Sungrow Fast grid-scale ESS project delivery with ...

25
2021 Copyright © SUNGROW Confidential 1 Sungrow Fast grid-scale ESS project delivery with Technical consultancy service

Transcript of Sungrow Fast grid-scale ESS project delivery with ...

2021 Copyright © SUNGROW

Confidential

1

Sungrow Fast grid-scale ESS project delivery

with Technical consultancy service

2021 Copyright © SUNGROW

Confidential

2

Content

Sungrow ESS Technology & Technical Consultancy02

Technical requirement for Dynamic Containment01

Sungrow ESS Reference03

2021 Copyright © SUNGROW

Confidential

3

Technical requirement for Dynamic Containment

2021 Copyright © SUNGROW

Confidential

4

Frequency Response Services UK

Designed to operate post-fault, i.e.

for deployment after a significant

frequency deviation in order to

meet our most immediate need for

faster-acting frequency response.

First of National Grid ESO new

end-state service (DC-HF/DC-LF)

Dynamic Containment (DC) Dynamic Moderation (DM) Dynamic Regulation

(DR)

A pre-fault service designed to slowly

correct continuous but small deviations in

frequency. The aim is to continually

regulate frequency around the target of

50Hz. New end-state service following

the launch of DC

Rapidly delivers with the aim of

assisting the ESO to keep frequency

within operational limits (Such as due

to an erroneous wind forecast by

responding quickly when frequency

moves towards the edge of the

operational range. ). New end-state

service following the launch of DC

2021 Copyright © SUNGROW

Confidential

5

DC Service Specification & Requirement

Dynamic Containment (DC) is designed to:

• Stabilize frequency to within frequency limits (obligation to control system frequency at 50Hz plus or minus 1%. make sure there is

sufficient generation and demand held in readiness to manage all credible circumstances that might result in frequency variations)

• Delivery dynamic response

• Limit response within operation limits

2021 Copyright © SUNGROW

Confidential

6

DC Benefits & Needs

• Ensure a stable grid at any

point in time

• Balance supply fluctuations

• Larger total losses (infeed +

RoCoF, outfeed)

Grid network supports: Customers/ESS Off-taker: ESS Suppliers:

• Lighter DOD (Depth of Discharge)

of Battery system

• Better Degradation Curve (SOH)

of Battery system

• Longer Battery System life

• DC service provider &

participation

• Another outstanding revenue

opportunity

• Less burdens to generation

plant assets

2021 Copyright © SUNGROW

Confidential

7

Sungrow ESS Technology & Technical Consultancy

2021 Copyright © SUNGROW

Confidential

8

R&D Teams Experiment & Test Platform R&D Achievements

Sungrow R&D Strength

• 40%+ proportion of technical R&D

personnel

• Professional battery, PCS, EMS,

integrated system R&D team

• 5%+ annual R&D investment

accounts of the company's revenue

• Comprehensive test center laboratory

for ESS

• 3MW micro-grid test platform

• 10M EMC anechoic chamber

• CNAS accredited, TUV and other

authorized laboratories

• 3000+ patent applications

• 360+ energy storage patents

• National Science and Technology

Progress Award

2021 Copyright © SUNGROW

Confidential

9

Testing Platform

Battery Cell, Module Test Rack Test

PCS Test Switchgear Test

Distribution Cabinet TestExtreme Temperature Test

EMC Test

Management Strategy

Battery Test Platform

Cells, Modules,

Rack

Equipment Test Platform

PCS, Switchgear, Battery

Power Distribution Cabinet

System Test Platform

Extreme Temperature, EMS,

Management Strategy

2021 Copyright © SUNGROW

Confidential

10

Sungrow PCS Key Technologies

88%

92%

96%

100%

0 0.2 0.4 0.6 0.8 1

Max. Efficiency

99.0%SVG

Fast power

responseVSGHV/LV RT

Multi-PCSs in

parallel

On/Off grid

modes

-1 +1

0.9PN

-0.9PN

2021 Copyright © SUNGROW

Confidential

11

ESS Turnkey Solutions to Grid Layout

Battery System Container PCS+MV solution Grid

isolarCloudEMS

FTM: Solar + Wind + Storage FTM: Peak Shaving,FR BTM: Peak & Valley Arbitrage

2021 Copyright © SUNGROW

Confidential

12RS485Ethernet DI/DO

ESS Monitoring & Energy Management System

2021 Copyright © SUNGROW

Confidential

13

Fast Charge-discharge Conversion and Power Response (Goose option)

BESS Grid

protocol

10~35kV

• P response time < 50ms

• Q response time < 50ms

• Transfer time between charge

and discharge < 100ms

• Ensure smooth output of new energy

source

• Fast adjustment and tracking of

frequency and voltage (Goose protocol)

Voltage Q

2021 Copyright © SUNGROW

Confidential

14

ESS Technical Consultancy Support

Our design capabilities have been further enhanced with our in-house team of experts with network connection

experience up to 132kV, a system design technical team and power system studies specialist, encompassing full

Utility Scale ESS generation system design works.

