Requirements Referenced Standards
ustainable Sites 14 points
Construction Activity
Pollution prevention
Option 1
The ESC (Erosion & Sedimentation Control) Plan shall conform to the erosion &
sedimentation requirements of the 2003 EPA Construction General Permit (CGP) which
outlines the provisions necessay to comply with phase I & phase II of the NPDES (National
Polluant Discharge Elimination System) program;
* Prevent loss of soil during construction
* Prevent sedimentation of storm sewer or receiving streams
* Prevent polluting the air with dust & particulate matter.
1/ Storm Water Management for
Construction Activities (USEPA-US
Environmental Protection Agency
Office of Water)
-
Option 2
The ESC (Erosion & Sedimentation Control) Plan follows local erosion & sedimentation
control standards & codes, which are more stringent than NPDES program requirements.
Site Selection Do not develop buildings, hardscape, roads or parking areas on portions of sites that meetany one of the following criteria:
1/ prime farmland as defined by the US Department of Agriculture in the United States
Code of Federal Regulations, Title 7, Volume 6, Parts 400 to 699, Section 657.5 (citation
7CFR657.5).
2/ previously undeveloped land whose elevation is lower than 5 feet above the
elevation of the 100-year flood as defined by FEMA (Federal Emergency Management
Agency)
3/ land that is specifically identified as habitat for any species on Federal or State
threatened or endangered lists
-
4/ within 100ft of any wetlands as definded by United States Code of Federal Regulations
40 CFR, Parts 230-233 and Part 22, and isolated wetland or areas of special concern
identified by state or local rule, OR within setback distance from wetland described in
state or local regulations, as defined by local or state rule or law, whichever is more
stringent.
5/ previously undeveloped land that is within 50ft of a water body, defined as seas,
lakes, rivers, streams and tributaries which support or could support fish, recreation or
industrial use, consistent with the terminology of the Clean Water Act.
6/ land which prior to acquisition for the project was public parkland, unless land of
equal or greater value as parkland is accepted in trade by the public landowner (Park
Authority project are exempt)
-
Development Density &
Community
Connectivity
1 point Option 1-Development DensityConstruct or renovate building on a previously developed site AND in a community with a
minimum density of 60.000sqft per acre net
- Project Development density(sq
=Gross building square footage
Density Radius (LF)=3x sqrt
(sqft/acre))
Average Property (neighborhoo
= Total sqft of the propertie
boundary / Total site area (ac
Option 2-Community Connectivity
Construct or renovate building on a previously developed site AND within 1/2 mile of a
residential neighborhood with an average density of 10 units per acre net AND within 1/2
mile of at least 10 basic services AND with pedestrian access between the building and
services.
- Prepare a site map and draw
building entrance
Brownfield
Redevelopment
1 point Option 1Develop on a site documented as contaminated by means of an ASTM E1903-97 Phase II
Environmental Site Assessment or a local Voluntary Cleanup Program
1/ ASTME 1903-97 Phase II
Environmental Site Assessment
2/ EPA Brownfields Definition
-
Option 2
Develop on a site defined as a brownfield by a local, state or federal government agency
ASTME 1903-97 Phase II
Environmental Site Assessment
EPA Brownfields Definition
-
S-c4 Alternative
Transportation
4 points
SS-c4.1 Public Transportation
Access
1 point Option 1Locate project within 1/2 mile of an existing-or planned and funded-commuter rail, light
rail or subway station (mass transit)
- Use an area drawing to indicate
of the project
Option 2
Locate project within 1/4 mile of one or more stops for two or more public or campus bus
lines usable by building occupants (public transportation)
- Use an area drawing to indica
mile of the project
S-c1 1
PointDescription
S-p1 Required
point 1/ US Department of Agriculture(USDA) definition of Prime
Agriculture Land as stated in United
States Code of Federal Regulations
Title 7, Volume 6, Parts 400 to 699,
Section 657.5 (citation 7CFR657.5)
2/ Federal Emergency Management
Agency (FEMA) 100-Year Flood
Definition
3/ Endangered Species Lists
4/ Definition of Wetlands in the
United States Code of federal
Regulations, 40CFR
S-c2
S-c3
-
8/13/2019 Summary Leed Nc
2/12
Requirements Referenced Standards
ustainable Sites 14 points
PointDescription
SS-c4.2 Bicycle Storage &
Changing Rooms
1 point Option 1 - Non Residential ProjectsFor commercial or institutional buildings, provide secure bicycle racks and/or storage
(within 200 yards of a building entrance) for 5% or more of all building users (measured at
peak period), AND provide shower & changing facilities in the building, or within 200 yards
of a building entrance for 0.5% of Full-Time Equivalent (FTE) occupants.
- *FTE Occupants=Occupant Hou
*Secure Bicycle Spaces (non-res
*Showering Facilities (non-resid
= FTE Occupants x 0.005
Option 2 - Residential Projects
Provide covered storage facil ities for securing bicycles for 15% or more of building
occupants in lieu of changing/shower facilities
- Secure Bicycle Spaces (resident
Option 3 - Mixed Residential & Nonresidential Projects
Provide covered storage facil ities for securing bicycles for 15% or more of building
occupants AND provide secure bicycle racks and/or storage for 5% or more of all building
users AND provide shower & changing facilities for 0.5% of Full-Time Equivalent (FTE)
occupants
- Peak building users = FTE occup
SS-c4.3 Low emitting & Fuel
efficient vehicles
1 point Option 1 - Low Emitting / Fuel Efficient Vehiclesprovide low emitting & fuel-efficient vehicles for 3% of FTE occupants AND provide
preferred parking for these vehicles.
