SUMMARY
The Department of Public Works and Highways
(DPWH) is one of the three departments of thegovernment undertaking major infrastructure
projects !t functions as the engineering and
construction arm of the government tasked to
continuously develop its technology for the purpose
of ensuring the safety of all infrastructure facilities
and securing for all public works and highways the
highest e"ciency and #uality in construction
To be able to implement projects throughout
the country e"ciently$ DPWH builds regional$ districtand sub%district engineering o"ces all over the
Philippines$ and one of them is the &avite !! District
'ngineering "ce located at kle *t cor +ahogany
ve$ ,rgy -aybagal *outh$ Tagaytay &ity$ &avite
The &avite !! District 'ngineering "ce of
DPWH covers the .thDistrict of &avite/ Tagaytay &ity
and the municipalities of lfonso$ 0eneral 'milio
guinaldo$ !ndang$ +agallanes$ +aragondon$
+ende1$ 2aic and Ternate DPWH &avite !! 'ngineersare the one assigned to do road constructions and
their maintenance and school building and rural
health unit constructions on those places under the
said legislative district
During the run of my internship$ ! was assigned
to focus on the development of the proposed
e3tension of the +aragondon 4ural Health 5nit 6irst$
! was tasked to estimate the amount and cost of the
materials that will be used for the said project$ mysupervisor then decided to also assign me the
drafting of the project ! was also given the chance to
present the plans to the head doctor of the
+aragondon 4H5 and to discuss the changes that
they wish to make
-
7/25/2019 Summaryqwe
2/10
! felt so happy and blessed that ! was entrusted
those tasks because those are the things that actual
engineers do
INTRODUCTION
The DPWH &avite !! District 'ngineering "ce
(D') had si3 main departments namely/
dministrative *ection$ 6inancial +anagement
*ection$ Planning and Design *ection$ &onstruction
*ection$ +aintenance *ection and 7uality +aterials
and Testing *ection ! was assigned to be under the
supervision of 'ngr Wenceslao 4 4obledo$ the chief
of Planning and Design *ection$ for the whole
duration of my internship that started on pril 89$
:;8< up to =une 8$ :;8
-
7/25/2019 Summaryqwe
3/10
whenever ! have #uestions so ! really didn>t have a
hard time during my training
ACKNOWLEDGMENT
! would like to e3tend my deepest gratitude to all
of the people who helped me all throughout my
!nternship period
To my family$ for the moral and ?nancial
support$ for always being there for me after a tiring
day at the o"ce and for always encouraging me to do
my best at work
To our &hief$ Wenceslao 4 4obledo$ for giving
me a chance to e3plore and e3perience the many
sides of being an engineer/ from being a manager$
decision%maker$ an inspector$ an estimator$ a
surveyor$ a designer to being a patient person who
conducts a 8A%hr tra"c count
To 'ngr riel P 5mipon$ for accompanying meduring the ?rst time that ! set foot on the o"ce and
for his words of encouragement
To 'ngr 2oel D Tolentino$ for giving me a
chance to learn a lot of new things$ for entrusting me
to estimate a project even though ! still haven>t taken
up that course at school$ for guiding me in making
plans that would be convenient for others to read$ for
taking me with him during site inspections and
consultative meetings with 4H5 doctors from thetowns under the .thDistrict of &avite and for
supervising me for almost all throughout of my on%
the%job training
To rch &ristopher 2 ,ayona$ for sharing his
ideas on how ! can improve my uto&d *kills and for
-
7/25/2019 Summaryqwe
4/10
being always approachable whenever ! have
#uestions
To 'ngr sistiel ,roas and 'ngr =ohn 4obin
7uini#uini for guiding me especially during our 8A%hr
tra"c count at Tagaytay B @aguna via &alamba *CD
4oad !ntersection -+ . E :;; last +ay :;$ :;8
-
7/25/2019 Summaryqwe
5/10
Lyceum of the Philippie! Ui"e#!ity
C$"ite
INTERNS%IP REPORT
pril 89$ :;8< B +ay :
-
7/25/2019 Summaryqwe
6/10
DESCRIPTION O. INTERNS%IP
The Dep$#tmet of Pu&lic Wo#'! $(
%i)h*$y!
M$($te
The Department of Public Works and Highways
(DPWH) is one of the three departments of the
government undertaking major infrastructure
projects The DPWH is mandated to undertake (a) the
planning of infrastructure$ such as national roads and
bridges$ Jood control$ water resources projects and
other public works$ and (b) the design$ construction$
and maintenance of national roads and bridges$ and
major Jood control systems
.uctio!
The Department of Public Works and
Highways functions as the engineering and
construction arm of the 0overnment tasked to
continuously develop its technology for the purpose
of ensuring the safety of all infrastructure facilities
and securing for all public works and highways the
highest e"ciency and #uality in construction
DPWH is currently responsible for the planning$
design$ construction and maintenance of
infrastructure$ especially the national highways$ Jood
control and water resources development system$and other public works in accordance with national
development objectives
/#ief %i!to#y
-
7/25/2019 Summaryqwe
7/10
The development of the Department of PublicWorks and Highways (DPWH) into its presentstructure underwent a long process of evolutionspanning a century of colorful and signi?cant eventsin laying the groundwork for the physical foundation
of the country
The Department is considered as old as thePhilippine government$ its e3istence dates back toabout four (A) centuries at the time of the *panishcolonial era !t emerged from its embryonic form in8
-
7/25/2019 Summaryqwe
8/10
,y :;M;$ DPWH is an eOective and e"cient
government agency$ improving the life of every
6ilipino through #uality infrastructure
Mi!!io
To provide and manage #uality infrastructure
facilities and services responsive to the needs of the
6ilipino people in the pursuit of national development
objectives
O#)$i0$tio$l Ch$#t
-
7/25/2019 Summaryqwe
9/10
-
7/25/2019 Summaryqwe
10/10
INTERNS%IP ACTI+ITIES