part Approval 

A4‐A‐6441  Supplier Request for Concession 

A4‐A‐6444  Supplier Request for Process Change 

A4‐A‐6361  Supplier Corrective Action Request 

A3‐A‐6.21  Logistics Vendor Packaging Method 

A4‐A‐6513  Q‐Sheet 

A4‐A‐60133  Visit Report 

SUPPLIER QUALITY MANUAL 

Section 2: Supplier Assessment  Page 6 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

1.0  Introduction 

Our objective  is to procure the highest quality and cost effective components for assembly 

into our vehicles delivered consistently on time.  This will be achieved through open, honest 

and clear communication with our suppliers and a philosophy of working  in partnership to 

address problems quickly and robustly to protect the end consumer. 

 

The purpose of  the Lotus Supplier Quality Manual  is  to document all of  the  requirements 

and associated processes for the development, approval and supply of production materials 

to Lotus Cars Limited.   If the supplier or any of its sub‐suppliers require clarification on any 

of  the  content within  this manual or  anticipate problems  achieving  its  requirements  they 

should contact Supplier Quality Assurance for assistance. 

 

A copy of this manual will be issued to each manufacturing site supplying parts to Lotus Cars 

Limited.    This  copy  shall  then  be  controlled  by  the  supplier’s  Quality  Department  and 

cascaded  to  ensure  that  all  relevant  business  functions  are  trained  and  meet  the 

requirements herein.   

 

The  front  cover  sheet  of  this manual  shall  be  completed  by  the  receiving  supplier  and 

returned to Supplier Quality Assurance for our records to ensure that the manual has been 

received and cascaded within the supplier’s site. 

 

SUPPLIER QUALITY MANUAL 

Section 2: Supplier Assessment  Page 7 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

2.0  Supplier Assessment 

2.1  Supplier Sourcing 

Our supplier quality management philosophy is to select suppliers who are registered to the 

following recognised quality standards: 

 

ISO 9001:2008  

TS16949: 2009   

 

Where  suppliers  do  not  hold  externally  accredited  quality management  systems  to  these 

international  standards  a  Supplier  Waiver  A4‐A‐6513  will  need  to  be  submitted  and 

approved by Lotus Cars Limited prior to supply of production materials. 

 

2.2  Site Assessment 

During the supplier sourcing process  it may be necessary for Supplier Quality Assurance to 

visit the proposed manufacturing facility to conduct an audit (Supplier Audit Questionnaire 

A4‐A‐6592).  Items covered as part of this audit include: 

 

Administration 

Manufacturing 

Inspection 

Delivery 

Follow‐up performance 

 

The overall score from the audit will be reviewed by Supplier Quality Assurance to define the 

supplier status.   

If concerns are raised from the output of the audit then an action plan will be agreed with 

the  supplier  in  support  of  the  sourcing  process  within  14  days  from  the  original  Site 

SUPPLIER QUALITY MANUAL 

Section 2: Supplier Assessment  Page 8 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

Assessment.  Progress will be monitored against the plan and all corrective actions must be 

completed prior to start of production material supply into Lotus Cars Limited.   

 

Supplier Quality Assurance reserves the right to follow‐up the audit with additional site visits 

as required to confirm corrective actions are complete and meet our requirements. 

 

2.3  Surveillance Audit 

Periodically  Supplier  Quality  Assurance will  either  visit  suppliers  to  undertake  additional 

audits  or  request  suppliers  carry  out  their  own  self‐assessment  (Supplier  Audit 

Questionnaire A4‐A‐6592).  

 

Depending  on  the  surveillance  audit  result  the  supplier  may  be  requested  to  develop 

corrective action plans to resolve areas of concern.  Supplier Quality Assurance reserves the 

right  to  follow‐up  the  audit  or  self  assessment  with  a  site  visit  if  required  to  confirm 

corrective actions are complete and meet our requirements. 

SUPPLIER QUALITY MANUAL 

Section 3: Part Approval  Page 9 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

3.0  Part Approval 

3.1  Process Overview 

Lotus  Cars  Limited  operates  its  own  bespoke  system  for  developing  parts  and  processes 

within the supply chain to ensure that they consistently deliver our requirements: Lotus Part 

Approval Process (LPAP).   