- Nb of vehicles & preferred park
= FTE Occupants x 0.003
Option 2 - Preferred Parking for Low Emitting / Fuel Efficient Vehicles
provide preferred parking for low emitting & fuel-efficient vehicles for 5% of the total
vehicle parking capacity of the site.
Nb of alternative fuel vehicle pa
= Total nb of parking spaces x 0
Option 3 - Alternative Refueling Stations
install alternative-fuel refueling stations for 3% of the total vehicle parking capacity of the
site
Nb of alternative fuel vehicle fu
= Total nb of parking spaces x 0
SS-c4.4 Parking capacity 1 point Option 1 - Non Residential with New ParkingSize parking capacity to not exceed minimum local zoning requirements AND provide
preferred parking for carpools or vanpools for 5% of the total provided parking spaces
1/ Portland, Oregon, Zoning Code:
Title 33, Chapter 33.266 (Parking &
Loading)
1/ Determine the nb of parki
requirements
2/ Total the parking spaces prov3/ Determine the nb of space
appropriate sqft area, closest t
handicapped spaces, as reserve
Option 2 - Non Residential with New Parking for Less Than 5% of the FTE Occupancy
Provide preferred parking for carpools or vanpools, markes as such, for 5% of the total
provided parking spaces
2/ Institute of Transportation
Engineers' Parking Generation, 3rd
Edition
1/ Identify the FT & PT building
2/ Calculate FTE
3/ Determine if the total nb of
FTE occupants
4/ Determine the nb of space
appropriate sqft area, closest t
handicapped spaces, as reserve
Option 3 - Residential with New Parking
Size parking capacity to not exceed minimum local zoning requirements AND provide
infrastructure & support programs to facilitate shared vehicle usage such as carpool drop-
off areas, designated parking for vanpools, or car-share services, ride boards, and shuttle
services to mass transit.
Comply with local zoning requir
Option 4 - Mixed Use (Non-Residential & Residential)
No new parking is provided
No Calculations required
S-c5 Site Development 2 points
SS-c5.1 Protect or Restore
Habitat
1 point Option 1 - Undisturbed Greenfield SitesAll site disturbance is limited to:
* 40ft beyond the building perimeter
* 10ft beyond surface walkways, patios, surface parking & utilities less than 12 inches in
diameter
* 15ft beyond primary roadway curbs & main utility branch trenches* 25ft beyond constructed areas with permeable surfaces (such as pervious paving areas,
stormwater detention facilities & playing fields) that required additional staging areas in
order to limit compaction in the constructed area.
- -
Option 2- Previously Developed OR Graded Sites
Restore or protect a minimum of 50% of the site area (excluding the building footprint)
with native or adapted vegetation.
Projects earning SSc2 & using vegetated roof surfaces may apply the vegetated roof
surface to this calculation (if the plants meet the definition of native/adapted), in which
case the requirement is 20% of the total site area (including building footprint). This option
is intended for urban sites with little or no building setback (i.e.zero-lot-line).
-
8/13/2019 Summary Leed Nc
3/12
Requirements Referenced Standards
ustainable Sites 14 points
PointDescription
SS-c5.2 Maximize Open Space 1 point Option 1
Exceed local open space zoning requirements by 25%
- Total Open Space Required
=Open Space Required by Zoning
Option 2
No local zoning requirements, provide open space greater than or equal to bui lding
footprint
Total Open Space Required = Bu
Option 3
A zoning ordinance exists with no open space requirements, provide vegetated open space
equal to 20% of the project's site area
Total Open Space Required
=Total Project Site Area x 0.20
All Options
* for projects located in urban areas earning ss-c2, vegetated roof areas can contribute to
credit compliance.
* for projects located in urban areas earning ss-c2, hardscape areas can contribute to
credit compliance.for such projects a minimum of 25% of the open space counted must be
vegetated.
* wetlands or naturally designed ponds may count as open space if the side slopegradients average 1:4(vertical:horizontal) or less and are vegetated.
S-c6 Stormwater
Management
2 points
SS-c6.1 Quantity Control 1 point Option 1 - Existing Imperviousness is Less than or Equal to 50% (Largely UndevelopedSites)
Implement a stormwater management plan that prevents the post-development peak
discharge rate & quantity from exceeding the pre-development peak discharge rate and
quantity for the one-and two-year, 24 hour design storms.
OR Implement a stormwater management plan that protects receiving stream channels
from excessive erosion by implementing a stream channel protection strategy & quantity
control strategies
- * Pre-development site run-off r
* Pre-development site run-off q
*Post-development site run-off
* Post-development site run-off
Vr = P x Rv x A / 12'
where
Vr=volume of proposed storage
=amount of runoff captured
Rv=volumetric runoff coefficient
I = Percent Imperviousness
Option 2 - Existing Imperviousness is Greater than 50% (Largely Developed Sites)
Implement a stormwater management plan that results in a 25% decrease in the volume
of stormwater runoff from the two-year, 24-hour design storm
SS-c6.2 Quality Control 1 point Implement a stormwater management plan that reduces impervious cover, promotesinfiltration, and captures & treats the stormwater runoff from 90% of the average annual
rainfall using acceptable best management practices (BMPs).
BMPs used to treat runoff must be capable of removing 80% of the average annual post
development total suspended solids (TSS) load based on existing monitoring reports.
