Environmental Monitoring Report Project Number: 48233-001 October 2018
THA: Subyai Wind Power Project
Prepared by United Analyst and Engineering Consultant Co., Ltd.
The environment monitoring report is a document of the borrower. The views expressed herein
do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may
be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation
of or reference to a particular territory or geographic area in this document, the Asian
Development Bank does not intend to make any judgments as to the legal or other status of any
territory or area.
IN OCTOBER 2018
ENVIRONMENTAL IMPACT MONITORING REPORT
FOR CHAIYAPHUM WIND FARM PROJECT
Presented by : United Analyst and Engineering Consultant Co., Ltd
3 Soi Udomsuk 41, Sukhumvit Road, Bangchak, Phrakhanong,
Bangkok 10260, Tel. 0-2763-2828 Fax 0-2763-2800
www.uaeconsultant.com e-mail: [email protected]
Project Owner : Chaiyaphum Wind Farm Co., Ltd
222 EGCO Tower, Vibhavadi Rangsit Road,
Tungsonghong, Laksi, Bangkok 10210
IN OCTOBER 2018
ENVIRONMENTAL IMPACT MONITORING REPORT
FOR CHAIYAPHUM WIND FARM PROJECT
Presented by : United Analyst and Engineering Consultant Co., Ltd
3 Soi Udomsuk 41, Sukhumvit Road, Bangchak, Phrakhanong,
Bangkok 10260, Tel. 0-2763-2828 Fax 0-2763-2800
www.uaeconsultant.com e-mail: [email protected]
Project Owner : Chaiyaphum Wind Farm Co., Ltd
222 EGCO Tower, Vibhavadi Rangsit Road,
Tungsonghong, Laksi, Bangkok 10210
Content
Title Page
1. Environmental Impact Monitoring Plan 1
2. Ambient Noise Level Method 4
3. Environmental Impact Monitoring Results 6
List of Tables
Title Page
Table 1 Ambient Noise Level Monitoring Plan 1
Table 2 Coordinates of Ambient Noise Level Monitoring Stations 2
Table 3 Sampling and Analytical Method, Chaiyaphum Wind Farm Project (Operation Period) 4
Table 4 The Result of Ambient Noise Level Monitoring of Chaiyaphum Wind Farm Project
during October 27-30, 2018 8
List of Figures
Title Page
Figure 1 Locations of Ambient Noise Level Monitoring Stations 3
Figure 2 Ambient Noise Level Monitoring Stations of Chaiyaphum Wind Farm Project
(operation period) during October 27-30, 2018 4
Figure 3 Graph of LAeq 24 hours Monitoring Results during October 27-30, 2018
compared with the Standard 10
Figure 4 Graph of LAmax Monitoring Results during October 27-30, 2018
compared with the Standard 11
Figure 5 Graph of LAeq 1 hour Monitoring Results during October 27-30, 2018 12
Figure 6 Graph of LA90 5 mins Monitoring Results during October 27-30, 2018 13
Appendix
Appendix A Analysis Report
Appendix B Registration Documents of Laboratory
Appendix C Certificate of Calibration
Appendix D The Related Environmental Quality Standard
Environmental Impact Monitoring Report for 1
Chaiyaphum Wind Farm Project in October 2018
United Analyst and Engineering Consultant Co., Ltd.
Certified Laboratory ISO/IEC 17025 : 2005
Environmental Impact Monitoring Report
for Chaiyaphum Wind Farm Project in October 2018
United Analyst and Engineering Consultant Co., Ltd. (UAE) was assigned by Chaiyaphum Wind Farm
Co., Ltd to implement the environmental impact monitoring measure which is ambient noise level monitoring
during operation period of Chaiyaphum Wind Farm Project in October 2018. The details of implementation are
described as follows:
1. Environmental Impact Monitoring Plan
The scope of environmental impact monitoring plan in the project operation period is referred to the
measures specified in the Initial Environmental Examination (IEE) report. The ambient noise level monitoring
period was on October 27-30, 2018. The details of monitoring plan are shown in Table 1. Locations and
coordinates of the monitoring stations are shown in Table 2 and Figure 1.
