Suomi NPP CrIS SDR Provisional Product Highlight
Yong Han, CrIS SDR Team Lead
Suomi NPP SDR Product ReviewNOAA Center for Weather and Climate Prediction (NCWCP)
5830 University Research Park, College Park, Maryland October 23 - 24, 2012
![Page 2: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/2.jpg)
Outlines
• Team Membership
• CrIS operational concept
• Beta product and issues
• SDR specifications
• Highlights and caveats of the current product (Provisional)
• Lessons learned
• Summary
2
![Page 3: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/3.jpg)
JPSS DPA Program Planning 3
CrIS SDR Team
PI Name Organization Funding Agency FY13 Task
Yong Han NOAA/STAR NJO Support NPP/J1 Calval
Deron Scott SDL NJO Support NPP/J1 Calval
Hank Revercomb UW NJO Support NPP/J1 Calval
Larrabee Strow UMBC NJO Support NPP/J1 Calval
Dan Mooney MIT/LL NJO Support NPP/J1 Calval
Neal Baker DPA NJO Support NPP/J1 Calval
Dave Johnson NASA NASA Support NPP/J1 Calval
Joe Predina Exelis NASA/NJO Support NPP/J1 Calval
Degui Gu NGAS NASA Support NPP/J1 Calval & transition
Wael Ibrahim Raytheon NASA Support NPP/J1 Calval
![Page 4: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/4.jpg)
CrIS Operational Concept
2,200 km Swath
Downlink
NWP, EDR Applications
Decode Spacecraft
Data
±50° Cross track
Scans
3x3 Array of CrIS FOVs
(Each at 14-km
Diameter)
Ground Station
RDR = Raw Data RecordSDR = Sensor Data RecordEDR = Environmental Data Record
30 Earth Scenes
RDRs
EDRs
Co-Located ATMS SDRs
Global Temperature, Moisture, Pressure Profiles
CrIS on NPP
RDRs
Interferograms
Calibrated / Geolocated Spectra
SDRs
CrIS SDR Algorithm
![Page 5: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/5.jpg)
CrIS SDR Algorithm
Pre-ProcessRDR
FFT to spectrum
FCE handling
Non-linearity
correction
Radiometric Calibration
Spectral resampling to user grid
Self-apodization
removalGeolocation
RDRs:Interferograms8 sec science Telemetry4 min Engineering packetGeometric data
SDR Residual ILS removal
Post calibration
filter
Spectral calibration
Radiometric calibration
All calibration coefficients and parameters are included in the Engineering packet
![Page 6: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/6.jpg)
6
CrIS CalVal Activity Category
• Early sensor checkout and optimization (EOC, completed)
• CrIS performance characterization (EOC, ICV)
• SDR software update and algorithm improvement (EOC, ICV, LTM)
• Radiometric calval – NEdN, nonlinearity, ICT model and etc (EOC, ICV, LTM)
• Spectral calibration calval (EOC, ICV, LTM)
• Geolocation calval (EOC, ICV, LTM)
• CrIS performance trending and monitoring (EOC, ICV, LTM)
46 CalVal tasks are detailed in the CalVal plan
EOC – Early Orbit Checkout (completed)ICV – Intensive Calibration and ValidationLTM – Long Term Monitoring
![Page 7: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/7.jpg)
7
Beta Product Declared on May 15
• Major Efforts resulted in CrIS SDR Beta product– Instrument checkout: PGA setting and bit trim mask updates (Engineering packet v32,
uploaded on Feb. 8)– Spectral and Radiometric CalVal: ILS parameters, nonlinearity coefficients and ICT emissivity
table updates (Engineering packet v33, uploaded on April 11)– Data quality assessment and data analysis: new onboard FIR filter (uploaded on April 18) to
remove sweep direction dependent radiance bias – Critical SDR software bug fixes
• Issues– Data quality flag errors: ~60% of good SDRs are flagged as Degraded– Missing and corrupted RDR packets are not handled appropriately under certain conditions– The fringe count error (FCE) detection and correction code module is defective and has been
turned off, as the FCE is currently a rare event
• Caveats described in the Beta Readme file – The data quality flags are defective– The fringe count error (FCE) detection and correction module was turned off– Monitored laser wavelength is set to zero– Some scans are incorrectly wrapped into granules whose time stamps don’t match
![Page 8: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/8.jpg)
8
CalVal Activities since Beta Review Meeting
• Spectral and radiometric uncertainty characterization– Inter-satellite/sensor comparisons– Observation vs. radiative transfer model comparisons– Gain analysis: orbital dependence, channeling, stability– Internal consistency check: FOV-2-FOV comparisons, FOR-2-FOR comparisons,
component correlation analysis and PCA– Calibration algorithm analysis: spectral ringing and proposal for improvement– Full resolution data analysis for SW spectral calibration
• Geolocation validation– Uncertainty estimated using VIIRS data and near coastline CrIS data; 4.5 km error was
found and fixed
• Algorithm improvement and code fix– New data quality flag based on imaginary part of radiances– New algorithm for checking temperature limits– Engineering packet updates from v33 to v34 and v35 – Code fixes for geolocation and handling missing packets
![Page 9: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/9.jpg)
9
NPP CrIS Sensor Data Record Calibration Uncertainty Specifications
Band Spectral range (cm-1)
