Sunrise stranding pool1 year monitoring reportSunrise stranding pool
1 year monitoring report
Tim HornerCSUS Geology Department
SACRAMENTOSTATE
Problem:Problem:
• Fry migrated onto floodplain during high spring flows
• Flows receded
• Pool was disconnected from main channel at flows < 3000 cfs
• 1000's of fry were trapped, overheated, eaten
Isolation pool:river mile 19.7
Site location:Site location:
Sunrise Blvd.
From: Sacramento County American River Parkway Map
• Concept: 2004
• Purpose: Low budget remediation of stranding pool (identified in RCMP)
• Construction: 10/1/05
• Sponsored by:• Water Forum, SAFCA, BOR, California Fly Fishers Unlimited, Fly Fishers of Davis, Granite Bay Fly Casters, Sacramento County, CSUS Geology Dept. Philip Williams and Associates
• Monitoring: CSUS
Project history:Project history:
• Connect stranding pool to the main channel
• Maintain connection at flows > 2000 cfs
• Connecting channel specs:• 4' wide• 1' deep
Project goals:Project goals:
• Questions:• effectiveness of volunteers• durability of project
• 11/2/05: initial measurements
• 12/20/06: 1 year update
• Measurements:• Perimeter shape and position • Width • Depth• Water temperature• Grain size
Post-project monitoring:Post-project monitoring:SACRAMENTO
STATE
20062005
River discharge:River discharge:
2007
Construction date 11/2/05
monitoring12/20/06 monitoring
35,000 cfs max. outflow
From: http://cdec.water.ca.gov
Measurements:Measurements:
Length and width (tape measure)
Depth (cross sections)
Grain size (pebble counts)
Measurements:Measurements:
Walked perimeter with GPS
Installed temperature loggers
Temperature logger in pond
Pond depth:Pond depth:
November 2005 longitudinal cross section (2050 cfs)
December 2006 longitudinal cross section (1950 cfs)
Pond width:Pond width:
November 2005 lateral cross section (2050 cfs)
December 2006 lateral cross section (1950 cfs)
Connecting channel:Connecting channel:
November 2005 connecting channel cross section (2050 cfs)
December 2006 connecting channel (1950 cfs)
Pond temperature:Pond temperature:
Sunrise Pool (Downstream Temperature Logger)
05
101520253035404550
Jul-06 Aug-06 Oct-06 Dec-06
Tem
pera
ture
(Deg
rees C
elc
ius)
010002000300040005000600070008000900010000
Dis
ch
arg
e (
cfs
)
Air Temp Temp 2 Discharge
Sunrise Pool (Upstream Temperature Logger)
05
101520253035404550
Jul-06 Aug-06 Oct-06 Dec-06
Tem
pera
ture
(Deg
rees C
elc
ius)
010002000300040005000600070008000900010000
Dis
ch
arg
e (
cfs
)
Air Temp Temp 1 Discharge
Pond temperature:Pond temperature:Sunrise Pool (Downstream Temperature Logger)
05
101520253035404550
8/26 8/31 9/5 9/10 9/15 9/20 9/25
Tem
pera
ture
(Deg
ree
s C
elc
ius)
010002000300040005000600070008000900010000
Dis
ch
arg
e (
cfs
)
Air Temp Temp 2 Discharge
Sunrise Pool (Upstream Temperature Logger)
05
101520253035404550
8/26 8/31 9/5 9/10 9/15 9/20 9/25
Te
mp
era
ture
(De
gre
es C
elc
ius)
010002000300040005000600070008000900010000
Dis
ch
arg
e (
cfs
)
Air Temp Temp 1 Discharge
Pebble counts:Pebble counts:
Pebble Count at Lower Sunrise Stranding Pool November 3, 2005
05
10152025303540
< 5/8 5/8 - 7/8 7/8 - 11/4
1 1/4 - 13/4
1 3/4 - 21/2
2 1/2 - 31/2
3 1/2 - 5 5 - 7 > 7
Size Range (inches)
Per
cen
t
Pebble Count at Lower Sunrise Stranding Pool November 3, 2005
0
20
40
60
80
100
0 2 4 6 8 10
Diameter (inches)
% F
iner
Pebble counts: 2005 vs. 2006Pebble counts: 2005 vs. 2006
Pebble Count at Lower Sunrise Stranding Pool November 3, 2005
0
20
40
60
80
100
0 2 4 6 8 10
Diameter (inches)
% F
iner
Pebble Count at Lower Sunrise Stranding Pool December 20, 2006
0
20
40
60
80
100
0 2 4 6 8 10
Diameter (inches)
% F
iner
• Volunteers are good, but a BobcatVolunteers are good, but a Bobcatis betteris better
• New channel withstood 35,000 cfs flow New channel withstood 35,000 cfs flow (10 year event) with little change(10 year event) with little change
• Vandalism was the biggest problemVandalism was the biggest problem
• Signs or information for the Signs or information for the public might helppublic might help
Conclusions:Conclusions: