Tantangan Berkarir di Industri Tambang (Batubara)
Darwin BintangMANAGEMENT SCIENCE DEPT HEADENGINEERING DIVISIONPT PAMAPERSADA [email protected] ; [email protected]
Management Science DepartmentENGINEERING DIVISION
Darwin BintangAcademic Background:
1. Statistics, S1, Institut Pertanian Bogor, 1994 - 19982. Computer Science, S2, Universitas Indonesia, 2000 – 2002
Working Experiences :3. LPPEM UI, Researcher, 1998 – 19994. Astra Graphia (Xerox), Product Support, 1999 – 19995. PT. Pamapersada Nusantara (PAMA), Engineer, 1999 – Now
Mining Experiences :6. Process Review Officer, PAMA, 1999 – 20027. Operation Research Engineer, PAMA, 2002 – 20078. Operation Reserarch & Project Evaluation Head, PAMA, 2007 - 20109. Management Science Head, PAMA, 2011 – Now
Patent :10. EWACS (Early Warning And Control System), computerized monitoring & control
system in mining operation Registered11. 24Seven Operation Patent Pending (Progress)12. PAMA Dispatch and Optimizer System Patent Pending (Progress)
Management Science DepartmentENGINEERING DIVISION
Objective •Peserta mengenal proses tambang secara umum.•Peserta mengenal PT. Pamapersada Nusantara
(PAMA) lebih baik dan menimbulkan ketertarikan dan minat untuk berkarya di PAMA dan perusahaan tambang lainnya.
•Mendorong & memotivasi seluruh peserta untuk mempersiapkan diri selama kuliah dengan lebih baik dan fokus, sehingga mampu bersaing dan berkarya di kemudian hari.
Management Science DepartmentENGINEERING DIVISION
Agenda•Profil PAMA•Mining Process•Engineering in Mining•Future of Mining Industries•PAMA Innovation•How to success & Insight•Question Answer
Management Science DepartmentENGINEERING DIVISION
PAMA INVESMENT
AUTOMOTIVE
FINANCIALSERVICES
HEAVYEQUIPMENT
UNITEDTRACTORS
AGRIBUSINESS
INFORMATION TECH. INFRA-
STRUCTUREASTRA
INTERNATIONALTbk
MINING CONTRACTORPAMAPERSADA
NUSANTARA
SALES OPERATION
MINING DEVELOPERKALIMANTAN
PRIMAPERSADA
MINING OWNERPRIMA
MULTI MINERAL
VISIONTo be a world leader mining Contractor with the best Productivity, Engineering, Safety, and Environment
What Business Are We In:Surface mining (gold, Coal, Quarry) and big scale earth moving contracting business
Indonesia Mining Contract Market Share 2012
Management Science DepartmentENGINEERING DIVISION
PAMA
COAL MININGCLIENT : PT TAMBANG
BATUBARABUKIT ASAM (PTBA) TJ. ENIM
Since 1985
COAL MININGPT KALIMANTAN PRIMA PERSADA
(KPP)Client :
1. PT. Bumi Rantau Energi (BRE)2. PT. Tanjung Alam Jaya (TAJ)
3. PT. Batu Gunung Mulia (BGM)Since : 2003
LIMESTONE QUARRYClient :
PT. IndokodecoSince 1997
COAL MININGCLIENT :
PT INDOMINCOMANDIRI BANPU
COAL MININGCLIENT :
PT KALTIM PRIMACOAL (KPC)
COAL MININGCLIENT : PT ANUGRAH
BARA KALTIMSince 2006
COAL MININGCLIENT : PT ADARO
Indonesia
VISIONTo be a world leader mining Contractor with the best Productivity,
Engineering, Safety, and Environment
COAL MININGClient :
PD : Baramarta (DEJ)Since 2002
COAL MININGCLIENT : PT BAHARI CAKRAWALA SEBUKU
Since 2010
COAL MININGCLIENT : PT ARUTMIN
INDONESIASince 2012
NEW
COAL MININGCLIENT : PT ASMIN
BARA BRONANGStart 2013
COAL MININGCLIENT : PT TELEN
ORBIT PRIMAIndonesia
Since 2010
NEXT
COAL MININGClient : PT. Jembayan
Muara Bara (JMB)Since 2005
COAL MININGCLIENT :
PT KIDECO JAYAAGUNG
COAL MININGCLIENT : PT BHARINTO
EKATAMASince 2011
COAL MININGCLIENT :
PT TRUBAINDOCOAL MINING
Since 2007
Management Science DepartmentENGINEERING DIVISION
Coal Value Chain
Exploration Coal TradingMining Coal Logistics Coal Shipment
Management Science DepartmentENGINEERING DIVISION
Mining Process1. Land Clearing
2. Drilling & Blasting
3. Overburden Removal
4. Overburden Piling
5. Coal Getting
6. Coal Stockpiling
8. Coal Hauling
9. Port Stockpiling
10. Barging & Transhipment
11. Top Soil spreading & Reclamation
7. Crushing & Sizing
Management Science DepartmentENGINEERING DIVISION
ENGINEERING
Exploration Coal TradingMining Coal Logistics Coal Shipment
• Estimasi Jumlah Cadangan
• Feasibility Study
• Eksploitasi• Pemindahan
tanah & “coal getting”
• Crushing• Stockpiling• Washing
• Blending• Quality Control• Marketing
• Barging• Shipment
Geology MiningCivil
MiningCivil
Management(Marketing)
Management(Transportation)
Disiplin ilmu yang lain ????
