Title
Supplier Portal – Purchase Order Confirm and Publish
Document Number SP-PO-CNF
Author
Nicholas Wynne
Version 4
Publish Date March 27, 2015
Last Revised Date July 15, 2016
Standard Work
Instruction
Supplier Portal
Purchase Order Confirm &
Publish
THIS DOCUMENT IS THE PROPERTY OF UTC AEROSPACE SYSTEMS. YOU MAY NOT POSSESS, USE, COPY OR DISCLOSE THIS
DOCUMENT OR ANY INFORMATION IN IT, FOR ANY PURPOSE, INCLUDING WITHOUT LIMITATION, TO DESIGN,
MANUFACTUR OR REPAIR PARTS, OR OBTAIN ANY GOVERNMENT APPROVAL TO DO SO, WITHOUT UTC AEROSPACE
SYSTEMS’S EXPRESS WRITTEN PERMISSION. NEITHER RECEIPT NOR POSSESSION OF THIS
DOCUMENT ALONE, FROM ANY SOURCE, CONSTITUTES SUCH PERMISSION.
POSSESSION, USE, COPYING OR DISCLOSURE BY ANYONE WITHOUT UTC AEROSPACE SYSTEMS’S EXPRESS WRITTEN
PERMISSION IS NOT AUTHORIZED AND MAY RESULT IN CRIMINAL AND/OR CIVIL LIABILITY.
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 2/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 2 -
Table of Contents
1. PURPOSE .................................................................................................................................................. 3
1.1. Description of Standard Work .................................................................................................... 3 1.2. Prerequisites .............................................................................................................................. 3
2. DOCUMENT CONTROL ............................................................................................................................ 3
2.1. Ownership .................................................................................................................................. 3 2.2. Version Change Log .................................................................................................................. 3
3. PROCESS .................................................................................................................................................. 4
3.1. Flow Diagram............................................................................................................................. 4 3.2. PO Confirmation ........................................................................................................................ 4
3.2.1 Cancel PO Confirmation ............................................................................................................................... 10 3.3. Split PO Confirmation .............................................................................................................. 11
4. EXCEPTIONS TO THE STANDARD WORK........................................................................................... 13
4.1. Alternate ways to find POs to Confirm .................................................................................... 13 4.1.1 Supplier Confirmations (“Promise Dating”) ................................................................................................. 14 4.1.2 Purchase Order – Overview .......................................................................................................................... 14 4.1.3 Quick View ................................................................................................................................................... 17
4.2. Determine the type of POs ...................................................................................................... 17 4.3. Add a Reason Code ................................................................................................................ 19
4.3.1 Add Notes to Reason Codes ......................................................................................................................... 21 4.3.2 Full List of Reason Codes ............................................................................................................................. 22
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 3/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 3 -
1. PURPOSE
Description of Standard Work
The purpose of this Standard Work Instruction for Suppliers is to describe the steps required for a Purchase Order (PO) Confirmation. These steps will document the process of a confirmation by the supplier of the purchase order receipt. The confirmation results in the notification to UTAS that the order was received by and terms and conditions agreed upon by the supplier.
Confirmation of a PO indicates that the supplier agrees with, or agrees by exception, to the PO information.
UTAS will use a report of orders that have not been confirmed to follow-up with supplier to ensure all orders are acknowledged on the supplier portal.
Prerequisites
The PO is created or changed and sent electronically to SNC.
2. DOCUMENT CONTROL
This section documents the revision control of the process
Ownership
Organization: UTAS Department: eSolutions Contact: Nicholas Wynne
Version Change Log
Version Number
Date Author Reviewed By Approved By
New 3-27-2015 Lee Setter Brenda Roberts Initial Release
Version 1 12-31-2015 Tanaya Krauss Nicole Benson Draft
Version 2 4/14/2016 Nick Wynne Updates
Version 3 5/23/2016 Nick Wynne Nicole Benson Added Content
Version 4 7/15/2016 Cam Demmerle
Nick Wynne Added troubleshooting tip
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 4/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 4 -
3. PROCESS
Flow Diagram
PO Confirmation
Log into Suppler Portal https://suppliers.utc.com
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 5/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 5 -
1.0 The supplier logs into the portal and navigates to the Alert Monitor
Note: PO Confirmations can also be done through PO Collaboration or Supplier Confirmations (“Promise Dating”). See section 6.1 for more information.
2.0 Select “Go” to see a list of PO’s. Note: If a PO is not found on the Alert Monitor, the alert may have expired. See section 6.1 at the end of the material for more information on how to find a particular PO to confirm. 3.0 Click on the quantity associated with the type of PO user is searching for.
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 6/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 6 -
4.0 Highlight a PO line and select “See Details”
5.0 Highlight line item (if not already selected) and click Confirm.
6.0 Select PO line items to be confirmed
Note: If you wish to split a PO into multiple line items for different delivery quantities or dates, please refer to section 3.3.
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 7/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 7 -
7.0 Click Create 1 CONF
Note: The status will change to REQUEST 8.0 Review the Conf. Ship Date and Conf. Delivery Date (Promise Dates). Conf Ship Date: Date that product is shipped from your facility Conf. Delivery Date: Data that product should arrive at the UTAS facility Note: These dates must be updated if the Conf Ship Date and Conf. Delivery Date are in the past.
Dates can be updated by clicking in the field. Clicking the box adjacent to the ship date will pull up a calendar to make selecting dates easier.
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 8/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 8 -
Note: A common error is updating the ship date without updating the delivery date. See below. The ship date is in 2016, but the delivery date is still set for 2015.
The Delivery Date must be at least one day after the Ship Date, as the dates are date and time stamped in the Supplier Portal. Additionally the promise dating cannot contain past due dates. The error below would show if either of these were case.
9.0 Highlight Row to be Confirmed
10.0 Click Save
Note: If the Conf. Ship and Conf. Delivery Date is different than the Req. Shipping and Req. Delivery date, a reason code will need to be added. See section 4.3 at the end of the material.
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 9/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 9 -
Note the status change “To Be Published”
11.0 Please Read and Acknowledge Note: If you choose to decline these terms and conditions, you will not be able to proceed and must contact your UTAS Buyer.
12.0 Receive Save Confirmation
Note: Please note PO is Not Published. It has been saved, and an additional step must be taken to Publish.
13.0 Highlight Row(s) and Click Publish POs 14.0 Click “Yes”
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 10/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 10 -
The message “Outbound processing of …” indicated that the PO has been published and information has been sent to UTAS.
3.2.1 Cancel PO Confirmation
1.0 Go to Alert Monitor 2.0 Select “Go” 3.0 Click on the Quantity associated with the type of PO user need to view. 4.0 Highlight the “Published PO” that need to cancelled 5.0 Click “Confirm” ‘ 6.0 Highlight line item that need to cancelled 7.0 Click “Cancel Conf” to cancel confirmatrion. 8.0 Clcik Save
Note: The status will change back to request.
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 11/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 11 -
Split PO Confirmation
To split the confirmation of a PO into multiple schedule lines for delivery, select the PO line item you wish to split, and click “Create Multi. Conf.” Note: You may not confirm partial quantities. Delivery can be split but the total quantity must be accounted for.
This will generate multiple PO line items, in which the “Conf. quantity”, “Conf. Ship Date / Time” and “Conf. Delivery Date / Time” can be altered.
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 12/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 12 -
You can then save and publish multiple confirmation lines.
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 13/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 13 -
The PO will then show multiple confirmed line items against a single request.
Note: If the promise dating is different than the Req. Shipping and Req. Delivery date, a reason code will need to be added. See section 6.2 to review adding a reason code.
4. EXCEPTIONS TO THE STANDARD WORK
Alternate ways to find POs to Confirm
If you are unable to find a PO within the Alert Monitor, you can also search in several places.
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 14/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 14 -
4.1.1 Supplier Confirmations (“Promise Dating”)
Supplier Confirmations (“Promise Dating”) will allow you to review all unconfirmed Purchase Orders.
Click “go” to run the query. Additional filters can be applied if desired before running the query.
You can resume reviewing the standard work from step 6.0
4.1.2 Purchase Order – Overview
Purchase Order – Overview allows you to review all Purchase Orders issued to your vendor code(s). Click on “Purchase Order” dropdown, and click “Purchase Order Overview”
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 15/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 15 -
To filter on unconfirmed POs, click the box icon in the field “Conf. Status”
Make a selection on what you would like to filter on. In this case, we want to see POs that have not been confirmed. Click the grey box, and then “Ok”
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 16/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 16 -
Once the filter is applied, click “go”.