Table 1 Ambient Noise Level Monitoring Plan
Measures Parameter Monitoring Stations Time / Frequency Monitoring
Date
Ambient Noise
Level
- LAeq 24 hours
- LAeq 1 hour
- LAmax
- LA90 5 mins
Station N1: Ban Bu Chanuan School, Sub Yai Subdistrict,
Sub Yai District, Chaiyaphum Province
Measures
3 consecutive days
every 6 months
27-30 Oct 18
Station N2: Ban Sub Hang Community Hall, Sub Yai
Subdistrict, Sub Yai District, Chaiyaphum Province
Station N3: Ban Sub Charoen Suk School, Sub Yai
Subdistrict, Sub Yai District, Chaiyaphum Province
Station N4: Buddha Kitjaram Temple, Na Yangklak
subdistrict, Thep Sathit district, Chaiyaphum province
Station N5: Thep Nimit Wanarak Priest's Camp Site, Ban
Rai subdistrict, Thep Sathit district, Chaiyaphum province
Station N6: Ban Wang Tathep School, Ban Rai subdistrict,
Thep Sathit district, Chaiyaphum province
Station N7: Ban Nong Bua (Bua Kaew Buddhawas
Temple), Sub Yai Subdistrict, Sub Yai District, Chaiyaphum
Province
Station N8: Project area at WTG 11, Sub Yai Subdistrict,
Sub Yai District, Chaiyaphum Province
Environmental Impact Monitoring Report for 2
Chaiyaphum Wind Farm Project in October 2018
United Analyst and Engineering Consultant Co., Ltd.
Certified Laboratory ISO/IEC 17025 : 2005
Table 2 Coordinates of Ambient Noise Level Monitoring Stations
Monitoring Stations
Coordinate
Zone Easting (X) Northing
(Y)
Ambient Noise Level
1. Station N1: Ban Bu Chanuan School,
Sub Yai Subdistrict, Sub Yai District, Chaiyaphum Province
47 P 770390 1727510
2. Station N2: Ban Sub Hang Community Hall,
Sub Yai Subdistrict, Sub Yai District, Chaiyaphum Province
47 P 774621 1726852
3. Station N3: Ban Sub Charoen Suk School,
Sub Yai Subdistrict, Sub Yai District, Chaiyaphum Province
47 P 776599 1729185
4. Station N4: Buddha Kitjaram Temple,
Na Yangklak subdistrict, Thep Sathit district, Chaiyaphum province
47 P 773036 1731369
5. Station N5: Thep Nimit Wanarak Priest's Camp Site,
Ban Rai subdistrict, Thep Sathit district, Chaiyaphum province
47 P 766955 1725041
6. Station N6: Ban Wang Tathep School,
Ban Rai subdistrict, Thep Sathit district, Chaiyaphum province
47 P 768294 1724161
7. Station N7: Ban Nong Bua (Bua Kaew Buddhawas Temple),
Sub Yai Subdistrict, Sub Yai District, Chaiyaphum Province
47 P 768864 1727960
8. Station N8: Project area at WTG 11,
Sub Yai Subdistrict, Sub Yai District, Chaiyaphum Province
47 P 771803 1724508
Environmental Impact Monitoring Report for 3
Chaiyaphum Wind Farm Project in October 2018
United Analyst and Engineering Consultant Co., Ltd.
Certified Laboratory ISO/IEC 17025 : 2005
Figure 1 Locations of Ambient Noise Level Monitoring Stations
Environmental Impact Monitoring Report for 4
Chaiyaphum Wind Farm Project in October 2018
United Analyst and Engineering Consultant Co., Ltd.
Certified Laboratory ISO/IEC 17025 : 2005
2. Ambient Noise Level Method
Sampling, analytical method and standard method are shown in Table 3.
Table 3 Sampling and Analytical Method, Chaiyaphum Wind Farm Project (Operation Period)
Parameter Sampling/Measurement Analytical Method Standard Method
Ambient Noise Level
- LAeq 24 hours
- LAeq 1 hour
- LAmax
- LA90 5 mins
Integrated Sound
Level Meter
Integrated Sound
Level Meter
ISO 1996/1
Source: Notification of the National Environment Board No.15 (B.E.2540) regarding Equivalent sound level standard
dated March 12, B.E. 2540 (1997), published in the Royal Government
Ambient noise level monitoring in the operation period during October 27-30, 2018 is shown as Figure 2.
Station N1 : Ban Bu Chanuan School Station N2 : Ban Sub Hang Community Hall
Figure 2 Ambient Noise Level Monitoring Stations of Chaiyaphum Wind Farm Project
during October 27-30, 2018
Environmental Impact Monitoring Report for 5
Chaiyaphum Wind Farm Project in October 2018
United Analyst and Engineering Consultant Co., Ltd.