Management Science DepartmentENGINEERING DIVISION
Future of MiningPotensi Batubara IndonesiaESDM, 2012
▫Resources batubara di Indonesia sebesar 105 Milyar Ton▫Proven Reserve (Cadangan) batubara di Indonesia sebesar 21
Milyar Ton▫Tingkat produksi batubara di Indonesia sebesar ~ 300 Juta Ton
per tahun▫Pemanfaatan batubara
PLTU Industri Semen, textile, kertas, metalurgy/baja, Briket dll
Management Science DepartmentENGINEERING DIVISION
Future of MiningChallenges
MINING
Complexity• Tambang semakin
dalam/kompleks• Quality problem• Productivity Problem
Safety & Environment• Green Energy• Carbon Tax
Price• Alternative Energy
(Gas)
Goverment & Regulation• Domestic Market Obligation (DMO)• UU Minerba
Management Science DepartmentENGINEERING DIVISION
Future of MiningMining Operation & Methodology
Mining (CURRENT)• Padat Karya• High Investment• Kotor & Resiko Tinggi• Remote Area Less
Attractive• Less Efficient• Technology : Scale Based
Mining (FUTURE)• High Tech• High Investment• Safe Operation• Autonomous & Remote
Operation• Efficient Operation• Technology : Optimization
Based
Management Science DepartmentENGINEERING DIVISION
Future of Mining
Autonomuous Mining Dispatch System
Collision SystemRemote Controlled Operation
Management Science DepartmentENGINEERING DIVISION
PAMA InnovationEWACS PRO Excellent PAMA own Dispatch System
• Operational tambang dikendalikan oleh komputer dengan module optimizer didalamnya.
• Main Features:• Tracking system & Real Time Monitoring• Assignment & Optimizer• Vehicle Health Management System
Management Science DepartmentENGINEERING DIVISION
Case 1 ROM (Stockpile)
Port Crusher (4)
Temporary Stockpile at KM30
Distance : 76 KMEquipments, PAMA : 30 x Double Trailer (120 Ton) ; 24 x Triple Trailer (140 Ton) Subcontractors:
SC1 :10 x Double Trailer (120 Ton) ; SC2 :130 x DumpTruck (20 Ton)
Management Science DepartmentENGINEERING DIVISION
Case 1 (Cont’d)
PROBLEM:
• Proses sebelumnya, seluruh unit (PAMA & SC) melakukan pengangkutan dari ROM langsung ke Port Crusher. Problem yang muncul adalah antrian yang panjang di Port sehingga menurunkan produktivitas alat angkut.
• Muncul ide untuk membuat temporary stock pile di KM30 sehingga pada saat terjadi antrian panjang di Port, maka alat angkut dapat melakukan penumpukan di temporary stockpile dan kemudian akan diangkut kembali oleh unit yang lain.
