JAIGAD REGASIFICATION PLANT LNG Onshore RegasificationThe capacity of the plant will be 8 MTPA. H-Energy has
obtained final Environmental Clearance in March along with
confirmation of grid connectivity at Dabhol
H-ENERGY n/a
EPC Jun '16
SENER AFCONS
6000251
CHAMBAL FERTILISERS AND CHEM.
FertilizersFirst time a large plant is built in 20 years. It will increase
India’s urea capacity by ~7%. India is pushing fertilizer makers
to boost production and competitiveness
Chambal ~$650M
EPC Jun '16Toyo
12000142
LEGEND
UPDATES ON KEY OIL&GAS PROJECT STATUS FROM PREVIOUS MONTH, APRIL ‘16SUPPLHI PROJECTS DATABASE
SHAH DENIZ 2 PROJECTOffshore Shallow WaterSoW includes transport and installation of subsea production
systems and subsea structures, laying of fiber optic cables,
production umbilicals and pipelines.
TRANS-ADRIATIC PIPELINE (TAP)Offshore Pipeline 35 inche, 2657 ft max. water depth. Bids for EPC were
submitted in Mar-15. Industria Meccanica Bassi and Nuova
Giungas will provide the neccessary pipeline equipment.
CALLATER FIELD DEVELOPMENTSubsea Field DevelopmentEPCI of 4 km, 45” Pipeline Bundle system (prod. lines and
power and supply services) and installation of 13km electro-
control umbilical, assoc. structures, testing and pre-commissioning
WOODFIBRE LNG PROJECT LNG Onshore Liquefaction plantThe project, which will have a capacity of 2.1 MTPA, has
received environmental approval from the federal government
in Mar ‘16
BP ~$1.5B
EPC Jul '16Saipem
Trans Adriatic
Pipeline n/a
EPC Jun '16Saipem
Apache ~$100M
EPC Feb '17To be awarded
Woodfibre LNG n/a
FEED Apr '16
KBR
Awarded On Hold Cancelled
Contract value
Award date
Engineering Co./
EPC Contractor(Country of Execution)Contract type
Clients
SupplHi Project ID
3000276
800001640002286000258
FIND NEW BUSINESS OPPORTUNITIES IN THE INDUSTRIAL WORLD. CONTACT [email protected] FOR MORE INFO
KAUTHER DEPL. COMP. 2 (KDC2)Upstream Onshore ConventionalThe field has thus far been in production through the Saih
Nihaydah Gas Plant (SNGP), which was commissioned in
2005. Project awarded following completion of Y3DC
Petroleum
Development Oman n/a
EPC Jul ’16
Larsen&Toubro
ITGI PIPELINE - IGI POSEIDONOffshore PipelineThe ITGI (Interconnector Turkey-Greece-Italy) System will
contribute to the European diversification of gas supply. IGI
Poseidon is a JV between Edison and the Greek Company Depa
IGI Poseidon ~$400M
EPC Jul ‘17
8000009
UGANDA-KENYA PIPELINEOnshore Pipeline - Crude In April 2016, Uganda decided to route a multibillion-dollar
crude-export pipeline through Tanzania, forcing neighboring
Kenya to develop a separate link to transport its own oil.
Kenian and Ugandean
Governements ~$6B
EPC Cancelled
7000134
To be Awarded
To be Awarded
PROJECTS DB
SAMPLE
FREE MARKET
REPORT, Jan ‘16
1000247
BUCKSKIN/MOCCASIN PLATFORMSemi-Submersible PlatformFEED work began in early 2015 at the Buckskin/Moccasin
Project. Back in May 2015, Chevron said it planned for 7
production wells. Project was cancelled in April 2016
Chevron n/a
EPC CancelledTo be Awarded
5000156
TERMINAL DEL CENTRO (TCMFTZ)Storage and TerminalsTerminal del Centro de México Petrolíferos y Petroquímicos
(TCM-FTZ) will be the first private gasoline storage and
distribution terminal in Mexico.
WTC Industrial ~$60M
EPC Jun '16
Watco
13000062
3000278
RAS TANURA REFINERY EXP.RefiningUpon completion of the expansion, asphalt production capacity
at the facility will increase from 22 thousand barrels per day to
42 thousand barrels per day.
Saudi Aramco n/a
EPC Apr ’16
10000413
SNC-Lavalin
SAFANIYAH, BERRI, MARJAN AND ZULU
Offshore Shallow WaterDetailed scope of work: flowline system detailed design and
support the related procurement and construction processes.
Production expected to start in the second half of 2019.
Saudi Aramco ~$1.3B
EPCI Jun ’16
McDermott
HASBAH GAS FIELD PHASE IIOffshore Shallow WaterDetailed scope of work: 6 wellhead topsides, 2 tie-in platforms,
laying offshore subsea pipelines and cables and 20 km of
umbilicals, onshore pipelines to the onshore Fadhili gas plant.
Saudi Aramco ~$1.5B
EPC Jun ’16
3000254
Larsen&Toubro
OREGON LNGLNG Onshore Liquefaction plantIn April 2016 Oregon LNG informed Warrenton city officials
that it has withdrawn its proposal for a $6 billion LNG terminal
and pipeline project on the Skipanon Peninsula.
Oregon LNG ~$6B
EPC CancelledTo be Awarded
6000168
LAZARO CARDENAS REF. PH. IIRefiningThe Detailed scope of work includes two new distillation units,
one sulfur recovery unit and auxiliary facilities.
PEMEX $800M
EPC Apr '16
Tecnicas Reunidas
10000405
HEYDAR ALIYEV MODERNIZATIONRefiningThe overall refinery capacity will be increased from 6 to 7.5
million tons per year (MTPA). The modernization of the Heydar
Aliyev Baku oil refinery will be completed by late 2018.
SOCAR n/a
FEED Apr '16
AMEC Foster
Wheeler
10000416
SUMGAYIT ETHILENE-POLYETHYLENE
PetrochemicalThe scope of work includes detailed design for the rebuilding
of the plant (originally built in 1994). The design and
construction works will be carried out in stages until 2019.
SOCAR n/a
FEED Apr '16
11000343
Technip