Guidance Specifying Management
Measures for Sources of Non-Point
Pollution in Coastal Waters, January
1993
Determine the annual rainfall us
* Humid Watersheds - 1 inch o
year)
* Semi-arid Watersheds - 0.75
rainfall each year)
* Arid Watersheds - 0.5 inch
rainfall each year)
S-c7 Heat Island Effect 2 points
SS-c7.1 Non-Roof 1 point Option 1Provide any combination of the following strategies for 50% of the site hardscape:
* Shade (within 5 years of occupancy)
* Paving materials with a Solar Reflectance Index (SRI) at least 29
* Open grid pavement system
- Q=O+R+S
Q=Qualifying Area
O=all hardscape surfaces that
that are at least 50% pervious
R=all hardscape features that h
S=Effective shaded area=arithm
10am, 12 noon and 3pm on the s
T=all non-roof hardscape surfac
Option 2Place a minimum of 50% of parking spaces under cover. Any roof used to shade or cover
parking must have an SRI of at least 29
Calculate the total number of paCalculate the number of parking
-
8/13/2019 Summary Leed Nc
4/12
Requirements Referenced Standards
ustainable Sites 14 points
PointDescription
SS-c7.2 Roof 1 point Option 1 - Reflective Roofing MaterialsUse roofing materials having a SRI X for a minimum of 75% of the roof surface.X=78 (Low-Sloped Roof-Slope 2:12)
X=29 (Steep-Sloped Roof-Slope > 2:12)
1/ Calculate Total Roof Su2/ Deduct areas with
appurtenances
3/ Determine wether X is
Option 2 - Green Roof
Install a vegetated roof for at least 50% of the roof area
Option 3 - Combined Reflective Roof & Green Roof Systems
Install high albedo & vegetated roof surfaces that, in combination, meet the following
criteria:
(Area of SRI Roof/0.75)+(Area of Vegetated Roof/0.5) Total Roof Area
S-c8 Light Pollution
Reduction
1 point For Interior LightingThe angle of maximum candela from each interior luminaire as located in the building shall
intersect opaque building interior surfaces and not exit out through the windows
OR All non-emergency interior lighting shall be automatically controlled to turn off during
non-business hours. Provide manual override capabilities for after hours use.
ASHRAE/IESNA Standard 90.1-2004,
Energy Standard for Buildings Except
Low-Rise Residential-Lighting,
Section 9 (without amendments)
Determine the direction
photometric data publish
For Exterior Lighting
Only light areas as required for safety & comfort.
Do not exceed 80% of the lighting power densities for exterior areas and 50% for building
facades and landscape features as defined in ASHRAE/IESNA Standard 90.1-2004, Exterior
Lighting section, without amendments
Calculate the Lighting Po
Determine if the Lightin
for LPD reduction
All projects shall be classified under one of the following zones, as defined in IESNA RP-33,
and shall follow all of the requirements for that specific zone:
LZ1 - Dark (Park& Rural settings)
Undeveloped areas - Population densities less than 200 people per square mile
Design exterior lighting so that all site & building mounted luminaires produce a maximum
initial illuminance value no greater than 0.01 horizontal & vertical footcandles at the site
boundary & beyond
Document that 0% of the total initial designed fixture lumens are emitted at an angle of
90degrees or higher from Nadir (straight down)
LZ2 - Low (Residential areas)
Population densities 200-3,000 people per square mile
Design exterior lighting so that all site & building mounted luminaires produce a maximum
initial illuminance value no greater than 0.1 horizontal & vertical footcandles at the site
boundary & no greater than 0.01 horizontal footcandles 10ft beyond the site boundary.
Document that no more than 2% of the total initial designed fixture lumens are emitted at
an an le of 90 de rees or hi her from Nadir strai ht downLZ3 - Medium (Commercial/Industrial, High-Density Residential)
Population densities greater than 3,000 people per square mile
Design exterior lighting so that all site & building mounted luminaires produce a maximum
initial illuminance value no greater than 0.2 horizontal & vertical footcandles at the site
boundary & no greater than 0.01 horizontal footcandles 15ft beyond the site boundary.
Document that no more than 5% of the total initial designed fixture lumens are emitted atan angle of 90 degrees or higher from Nadir (straight down)
LZ4 - High (Major City Centers, Entertainment Districts)
Cities with populations greater than 100,000
Design exterior lighting so that all site & building mounted luminaires produce a maximum
initial illuminance value no greater than 0.6 horizontal & vertical footcandles at the site
boundary & no greater than 0.01 horizontal footcandles 15ft beyond the site boundary.
Document that no more than 10% of the total initial designed fixture lumens are emitted
at an angle of 90 degrees or higher from Nadir (straight down)
1/ AST M Standard E1980-01-Standard
Practice for Calculating Solar Reflectance
Index of Horizontal & Low-Sloped Opaque
surfaces
2/ ASTM Standard E408-71 (1996)e1-
Standard Test Methods for Total Normal
Emittance of Surfaces Using Inspection-
Meter Techniques.