 

The diagram below illustrates the generic timing of the 14 activities that make up the LPAP 

process  aligned with  the  Lotus  Product  Development  System  (LPDS) milestones  for  new 

models: 

 

Activity Start Finish Lotus Lead

Planning Phase CI CA SQA

Supplier Visits CD SOP SQA

LPAP Status Reporting CA SOP SQA

Quality History Review CD FA NPQ

Feasibility Review CD FA NPQ

Design FMEA CD FA NPQ

Process FMEA CA PPA SQA

Part Quality Requirements CA PPA NPQ

Tooling & Facilities CA SOP SQA

Process Control Chart FA PA SQA

Training Records FA PA SQA

Checking Fixtures FA PA SQA

Part Submission Sheet FA SOP NPQ

Sub-Supplier Approval PA LA SQA

Run @ Rate PA LA SQA

Appearance Approval PA SOP NPQ

Final Part Approval PA LA SQA

VP PPEP

CD FA PPA SOP LACACIPS PA

2 31 4

   

Fig 3.1.1: Lotus Parts Approval Process 

 

SUPPLIER QUALITY MANUAL 

Section 3: Part Approval  Page 10 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

The following flow chart gives an overview of the LPAP submission and approval process: 

SupplierLotus

Complete Final Part Approval

Complete LPAP activities as required

Review Final Part Approval

Agree corrective actions with supplier

No

Agree Supplier Category and Submission 

Requirements

Parts OK Fit and Func?

All Elements OK?

Yes

Raise Interim Approval

Agree action plan to full approval

Raise Full Approval

No

Yes

Email

 

Fig 3.1.2: Process Flow for Part Approval 

 

All aspects of  this process and associated activities are documented within  the  Lotus Part 

Approval  Process  (LPAP)  Manual  A3‐A‐6148  which  is  available  from  Supplier  Quality 

Assurance. 

SUPPLIER QUALITY MANUAL 

Section 3: Part Approval  Page 11 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

3.2  Submission Requirements 

The  Lotus  Part  Approval  Process  applies  to  all  external  suppliers  of  bulk  materials, 

production or service parts.   The specific activities required for each supplied part to Lotus 

Cars Limited will depend upon change content and shall be agreed between the supplier and 

the Supplier Quality Assurance representative during the planning phase. 

 In terms of submission data to support evidence of activity completion Lotus Cars Limited 

operates different submission levels as follows: 

 

Category A  Lotus certification 

Supplier must submit all of the LPAP documentation for full 

review 

Category B  Self certification 

Final Part Approval, ELV/RRR Data Recording Sheet, Part Quality 

Requirements, Part Submission Sheets, Process Capacity Sheets 

and Appearance Approval Report (where appropriate) are 

required for submission 

Category X  Supplier uses alternative to LPAP 

Supplier may use an alternative approval process if agreed in 

advance with Supplier Quality Assurance.  Final Part Approval, 

ELV/RRR Data Recording Sheet, Part Quality Requirements and 

Appearance Approval Report (where appropriate) are required 

for submission 

 

Suppliers will be advised by Supplier Quality Assurance which submission category they fall 

into based on part technology, complexity and previous quality performance. 

SUPPLIER QUALITY MANUAL 

Section 3: Part Approval  Page 12 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

3.3  Part Approval 

Once all LPAP activities have been completed the Final Part Approval (A4‐A‐614817.1) form 

should be completed and submitted together with required supporting documentation and 

sample part(s) for review. 

 

Supplier  Quality  Assurance  will  then  review  the  data  submission  together  with  an 

assessment of sample part(s) for physical appearance and vehicle fit and function.   

 

If all elements of the assessment are passed then a Full Approval will be granted.   The FPA 

form  (A4‐A‐614817.1) will be signed and a copy will be sent back  to  the supplier  for  their 

records as authority to ship materials into Lotus Cars Limited. 

 

Important Note: ELV/RRR Data must be supplied for all parts as part of the submission 

paperwork to gain Full Approval. 

 

Where issues are found that do not directly affect part fit/function an Interim approval may 

be  raised.   The FPA  form  (A4‐A‐614817.1) will be  signed and  sent back  to  the  supplier  to 

allow shipment of materials into Lotus Cars Limited pending correction of open items. 

 

Where  issues  found  do  affect  part  fit  and  function  or  insufficient  information  has  been 

provided to make an approval Supplier Quality Assurance will contact the supplier direct to 

agree corrective actions and timing to achieve Part Approval.  In order to authorise shipment 

of this material  into Lotus Cars Limited a Supplier Request  for Concession  (A4‐A‐614817.1) 

will be required documenting the agreed corrective action plan pending completion of the 

updated approval documentation – refer to section 5.4. 

