summer presentation (Sultan)

11
Prepared by: King Fahd University Of Petroleum and Minerals Electrical Engineering Department

Transcript of summer presentation (Sultan)

Page 1: summer presentation (Sultan)

Prepared by:

King Fahd University Of Petroleum and Minerals Electrical Engineering Department

Page 2: summer presentation (Sultan)

About Schlumberger

How Big

• Approximately 126 thousands employees

• More than 140 nationalities

• Working in more than 85 countries

Objective

• is known by its commitment to delivery anywhere anytime and its quality in services.

Segments • 17 segments.

Page 3: summer presentation (Sultan)

Drilling Services

Well Services

Well Completion

Wireline Logging

Schlumberger Segments

• Coiled Tubing

• Cementing

• Sand Control • Stimulation

Page 4: summer presentation (Sultan)

Coiled Tubing Services (CTS)

1. Horizontal wells

3. Logging and perforating

5. Milling and drilling

2. Cleaning boreholes

4. isolating leaks

6. Fishing

More Efficiency

Lower Cost

Shorter Time

most common jobs:

Page 5: summer presentation (Sultan)

1. New Employee Safety Training Program (NEST)

2. Schlumberger Injury Prevention Program (SIPP L2)

3. H2S Training (H2S)

Safety Courses

Page 6: summer presentation (Sultan)

• Job Name: Scale Inhibitor Squeeze

• Location: Ain Dar & Shudgom

• Duration: 14 days

• Job Name: Coiled Tubing Acid Job

• Location: Khurais

• Duration: 7 days

• Job Name: Coiled Tubing cleaning Job

• Location: Harmaliyah

• Duration: 1 day

My Jobs Schlumberger

1st Job

2nd Job

3rd Job

Page 7: summer presentation (Sultan)

Transferring water, Diesel and chemicals to our frac

tanks using c-pumps

Do the mixing according to quantities given in the program. We mix the chemicals inside

the frac tanks with the help of c-pumps

(Low Pressure Rig Up)

Connect the irons from the triplex pump to the well head and connect the hoses from the frac tanks to the c-pump to the triplex

pump

(High Pressure Rig Up)

Do the test. If everything is okay then start pumping

Keep watching the values of pressure and transferring rate. If exceed the limits reduce the rate until it get stable. (don’t leave the area!)

Process of Scale Inhibitor Squeeze job

Page 8: summer presentation (Sultan)

Most important Equipments in the job

C-pump unit Frac Tanks

Triplex pump unit Irons Hoses

Page 9: summer presentation (Sultan)

Coiled Tubing Acid/Cleaning Jobs

Page 10: summer presentation (Sultan)

Reel (Side view) Reel (Back view)

Cabin Room Blowout Preventer (BOP)

Most important Equipments in the job

Page 11: summer presentation (Sultan)