3/ ASTM E903-96-Standard Test Method for
Solar Absorptance, Reflectance, and
Transmittance of Materials Using Integrating
Spheres
4/ ASTM E1918-97-Standard Test Method for
Measuring Solar Reflectance of Horizontal &
Low-Sloped Surfaces in the Field
5/ ASTM C1371-04-Standard Test Method for
Determination of Emittance of Materials
Near Room Temperature Using Portable
Emissometers
6/ ASTM C1549-04-Standard Test Method for
Determination of Solar Reflectance Near
-
8/13/2019 Summary Leed Nc
5/12
Requirements Referenced Standards
Water Efficiency 5 points
WE-c1 Water Efficient Landscaping 2 pointsWE-c1.1 Reduce by 50% 1 point Option 1
Reduce potable water consumption for irrigation by 50% from a
calculated mid-summer baseline case
*plant species factor
*irrigation efficiency
*use of captured rainwater
*use of recycled wastewater
*use of water treated & conveyed by a public agency specifically for non-
potable uses
Option 2
The irrigation water used on site is supplied by a non-potable source
WE-c1.2 No Potable Water Use or No Irrigation 1 point Option 1Use only captured rainwater, recycled wastewater, recycled graywater,
or water treated and conveyed by a public agency specifically for non-potable uses for irrigation
Option 2
Install landscaping that does not require permanent irrigation systems.
Temporary irrigation systems used for plant establishment are allowed
only if removed within one year of installation
1 point Option 1 - Water Savings CalculationReduce potable water use for bui lding sewage conveyance by 50%
through the use of water-conserving fixtures or non-potable water
-
Option 2 - On-Site Wastewater Treatment
Treat 50% of wastewater on-site to tertiary standards. Treated water
must be infiltrated or used on-site.
-
WE-c3 Water Use Reduction 2 points
WE-c3.1 20% Reduction 1 pointEmploy strategies that in aggregate use 20% less water than the water
use baseline calculated for the building (not including irrigation) after
meeting the Energy Policy Act of 1992 fixture performance requirements.
WE-c3.2 30% Reduction 1 point Employ strategies that in aggregate use 30% less water than the wateruse baseline calculated for the building (not including irrigation) after
meeting the Energy Policy Act of 1992 fixture performance requirements.
WE-c2 Innovative Wastewater Technologies
-
Description Point
-
KL= ks x kdx kmc
KL = Landscape coefficient
= the volume of water l
ks= Species factor (high, a
accounts for variation
(ks=0 for species that d
kd= Density factor
accounts for the nb of
landscape(kd=0.5 for a
kmc= Microclimate factor
accounts for environm
landscape, including te
(average kmc=1 cd wh
is unaffected by buildin
& slopes)
ETL (in) = ET0x KL
ETL = project-specific evap
ET0= reference evapotran
= measurement of the
a certain reference p
KL= Landscape coefficient
IE = Irrigation Efficiency
= 0.625 (sprinkler)
= 0.90 (drip)
CE = Controller Efficiency
= percent reduction in w controllers or moistur
Design Case TWA[gal]=(A
Design Case TPWA[gal]=T
Baseline Case TWA[gal]=(
Percent Reduction of Pota
Percent Reduction of Tota
The Energy Policy Act(EPAct) of 1992
-
Sewage Volume[gal]
=UsesxDuration[min or flu
Daily Sewage Generation
=(Male OccupantsxMale S
+(Female OccupantsxFem
Annual Sewage Generatio
=Total Sewage Generation
Rainwater Volume[gal]
=collection area[sf]xcollec
-
8/13/2019 Summary Leed Nc
6/12
Requirements Referenced Stand
Energy & Atmosphere 17 points
EA-p1 Fundamental Commissioning of the Building
Energy Systems
Required 1/ Designate an individual as the Commissioning Authority (CxA) to lead, reviewand oversee the completion of the commissioning process activities.
2/ The Owner shall document the Owner's Project Requirements (OPR)
The Design Team shall develop the Basis of Design (BOD)
The CxA shall review these documents for clarity & completeness
The Owner & Design Team shall be responsible for updates to their respective
documents
3/ Develop & Incorporate commissioning requirements into the construction
documents
4/ Develop & Implement a commissioning plan
5/ Verify the Installation & performance of the systems to be commissioned
6/Complete a summary commissioning report
-
EA-p2 Minimum Energy Performance Required Design the building project to comply with both:* the mandatory provisions (Sections 5.4, 6.4, 7.4, 8.4, 9.4 & 10.4) of
ASHRAE/IESNA Standard 90.1-2004
* AND the prescriptive requirements (Sections 5.5, 6.5, 7.5 & 9.5) or performance
requirements (Section 11) of ASHRAE/IESNA Standard 90.1-2004
ASHRAE/IESNA 90.1-2004
Standard for Buildings Exc
Rise Residential
EA-p3 Option 1-Zero use of CFC-based refrigerants in new base buildings -
Option 2-Phase out Plan for any Existing CFC-based Equipment
1-10 points Option 1 - Whole Building Energy SimulationDemonstrate a percentage improvement in the proposed building performance
rating compared to the baseline building performance rating per ASHRAE/IESNA
Standard 90.1-2004 by a whole building project simulation using the Building
Performance Rating Method in Appendix G of the Standard.
Percentage Improvement=100x1-(Proposed Building Performance/Baseline BuildingPerformance)
New Buildings Existing Building Renovations Points
10.5% 3.5% 1
14% 7% 2
17.5% 10.5% 3
21% 14% 4
24.5% 17.5% 5
28% 21% 6
31.5% 24.5% 7
35% 28% 8
38.5% 31.5% 9
42% 35% 10
ASHRAE/IESNA 90.1-2004
Standard for Buildings Exc
Rise Residential, and Infor
Appendix G-Performance
Method
1-4 points Option 2 - Prescriptive Compliance PathComply with the prescriptive measures of the ASHRAE Advanced Energy Design
Guide for Small Office Buildings 2004. The following restrictions apply:
* Buildings must be under 20,000sqft
* Buildings must be office occupancy
* Project teams must fully comply with all applicable criteria as established in the
Advanced Energy Design Guide for the climate zone in which the building is
located.
