Application Documents Summary
The Application Documents consist of the loan guarantee applications for Georgia Power
Company, Municipal Electric Authority of Georgia, and Oglethorpe Power Company. These applications
vary in length between about 1,300 pages to over 2,000 pages and contain thorough descriptions of the
technical and financial information for construction of Vogtle Units 3 & 4. Unfortunately, nearly all of
this pertinent information is withheld in a series of sweeping redactions. In some places, these long
stretches of redactions span 200 pages. DOE claims FOIAs trade secrets and deliberative process
exemptions to justify these redactions, though it does not indicate which particular exemption applies to
each redaction.
Also among the Application Documents is a thirty-page Environmental Critique. DOE
performed this assessment in accordance with NEPA procedures, citing 10 C.F.R. 1021.216(g), to
support the selection process for the loan guarantee program. The final document included in the
Application Documents is the Nuclear Application Criteria, a document that defines the three major
criteria for loan guarantee approval (creditworthiness; construction and start up factors; and legal,
regulatory, and permitting factors) in terms of measurable attributes. Neither the Environmental
Critique nor Nuclear Application Criteria contain many redactions.