Project Objectives
Application of knowledge and techniques learned in the 1st yearthrough the analysis of a business issue involving a substantialpiece of independent work by the student over an extendedperiod.
To demonstrate proficiency in the design of a research project,application of appropriate research methods, collection andanalysis of data and presentation of results
Understand an organization and the real life situation prevailingthere.
To improve the understanding of the functional area of theproject (which should normally be your area of majorspecialization)
To appreciate interlinking of different functions and departmentsof the organization and the need for coordinated work culture.
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
2/28
2
Project Duration
ISCS/ ISCD mandates 8 weeks (excluding holidays and
Sundays) to be spent in the company as a part of the
project work.
The project work can commence immediately after PGexaminations.
Management Trainees shall finish the project
by the deadline given
Extension of project duration without the permission
of the Director will be considered as unauthorized
absence and will affect your attendance and TNG
status for 3rd Term. It would also adversely affect
your placement prospects.
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
3/28
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
4/28
4
Physical Features of the Report
Report shall be typed on white paper (A4 size bond) and madein 2 copies for PGP one copy for the Institute and one for thestudent.
For SMU, the report shall be prepared in the same way- Onecopy forSMU and one for the student.
The typing shall be of standard letter size (12 font) black colorusing only one side of the paper with double spacing.
Margins: left - 35 mm, right - 20 mm, bottom - 20mm, top - 35mm.
Binding: Report shall be Rexene bound in black. Plastic and
spiral bound project reports are not accepted. Front cover: The front cover should contain the following details.
Contd.
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
5/28
5
Physical Features .. Contd
TOP: The title in block capitals of 6 mm to 15 mmletters
CENTER: Full name of the Management Trainee inblock capitals of 6 mm to 10 mm letters
BOTTOM: Name of the Institute, Year of submission all in block capitals of 6m to 10mm letters onseparate lines with proper spacing and centering.
Blank sheets: At the beginning and end of the
Report, two white bond papers should be provided,one for the purpose of binding and other to be leftblank.
The length of the project should be between 8,000 to10,000 words excluding annexure, tables, graphs etc.
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
6/28
6
Selecting the topic
It should preferably be in the area majorspecialization
Before going to the company you should jot
down two or three topics of your interest. Thiswill be useful in case company gives you achoice.
In case company insists on direct selling you
have to explain to them that you are required tosubmit a project report and you can do sellingas well as work on the project simultaneously.It is difficult to prepare research project report ifthe sole activity is selling during the project.
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
7/28
7
Selecting the topic (Contd)
Even if you are involved in selling, design a
questionnaire to survey the potential
customers you are selling to and analyze the
data for findings.
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
8/28
8
Before reporting to the Company
Confirm your project title and the scope ofwork with the company.
Try to find out your guide in the company as
well as in the institute and discuss the topicwith them.
Do through review of literature by goingthrough all possible secondary sources.
Prepare a flow chart of the activities forentire duration of project which will act as aguide for you.
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
9/28
9
After Joining the Company
Maintain a daily record of work done in aseparate log book. This should include thepoints discussed and the information
provided to you and will be useful indrafting the report later.
Find the name of the person in thecompany who will be acting as your
external guide (if this is not already done)and discuss and finalize the project topicwith him.
Companys requirements are superior and
should be followed.Contd
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
10/28
10
After Joining the Company Contd
The sincere efforts put in by the ManagementTrainee may some times lead to a Pre PlacementOffer (PPO) from the company.
Therefore, take your project seriously!! Data collection must be completed while you are
in the company otherwise it will be impossible tovisit the company again.
Companies may demand tentative report beforeyou leave. In such a case you may have tosubmit two reports one for the company andother to the ISCS/ISCD according to theirrequirements.
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
11/28
11
Academic requirements
Companys certificate evidencing satisfactorycompletion is an essential document.
Some times the issue of the certificate is delayed by thecompany or your external guide. It could be either due
to: Poor quality of the project work
Preoccupation by your external guide
In either case, consider that you are responsible toget the certificate!!!
Often restructuring and redrafting the report isnecessary to meet the requirement ofISCS.
Be in touch with your internal guide
No two reports can have same objectives, data andfindings. If so ISCS/ISCD will reject both the reports.
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
12/28
12
Preparing the Report
Minimum 8000 words and maximum
10000 words
The Annexure is not considered for
word count
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
13/28
13
Preparing the Report Contents
The Project Report should have the contents in
the following order
1. Institute certificate
2. Company Certificate
3. Acknowledgements
4. Table ofContents with page numbers
5. Executive Summary (This should be a brief
summary not exceeding 2-3 pages consisting of
introduction, objective & scope, methodology,
data analysis, conclusions &recommendations)
.