 

SUPPLIER QUALITY MANUAL 

Section 4: Part Control  Page 13 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

4.0  Part Control 

4.1  Key Characteristics 

Key  Characteristics  are  identified  on  Drawings,  Technical  Specifications  and  Part  Quality 

Requirements in line with the following: 

 

Symbol  Definition  Description 

 Fit / Function 

Item likely to affect ability to build, performance or 

appearance which would lead to customer complaint. 

 

Regulatory 

Compliance 

Item which would affect vehicle ability to meet market 

specific legislation  

 

Safety 

Compliance 

Item which could affect safe vehicle operation or part 

assembly at Lotus  

 

For  all  key  characteristics  defined  adequate  controls  must  be  in  place  within  the  part 

manufacturing process to ensure specifications are achieved.   These requirements must be 

cascaded within all documentation to include: 

 

Drawings 

Specifications 

Part Quality Requirements 

Process FMEA 

Process Control Chart 

Operator Instructions / Training documents 

  

SUPPLIER QUALITY MANUAL 

Section 4: Part Control  Page 14 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

4.2  Batch Control and Traceability 

Parts  with  safety  ( )or  legislative  ( )  key  characteristics  may  be  required  for  Batch 

Control with  full  Traceability  required  between  delivered  product  back  to  raw material  / 

manufacturing process and date at the supplier’s site.   

 

Supplier Quality Assurance will advise Batch Control and Traceability requirements based on 

the following definitions during the LPAP process:   

 

Type  Definition 

A  Each individual part identified with unique traceable serial number 

B  Batch traceable and marked on part within agreed batch size / time period 

C  Batch traceable and marked on packaging / delivery note with agreed batch 

size/time period.  To be used when not possible to mark parts. 

 

 

Where the supplier has an alternative method of batch control / traceability this may be 

used only if agreed in advanced with Supplier Quality Assurance. 

SUPPLIER QUALITY MANUAL 

Section 4: Part Control  Page 15 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

4.3  Documentation 

Documents and records pertaining to the design and manufacture of parts supplied should 

be controlled in line with the suppliers’ quality management system and ISO 9001:2008.  

 

Retention of  all  such documentation  in  the  form of hard  copy, electronic or other media 

shall be in line with the following table: 

 

Record Type  Example  Retention Period 

Transient / Live Documents  ISO Audits 

Corrective Action Reports 

Created Date 

+ 1 Year 

Product Records  Inspection / Test Results 

Non Conformance Reports 

Product Life* 

+ 1 Year 

Product Records – Safety   

or Legislative   related 

Inspection / Test Results 

Non Conformance Reports 

Product Life* 

+ 15 Years 

Process Records  Tooling and Fixtures  

Process Controls 

Product Life* 

 

*   Product Life is defined as the manufacturing lifespan of the vehicle(s) into which 

the parts are fitted.   

 

Where  the  supplier  has  alternative  document  control  procedures  these  may  be  used 

providing  they  exceed  the  Lotus  requirements  as  detailed  above  and  advanced  approval 

from Supplier Quality Assurance has been granted. 

SUPPLIER QUALITY MANUAL 

Section 4: Part Control  Page 16 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

4.4  Supplier Request for Process Change (SRPC) 

When  the  supplier wishes  to make  a  change  to  the process used  for  the manufacture of 

parts  supplied  an  SRPC  form  (A4‐A‐6444)  is  required  to  gain  approval  for  the  proposed 

change in advance of its implementation.  Changes requiring such approval include: 

Manufacturing Process Change 

New or relocation of Equipment / Facility 

Change of sub‐supplier / components within a supplied assembly 

Design changes (where supplier is design responsible) 

 

The process for SRPC submission and approval is as per the flow diagram below: 

 

SupplierLotus

Complete SRPC Form 

Review SRPC

REJECTchange request.

No

Change to process is proposed

Change acceptable?