ASHRAE Advanced Energy
Guide for Small Office Bui
2004
2-5 points Option 3 - Prescriptive Compliance Path-Advanced Buildings Core PerformanceGuide
Comply with the prescriptive measures identified in the Advanced Buildings Core
Performance Guide developed by the New Buildings Institute.
* Applicable for buildings under 100,000sqft
* Not applicable for health care, warehouse or laboratory projects* Project teams must fully comply with Sections 1 (Design Process Strategies) & 2
(Core Performance Requirements), & up to 2 additional points are available for
projects that implement performance strategies listed in section 3 (Enhanced
Performance)
Advanced Buildings Core
Performance Program
1 point Option 4 - Prescriptive Compliance Path-Advanced Building Benchmark v1.1Comply with the Basic Criteria & Prescriptive measures of the Advanced Building
Benchmark V1.1 with the exception of the following sections:
* 1.7 Monitoring & Trend-Logging
* 1.11 Indoor Air Quality
* 1.14 Networked Computer Monitor Control
Projects registered after June 26, 2007 may not use this option
Advanced Buildings Bench
Version 1.1
Description Point
EA-c1 Optimize Energy Performance
Fundamental Refrigerant Management Required
-
8/13/2019 Summary Leed Nc
7/12
Requirements Referenced Standa
Energy & Atmosphere 17 points
Description Point
EA-c2 On-Site Renewable Energy 1-3 points Calculate project performance by expressing the energy produced by therenewable systems as a percentage of the building annual energy cost:
% Renewable Energy Points
2.5% 1
7.5% 2
12.5% 3
To determine the building annual energy cost, use:
option1: the building annual energy cost calculated in EAc1
option2: DOE-CBECS (Commercial Buildings Energy Consumption Survey) database
ASHRAE/IESNA 90.1-2004:E
Standard for Buildings Exce
rise Residential
EA-c3 Enhanced Commissioning 1 point 1/ Designate an individual as the Commissioning Authority (CxA) to lead, reviewand oversee the completion of the commissioning process activities.
This requirement has no deviation for project size
2/ The CxA shall conduct, at a minimum, one commissioning design review of the
OPR, BOD & design documents prior to mid-construction documents phase & back-
check the review comments in the subsequent design submission.
3/ The CxA shall review contractor submittals applicable to systems being
commissioned for compliance with the OPR & BOD. This review shall be concurrent
with A/E reviews & submitted to the design team & the Owner.
4/ Develop a systems manual that provides future operating staff the information
needed to understand & optimally operate the commissioned systems.
5/ Verify that the requirements for training operating personnel & building
occupants are completed.
6/ Assure the involvement by the CxA in reviewing building operation within 10
months after substantial completion with O&M staff & occupants. Include a plan
for resolution of outstanding commissioning-related issues.
-
1 point Option 1Do Not use refrigerants
-
Option 2
Select refrigerants and HVAC&R that minimize or eliminate the emission of
compounds that contribute to ozone depletion & global warming:
LCGWP + LCODP x 105 100
*(LCGWP LCODP x 105)xQunit+ / Qtotal 100
LCODP = [ODPr x (Lr x Life + Mr) x Rc] / Life
LCGWP = [GWPr x (Lr x Life + Mr) x Rc] / Life
LCODP=Lifecycle Ozone Depletion Potential (lb CFC11/Ton-Year)
LCGWP=Lifecycle Direct Global Warming Potential (lbCO2/Ton-year)GWPr=Global Warming Potential of Refrigerant (0 to 12,000lbCO2/lbr)
ODPr=Ozone Depletion Potential of Refrigerant (0 to 0.2lb CFC11/lbr)
Lr=Refrigerant Leakage Rate (0.5% to 2.0%;default of 2% unless otherwise
demonstrated)
Mr=End-of-Life Refrigerant Loss (2% to 10%; default of 10% unless otherwise
demonstrated)
Rc=Refrigerant charge (0.5 to 5.0 lbs of refrigerant per ton of Gross ARI rated
cooling capacity)
Life=Equipment Life (10years; default based on equipment type, unless otherwise
demonstrated)
AND Do not install fire suppression systems that contain ozone-depleting
substances (CFCs, HCFCs or Halons)
1 point IPMVP Option D - Calibrated Simulation (Savings Estimation Method 2)
IPMVP Option B - Energy Conservation Measure Isolation
Green Power 1 point Provide at least 35% of the building's electricity from renewable sources byengaging in at least a two-year renewable energy contract. Renewable sources are
as defined by the Center for Resource Solutions (CRS) Green-e products
certification requirements.
Option 1 - Green Power, based on Design Energy Cost (from EA Credit 1)
Option 2 - Green Power, based on Actual Electricity Consumption
Option 3 - Green Power, based on Default Electricty Consumption
(DOE-Commercial Buildings Energy Consumption Survey CBECS database)
Center for Resource Solutio
Green-e Product Certificatio
Requirements
EA-c6
EA-c4 Enhanced Refrigerant Management
EA-c5 Measurement & Verification International PerformanceMeasurement & Verificatio
Protocol (IPMVP) Volume II
Concepts and Options for
Determining Energy Saving
Construction, April, 2003.