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
14/28
14
Contents
Part I Company Profile
7. Brief introduction of
the company.
8. History of theCompany / Organization
profile
Part II Project
Overview
9. Introduction
10 Objectives& scope
11. Research
Methodology
12. Data Analysis
13.Conclusions
14.Limitations
13.
Recommendations
and Observations
Part III
Appendix
Bibliography
References
Glossary
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
15/28
15
Objectives & Scope
Prefer to keep only one main objective
May have a number of subsidiary objectives.
A Problem well defined is half solved.
SMART Objectives: Specific, Measurable,
Achievable, Relevant & Time bound
Scope: To what extent and within what
boundaries you plan to explore the topic (e.g.geographical, Mkt. Potential in south
Maharashtra)
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
16/28
16
Company / Organization Profile
General Information: Products & Services,Vision, Mission, Philosophy, Founders,Organogram, etc.
Functional area related: Marketing / HR /Finance scenario, department structure,topic related activities.
Industry Profile can also be briefly included
in this part as background information ifnecessary or, it can be appended in theend, if exhaustive
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
17/28
17
Research Methodology
Project Design: include flow chart for clarity
Information needed
Sources of data: Primary & Secondary
Designing the Questionnaire: Pains taken in Qnr.
Designing earlier can save more efforts in Data
Analysis later.Questionnaire should be
designed with the Objectives of the project in
mind.
Sampling
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
18/28
18
Questionnaire Design: The Art of
AskingQuestions
What should be asked? Relevance and Accuracy
How should each question be phrased? Open
ended questions and fixed alternative questions
In what sequence the questions to be arranged?
Order bias, Funnel techniques, Filter bias.
What questionnaire layout will best serve the
research objectives? Print, Post, Internet etc.
How should the questionnaire be pre-tested?
Does the questionnaire need to be revised?
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
19/28
19
Sampling
Sample size? Variance (s), Magnitude of
Error (e), Confidence Level (z) n =(zs / e)2
Availability of time & other resources.
Sampling frame
Sampling Procedure : Probability & Non
probability
Sampling Size procedure relationship
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
20/28
20
Data Analysis
Cross tabulation of the Questionnaire by
classification of responses and frequency
distribution.
The more effort you put in developing thequestionnaire, i.e. aided recall, use a uniform
rating scale, the easier it is to do data analysis.
Statistical methods; Central tendencies, Weighted
Averages etc. s/w like MS-Excel
Appropriate Graphical representation of key
questions with comments.
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
21/28
21
Conclusions & Observations
Observations:Related to thoseissues only, which were NOTincluded and explored thru thequestionnaire
Observations may not require a
data support
Keep your Objectives &Tabulation sheet before youwhen you sit to write yourconclusions.
Conclusions have to be strictlybased on the collected data,attempting to answer theobjectives
Conclusions should match &satisfy the objectives
List down theC
onclusions Write positive Conclusions first
Key Conclusions can beGraphically represented statingthe importance andimplications for the company
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
22/28
22
Limitations
Constraints of resources including time
Availability of data
Reliability of data
Academic scope
Access to information etc.
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
23/28
23
Bibliography & References
Author, year of Publication, Title Sub-Title,Edition, Name and Place of Publisher,Chapter & Pages.
e.g. Kazmi, A. Business Policy & StrategicManagement Tata McGraw Hill, New Delhi,2nd Edition, 2002.
E.g. Khandwala P.N. , Two routes to
turnaround in business world, Apr.12-
251989. pp 17-19.
Websites
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
24/28
24
Executive Summary
Prepare a summary of Objectives,
Findings, Limitations & Recommendations
only.
Overall should not be more than 800 words.
Though the Executive Summary is
prepared in the end, it is included first in
order.
Should provide an overview of the project
emphasizing the value added by it.
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
25/28
25
Annexure
Any documents, the inclusion of which in the
main report may hamper the flow e.g.
Sample questionnaire
Company formats, e.g. Performance
Appraisal etc.
Company Leaflets or Handouts etc.
Copy of Legal documents
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
26/28
26
Deadline for Project Report
Submission
Failure to adhere to the deadlines for
submission of the reports could lead to
disqualification from Placement
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
27/28
27
Things To Take Care Of
The Company may delay issue of certificate
of completion of project. Please take care to
do and submit a good project report. Also
follow up with the the Company at least 3 4weeks before your project submission date to
ISCS for issue of completion certificate.
DO NOT wait till the last date to bind your
report.
Contd
-
8/6/2019 Summer_Project_PGP Revised 23 Feb 09
28/28
28
Things To Take Care Of Contd
DO NOT wait till the last date to submit the
draft report to your internal project guide.
Give him / her a little extra time as they are
busy people.