Certified Laboratory ISO/IEC 17025 : 2005
Station N3 : Ban Sub Charoen Suk School Station N4 : Buddha Kitjaram Temple
Station N5 : Thep Nimit Wanarak Priest's Camp Site Station N6 : Ban Wang Tathep School
Station N7 : Ban Nong Bua
(Bua Kaew Buddhawas Temple)
Station N8 : Project area at WTG11
Figure 2 (Cont.) Ambient Noise Level Monitoring Stations of Chaiyaphum Wind Farm Project
during October 27-30, 2018
Environmental Impact Monitoring Report for 6
Chaiyaphum Wind Farm Project in October 2018
United Analyst and Engineering Consultant Co., Ltd.
Certified Laboratory ISO/IEC 17025 : 2005
3. Environmental Impact Monitoring Results
Referring to the analysis number T18AG359-0001 to T18AG359-0024, The results of LAeq 24 hours and LAmax
from 8 monitoring stations during October 27-30, 2018 were found as follow;
N1 : Ban Bu Chanuan School during October 27, 2018 at 07.00 a.m. to October 30, 2018 at 07.00 a.m.
demonstrated that the results of LAeq 24 hours were in the range of 51.7-52.8 dB(A) and LAmax were in the range
of 55.5-90.0 dB(A). Both results complied with Ambient Noise Level Standards, Notification of the National
Environment Board No.15, B.E.2540 (1997) which determined that LAeq 24 hours should not exceed 70 dB(A) and
LAmax should not exceed 115 dB(A) while there was no standard specified for LA90 and LAeq 1 hour as shown in
Table 4 and Figure 3 to Figure 6.
N2 : Ban Sub Hang Community Hall during October 27, 2018 at 07.00 a.m. to October 30, 2018 at 07.00 a.m.
demonstrated that the results of LAeq 24 hours were in the range of 51.1-53.1 dB(A) and LAmax were in the range
of 51.8-86.5 dB(A). Both results complied with Ambient Noise Level Standards, Notification of the National
Environment Board No.15, B.E.2540 (1997) which determined that LAeq 24 hours should not exceed 70 dB(A) and
LAmax should not exceed 115 dB(A) while there was no standard specified for LA90 and LAeq 1 hour as shown in
Table 4 and Figure 3 to Figure 6.
N3 : Ban Sub Charoen Suk School during October 27, 2018 at 07.00 a.m. to October 30, 2018 at 07.00 a.m.
demonstrated that the results of LAeq 24 hours were in the range of 51.0-52.6 dB(A) and LAmax were in the range
of 53.6-101.0 dB(A). Both results complied with Ambient Noise Level Standards, Notification of the National
Environment Board No.15, B.E.2540 (1997) which determined that LAeq 24 hours should not exceed 70 dB(A) and
LAmax should not exceed 115 dB(A) while there was no standard specified for LA90 and LAeq 1 hour as shown in
Table 4 and Figure 3 to Figure 6.
N4 : Buddha Kitjaram Temple during October 27, 2018 at 07.00 a.m. to October 30, 2018 at 07.00 a.m.
demonstrated that the results of LAeq 24 hours were in the range of 51.1-51.7 dB(A) and LAmax were in the range
of 49.1-94.3 dB(A). Both results complied with Ambient Noise Level Standards, Notification of the National
Environment Board No.15, B.E.2540 (1997) which determined that LAeq 24 hours should not exceed 70 dB(A) and
LAmax should not exceed 115 dB(A) while there was no standard specified for LA90 and LAeq 1 hour as shown in
Table 4 and Figure 3 to Figure 6.
N5 : Thep Nimit Wanarak Priest’s Camp Site during October 27, 2018 at 07.00 a.m. to October 30, 2018 at
07.00 a.m. demonstrated that the results of LAeq 24 hours were in the range of 51.3-52.3 dB(A) and LAmax were in
the range of 55.1-89.1 dB(A). Both results complied with Ambient Noise Level Standards, Notification of the
National Environment Board No.15, B.E.2540 (1997) which determined that LAeq 24 hours should not exceed 70
dB(A) and LAmax should not exceed 115 dB(A) while there was no standard specified for LA90 and LAeq 1 hour as
shown in Table 4 and Figure 3 to Figure 6.
Environmental Impact Monitoring Report for 7
Chaiyaphum Wind Farm Project in October 2018
United Analyst and Engineering Consultant Co., Ltd.