N. of chan.
Resolution (cm-1)
FORs per
Scan
FOVs per FOR
NEdN@287K BBmW/m2/sr/
cm-1
Radiometric Uncertainty@287K BB
(%)
Spectral (chan center) uncertainty
ppm
Geolocation uncertainty
km
LW 650-1095 713 0.625 30 9 0.14 0.45 10 1.5MW 1210-1750 433 1.25 30 9 0.06 0.58 10 1.5SW 2155-2550 159 2.5 30 9 0.007 0.77 10 1.5
SDR Calibration Uncertainty
Radiometric uncertainty specification converted to that expressed in brightness temperature
![Page 10: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/10.jpg)
Highlights of the Current CrIS SDRs (Provisional)
![Page 11: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/11.jpg)
11
NEdN
Feb
1
Mar
2
May
2
Jun
4
Jul 4
Aug
6
NEdN
The noise levels are much better than the specification
The large NEdN at MW FOV 7 is a known issue before NPP launch
NEdN at selected wavenumber ranges
Stable NEdN over 8 months
![Page 12: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/12.jpg)
12
Spectral Uncertainty
Longwave band, 730-740 cm-1
Midwave band, 1350-1380 cm-1
Shortwave band, 2200-2250 cm-1
Inter-FOV spectral shifts relative to FOV5 derived from correlation analysis
Longwave band
Midwave band
ppm
ppm
Spectral shifts assessed with RTM
LW & MW band frequency uncertainty < 3 ppm (specification 10 ppm)SW band frequency uncertainty relative to FOV5 < 3 ppm
![Page 13: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/13.jpg)
13
Radiometric Uncertainty AssessmentInter-FOV difference
LW, 672-682 cm-1, wrt FOV5
LW, 830-840 cm-1, wrt FOV5
MW, 1382-1408 cm-1, wrt FOV9
MW, 1585-1600 cm-1, wrt FOV9
SW, 2360-2390 cm-1, wrt FOV5
SW, 2500-2520 cm-1, wrt FOV5
BT D
iff (K
)BT
Diff
(K)
0.1
-0.1
0.1
-0.1
FOV-2-FOV differences are less than 0.04 K for LW and MW and less than 0.1 K for SW
![Page 14: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/14.jpg)
14
Radiometric Uncertainty AssessmentDaily Mean CrIS-AIRS Differences
Stable difference ~0.1 K
v33 upload
Mar
MarMarMar
Mar Mar
Oct
Oct
Oct
Oct
Oct
![Page 15: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/15.jpg)
15
Radiometric Uncertainty Assessment CrIS-IASI SNO (North Pole)
Sample size = 411CrIS
- IA
SI
CrIS IASI
The CrIS IASI difference is ~ 0.2 K
![Page 16: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/16.jpg)
16
Radiometric Uncertainty Assessment Time-Series of GEO-LEO Tb Difference
Similar CrIS-GOES, AIRS-GOES and IASI-GOES differences
![Page 17: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/17.jpg)
17
Radiometric Uncertainty Assessment CrIS/VIIRS (M13 4um) comparisons
Difference is less than 0.2 K
![Page 18: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/18.jpg)
18
Standard deviations of Biases vs Radiative Transfer Model (RTM) simulated radiances
Radiometric Uncertainty Assessment Radiance Bias Estimated with RTM
Overall bias < 0.2 KFOV-2-FOV differences < 0.1 K
Standard deviation (over 9-FOVs) of Bias vs RTM simulated radiances
Bias
(K)
![Page 19: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/19.jpg)
19
• Co-located VIIRS IR data are used to estimate the CrIS geolocation uncertaintyA coding error was found that caused the geolocation error
Geolocation Uncertainty Assessed with VIIRS
Geolocation uncertainty within 30o scan angles < 1 km (specification 1.5 km)
IDPS MX6.2 4.5 km geolocation error
errorCrIS - VIIRS
IDPS MX6.3CrIS image
Bias (m)
RMSE (m)
Track -21 80
Scan -8 64
VIIRS geolocation uncertainty
Image differences (CrIS – VIIRS) before and after a coding error fix
![Page 20: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/20.jpg)
20
Overall Quality Flag Improvement
Quality flag: Blue color – GOOD Green color - DEGRADED
Beta product
Current product
Engineering packet v34 uploaded
Perc
enta
ge (%
)
A false alarm (data labeled as Degraded) was fixed with code changes and parameter updates
Will be fixed with uploading Engpkt v35 on Oct. 22, 2012
![Page 21: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/21.jpg)
21
New Quality Flag Based on Imaginary Radiance
• Good radiance spectra have near zero imaginary radiances• Add a bit flag to indicate the spectrum is Invalid if any imaginary channel in the
range exceeds the thresholds:– LW: upper limit 1.5, lower limit -1.5, in the range 800 – 980 cm-1
– MW: upper limit 0.5, lower limit -0.5, in the range 1500 – 1700 cm-1
– SW: upper limit 0.05, lower limit -0.05, in the range 2250 – 2350 cm-1
Hit thresholdto makethe bit flagturned on
Range ofinterest
Invalid spectrum example
This is an important QC algorithm for detecting invalid SDR data caused by FCE events and many other RDR problems
![Page 22: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/22.jpg)
22
Issue under Investigation SW Cold Scene FOV Differences