-
8/13/2019 Summary Leed Nc
8/12
Requirements Referenced Stand
Materials & Resources 13 points
MR-p1 Storage & Collection of Recyclables Requi
red
Provide collection & storage areas for recyclable materials to serve the entire
building. The collection area has been sized to meet the projected building
needs.
The following materials will be accomodated by the building's recycling
collection & storage area:
paper, corrugated cardboard, glass, plastics & metals.
-
MR-c1 Building Reuse 3 points
MR-c1.1 Maintain 75% of Existing Walls, Floors & Roof 1 point Maintain at least 75%(based on surface area) of existing building structure(including structural f loor & roof decking) and envelope (exterior skin &
framing, excluding window assemblies & non-structural roofing material).
Hazardous materials that areremediated as a part of the project scope shall be
excluded from the calculation of the percentage maintained.
-
MR-c1.2 Maintain 95% of Existing Walls, Floors & Roof 1 point Maintain at least 95%(based on surface area) of existing building structure(including structural f loor & roof decking) and envelope (exterior skin &
framing, excluding window assemblies & non-structural roofing material).
Hazardous materials that areremediated as a part of the project scope shall be
excluded from the calculation of the percentage maintained.
-
MR-c1.3 Maintain 50% of Interior Non-Structural
Elements
1 point Use existing interior non-structural elements (interior walls, doors, floorcoverings & ceiling systems) in at least 50% (by area) of the completed building
(including additions).
-
MR-c2 Construction Waste Management 2 points
MR-c2.1 Divert 50% from Disposal 1 point Recycle and/or salvage at least 50% of non-hazardous construction anddemolition.
-
MR-c2.2 Divert 75% from Disposal 1 point Recycle and/or salvage at least 75% of non-hazardous construction anddemolition.
-
MR-c3 Materials Reuse 2 points
MR-c3.1 5% 1 point Use salvaged, refurbished or reused materials such that the sum of thesematerials constitute at least 5% based on cost, of the total value of materials
on the project.
-
MR-c3.2 10% 1 point Use salvaged, refurbished or reused materials such that the sum of thesematerials constitute at least 10% based on cost, of the total value of materials
on the project.
-
MR-c4 Recycled Content 2 points
MR-c4.1 10%(post-consumer+1/2 pre-consumer) 1 point Use materials with recycled content such that:post-consumer recycled content+1/2 pre-consumer content
10% of the total value of the materials in the project
MR-c4.2 20%(post-consumer+1/2 pre-consumer) 1 point Use materials with recycled content such that:post-consumer recycled content+1/2 pre-consumer content
20% of the total value of the materials in the project
MR-c5 Regional Materials 2 points
MR-c5.1 10% Extracted, Processed & Manufactured
Regionally
1 point Use building materials or products that have been extracted, harvested orrecovered, as well as manufactured, within 500miles of the project site for a
minimum of 10% (based on cost) of the total materials value.
-
MR-c5.2 20% Extracted, Processed & Manufactured
Regionally
1 point Use building materials or products that have been extracted, harvested orrecovered, as well as manufactured, within 500miles of the project site for a
minimum of 20% (based on cost) of the total materials value.
-
MR-c6 Rapidly Renewable Materials 1 point Use rapidly renewable building materials & products (made from plants that -
International Standard IS
1999-Environmental La
Declarations-Self-Declared
Environmental Claims
Environmental Labeling)
Description Point
-
8/13/2019 Summary Leed Nc
9/12
Requirements Referenced
Indoor Environmental Quality 15 pointsOption 1 -Mechanically Ventilated Buildings = Active Ventilation
Meet the minimum requirements of ASHRAE 62.1-2004 Sections 4 through 7
(Ventilation for Acceptable Indoor Air Quality) using the ventilation rate procedure
or the applicable local code, whichever is more stringent.
Option 2 - Naturally Ventilated Buildings = Passive Ventilation
Shall comply with ASHRAE 62.1-2004, paragraph 5.1
Option 3 - Both Mechanical & Natural Ventilation = Mixed-mode Ventilation
Shall comply with ASHRAE 62.1-2004, chapter 6
Option 1 - Non Smoking Building
Smoking is prohibited within the buillding
ANDDesignated exterior smoking areas have been located at least 25ft away from
entries, outdoor air intakes and operable windows.
Option 2 - Designated Smoking Rooms
Smoking is prohibited within the buillding except in designated smoking areas
ANDDesignated exterior smoking areas have been located at least 25ft away from
entries, outdoor air intakes and operable windows
AND the project has provided one or more designated smoking rooms. The
smoking rooms are designed to be directly exhausted to the outdoors with no re-
circulation of ETS-containing air to the non-smoking area of the building, and
enclosed with impermeable deck-to-deck partitions and operated at a negative
pressure compared with the surrounding spaces of at least an average of 5Pa
(0.02in wg) & with a minimum of 1 Pa (0.004in wg) when the door(s) to the
smoking room are closed
ANDThe performance of the smoking room differential air pressures has been
verified by conductiong 15 minutes of measurement, with a minimum of one
measurement every 10 seconds, of the differential pressure in the smoking room
with respect to each adjacent area and in each adjacent vertical chase with the
doors to the smoking room closed. The testing was conducted with each space
configured for worst case conditions of transport of air from the smoking rooms to
adjacent spaces with the smoking rooms'doors closed to the adjacent spaces.