Certified Laboratory ISO/IEC 17025 : 2005
N6 : Ban Wang Tathep School during October 27, 2018 at 07.00 a.m. to October 30, 2018 at 07.00 a.m.
demonstrated that the results of LAeq 24 hours were in the range of 53.1-53.7 dB(A) and LAmax were in the range
of 50.9-91.1 dB(A). Both results complied with Ambient Noise Level Standards, Notification of the National
Environment Board No.15, B.E.2540 (1997) which determined that LAeq 24 hours should not exceed 70 dB(A) and
LAmax should not exceed 115 dB(A) while there was no standard specified for LA90 and LAeq 1 hour as shown in
Table 4 and Figure 3 to Figure 6.
N7 : Ban Nong Bua (Bua Kaew Buddhawas Temple) during October 27, 2018 at 07.00 a.m. to October 30,
2018 at 07.00 a.m. demonstrated that the results of LAeq 24 hours were in the range of 52.6-52.8 dB(A) and LAmax
were in the range of 52.2-90.3 dB(A). Both results complied with Ambient Noise Level Standards, Notification
of the National Environment Board No.15, B.E.2540 (1997) which determined that LAeq 24 hours should not exceed
70 dB(A) and LAmax should not exceed 115 dB(A) while there was no standard specified for LA90 and LAeq 1 hour
as shown in Table 4 and Figure 3 to Figure 6.
N8 : Project area at WTG11 during October 27, 2018 at 07.00 a.m. to October 30, 2018 at 07.00 a.m.
demonstrated that the results of LAeq 24 hours were in the range of 59.9-60.6 dB(A) and LAmax were in the range
of 59.8-81.2 dB(A). Both results complied with Ambient Noise Level Standards, Notification of the National
Environment Board No.15, B.E.2540 (1997) which determined that LAeq 24 hours should not exceed 70 dB(A) and
LAmax should not exceed 115 dB(A) while there was no standard specified for LA90 and LAeq 1 hour as shown in
Table 4 and Figure 3 to Figure 6.
Environmental Impact Monitoring Report for 8
Chaiyaphum Wind Farm Project in October 2018
United Analyst and Engineering Consultant Co., Ltd.
Certified Laboratory ISO/IEC 17025 : 2005
Table 4 The Result of Ambient Noise Level Monitoring of Chaiyaphum Wind Farm Project during October 27-30, 2018
Monitoring Stations Monitoring Date Result
LAeq 24 hours LAmax LAeq 1 hour LA90 5 mins
1. Station N1 : Ban Bu Chanuan School 27-28 Oct 18 52.4 58.5-90.0 44.0-59.5 33.8-51.2
28-29 Oct 18 52.8 57.5-88.8 44.2-60.8 33.1-50.6
29-30 Oct 18 51.7 55.5-86.4 43.4-57.9 33.7-52.1
Min-Max 51.7-52.8 55.5-90.0 43.4-60.8 33.1-52.1
2. Station N2 : Ban Sub Hang Community Hall 27-28 Oct 18 52.7 53.0-86.5 43.2-59.9 37.8-52.5
28-29 Oct 18 53.1 51.8-82.1 44.6-57.6 37.8-55.0
29-30 Oct 18 51.1 56.1-80.4 47.2-57.8 41.7-50.6
Min-Max 51.1-53.1 51.8-86.5 43.2-59.9 37.8-55.0
3. Station N3 : Ban Sub Charoen Suk School 27-28 Oct 18 52.6 53.6-95.7 44.5-59.3 34.0-54.3
28-29 Oct 18 52.4 57.4-101.0 43.4-59.7 33.2-56.2
29-30 Oct 18 51.0 55.8-93.1 47.2-53.9 33.8-53.7
Min-Max 51.0-52.6 53.6-101.0 43.4-59.7 33.2-56.2
4. Station N4 : Buddha Kitjaram Temple 27-28 Oct 18 51.7 49.1-90.6 40.9-59.3 29.3-50.1
28-29 Oct 18 51.1 52.6-94.3 39.5-59.7 27.8-51.1
29-30 Oct 18 51.6 49.6-94.2 40.0-59.5 28.7-50.0
Min-Max 51.1-51.7 49.1-94.3 40.0-59.7 27.8-51.1
5. Station N5 : Thep Nimit Wanarak Priest's Camp Site 27-28 Oct 18 51.8 56.9-85.9 44.3-58.1 32.6-58.6
28-29 Oct 18 52.3 56.1-89.0 44.1-59.5 34.9-56.5
29-30 Oct 18 51.3 55.1-89.1 43.5-59.4 35.3-54.3
Min-Max 51.3-52.3 55.1-89.1 43.5-59.5 32.6-58.6
6. Station N6 : Ban Wang Tathep School 27-28 Oct 18 53.6 50.9-90.1 39.4-61.8 31.8-61.5
28-29 Oct 18 53.1 55.3-91.1 39.2-59.4 32.1-55.7
29-30 Oct 18 53.7 54.3-89.4 39.0-59.7 32.9-58.5
Min-Max 53.1-53.7 50.9-91.1 39.0-61.8 31.8-61.5
Environmental Impact Monitoring Report for 9
Chaiyaphum Wind Farm Project in October 2018
United Analyst and Engineering Consultant Co., Ltd.
