Subsea : Way to Future
Fully Autonomous Plant
TOTAL SA – R&D Deep Offshore
Luc RIVIERE
2
Agenda • Introduction
• Avant-Hier
• Hier • Aujourd’hui
• Demain
• Conclusion
TOTAL SA - R&D Deep Offshore – LR
Subsea - Way to Future : Fully Autonomous Plant
3
Subsea Oil Resources (WD > 150m) = 300 Gbo – 200 Gbo Deep Offshore
Source: Quest Offshore May 2011 (>150 m WD)
87
36
54
78 40
TOTAL SA - R&D Deep Offshore – LR
Introduction: les ressources Subsea (> 150m WD)
0
5
10
15
20
25
1995 2000 2005 2010 2015 2020 2025 2030
Prod
uctio
n (M
boep
d)
year
Deep Offshore Oil & Gas Production
Oil
Gas
Source : Energyfiles 2010
4 TOTAL SA - R&D Deep Offshore – LR
Introduction : la production deep offshore
1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf Océan (articulated tower prototype in 100 m WD)
1978 – Gabon - North East Grondin (3 oil production wells in a template) 1983 – North Sea – Start-up of North East Frigg (gas field tied back to Frigg)
1981-85 – North Sea – Skuld and Super Skuld (R&D projects - target 300m WD) 1988 – North Sea – Alwyn North Extension (3 individual subsea wells) 1988 – North Sea – Stat-up of East Frigg (1st diverless subsea development – gas field)
Articulated tower (Subsea Control System) Subsea template
Xmas Tree
Tie-back to Frigg
Central Manifold Station
2 Bundles between Manifold & Production Templates
3 wels template
5 5 TOTAL SA - R&D Deep Offshore – LR
Avant-Hier : les premiers pas du subsea
Pazflor Block 17 Angola field development
1987-90 – North Sea – DISPS project in JV with BP (Diverless Subsea Production System) 1992 – North Sea – Ellon – Subsea tie back to Dunbar (flowline loop design)
1993 – North Sea – Start up of Lille Frigg (HP/HT gas field: 670 bar, 125°C) 1995-97 – North Sea – HOST R&D Project (Hinge Over Subsea Template) Target: Develop a modularized Subsea Production System for 2 500m WD Partners: Total (Elf), Mobil, Shell, Statoil, KOS
Production Manifold Choke Removal Tool Subsea Development
Ellon / Dunbar
Template config Hybrid config Cluster config
The basis of future Subsea Developments
Avant-Hier : les premiers pas du subsea
6 TOTAL SA - R&D Deep Offshore – LR
Plateau: 130 kbopd First oil : June 2007 WD = 1350 m
Angola B17 - Rosa
Plateau: 250 kbopd First oil : Dec 2001 WD = 1350 m
Angola B17 - Girassol
Plateau: 240 kbopd First oil : Dec 2006 WD = 1200-1500 m
Angola B17 - Dalia
7 TOTAL SA - R&D Deep Offshore – LR
Hier : les grands développements subsea (TOTAL)
Hier : les grands développements subsea (TOTAL)
Plateau: 225 kbopd First oil : March 2009 WD = 1320 m
Nigeria - Akpo
Plateau: 90 kbopd First oil : April 2008 WD = 600 m
Congo – Moho-Bilondo
Plateau: 160 kbopd First oil (e) : 2014 WD = 1100-1400 m
Angola B17 - CLOV
Plateau: 180 kbopd First oil (e) : Q1 2012 WD = 750-850 m
Nigeria - Usan
8 TOTAL SA - R&D Deep Offshore – LR
• EXXONMOBIL – Angola – Kizomba (2004) – WD 1400 m
• SHELL – Nigeria – Bonga (2005) – WD 1000 m
• ANADARKO – US GoM – Independance Hub (2007) – WD 2800 m
• PETROBRAS – Bresil – Jubarte (2006) – WD 1500 m
• BP – US GoM - Thunder Horse (2008) – WD 1800 m
• CHEVRON – Nigeria – Agbami (2008) – WD 1500 m
9 TOTAL SA - R&D Deep Offshore – LR
Hier : les grands développements subsea (autres opérateurs)
Pazflor Block 17 Angola field development
Aujourd’hui : les longs tie-backs ‘simples’
Boucle de production
Séparation G/L
Boucle hybride
Chauffage électrique
10 TOTAL SA - R&D Deep Offshore – LR
Pazflor Block 17 Angola field development
Aujourd’hui : les longs tie-backs ‘simples’
11 TOTAL SA - R&D Deep Offshore – LR
Transport & Test des SSU en Norvège (Février 2010)
Installation des séparateurs en Angola (Février 2011)
Aujourd’hui : Pazflor et la séparation G/L
Construction des 3 séparateurs a Arles
Construction des 8 Pompes en Norvège
Démarrage du 1er séparateur le 3 sept. 2011
Installation des pompes en Angola (Août 2011)
12 TOTAL SA - R&D Deep Offshore – LR
• Oil
• Water Depth : 3000 m
• Operator : Shell
• Partners : BP / Chevron
• Separation Gas/Liquid
• Platform : SPAR
• Production Capacity : 100 kbopd
• Production Start : 2010 (Great White)
Aujourd’hui : Perdido et la séparation G/L
13 TOTAL SA - R&D Deep Offshore – LR
Aujourd’hui : Chinook et le pompage à la mudline par ESP
• Oil
• Water Depth : 2500-2700 m
• Operator : Petrobras
• Partners : Devon/Total
• Platform : FPSO (1st in GoM) disconnectable
• Production Start : end 2011
• Production Capacity : 80 kbopd
