sullivan courthouse renovation Thorndike · building bulk & scale 2 Floors oF tower removed...
Transcript of sullivan courthouse renovation Thorndike · building bulk & scale 2 Floors oF tower removed...
building bulk & scale 2 Floors oF tower removed (-40,o00 sF) smaller south oFFice lobby entrance
night-time lantern eFFect reduced vision glass (__%) ligthing controls
glare reduced glass (__%) wind mitigation additional wind tunnel testing
executive summary
bulk & mass reduction
design changes - Facade treatment - entry & landscape on spring street
40 Th
or
nd
ike
Planning board submittal:
revised ProPosal
existing view From third street & spring street
existing building
leggat mccall | elkus manfredi architects 40 thorndike | July 22, 2014
existing view From third street & spring street
ProPosal to Planning board november 2013
leggat mccall | elkus manfredi architects 40 thorndike | July 22, 2014
existing view From third street & spring street
revised ProPosal July 2014
leggat mccall | elkus manfredi architects 40 thorndike | July 22, 2014
City-Owned first street garage
Future Market
retail community / conFerence
loading
Parkingentry
oFFice lobby
res.
Thorndike ST
Spring StSe
co
nd
St
lop
ez a
ve
fir
st s
t
Thir
d S
T
Pedestrian entry
daycare retail
hubway h
ub
way
n
context plan
40 thorndike | July 22, 2014 leggat mccall | elkus manfredi architects
landscape and ground Floor plan
daycare
retail
retail retail retail
community /conFerence
loading
parking entry
oFFice lobby
res. lobby
lawn
Thorndike ST
Spring St
Seco
nd
St
Thir
d S
T
City-Owned first street garage
Pedestrian entry
lope
z av
e
0 10’ 20’ 40’ 80’ n
leggat mccall | elkus manfredi architects 40 thorndike | July 22, 2014
hubway
hubway
retail
retail retail retail
loading
parking entry
oFFice lobby
res. lobby
Thorndike ST
Spring St
Thir
d S
T
lope
z av
e
daytime use: similar to microsoFt nerd center
source For photos: http://blog.microsoFtcambridge.com
daycare
community /conFerence
lawn
Day care
ground Floor uses
40 thorndike | July 22, 2014 leggat mccall | elkus manfredi architects
ground Floor uses
retail
retail retail retail
loading
parking entry
oFFice lobby
res. lobby
Thorndike ST
Spring St
Seco
nd
St
Thir
d S
T
lope
z av
e
evening uses: community meetings yoga movies senior activities
restaurant
daycare
community /conFerence
lawn
40 thorndike | July 22, 2014 leggat mccall | elkus manfredi architects
wind, light, and glare mitigation
wind mitigation: projections at top and bottom oF tower
localized wind mitigation: pedestrian canopies marsecent trees trellis landscaping walls arcade
light mitigation: terra cotta Frame (reduced glazing) less glass at oFFice lobby window Frames and metal projections provide baFFles
glare mitigation: terra cotta Frame (reduced reFlective surFaces)
leggat mccall | elkus manfredi architects40 thorndike | July 22, 2014
1
2 3 4 5 6
78 7
9
10
1
1
33 3
2
2
2 2 5
5 5
4
4
6
7
8 8
9
9
6 2
2
10
3
5
9
4
Former and current proposal – Full building view From third street & spring street
leggat mccall | elkus manfredi architects 40 thorndike | July 22, 2014
Former and current proposal – pedestrian view From third street & spring street
Thorndike sT
spring sT
seco
nd
sT
Thir
d s
T
leggat mccall | elkus manfredi architects 40 thorndike | July 22, 2014
Former and current proposal – pedestrian view From cambridge and third
leggat mccall | elkus manfredi architects 40 thorndike | July 22, 2014
leggat mccall | elkus manfredi architects 40 thorndike | July 22, 2014
Former and current proposal – view From longFellow bridge
leggat mccall | elkus manfredi architects 40 thorndike | July 22, 2014
Former and current proposal – third street view From kendall square
context plan n
leggat mccall | elkus manfredi architects 40 thorndike | July 22, 2014
City-Owned first street garage
Future Market
retail
loading
Parkingentry
oFFice lobby
res.
Thorndike ST
Spring StSe
co
nd
St
lop
ez a
ve
fir
st s
t
Thir
d S
T
Pedestrian entry
daycare retail
hubway h
ub
way
community / conFerence
hubway
hubway
landscape and ground Floor plan
retail
retail retail retail
loading
parking entry
oFFice lobby
res. lobby
Thorndike ST
Spring St
Seco
nd
St
Thir
d S
T
City-Owned first street garage
Pedestrian entry
lope
z av
e
daycare
community /conFerence
lawn
0 10’ 20’ 40’ 80’ n
leggat mccall | elkus manfredi architects 40 thorndike | July 22, 2014
spring street terrace design - april 2014 n
leggat mccall | elkus manfredi architects 40 thorndike | July 22, 2014
+5’
+0’
SPRING STREET
Lawn
Deck
Deck
Retail Terrace Upper Garden Terrace
Water Feature
StonePavers
Stairs Stairs
Bench
StairsRamp
Ramp
Trellis
THIR
D S
TREE
T
SEC
ON
D S
TREE
T
sloped w
alk
ramp
ramp
ramp
oFFice lobby bikeel. 29’ parking
retail active use parking entry
el. 29’
terrace trellis with
Seco
nd
St
Thir
d S
Tretail seating el. 29’
terrace, level with lobby
stepped lawn
benches
lawn lawn el. 24’
hubway location
el. 25’-6” el. 23’-8” el. 21’-10”
Spring St
lope
z av
e
0 20 40 60
+5’
+0’
SPRING STREET
Lawn
Deck
Deck
Retail Terrace Upper Garden Terrace
Water Feature
Stone Pavers
Stairs Stairs
Bench
Stairs Ramp
Ramp
Trellis
THIR
D S
TREE
T
SECO
ND
STR
EET
0 20 40 60
n
hubway location
leggat mccall | elkus manfredi architects 40 thorndike | July 22, 2014
hubway location
spring street terrace design - urban garden concept
UPPER TERRACE COMMUNITY GARDEN SIDEWALK SPRING STREET
+5’
+0’
+0’
UPPER TERRACE COMMUNITY GARDEN SIDEWALK SPRING STREET
+5’
urban garden concept section
40 thorndike | July 22, 2014 leggat mccall | elkus manfredi architects
spring street terrace view looking east
40 thorndike | July 22, 2014 leggat mccall | elkus manfredi architects