Certified Laboratory ISO/IEC 17025 : 2005
Table 4 (Cont.) The Result of Ambient Noise Level Monitoring of Chaiyaphum Wind Farm Project during October 27-30, 2018
Monitoring Stations Monitoring Date Result
LAeq 24 hours LAmax LAeq 1 hour LA90 5 mins
7. Station N7 : Ban Nong Bua (Bua Kaew Buddhawas Temple) 27-28 Oct 18 52.8 53.8-90.3 45.9-58.9 34.4-55.0
28-29 Oct 18 52.6 52.2-89.0 42.8-58.9 35.7-58.3
29-30 Oct 18 52.7 56.2-87.8 44.9-60.8 34.2-53.8
Min-Max 52.6-52.8 52.2-90.3 42.8-60.8 34.2-58.3
8. Station N8 : Project area at WTG 11 27-28 Oct 18 60.6 59.8-81.2 55.8-63.5 54.7-65.0
28-29 Oct 18 59.9 61.3-77.2 55.9-62.0 54.5-61.2
29-30 Oct 18 60.4 61.2-72.7 58.3-62.5 50.8-62.1
Min-Max 59.9-60.6 59.8-81.2 55.8-63.5 50.8-65.0
Standard1/ < 70 < 115 - -
Unit dB(A)
Remark: 1/ Ambient Noise Level Standards, Notification of the National Environment Board No.15 (B.E. 2540)
Environmental Impact Monitoring Report for
Chaiyaphum Wind Farm Project in October 2018
United Analyst and Engineering Consultant Co., Ltd.
Certified Laboratory ISO/IEC 17025 : 2005
10
Figure 3 Graph of LAeq 24 hours Monitoring Results during October 27-30, 2018
compared with the Standard
52.4
52.7
52.6
51.7
51.8 53.6
52.8
60.6
52.8
53.1
52.4
51.1
52.3
53.1
52.6
59.9
51.7
51.1
51.0
51.6
51.3 53
.7
52.7
60.4
≤ 70
0
10
20
30
40
50
60
70
80
Station N1 :
Ban Bu
Chanuan
School
Station N2 :
Ban Sub
Hang
Community
Hall
Station N3 :
Ban Sub
Charoen Suk
School
Station N4 :
Buddha
Kitjaram
Temple
Station N5 :
Thep Nimit
Wanarak
Priest's
Camp Site
Station N6 :
Ban Wang
Tathep
School
Station N7 :
Ban Nong
Bua (Bua
Kaew
Buddhawas
Temple)
Station N8 :
Project area
at WTG 11
L Aeq
24
hour
s (d
B(A
))
Stations
27-28 Oct 2018 28-29 Oct 2018 29-30 Oct 2018 Standard
Environmental Impact Monitoring Report for
Chaiyaphum Wind Farm Project in October 2018
United Analyst and Engineering Consultant Co., Ltd.
Certified Laboratory ISO/IEC 17025 : 2005
11
Figure 4 Graph of LAmax Monitoring Results during October 27-30, 2018
compared with the Standard
90.0
86.5
95.7
90.6
85.9 90
.1
90.3
81.288
.8
82.1
101.
0
94.3
89.0
91.1
89.0
77.2
86.4
80.4
93.1
94.2
89.1
89.4
87.8
72.7
≤ 115
0
20
40
60
80
100
120
140
Station N1 :
Ban Bu
Chanuan
School
Station N2 :
Ban Sub
Hang
Community
Hall
Station N3 :
Ban Sub
Charoen Suk
School
Station N4 :
Buddha
Kitjaram
Temple
Station N5 :
Thep Nimit
Wanarak
Priest's Camp
Site
Station N6 :
Ban Wang
Tathep
School
Station N7 :
Ban Nong
Bua (Bua
Kaew
Buddhawas
Temple)
Station N8 :
Project area
at WTG 11
L Am
ax (d
B(A
))
Stations
27-28 Oct 2018 28-29 Oct 2018 29-30 Oct 2018 Standard
Environmental Impact Monitoring Report for
Chaiyaphum Wind Farm Project in October 2018
United Analyst and Engineering Consultant Co., Ltd.