You can resume reviewing the standard work from step 4.0
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 17/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 17 -
4.1.3 Quick View
Quick View will also allow you to view unconfirmed requests in a graphical format. 1.0 Click on Exceptions >Quick View
2.0 Click on Quantity
You can resume reviewing the standard work from step 6.0
Determine the type of POs
1.0 Click on Alert Monitor under Quick Links 2.0 Click on Purchase Order → Purchase Order Overview
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 18/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 18 -
3.0 In the Order Type C field, select the type of order to view by click on the square in the flied. 4.0 Select the PO/SA to view 5.0 Click ‘OK’
6.0 Click Go (Note: you can more search criteria if needed from other fields to narrow search)
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 19/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 19 -
Add a Reason Code
If you are confirming and you wish to add a REASON CODE, or notes, or if the system requires a reason code, it must be added. Reason Codes are required if the promise dating differs from the original UTAS requirement. The below error message would tell you that a reason code is required.
Highlight the row and click the “Details”
Click the Edit button
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 20/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 20 -
Click the New button
Select your REASON CODE
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 21/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 21 -
Click OK
Click the blue back arrow (at the top of the screen), and return to step 14.0 in the standard work.
4.3.1 Add Notes to Reason Codes
1.0 Go to Alert Monitor 2.0 Select Grouping Criteria (ex. Is showing Acknowledged) 3.0 Click on the number to view schedule agreements 4.0 Highlight line item to that need notes added
5.0 Click ‘Notes ‘ 6.0 Enter notes in to the field 7.0 Click Save
This document does not contain any US export controlled technical data. Monday, July 18, 2016 Purchase Order Confirm and Publish Page 22/22
UTC Aerospace Systems Proprietary – ECCN: EAR99
- 22 -
4.3.2 Full List of Reason Codes
CODE SHORT_TEXT
CODE SHORT_TEXT
XA Material Inventory Accuracy
Z6 Supplier Capacity - Manpower
XB Material - MFG late to Distr
Z7 Sub tier - outside operation
XC Material -Short Material
Z8 Producability
XD Material - Scrap, Rewk, Rep
Z9 Part obsolescence
XE Producability - Castg/Forgs
ZA Sub-tier capacity manpower
XF Supplier Producability - Other
ZB Material scrap-rework-repair
XG QA Defective Material
ZC Tooling -inadequate /not available
XH QA FAI
ZD Tooling -repair/replace
XI QA MR/NCM
ZE Transition
XJ QA Pending CAD / SRI / Dev.
ZF Supplier Engineering
XK QA Inadequate Quality Reqmt.
ZG Engineering - MFG Issues
XL QA 3rd Party Inspection
ZH Supplier Engineering - Tooling
XM Sub-tier - Demand Exc Cap.
ZI Customs/Carrier Days
XN Supplier Sub-tier - logistics
ZJ ERP Data Integrity
XO Sub-tier Capacity-Machine
ZK Engineering Issues
XP Sub-tier MFG Proces Delays
ZL No Pick On Portal
XQ Supplier MFG Issues
ZM Pick List Restriction
XR Sub-tier Cap.-Manpower
ZN Quality / Inspection Issue
XS Sub-tier- Outside Operation
ZO Flight Safety
XT Spot Buy
ZP Receiving Dock Issue
XU Supplier Sub-tier - Quality
ZQ Pull In / Expedite
XV Parts held until QN response
ZR Supplied Material Shortage
XW Tooling - Inadeq/not Available
ZS Supplier Transition
XX Tooling-Repair/Replace
ZT Under LT PO Placement
XY Waiting Quote Approval
ZU HSM Kits not pulled
Z1 Parts waiting for CAD approval
ZV Logistics -Damaged/Lost Material
Z2 Sub-tier capacity machine
ZW Logistics - Ship to Inc.Loc
Z3 Supplier Engineering - E/C
ZX Supplier Logistics - SNR
Z4 Supplier Engineering - Capacity
ZY LTA Expires
Z5 Engineering - MFG issues
ZZ MFG Issues - Late Starts
Troubleshooting Tip: If you encounter any errors, please refer to the Error Message Reference Guide: https://suppliers.utc.com/Portal/Pages/Error-20Troubleshooting-20Guide