➢ UK Based ESS Technical Team Memberships & Qualification

• IET Membership since 2014

• PhD & Masters qualifications in Power Systems Engineering

• Chartered Engineer certification since 2014 by Engineering Council

• CIGRE membership

➢ UK Based In-house design & consultancy service

• Energy storage system network connection and EPC configuration overall principal design and equipment

specification

• Power quality study reports for utilities connection team approval (P28, P29 & G5/5 stage 3)

• G99 compliance dynamic studies for ESS connection

• Commissioning, Site Acceptance Testing & O&M Provision

2021 Copyright © SUNGROW

Confidential

15

ESS-Grid Power Quality & Dynamic Studies

Power Quality Studies & Dynamic Analysis

Voltage fluctuation

Fault ride through

Inverter Dynamic Model

Reactive Stability

Voltage Controller Model

System Diagram Model

2021 Copyright © SUNGROW

Confidential

16

Income and investment under

different battery capacities Thermal simulation Snow/earthquake simulationEOL simulation

Multi-Fields (FEM) of ESS Design

Simulation Types

Battery life simulation

PSCAD & PSSE

Battery capacity configuration

sensitivity simulation

Economic analysis and simulation

Thermal simulation

Stress simulation

2021 Copyright © SUNGROW

Confidential

17

Sungrow ESS Reference

2021 Copyright © SUNGROW

Confidential

18

100MW/100MWh

Frequency & Peak

regulation

16MW/8.5MWh

Frequency regulation

16MW/8.5MWh

Peak regulation

Europe

250kW/548kWh

C & I

9MW/4.5MWh

Thermal power

combines with

ESS to regulate

frequency

Australia

China

1.1MW/3.3MWh

DC coupled

APAC

500kW/1.2MWh

Photovoltaic and energy

storage microgrid

10MW/42MWh

AC coupled

500kW/1.3MWh

C & I

North

America5MW+1.5MW/

3.836MWh

DC coupled

2020 ESS Shipments

202MW/202MWh

AC coupled

Global ESS Applications

Safety Accidents

2021 Copyright © SUNGROW

Confidential

19

COD 2020.Q3

Location Minety, North Wiltshire

Customer HUANENG,China

Project

Capacity100MW/100MWh

SolutionLFP: 20* ST3061KWH(L)-2500HV; NCM: 20* ST2947KWH-

2500HV

Feature

Project participation in grid operation services including:

• Dynamic Containment

• Firm Frequency Response

• Capacity Market

• Balancing Mechanism

• Energy Arbitrages services - Wholesale Trading

100MW/100MWh BESS Project in Minety (Largest DC service plant UK)

阳光设备近景图

Sungrow Achievement

• 100MWh ESS system delivery to UK site within 5 months

• 100MWh ESS system site installation within 4 weeks

• 100MWh ESS system cold commission within 3 weeks

• 100MWh ESS system hot commission within 2 weeks

• Multiple cooperation (ESO/DNO/IDNO/ICP/BOP/ESS)

• 100MWh ESS system DC service in credit over 6 months

• Phase 2 50MW/100MWh solution completed with 6 months

project delivery to 2022

2021 Copyright © SUNGROW

Confidential

20

Location Braintree, UK

Customer Gridserve, UK

Project Capacity

6.3MW/6.092MWh

Solution 2 * ST3046KWH(L)-3150UD-MV

Feature

Pilot project in customer headquarter. Project participation in grid operation services including but not limited to: • Dynamic Containment • Firm Frequency Response• Capacity Market• Balancing Mechanism• Energy Arbitrages services - Wholesale Trading

UK- 6.3MW/6.092MWh BESS Project in Braintree

2021 Copyright © SUNGROW

Confidential

21

COD 2021.Q4

Location Wicken, UK

Customer G2, UK

Project Capacity

5MW/ 7.454MWh

Solution 2 * ST3727KWH(L)-2500HV

Feature

Project participation in grid operation services including but not limited to: • Firm Frequency Response• Capacity Market• Energy Arbitrages services - Wholesale Trading

UK- 5MW/7.454MWh BESS Project in Wicken

2021 Copyright © SUNGROW

Confidential

22

COD time 2020

Location USA

Capacity 150MW/150MWh

Feature

• The energy storage system has the functions of up-frequency modulation, down-frequency

modulation, response backup and non-spinning backup. Energy storage is used as a

flexible resource for the grid to solve the instability problem caused by renewable energy.

USA - 150MW/150MWh Project in Texas

2021 Copyright © SUNGROW

Confidential

23

USA - 15MW/5.5MWh BESS Black Start Project in Indiana

COD time 2019.12

Location USA

Capacity 15MW/5.5MWh

Feature

• World's largest project using battery energy storage as a black start power source;

• Replace diesel black start, more environmentally friendly and economical.

• 6 PCS in parallel , 2C continuous discharge rate and the maximum 3C.

2021 Copyright © SUNGROW

Confidential

24

COD time 2018.Q3

Location Germany

Capacity 16MW/8.5MWh

Feature

• Receive real-time power frequency from the grid, control the active output, and join in the

control of FFR stability.

• Realize the balance between load fluctuation and power generation fluctuation.

• Maintain the stable operation of electricity system and guarantee the power supply.

Germany - 16MW/8.5MWh Project in Kempten

2021 Copyright © SUNGROW

Confidential

25

THANK YOU!

2021 Copyright © SUNGROW. Confidential