Certified Laboratory ISO/IEC 17025 : 2005
12
Figure 5 Graph of LAeq 1 hour Monitoring Results during October 27-30, 2018
59.5
59.9
59.3
59.3
58.1 61
.8
58.9 63
.5
60.8
57.6 59.7
59.7
59.5
59.4
58.9 62
.0
57.9
57.8
53.9
59.5
59.4
59.7
60.8 62.5
0
10
20
30
40
50
60
70
80
Station N1: Ban
Bu Chanuan
School
Station N2: Ban
Sub Hang
Community Hall
Station N3: Ban
Sub Charoen Suk
School
Station N4:
Buddha Kitjaram
Temple
Station N5: Thep
Nimit Wanarak
Priest's Camp
Site
Station N6: Ban
Wang Tathep
School
Station N7: Ban
Nong Bua (Bua
Kaew Buddhawas
Temple)
Station N8:
Project area at
WTG 11
L Aeq
1 h
our (d
B(A
))
Stations
27-28 Oct 2018 28-29 Oct 2018 29-30 Oct 2018
Environmental Impact Monitoring Report for
Chaiyaphum Wind Farm Project in October 2018
United Analyst and Engineering Consultant Co., Ltd.
Certified Laboratory ISO/IEC 17025 : 2005
13
Figure 6 Graph of LA90 5 mins Monitoring Results during October 27-30, 2018
51.2
52.5
54.3
50.1
58.6 61
.5
55.0
65.0
50.6 55
.0
56.2
51.1 56
.5
55.7 58
.3 61.2
52.1
50.6 53
.7
50.0 54
.3 58.5
53.8
62.1
0
10
20
30
40
50
60
70
80
Station N1 : Ban
Bu Chanuan
School
Station N2 : Ban
Sub Hang
Community Hall
Station N3 : Ban
Sub Charoen Suk
School
Station N4 :
Buddha Kitjaram
Temple
Station N5 : Thep
Nimit Wanarak
Priest's Camp
Site
Station N6 : Ban
Wang Tathep
School
Station N7 : Ban
Nong Bua (Bua
Kaew Buddhawas
Temple)
Station N8 :
Project area at
WTG 11
L A90
5 m
ins (d
B(A
))
Stations
27-28 Oct 2018 28-29 Oct 2018 29-30 Oct 2018
APPENDIX
Appendix A Analysis Report
Appendix B Registration Documents of Laboratory
Appendix C Certificate of Calibration
Appendix D The Related Environmental
Quality Standard
No. Instrument/Equipment Parameter Manufacturer Model/Serial No. Calibrator Certification Date of Due date of Remark