Option 3 - Residential Compliance
Smoking is prohibited in all commom areas of the buillding
AND Designated exterior smoking areas have been located at least 25ft away from
entries, outdoor air intakes and operable windows.
ANDindividual residential units have been designed to minimize ETS transfer
between units by sealing penetrations in walls, ceilings, and floors in the
residential units, and by sealing vertical chased adjacent to the units. In addition,all doors in the residential units leading to common hallways shall be weather-
stripped to minimize air leakage into the hallway. If the common hallways are
pressurized with respect to the residential units then doors in the residential units
leading to the common hallways need not be weather-stripped provided that the
positive differential pressure is demonstrated as in Option 2.
Option 1 - Mechanically Ventilated Spaces
* for densely occupied spaces(design occupant spaces25people/1000sqft): a
permanent CO2 monitoring system that provides feedback on ventilation system
performance to ensure that ventilation systems maintaining design minimum
ventilation requirements has been installed. The system is configured to generate
an alarm when the conditions vary by 10% or more from setpoint, via either a
building automation system alarm to the building operator or via a visual or
audible alert to the building occupants.
CO2 monitoring locations shall be between 3ft & 6ft above the floor
* for each mechanical ventilation system serving non-densely occupied spaces,
provide a direct outdoor airflow measurement device capable of measuring the
minimum outdoor airflow rate with an accuracy of 15% of the design minimum
outdoor air rate, as defined by ASHRAE 62.1-2004
-
Option 2 - Naturally Ventilated Spaces
The project has been designed to comply with the requirements for location and
size of window openings per ASHRAE Standard 62.1-2004, Section 5.1.
Monitor CO2 concentrations within all naturally ventilated spaces.CO2 monitoring shall be located within the room between 3 ft & 6 ft above the
floor.
Option 1 -Mechanically Ventilated Spaces
Increase breathing zone outdoor air ventilation rates to all occupied spaces by at
least 30% above the minimum rates required by ASHRAE 62.1-2004 as determined
by EQ-p1
Option 2 - Naturally Ventilated Spaces
Design natural ventilation systems for occupied spaces to meet the
recommendations set forth in the Carbon Trust Good Practice Guide 237 [1998].
EQ-c3 Construction IAQ-Management Plan 2 points
EQ-p2 Environmental Tobacco Smoke (ETS)Control Required
EQ-c2 Increased Ventilation 1 point
EQ-c1 Outdoor Air Delivery Monitoring 1
Required 1/ ASHRAE StandaVentilation For Ac
Quality
2/ ASHRAE Standa
Ventilation & Acce
Quality in Low-Ris
Buildings
point
1/ ASHRAE Standa
Ventilation For Ac
Quality
2/ The Carbon Tru
Guide 237-Natura
domestic building
designers;develop
(1999)
3/ CIBSE Applicatio
10:2005, Natural v
domestic buildings
1/ ANSI/ASTM-E77Test Method for D
Leakage Rate By Fa
2/ Residential Man
Compliance with C
Energy Efficiency S
Rise Residential Bu
Description Point
EQ-p1 Minimum IAQ Performance
-
8/13/2019 Summary Leed Nc
10/12
Requirements Referenced
Indoor Environmental Quality 15 points
Description Point
Option 1b - Buildling Flush-out with early Occupancy
perform a building flush-out by supplying a minimum of 3,500cu.ft of OA per sqft
of floor area (at minimum rate of 0.3 cfm/sqft of OA or at the design minimum
outside air rate, whichever is greater) a minimum of three hours prior to
occupancy, until a total of 14.000 cu.ft/sqft of OA has been delivered to the space
Option 2 - Indoor Air Quality (IAQ) Testing
conduct baseline IAQ testing, after construction ends & prior to occupancy, using
testing protocols consistent with the United States Environmental Protection
Agency Compendium of Methods for the Determination of Air Polluants in Indoor
Air & as additionally detailed in this Reference Guide.
EQ-c4 Low-Emitting Materials 4 points
EQ-4.1 Adhesives & Sealants 1 point All adhesives and sealants used on the interior of the building shall comply with
the requirements of the following reference standards:* Adhesives, Sealants and Sealant Primers: South Coast Air Quality Management
District (SCAQMD) Rule #1168 , where the VOC limits are listed and correspond to
an effective date of July 1, 2005.
* Aerosol Adhesives: Green Seal Standard for Commercial Adhesives GS-36
requirements in effect on October 10, 2000
1/ South Coast Rule
3, 2003 AmendmenCoast Air Quality M
District
2/ Green Seal Starn
effective October 19
EQ-4.2 Paints & Coatings 1 point Paints & coatings used on the interior of the building shall comply with therequirements of the following reference standards:
* Architectural paints, coating & primers applied to interior walls & ceilings: do not
exceed the VOC content limits established in GS-11,Paints, First Edition, May
20,1993.
Primers must meet the VOC limit for non-flat paint:
Flats: 50g/l & Non-Flats: 150g/l
* Anti-Corrosive & anti-rust paints applied to interior ferrous metal substrates: do
not exceed the VOC content limit of 250g/l established in Green Seal Standard GS-
03, Anti-corrosive Paints, Second Edition, January 7, 1977.
* Clear wood finishes, floor coatings, stains, sealers, and shellacs applied to interior
elements:
do not exceed the VOC content limits established in SCAQMD Rule 1113,
Architectural coatings, rules in effect on Januray 1, 2004.