Brightness temperature averaged over the range from 2256 to 2302 cm-1 ; the scene is very cold
![Page 23: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/23.jpg)
23
Issue under InvestigationRinging at the End of Un-apodized Spectra
Differences in NWP biases with interferometer scan direction
Difference between IDPS and MIT/LL SDRs
External apodization (e.g. Hamming) is recommended that can reduce the ringing to a level below 0.1 K
![Page 24: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/24.jpg)
24
Status of Discrepancy Report (DR)
• Total 87 CrIS SDR DRs on CasoNOSA
• 72 DRs closed
• 16 DRs still open – none is critical for the Provisional– 4 DRs (#3563, #4937, #4661, #4232) are being closed
– 2 FCE-related DRs (#4508, #4481) will be fixed in future together with the algorithm fix
• FCE even has been rare so far
• A new QC algorithm has been implemented, which is able to flag the data as Invalid If FCE happens
– 5 DRs (#3081, #4198, #4253, #4774, #4812, #4407) will be handled in the future (DPA agrees)
• No significant impact on the Provisional product users
– 3 DRs (#4391, #4389) are minor code issues and will be fixed for Validated product
• no significant impact on the Provisional product users
– 2 DRs (#4868, #4090) will be fixed in Mx6.5 and Mx7.0
• Once a month the IDPS will generate a bad scan of SDRs from a good scan of RDRs
• Currently the data are correctly labeled as Invalid
![Page 25: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/25.jpg)
25
Issues and Provisional Product Caveats
• Issues– Software issues are still appearing– Significant SW cold scene FOV differences– Spectral ringing– FCE module currently turned off– Several potential software components need to be checked out (e.g. the
process of triggering CMO calculation by metrology laser variations has not been verified)
• Provisional product caveats
– The value of the ESZPDMMagnitude field may not be corrected due to an inconsistency between the internal data types (DR 4389); the error will be fixed in the next build
– The fourth scan of the SDR granule generated from a short RDR granule (3 scans) is not valid (filled with fillvalue), but labeled as Valid; will be fixed in Mx6.5
![Page 26: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/26.jpg)
26
Path Forward
• Suomi NPP– Continuation of CalVal as planned for the remaining ICV and LTM– Fine adjustment of spectral and radiometric calibration parameters and geolocation
mapping parameters
– Algorithm and software quality control improvements (FCE detection/correction, self-apodization correction and code fix)
– Close of all remaining and new DRs – Aircraft campaigns– Documentation, including SDR product user guide– Algorithm and code enhancement for handling full resolution RDRs– SDR Validated product: June 2013
• JPSS J1– Support of and participation in pre-launch testing and instrument characterization– Algorithm and software improvement (calibration algorithm, full resolution SDR and
computation efficiency)
![Page 27: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/27.jpg)
27
Lessons Learned
• Inadequate pre-launch software and algorithm testing resulted in a number of critical post-launch problems
• ADL is not fully compatible with IDPS, which caused delays of CalVal fixes, as the team had to wait for results from IDPS, which was not updated as often as the team wanted
![Page 28: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/28.jpg)
28
Summary
• CrIS SDR has reached the Provisional maturity level
• All critical DRs and document issues have been addressed
• A number of CalVal and software issues have been identified and will be addressed for the Validated product
• The team has a clear path moving forward for both NPP and J1 missions
Calibration typeMeet Specification
LW band MW band SW band
NEdN
Radiometric calibration
Spectral calibration *
Geolocation ** ** **
* Relative to FOV5** Within 30o scan angles
![Page 29: Suomi NPP CrIS SDR Provisional Product Highlight Yong Han, CrIS SDR Team Lead Suomi NPP SDR Product Review NOAA Center for Weather and Climate Prediction.](https://reader035.fdocuments.in/reader035/viewer/2022081504/5697c0291a28abf838cd793a/html5/thumbnails/29.jpg)
29
CrIS SDR Status at Provisional Maturity Level
Provisional Maturity Level Definition Status
Ready for operational evaluation True
Product quality may not be optimal True
Incremental product improvements are still occurring as calibration parameters are adjusted True
Version control is in affect True
General research community is encouraged to participate in the QA True
Users are urged to consult the SDR product status documents prior to use of the data in publications True