Customer from Chlorine Industry
Country: Israel
Location: Dead Sea
Production of Bromium; Magnesium; Potash; Chlorine
Detail: 428m below sea level; +45°C
Success stories creating value
May 9, 2019
Page 3
Situation for DSM in 2015
1 Compressor Operation – Low reliability - #1
1 Compressor Operation – Low reliability - #2
1 Compressor Out of operation - #3
1 Compressor Out of operation - #4
• Necessary 2 compr. to keep the plant in operation
• #3 and #4 needed major repair
• DSM was planing to repair the compressor at site
• Limitation of resources at site
Success stories creating value
May 9, 2019
Page 4
What convinced our partner on-site
‘‘Lack of project management skills on-site. We will not get out of this situation
alone – Burckhardt will help us’’
‘‘‘Your will receive new compressors - warranty as new’’
‘‘Less expensive compared than doing it by ouselves’’
‘‘Quality of Burckhardt Compession – Included mechanical test run’
‘‘Lower risk at the Service Center working under 45°C or in a Chlorine Site’’
‘‘We will upgrade your compressor with latest technology’’
‘‘Strong consultancy support on-site’’
Success stories creating value
May 9, 2019
Page 5
Sales Project – PO
2015
2016
2017
Success stories creating value
May 9, 2019
Page 6
Project Execution
Removal of the
compressor
Arrival at the service
center
Success stories creating value
May 9, 2019
Page 7
Project Execution
Success stories creating value
May 9, 2019
Page 8
Project Execution
Laser control
of the
crankcase
Complete
repair
Success stories creating value
May 9, 2019
Page 9
Project Execution
Cylinder:
Inspection
Machining
Test
Pinting
Parts:
Repair
&
Replacement
&
Re-use
Success stories creating value
May 9, 2019
Page 10
Project Execution
Compessor:
Assembley
Test Run
Customer Visit
Disassembley
Packing
Shipping
Success stories creating value
May 9, 2019
Page 11
Project Execution
2016 201720182019*
Foundation Repair
Compressor Install
Compressor Test
Commissioning
Warranty support
Next Compressor
Success stories creating value
May 9, 2019
Page 12
Results and Time line
2016 2017 2018
55131
200118
Inst
Inst
53702 Inst
53701 Inst
2019
• All complext compressors repairs in HQ to ensure best possible quality
• Learning Organization: Delivery time was reduced after 1st project
• Quality increased, as condition of compressor was repeating over time
• Installation executed with supervsion of FSR (separated order)
Success stories creating value
May 9, 2019
Page 13
DSM from risk of total collapse back to normal
operation with great efforts of various teams.
Risk of total
collapse
Order to
BC
Inspection
Site back to
operation
3 Follow up
orders
Measurements
Repair
Assembly
Test run
Installation
Satisfied
customer
Procurement Malen
9 months
Pressure testQuality
Success stories creating value
May 9, 2019
Page 15
Customer Moment: Repsol Polímeros - Turnaround 2018
Overhaul of BC compressors in Repsol Polímeros LDPE plant
Scope: Complete overhaul of the LDPE lines 1 and 2
2 primary and 2 F6 Hyper Compressors
Success stories creating value
May 9, 2019
Page 16
Customer Moment: Repsol Polímeros - Turnaround 2018
Job preparation
May
1st
preparation
meeting
20182016
March
Challenging
news
May
> 2 year preparation period
Scope definition
Checking spare
parts inventory
Defining required
resources
Tu
rna
rou
nd
an
tic
ipa
tio
n
June
Resources
re-scheduling
Success stories creating value
May 9, 2019
Page 17
Customer Moment: Repsol Polímeros - Turnaround 2018
Activities
Repair of the plungers (subcontracted)
Success stories creating value
May 9, 2019
Page 18
Customer Moment: Repsol Polímeros - Turnaround 2018
Activities
Repair of the line 2 Hyper lube pumps at HQ during the overhaul
Success stories creating value
May 9, 2019
Page 19
Customer Moment: Repsol Polímeros - Turnaround 2018
Activities
Replacement of one of the Hyper motors (not in our scope)
Success stories creating value
May 9, 2019
Page 20
Customer Moment: Repsol Polímeros - Turnaround 2018
Activities
Reaming of the hyper/motor adaption flanges
Success stories creating value
May 9, 2019
Page 21
Customer Moment: Repsol Polímeros - Turnaround 2018
Activities
Machining of the crankcase/distance piece surfaces
(subcontracted to Metalock). Job cancelled 3 months prior to the
turnaround. Foreseen for next turnaround.
Success stories creating value
May 9, 2019
Page 22
Customer Moment: Repsol Polímeros - Turnaround 2018
Human resources
site coordination - BCES
primary line 1 - 2B3C1.38 S/N 40419
1 BCAG supervisor (Jan Siczek)
1 Repsol lead mechanic
2 outsourced lead mechanics
primary line 2 - 2B3C1.38 S/N 40420
1 BCAG supervisor (Jan Siczek)
1 Repsol lead mechanic
2 outsourced lead mechanics
hyper line 1 - F6 S/N 40421
1 BCFR supervisor (Franck Fontaine)
1 Repsol lead mechanic
2 outsourced lead mechanics
hyper line 2 - F6 S/N 40422
1 BCAG supervisor day shift (Miguel Tafula)
1 Repsol lead mechanic day shift
2 outsourced lead mechanics day shift
1 BCES supervisor night shift (Miguel Zamarra)
2 outsourced lead mechanics night shift
technical support - BCAG
Success stories creating value
May 9, 2019
Page 23
Customer Moment: Repsol Polímeros - Turnaround 2018
Job execution The turnaround started the 14th may and the
last compressor was started the 6th July.
Success stories creating value
May 9, 2019
Page 24
Customer Moment: Repsol Polímeros - Turnaround 2018
Execution
Some unscheduled activities had to be
carried out, like the dismantling, cleaning
and painting of the primaries cylinder
cooling chambers.
Success stories creating value
May 9, 2019
Page 25
Customer Moment: Repsol Polímeros - Turnaround 2018
Execution
We have coordinated all the motor
replacement related activities to avoid any
damage on the hyper bearings or
crankshaft/camshaft.
Success stories creating value
May 9, 2019
Page 26
Customer Moment: Repsol Polímeros - Turnaround 2018
After job completion
All wear parts and many capital parts replaced
Some activities had never been carried out, like replacing the o-ring
between distance piece and crankcase bodies of the primaries.
New design oil wiper packings were installed on Hyper in line 1
New electric motor for Hyper in line 2
Compressors ready to run for 5/6 years until next turnaround.
Lessons learnt
It’s important to start preparing the turnaround as soon as possible
to maximize business opportunities
We need to be prepared for all kinds of surprises – flexibility is very
important.
Success stories creating value
May 9, 2019
Page 27
Customer Moment: Repsol Polímeros - Turnaround 2018
What Our Customer Says
"The work carried out by Burckhardt Compression was very
good – the planning, technical support, follow-up, last-minute
spare parts orders and unscheduled repairs, as well as
administrative issues. They never had any difficulties adapting
to Repsol’s requirements and last-minute requests, even
though the turnaround timetable created some additional
difficulties for both parties."
André Afonso
Reliability Engineer, Repsol Polímeros
Success stories creating value
May 9, 2019
Page 28
Success stories creating value
May 9, 2019
Page 29
We want to keep you updated
Register Now!
We would like to give you regular
updates
If you are interested getting
regular updates just register, we
do not want to spam you
Register + Confirm Email = full
subscription
Link:
https://www.burckhardtcompressio
n.com/newsletter/