1/ Green Seal Stand
2/ Green Seal Stand
3/ South Coast Air Q
Management Distric
1113, Architectural
EQ-4.3 Carpet Systems 1 point All carpet installed in the building interior shall meet* the testing & product requirements of the Carpet & Rug Institute's Green Label
Plus Program
* the requirements of the Carpet & Rug Institute Green Label Program
All carpet adhesive shall meet the requirement of EQ-c4.1:VOC limit of 50g/l
Carpet and Rug Inst
Label Plus Testing P
EQ-4.4 Composite Wood & Agrifiber 1 point Composite wood & agrifiber products used on the interior of the building shallcontain no added urea-formaldehyde resins.
Laminating adhesives used to fabricate on-site and shop-applied composite wood
& agrifiber assemblies shall contain no added urea-formaldehyde resins.
-
EQ-c5 Indoor Chemical & Pollutant Source Control 1 point * Employ permanent entryway systems at least six feet long in the primarydirection of travel. Acceptable entryway systems include permanently installed
grates, grilles, or slotted systems that allow for cleaning underneath. Roll-out mats
are only acceptable when maintained on a weekly basis by a contracted service
organization.
* Where hazardous gases chemicals may be present or used, exhaust each space
sufficiently to create negative pressure with respect to adjacent spaces with the
door of the room closed.
The exhaust rate shall be at least 0.5 cfm/sqft with no air re-circulation.
The pressure differential with the surrounding spaces shall be at least 5Pa (average
1 Pa).* In mechanically ventilated buildings, provide regularly occupied areas of the
building with air filtration media prior to occupancy that provides a MERV of 13 or
better.
ANSI/ASHRAE 52.2-
Testing General Ven
Cleaning Devices fo
Efficiency by Particl
EQ-c6 Controllability of Systems 2 points
EQ-6.1 Lighting 1 point * Provide individual lighting controls for 90% (minmum) of the building occupantsto enable adjustments to suit individual task needs & preferences.
* AND provide lighting system controllability for all shared multi-occupant spaces
to enable lighting adjustement that meets group needs & preferences.
-
EQ-6.2 Thermal Comfort 1 point * Provide individual comfort controls for 50% (minmum) of the building occupantsto enable adjustments to suit individual task needs & preferences. Operable
windows can be used in lieu of comfort controls for occupants of areas that are20ft inside of and 10ft to either side of the operable part of the window
* AND provide comfort system controls for all shared multi-occupant spaces to
enable adjustements to suit group needs & preferences.
1/ ANSI/ASHRAE Sta
2004: Ventilation fo
Indoor Air Quality
2/ ANSI/ASHRAE Sta
Thermal Environme
for Human Occupan
EQ-c7 Thermal Comfort 2 points
EQ-7.1 Design 1 point Design HVAC systems & building envelope to meet the requirements of ASHRAEStandard 55-2004, Thermal Comfort Conditions for Human Occupancy (section
6.1.1.)
ASHRAE Standard 5
Comfort Conditions
Occupancy
-
8/13/2019 Summary Leed Nc
11/12
Requirements Referenced
Indoor Environmental Quality 15 points
Description Point
EQ-c8 Daylighting & Views 2 points
Option 1 - Glazing Factor Calculation
Achieve a minimum glazing factor of 2% in a minimum 75% of all regularly
occupied areas.
-
Option 2 - Daylight Simulation Model
Demonstrate, through computer simulation, that a minimum daylight illumintion
level of 25 footcandles has been achieved in a minimum of 75% of all regularlyoccupied areas. Modeling must demonstrate 25 horizontal footcandles under clear
sky conditions, at noon, on the equinox, at 30" (desk height, typical work plan
height) above the floor
Option 3 - Daylight Measurement
Demonstrate, through records of indoor light measurements, that a minimum
daylight illumination of 25 footcandles has been achieved in at least 75% of all
regularly occupied areas. Measurements must be taken on a 10-foot grid for all
occupied spaces & must be recorded on building floor plans.
EQ-8.2 Views for 90% of Spaces 1 point Achieve a direct line of sight to the outdoor environment via vision glazingbetween 2'6" & 7'6" above finish floor for building occupants in 90% of all regularly
occupied areas.
Determine the area with direct line of sight by totaling the regularly occupied
square footage that meets the following criteria:
* In plan view, the area is within sight lines drawn from perimeter vision glazing.
* In section view, a direct sight line can be drawn from the area to perimeter vision
glazing
-
pointEQ-8.1 Daylighting 75% of Spaces 1
-
8/13/2019 Summary Leed Nc
12/12
Requirements Referenced Standards
Innovation & Design Process 4 points
ID-c1 Innovation in Design 4 points
ID-1.1 Credit 1 1 point
ID-1.2 Credit 2 1 point
ID-1.3 Credit 3 1 point
ID-1.4 Credit 4 1 point
ID-c2 LEED Accredited Professional 1 point Al least one (1) principal participant of the project team shall be a LEED AccreditedProfessional (AP)
- * Provide th
* Provide th
* Provide a
* Provide a c
Provide design teams and projects the opportunities to be awarded points for
exceptional performance above the requirements set by the LEED for New
Construction Green Building Rating System and/or innovative performance in
Greesn Building categories not specifically addressed by this Rating System.
Four (4) independant sustainability measures may be applied to ID credits
Description Point
-
There are tw
* strategies
rule of thum
requiremen
* innovation
There are th
1/ the proje
environmen
to the final d
2/ the proce
portion of a
category.
3/ the formu
other projec