Yes

APPROVE change request

Confirm  action plan with supplier

Implement Process Change

Email

Email

A4‐A‐6144

 

Fig 4.4.1: Supplier Request for Process Change 

SUPPLIER QUALITY MANUAL 

Section 5: Non Conforming Product  Page 17 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

5.0  Non Conforming Product 

5.1  Supplier Corrective Action Request 

A  Supplier  Corrective Action  Request  (SCAR) will  be  raised  by  Supplier Quality Assurance 

when  a  concern  or  quality  issue  is  identified  as  supplier  related  and  one  or more  of  the 

following criteria apply: 

a)  Concern investigation reveals risk of disruption to production 

b)  Concern involves a repeat issue previously communicated to the supplier. 

c)  Supplier has had similar concerns on other parts. 

 

SCAR  responses  from  suppliers  should be  received within a 24 hour period &  include any 

required containment actions. 

 

Closure plans for SCARs should be agreed with Supplier Quality Assurance within 2 working 

weeks of being raised. If a supplier requires additional time to collate permanent corrective 

actions,  they  should  request  a  time  extension  through  their  Supplier  Quality  Assurance 

representative. 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUPPLIER QUALITY MANUAL 

Section 5: Non Conforming Product  Page 18 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

The following process flow shows the process from concern identified at Lotus Cars Limited 

to issue resolved at supplier: 

 

SupplierLotus

SCAR RaisedInvestigate Concern

Implement Interim 

Containment Action (ICA)

Review ICA

NoICA acceptable?

Yes

Implement Permanent 

Corrective Action (PCA)

Contact Supplier to resolve

Review PCA

NoPCA acceptable?

Yes

Contact Supplier to resolve

Close SCAR

ICA req

uired

 in 24 Hours

PCA req

uired

 in 14 Days

Email

Email

Email

A4‐A‐6391

 

Fig 5.1.1: Supplier Corrective Action Request Process 

 

 

 

 

 

SUPPLIER QUALITY MANUAL 

Section 5: Non Conforming Product  Page 19 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

5.2  Stock Swap 

Where  non‐conforming  parts  are  identified  a  stock  swap  process  is  available  whereby 

suppliers can replace this material with good parts within an agreed window with Supplier 

Quality Assurance.   

 

Such parts will not be considered as reject material and hence will not impact on a supplier’s 

PPM (Parts per Million) score but will still require SCAR (Supplier Corrective Action Request) 

completion.  The following process illustrates how stock swaps are handled: 

 

SupplierLotus

Non‐Conforming parts identified

Review New Parts

NoParts OK?

Yes

Contact Supplier to resolve

Raise SCAR

Maximum 5 Days

Email

Email

Raise Reject NoteStockSwap?

No

SupplyNew Parts

Yes

A4‐A‐6391

 

Fig 5.2.1: Stock Swap Process 

SUPPLIER QUALITY MANUAL 

Section 5: Non Conforming Product  Page 20 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

5.3  Rejects 

When  a  reject note has been  raised, details are emailed  to  the  supplier, who  then has 5 

working  days  to  investigate  the  details  of  the  rejection  and  to  either;  accept,  rework  or 

query  liability. At the end of this 5 day window, materials will be scrapped  if they have not 

been  requested  for  return  by  the  supplier.  If  parts  are  being  returned  to  the  supplier 

transportation costs will be cross‐charged and debited from the supplier’s account: 

 

SupplierLotus

Reject Note Raised

Reject NoteClosed

Email

No

Hold Parts5 Days

PartsCollected?

Supplier Account Debited 

(Incl Admin Fee)

Scrap Parts

Agree part collect / scrap

Yes

 

Fig 5.3. 1: Reject Part Process 

 

 

 

 

 

SUPPLIER QUALITY MANUAL 

Section 5: Non Conforming Product  Page 21 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

Important Note 

From October 2013 the following may be cross‐charged to suppliers: 

Administration charge for handling and processing reject notes 

Inspection charges for undertaking time consuming batch / part reviews 

Rework charges if non‐conforming parts are being reworked by Lotus Cars Limited 

personnel 

Consequential part costs if non‐conforming materials have been processed into 

assembly or parts fitted to vehicles which need to be replaced 

Warranty recovery costs may also be passed on to suppliers in some circumstances 

 

Where applied,  these charges will be debited  from  the suppliers account  in addition  to  the 

cost of the parts themselves. 

SUPPLIER QUALITY MANUAL 

Section 5: Non Conforming Product  Page 22 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

5.4  Supplier Request for Concession (SRC) 

Where  a  supplier wishes  to make  a  temporary  change  to  the  parts  supplied  a  Supplier 

Request  for  Concession  (SRC)  is  required  to  gain  approval  for  the  proposed  change  in 

advance of its implementation.  

