GIZA, FAYOUM & RAVEN FLDS DEV.Subsea Field DevelopmentThe project involves EPC and installation of a subsea
infrastructure from 12 wells, with 49 miles of umbilicals and
136 miles of pipelines.
CHISSONGA FPSOFPSO Project officially delayed due to low oil prices. Contractors have
been asked to revise bids down by 20%.
MARINER EAST 2 PIPELINEOnshore PipelineMariner East 2 is the 2nd phase of the company’s plan to
transport 275,000 b/d of various NGLs from processing and
fractionation complexes to Sunoco Logistics’ MHIC.
SOUTH SANTA CRUZ/BARATARIASubsea Field DevelopmentThe project consists in the development of ~23 km of pipe-in-
pipe flowline. Installation of flowline end terminations, fabrication and
installation of jumpers; and pre-commissioning for the flowline.
Maersk ~$2650M
EPC On Hold
5000002
FIND NEW BUSINESS OPPORTUNITIES IN THE INDUSTRIAL WORLD. CONTACT [email protected] FOR MORE INFO
BP ~$750M
EPCI Feb’16To Be Awarded Subsea 7
Sunoco ~$2.5B
EPC Feb’16
Fluor
Deep Gulf Energy II n.a.
EPCI Feb’16
Technip
Awarded On Hold Cancelled
Contract value
Award date
Engineering Co./
EPC Contractor(Country of Execution)Contract type
Clients
SupplHi Project ID
4000202
RHOURDE-NOUSS LPG PLANTUpstream Onshore ConventionalThe contract includes the EPC, commissioning and testing of
hardware and software for the plant. ABB will revamp the
treatment and fractionation unit that was damaged in 2009.
Sonatrach ~$100M
EPC Feb’16
1000238
7000121
4000204
ABB
1000231 11000327 11000293
BALTIC GAS PROJ.Upstream Onshore ConventionalFID is expected by year end 2016. The project consists in two
small offshore developments connected to an onshore gas
plant (for which Jacobs is executing pre-FEED studies).
Baltic Gas ~$10M
pre-FEED Feb’16Jacobs
SUMGAYIT E/PE PLANTPetrochemicalThe project includes EPC activities up to start up and
guarantee test run. The plant will rely on the Ineos Innovene S
technology with a capacity of 120,000 t/y.
SOCAR ~$180M
EPC Feb’16
Maire Tecnimont
Group
BOROUGE NEW BOG COMP.PetrochemicalThe SOW includes EPC services for a new Boil Off Gas (BOG)
compressor project at the plant. It will also entail a number of
tie-ins to the existing facility.
Borouge n.a.
EPC Feb’16
Linde Engineering
FORTUNA OFFSHORE FLD. FLNG Subsea Field DevelopmentFID reported on track by mid-2016, first gas is expected in
2019. The proposed development involves the initial drilling of
up to 7 development wells to be tied back to the FLSO vessel.
Ophir Energy ~$350M
EPC Jul’16
To Be Awarded
4000163
TAKREER RUWAIS REFINERYRefiningThe project consists in improving efficiency at the GUP to
enhance power generation and water production, while
reducing adverse environmental impacts.
FAHUD-SOHAR GAS PIPELINE Onshore PipelineDual pipeline 14 inches and 32 inches. Pipelines to feed the
Liwa Plastics Complex and the North Power Station respectively. The
pipelines are expected to be completed within 38 months.
SAUDI KAYAN CRACKING FURNACEPetrochemicalThe project should boost ethylene production capacity of the
plant in Jubail. Completion is expected in the second half of
2017.
Saudi Kayan ~$95M
EPC Feb’16
CTCI
ORPIC ~$304M
EPC Feb’16
Punj Lloyd
TAKREER ~$20M
FEED Feb’16
Jacobs
10000399
7000150
11000329
JAMBARAN-TIUNG BIRU FLD. DEV.Upstream Onshore ConventionalExpected to start construction before the end of next year so
that Pertamina can meet its target of going on-stream in 2019.
Pertamina ~$1.4B
EPC May'16
1000053
To be awarded
UPDATES ON KEY OIL&GAS PROJECT STATUS FROM PREVIOUS MONTH, FEBRUARY ‘16SUPPLHI PROJECTS DATABASE
PLAJU REFINERYRefiningState-owned Pertamina has cancelled the Plaju project with
Chinese state-owned Sinope. Once completed, the expansion
would have doubled the current capacity of 118000 b/d.
Pertamina
Sinopec ~$3B
EPC CancelledTo be awarded
10000409
DOUGLAS CHANNEL LNGLNG Onshore LiquefactionAltaGas Inc., partner in the Douglas Channel LNG plant,
announced the decision to cancel the project that had an
expected in-service date in late 2017.
AltaGas ~$500M
EPC Cancelled
n.a.
6000034
ÅSGARD OFFSHORE FLD LPWSubsea Field DevelopmentStatoil awarded Aker Solutions for a concept study for the LPW
(Low Pressure Well) project at Åsgard A to sustain future
production.
Statoil ~$10M
pre-FEED Feb’16
Aker Solutions
4000211
TRESTAKK FLD SUBSEA TIEBACK Subsea Field DevelopmentThe field will be developed as a tieback to Asgard FPSO. FEED
to be executed in Oslo office, in cooperation with Technip and
FMC Technologies (in fact, Forsys is a Technip/FMC JV)
Statoil n.a.
FEED Feb’16
Forsys Subsea
4000206
OSEBERG VESTFLANKEN 2 WHPOffshore Shallow WaterThe project will provide 110M BOE and is profitable even in a
low oil price scenario. The SOW consists of the construction,
transportation and installation of the unmanned platform.
Statoil ~$97M
EPCI Feb’16
Heerema Marine
Contractors
3000266