• Pertanyaan yang timbul adalah :• Berapa unit & jenis unit yang ditugaskan untuk beroperasi dari Temp SP – Port ?• Seberapa tinggi peningkatan produktivitasnya?• Apakah layak (feasible) mengingat biaya yang harus dikeluarkan untuk membuat temp.
stockpile dan tambahan alat muat (loader)?• dll
Management Science DepartmentENGINEERING DIVISION
Case 1 (Cont’d)
Activities untuk setiap jenis unit• Runoff Mine (ROM)
Spotting Loading (Proses pengisian) Payload (berat muatan)
• Travel Isian & Kosongang Kecepatan pada masing-masing segment jalan (isian
dan kosongan)• Port Crusher
Spotting Dumping
Modeling
Sampling & Data Collecting
Simulation
Fitting Distribution
Analisis
SOLUTION ??? SIMULATION
Management Science DepartmentENGINEERING DIVISION
Case 1 (Cont’d)
49 Unit PAMA (25 Double & 24 Triple)
5 Unit Double Trailer PAMA8 Unit Double SC1 (minus 2 unit)
All unit SC2 (130 Dump truck)
SC1
OPTIMUM SOLUTIONActual Result : Improve 15% Productivity
Management Science DepartmentENGINEERING DIVISION
Case 2
Management Science DepartmentENGINEERING DIVISION
Case 2 (Cont’d)
Problem:
• Terdapat 30 unit alat muat (loader) dengan type yang berbeda-beda dalam suatu site. Tambang adalah salah industri dengan investasi tinggi dan “rigid” (tidak flexible terhadap perubahan).
• Target produksi perjam seluruh alat loader pada umumnya sudah ditetapkan sedemikian rupa sehingga target bulanan dapat dipenuhi. Ketidaktercapaian target di akhir bulan dapat menimbulkan pinalti dari pihak customer.
• Untuk memastikan tercapainya target produksi, maka monitoring dan pengawasan yang relatif ketat perlu dijalankan.
• Permasalahannya adalah, bagaimana system Monitioring & Control yang paling optimum mengingat:
o Jumlah unit yang dimonitor cukup banyak sehingga membutuhkan effort dan manpower yang lebih untuk melakukan monitoring & perbaikan langsung di masing-masing unit setiap jam.
o Alat muat dioperasikan oleh manusia, sehingga produkstivitas perjam akan dinamis tergantung dengan kondisi yang ada.
Management Science DepartmentENGINEERING DIVISION
Case 2 (Cont’d)Statistical Process Control (SPC)
Management Science DepartmentENGINEERING DIVISION
Case 2 (Cont’d)SPC
Out of Control
Get Supporting Data
Analysis
Followup & Improve
yes
No
Management Science DepartmentENGINEERING DIVISION
INSIGHT• Efisiensi dan optimalisasi proses tambang menjadi hal utama
dalam menghadapi tantangan industri tambang di masa yang akan datang.
• Tambang di masa yang akan datang akan lebih “attractive”, safe, high tech, dan optimum.
• “Great Challenges” dalam evolusi industri tambang sekaligus sebagai “Great Opportunity”. ▫New Technology & Innovation.▫Tambang sebagai “laboratorium” improvement.
• Kompetensi dan skill yang dibutuhkan dalam industri tambang akan semakin luas dan beragam (multidisciplinary team).
Management Science DepartmentENGINEERING DIVISION
INSIGHT
Exploration Coal TradingMining Coal Logistics Coal Shipment
MULTI DISCIPLINE(Geology, Mining, Civil, Industrial Eng., Computer Science, Math & Statistics,
Metallurgy, Machanical Eng., Finance & Mgmnt, Social Science & Psychology)
Management Science DepartmentENGINEERING DIVISION
Prepare Yourself ...•Paradox
Problem real & complex .Solution & Methodology simple but applicable.
Simplified Problem (Case Study).Solution & Methodology complex, theory based but less applicable.
Tambang Campus
Problem Real & ComplexSolution & Methology Complex (Comprehensive) and applicable
Management Science DepartmentENGINEERING DIVISION
Prepare Yourself ...• Seluruh disiplin ilmu (background) pada dasarnya dapat berkontribusi
dan memiliki kesempatan yang sama dalam industri tambang.• Kontribusi positif menentukan karir dan masa depan Anda dalam
perusahaan.▫ Kuasai disiplin ilmu anda dengan baik dan terbuka dengan disiplin ilmu
lainnya.▫ Seluruh skill dan knowledge yang didapatkan selama kuliah pasti
bermanfaat, tergantung tingkat pemahaman dan kemampuan anda mencari peluang (analogi) dan menerapkannya.
▫ Peluang mengembangkan diri melalui terobosan dan temuan-temuan baru dalam industri tambang.
▫ Interpersonal skill juga akan memberikan peranan besar dalam keberhasilan. Libatkan diri dalam organisasi dan kegiatan kemasyarakatan lainnya.