 

Changes requiring such approval include: 

a)  Material specification change 

b)  Cosmetic quality specification change 

c)  Dimensional specification change 

 

The process for submission of the SRC form (A4‐A‐6441) and approval is as follows: 

 

SupplierLotus

Supplier requires change / deviation

Email

No

Yes

Complete SRC Document

Review SRC

RequestOK?

Contact supplier to resolve

Approve SRCImplement Request

Email

A4‐A‐6441

Fig 5.4.1: Process for Supplier Request for Concession 

SUPPLIER QUALITY MANUAL 

Section 6: Material Handling  Page 23 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

6.0  Materials Handling 

In order to maintain the quality of finished goods during transit and storage suppliers should 

refer to the Logistics Vendor Packaging Method  (LVPM) policy  (A3‐A‐6.21).   This  is used to 

agree,  develop  and  sign‐off  the  packaging method  for  all  parts  supplied  into  Lotus  Cars 

Limited.  Copies of this policy and associated documentation for packaging approval can be 

obtained from the suppliers’ Lotus logistics contact. 

 

SUPPLIER QUALITY MANUAL 

Section 7: Metrics and Reporting  Page 24 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

7.0  Metrics and Reporting 

7.1  Q‐Sheet 

Supplier Quality Assurance will  issue quality feedback to  its suppliers via the Q‐Sheet A4‐A‐

6514 on a quarterly basis.   This report contains key performance  indicators (KPIs) covering 

the following items: 

Part Approval Status for parts supplied; 

LPAP Status for new models; 

SCARs – quantity and ageing profile; 

PPM – reject rates for parts supplied; 

Key issues and action items for both parties where appropriate; 

 

The purpose of this report is to provide data for cascade through the supplier’s management 

and organisation.   This will then be used to drive a continuous  improvement approach and 

promote open and honest feedback between Lotus Cars Limited and the supplier. 

 

7.2  Visit Report 

When Supplier Quality Assurance visit the supplier to investigate a concern or follow‐up on a 

previous  activity  a  visit  report  (A4‐A‐60133)  will  be  issued  within  48  hours  of  the  visit 

completion.   This report will  include full details of the supplier team members seen and all 

actions  agreed  from  the meeting.    Actions  and  status  will  be  summarised  with  a  RED‐

AMBER‐GREEN status and follow‐up will be conducted by Supplier Quality Assurance until all 

items are completed and achieve a GREEN status. 

 

 

 

SUPPLIER QUALITY MANUAL 

Section 8: Glossary  Page 25 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

8.0  Glossary 

 

Acronym  Definition  Description 

ELV/RRR  End of Live /  Material / Chemical data for all 

component parts used within Lotus 

products that is required for vehicle 

type approval. 

FPA  Final Part Approval  Form used to request approval at the 

end of LPAP process. 

LPAP  Lotus Part Approval Process  Method implemented 2013 to 

replace APQP/PPAP for new part 

maturation and approval. 

LPDS  Lotus Product Development System  Project management and delivery 

process for new models at Lotus Cars 

Limited. 

LVPM  Logistics Vendor Packaging Method  Packaging requirements for 

production parts.  

PPM  Parts Per Million  Measure of defects supplied against 

total quantity of supplied. 

PQR  Part Quality Requirements  Documented quality standards and 

checking method for production 

parts. 

PSS  Part Submission Sheet  Document for dimensional / 

functional measurement submission 

as part of LPAP. 

SCAR  Supplier Corrective Action Request  Report submitted to supplier for 

feedback regarding quality issues 

found with their parts. 

SUPPLIER QUALITY MANUAL 

Section 8: Glossary  Page 26 of 26 A5‐A‐6511 

C1 Unclassified 

© LOTUS CARS LIMITED Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England Registered Office: Potash Lane, Hethel, Norwich, Norfolk NR14 8EZ England No. 606189 VAT Reg No. GB 105 9863 55 

Acronym  Definition  Description 

SQA  Supplier Quality Assurance  Department responsible for 

managing supplier performance.  

Part of Quality Department. 

SQM  Supplier Quality Manual  Manual with all supplier related 

processes. 

SRC  Supplier Request for Concession  Form used to request deviation 

against technical specification / 

process / PQR. 

SRPC  Supplier Request for Process Control  Form used to request change to 

process for manufacture of parts.