Prepared By: Aayush Kumar
Study of Power Distribution of 3MTPA Blast Furnace in TATA
STEEL
![Page 2: Summer Internship Presentation](https://reader036.fdocuments.in/reader036/viewer/2022072118/58ef94901a28ab44038b456d/html5/thumbnails/2.jpg)
Study PatternPower Supply in IBF• Grid Supply• TRT Emergency Generator• UPS System
Study of Power Distribution Elements• Transformers• Busbars and Cables• Motors
Power Maintenance and Quality Improvement• Protection System• Harmonics Filtering• Power Factor Correction
![Page 3: Summer Internship Presentation](https://reader036.fdocuments.in/reader036/viewer/2022072118/58ef94901a28ab44038b456d/html5/thumbnails/3.jpg)
Power Supply in IBFGrid Supply• Obtained directly from DVC and Tata Power at 132 kV;
stepped down to 6.6kV at LBSS and further to distribution
Emergency TRT Generator• Local power generation at 10kV (16 MW) and stepping up to 33kV• Oil based generator; used in case of regional shut-down
Backup UPS System• 6 x 60 kVA UPS system to ensure backup
![Page 4: Summer Internship Presentation](https://reader036.fdocuments.in/reader036/viewer/2022072118/58ef94901a28ab44038b456d/html5/thumbnails/4.jpg)
Power Distribution Architecture
![Page 5: Summer Internship Presentation](https://reader036.fdocuments.in/reader036/viewer/2022072118/58ef94901a28ab44038b456d/html5/thumbnails/5.jpg)
Power Distribution Elements• Transformer rating from 20kVA to 20 MVA
• Total of 27 transformers in operation (Dry and Oil Cooled)
• Maintenance Tests
Transformers
• Busbars used for more delicate and firm connections (High Ampere Rating)
• Cables of different rating (LT, HT, EHT, UHT)Busbars &
Cables
• Electrical Characteristics Test• Physical Test• Motor Current Signature Analysis• Advanced Vibrational Analysis
Motors
![Page 6: Summer Internship Presentation](https://reader036.fdocuments.in/reader036/viewer/2022072118/58ef94901a28ab44038b456d/html5/thumbnails/6.jpg)
Power Maintenance and Quality Improvement
Maintenance
Relays Circuit Breakers
Quality Improvement
Harmonic Filtering
Power Factor Correction
• Siprotech 7SJ63 Relay
• MiCOM P220 Motor Protection
• G60 Generator Protection
• MM 30 LT Motor
• Air Circuit Breaker
• Vacuum Circuit Breaker
• Vacuum Circuit Unit
• Active Harmonic Filter
• Passive Harmonic Filter
• Reduce reactive load
• Use of Capacitor bank
![Page 7: Summer Internship Presentation](https://reader036.fdocuments.in/reader036/viewer/2022072118/58ef94901a28ab44038b456d/html5/thumbnails/7.jpg)
References• Materials Provided by Tata Steel
• Theoretical aspects by SNTI• Data Sheets of equipment installed
• Device Manuals• Micom P220 Relay• General Electric G60 Generator Protection Relay• Siprotech 7SJ63 Relay• MM30 Relay• L&T SR21i Release
• Electrical Engineering Related Blogs• http://www.electrical4u.com/tan-delta-test-loss-angle-test-dissi
pation-factor-test/• http://electrical-engineering-portal.com/selection-of-number-of-
cable-cores-with-emphasis-on-sizing-parameters• https://electricalnotes.wordpress.com/2014/08/05/panel-design
-calculate-size-of-bus-bar/• Electrical Machinery by Dr. P.S. Bhimbhra