No. Calibration Calibration
Ambient
1 Sound Level Calibrator Calibrate Sound Level Meter SVANTEK SV35A / 73246 SVANTEK 11052018 11 May 18 10 May 19 -
(Acoustic Calibrator)
2 Sound Level Meter LAeq1 hour, LAeq 24 hours, LAmax, LA90 Rion, Japan NL-21 Quality Calibration Co.,Ltd. 18E6017 3 Jul 18 2 Jul 19 -
00109005
3 Sound Level Meter LAeq1 hour, LAeq 24 hours, LAmax, LA90 Rion, Japan NL-21 Quality Calibration Co.,Ltd. 18E5832 3 Jul 18 2 Jul 19 -
00109003
4 Sound Level Meter LAeq1 hour, LAeq 24 hours, LAmax, LA90 Rion, Japan NL-21 Quality Calibration Co.,Ltd. 18E6010 3 Jul 18 2 Jul 19 -
00965934
5 Sound Level Meter LAeq1 hour, LAeq 24 hours, LAmax, LA90 Rion, Japan NL-21 Quality Calibration Co.,Ltd. 18E6018 3 Jul 18 2 Jul 19 -
00965931
6 Sound Level Meter LAeq1 hour, LAeq 24 hours, LAmax, LA90 Rion, Japan NL-21 Quality Calibration Co.,Ltd. 18E6013 3 Jul 18 2 Jul 19 -
00865788
7 Sound Level Meter LAeq1 hour, LAeq 24 hours, LAmax, LA90 Rion, Japan NL-21 Quality Calibration Co.,Ltd. 18E5833 3 Jul 18 2 Jul 19 -
00865777
8 Sound Level Meter LAeq1 hour, LAeq 24 hours, LAmax, LA90 Rion, Japan NL-21 Quality Calibration Co.,Ltd. 18E6015 3 Jul 18 2 Jul 19 -
00365336
9 Sound Level Meter LAeq1 hour, LAeq 24 hours, LAmax, LA90 Rion, Japan NL-21 Quality Calibration Co.,Ltd. 18E5835 3 Jul 18 2 Jul 19 -
00865774
List of Instruments Certification for Air & Noise Quality Analysis
254
ª√–°“»§≥–°√√¡°“√ ‘Ëß·«¥≈âÕ¡·Ààß™“µ‘©∫—∫∑’Ë Òı (æ.». ÚıÙ)
‡√◊ËÕß °”Àπ¥¡“µ√∞“π√–¥—∫‡ ’¬ß‚¥¬∑—Ë«‰ª
Õ“»—¬Õ”π“®µ“¡§«“¡„π¡“µ√“ ÛÚ (ı) ·Ààßæ√–√“™∫—≠≠—µ‘ à߇ √‘¡·≈–√—°…“§ÿ≥¿“æ ‘Ëß·«¥≈âÕ¡·Ààß™“µ‘ æ.». ÚıÛı §≥–°√√¡°“√ ‘Ëß·«¥≈âÕ¡·Ààß™“µ‘°”Àπ¥¡“µ√∞“π√–¥—∫‡ ’¬ß‚¥¬∑—Ë«‰ª‰«â¥—ßµàÕ‰ªπ’È
¢âÕ Ò „πª√–°“»π’Èç√–¥—∫‡ ’¬ß‚¥¬∑—Ë«‰ªé À¡“¬§«“¡«à“ √–¥—∫‡ ’¬ß∑’ˇ°‘¥¢÷Èπ„π ‘Ëß·«¥≈âÕ¡ç§à“√–¥—∫‡ ’¬ß Ÿß ÿ¥é À¡“¬§«“¡«à“ §à“√–¥—∫‡ ’¬ß Ÿß ÿ¥∑’ˇ°‘¥¢÷Èπ„π¢≥–