• Boosting by 2 ESPs (400 DP)
• Tie-back length : 8 km / 19 km
14 TOTAL SA - R&D Deep Offshore – LR
Aujourd’hui : Lianzi et la ligne simple chauffée
• Oil
• Water Depth : 1000m
• Operator : Chevron
• Partners : Total
• Platform : Compliant Tower (BBLT)
• Production Start : 2012
• Tie-Back Length : 43km
• Heating DEH (Direct Electrical Heating)
15 TOTAL SA - R&D Deep Offshore – LR
Aujourd’hui : GIRRI et les MPPs de Rosa (Bloc 17 - Angola)
MPP module installed complete with Pump Units (2off)
MPPS to be installed in 3 lifts
MPP module ~290T
Support & Leveling Structure ~120T
Foundation ~130T
16 TOTAL SA - R&D Deep Offshore – LR
Rosa (B17) - Angola
King - GoM
Penguin A-E - UK
Machar - UK
Chinook - GoM
Aspen - GoM
Tyrihans - Norway
Manatee - GoM
Europa - GoM
Herschel (Nakika) - GoM
Ladybug - GoM
Habanero - GoM
Oregano - GoM Macaroni - GoM
Marshall - GoM
Madison - GoM
Kepler (Nakika) - GoM
Crosby - GoM
Silvertip (Perdido) - GoM
Acacia (B17) - Angola
Cascade - GoM
Tobago (Perdido) - GoM
Great White (Perdido) - GoM
Marte (B31) - Angola
Plutao (B31) - Angola
Saturno (B31) - Angola
Venus (B31) - Angola
Galio (B18) - Angola
Lianzi (ZIC) - Angola
-3000
-2500
-2000
-1500
-1000
-500
0 0 10 20 30 40 50 60 70
TIE-
BAC
K D
EPTH
(m)
TIE-BACK LENGTH (km)
Troll C pilot - Norway
Tordis IOR - Norway
CLOV (B17) - Angola
BC-10 - Brazil
Pazflor (B17) - Angola
Topacio
Ceiba – Equat. Guinea
Development in progress
Innovative technology
Single Line with G/L Separation and Hybrid Pump
Boosting with ESP
Single Line with G/L Separation and ESP in Caisson
Single Line with Direct Electrical Heating
Boosting with MPP
Single Line with Service Line (hybrid loop)
HC/Water Separation
ExxonMobil Statoil ATP Shell
Total Petrobras BP Chevron Hess
Marlim - Brazil
R&D DOP - June 2011
Aujourd’hui : longs tie-backs
17 TOTAL SA - R&D Deep Offshore – LR
Demain 1 : les longs tie-backs complexes (champs huile)
WEC
SWIMMER
SPRINGS
18 TOTAL SA - R&D Deep Offshore – LR
Demain 1 : les longs tie-backs complexes (champs huile)
3 briques essentielles
SPRINGS (traitement et injection d’eau de mer)
Pipes chauffés (PIP Heat tracing, ECS, DEH)
Séparation G/L et pompage
19 TOTAL SA - R&D Deep Offshore – LR
Le challenge : le développement des technos mais aussi la capacité à les combiner
Pazflor Block 17 Angola field development
Demain 2 : le subsea to shore (champs à huile)
Full Autonomous Subsea Plant
20 TOTAL SA - R&D Deep Offshore – LR
Pazflor Block 17 Angola field development
Conclusion
Nous sommes encore au début de l’ère du subsea; les enjeux sont importants, tous les IOC sont présents.
Les briques à développer sont :
Séparation Gaz/Liquide et Eau/Hydrocarbures
Pompage sous-marin et la compression sous-marine
Traitement et Injection d’eau de mer en sous-marin
Chauffage des lignes de production
Systèmes tout électriques
Stockage et injection de produits chimiques en sous-marin
Inspection et maintenance des équipements sous-marins
Bateaux de pose de grande capacité
Génération d’énergie en local
C’est par l’art de combiner ces différentes briques que nous serons capables de développer les champs du futur.
21 TOTAL SA - R&D Deep Offshore – LR
DISCLAIMER and COPYRIGHT RESERVATION
The TOTAL GROUP is defined as TOTAL S.A. and its affiliates and shall include the party making the presentation.
Disclaimer
This presentation may include forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995 with respect to the financial condition, results of operations, business, strategy and plans of TOTAL GROUP that are subject to risk factors and uncertainties caused by changes in, without limitation, technological development and innovation, supply sources, legal framework, market conditions, political or economic events.
TOTAL GROUP does not assume any obligation to update publicly any forward-looking statement, whether as a result of new information, future events or otherwise. Further information on factors which could affect the company’s financial results is provided in documents filed by TOTAL GROUP with the French Autorité des Marchés Financiers and the US Securities and Exchange Commission.
Accordingly, no reliance may be placed on the accuracy or correctness of any such statements.
Copyright
All rights are reserved and all material in this presentation may not be reproduced without the express written permission of the TOTAL GROUP.
22 TOTAL SA - R&D Deep Offshore – LR