„¥¢≥–Àπ÷Ëß√–À«à“ß°“√µ√«®«—¥√–¥—∫‡ ’¬ß ‚¥¬¡’Àπ૬‡ªìπ‡¥´‘‡∫≈‡Õ À√◊Õ dB (A)ç§à“√–¥—∫‡ ’¬ß‡©≈’ˬ ÚÙ ™—Ë«‚¡ßé À¡“¬§«“¡«à“ §à“√–¥—∫‡ ’¬ß§ß∑’Ë∑’Ë¡’
æ≈—ßß“π‡∑’¬∫‡∑à“√–¥—∫‡ ’¬ß∑’ˇ°‘¥¢÷Èπ®√‘ß ´÷Ëß¡’√–¥—∫‡ ’¬ß‡ª≈’ˬπ·ª≈ßµ“¡‡«≈“„π™à«ßÚÙ ™—Ë«‚¡ß (ÚÙ hours A-weighted Equivalent Continuous Sound Level) ´÷Ë߇√’¬°‚¥¬¬àÕ«à“ Leq ÚÙ hr ‚¥¬¡’Àπ૬‡ªìπ‡¥´‘‡∫≈‡Õ À√◊Õ dB (A)
ç¡“µ√√–¥—∫‡ ’¬ßé À¡“¬§«“¡«à“ ‡§√◊ËÕß«—¥√–¥—∫‡ ’¬ßµ“¡¡“µ√∞“π IECˆıÒ À√◊Õ IEC ¯Ù ¢Õߧ≥–°√√¡“∏‘°“√√–À«à“ߪ√–‡∑»«à“¥â«¬‡∑§π‘§‰øøÑ“ (Interna-tional Electrotechnical Commission, IEC)
¢âÕ Ú „Àâ°”Àπ¥¡“µ√∞“π√–¥—∫‡ ’¬ß‚¥¬∑—Ë«‰ª ‰«â¥—ßµàÕ‰ªπ’È(Ò) §à“√–¥—∫‡ ’¬ß Ÿß ÿ¥ ‰¡à‡°‘π ÒÒı ‡¥´‘‡∫≈‡Õ(Ú) §à“√–¥—∫‡ ’¬ß‡©≈’ˬ ÚÙ ™—Ë«‚¡ß ‰¡à‡°‘π ˜ ‡¥™‘‡∫≈‡Õ
255
¢âÕ Û °“√µ√«®«—¥√–¥—∫‡ ’¬ß‚¥¬∑—Ë«‰ª „À⥔‡π‘π°“√¥—ßµàÕ‰ªπ’È(Ò) °“√µ√«®«—¥§à“√–¥—∫‡ ’¬ß Ÿß ÿ¥ „Àℙ⡓µ√√–¥—∫‡ ’¬ßµ√«®«—¥
√–¥—∫‡ ’¬ß„π∫√‘‡«≥∑’Ë¡’§πÕ¬ŸàÀ√◊ÕÕ“»—¬Õ¬Ÿà(Ú) °“√µ√«®«—¥§à“√–¥—∫‡ ’¬ß‡©≈’ˬ ÚÙ ™—Ë«‚¡ß „Àℙ⡓µ√√–¥—∫‡ ’¬ßµ√«®
«—¥√–¥—∫‡ ’¬ßÕ¬à“ßµàÕ‡π◊ËÕßµ≈Õ¥‡«≈“ ÚÙ ™—Ë«‚¡ß„¥Ê(Û) °“√µ—È߉¡‚§√‚øπ¢Õß¡“µ√√–¥—∫‡ ’¬ß∑’Ë∫√‘‡«≥¿“¬πÕ°Õ“§“√„Àâµ—Èß
Ÿß®“°æ◊Èπ‰¡àπâÕ¬°«à“ Ò.Ú ‡¡µ√ ‚¥¬„π√—»¡’ Û.ı ‡¡µ√ µ“¡·π«√“∫√Õ∫‰¡‚§√‚øπµâÕ߉¡à¡’°”·æßÀ√◊Õ ‘ËßÕ◊Ëπ„¥∑’Ë¡’§ÿ≥ ¡∫—µ‘„π°“√ –∑âÕπ‡ ’¬ß°’¥¢«“ßÕ¬Ÿà
(Ù) °“√µ—È߉¡‚§√‚øπ¢Õß¡“µ√√–¥—∫‡ ’¬ß∑’Ë∫√‘‡«≥¿“¬„πÕ“§“√„Àâµ—Èß Ÿß®“°æ◊Èπ‰¡àπâÕ¬°«à“ Ò.Ú ‡¡µ√ ‚¥¬„π√—»¡’ Ò. ‡¡µ√ µ“¡·π«√“∫√Õ∫‰¡‚§√‚øπµâÕ߉¡à¡’°”·æß ‘ËßÕ◊Ëπ„¥∑’Ë¡’§ÿ≥ ¡∫—µ‘„π°“√ –∑âÕπ‡ ’¬ß°’¥¢«“ßÕ¬Ÿà·≈–µâÕßÀà“ß®“°™àÕßÀπ⓵à“ßÀ√◊Õ™àÕß∑“ß∑’ˇªî¥ÕÕ°πÕ°Õ“§“√Õ¬à“ßπâÕ¬ Ò.ı ‡¡µ√
¢âÕ Ù °“√§”π«≥§à“√–¥—∫‡ ’¬ß®–µâÕ߇ªìπ‰ªµ“¡«‘∏’°“√∑’ËÕߧ尓√√–À«à“ߪ√–‡∑»«à“¥â«¬¡“µ√∞“π (International Organization for Standardization, ISO) °”Àπ¥ ´÷Ëß°√¡§«∫§ÿ¡¡≈æ‘…®–ª√–°“»„π√“™°‘®®“πÿ‡∫°…“
ª√–°“» ≥ «—π∑’Ë ÒÚ ¡’π“§¡ æ.». ÚıÙæ≈‡Õ° ™«≈‘µ ¬ß„®¬ÿ∑∏
𓬰√—∞¡πµ√’ª√–∏“π§≥–°√√¡°“√ ‘Ëß·«¥≈âÕ¡·Ààß™“µ‘
(ª√–°“»„π√“™°‘®®“πÿ‡∫°…“ ‡≈à¡ ÒÒÙ µÕπ∑’Ë Ú˜ ß «—π∑’Ë Û ‡¡…“¬π ÚıÙ)