Page 1: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

Subsea : Way to Future

Fully Autonomous Plant

TOTAL SA – R&D Deep Offshore

Luc RIVIERE

Page 2: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

2

Agenda • Introduction

• Avant-Hier

• Hier • Aujourd’hui

• Demain

• Conclusion

TOTAL SA - R&D Deep Offshore – LR

Subsea - Way to Future : Fully Autonomous Plant

Page 3: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

3

Subsea Oil Resources (WD > 150m) = 300 Gbo – 200 Gbo Deep Offshore

Source: Quest Offshore May 2011 (>150 m WD)

87

36

54

78 40

TOTAL SA - R&D Deep Offshore – LR

Introduction: les ressources Subsea (> 150m WD)

Page 4: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

0

5

10

15

20

25

1995 2000 2005 2010 2015 2020 2025 2030

Prod

uctio

n (M

boep

d)

year

Deep Offshore Oil & Gas Production

Oil

Gas

Source : Energyfiles 2010

4 TOTAL SA - R&D Deep Offshore – LR

Introduction : la production deep offshore

Page 5: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf Océan (articulated tower prototype in 100 m WD)

1978 – Gabon - North East Grondin (3 oil production wells in a template) 1983 – North Sea – Start-up of North East Frigg (gas field tied back to Frigg)

1981-85 – North Sea – Skuld and Super Skuld (R&D projects - target 300m WD) 1988 – North Sea – Alwyn North Extension (3 individual subsea wells) 1988 – North Sea – Stat-up of East Frigg (1st diverless subsea development – gas field)

Articulated tower (Subsea Control System) Subsea template

Xmas Tree

Tie-back to Frigg

Central Manifold Station

2 Bundles between Manifold & Production Templates

3 wels template

5 5 TOTAL SA - R&D Deep Offshore – LR

Avant-Hier : les premiers pas du subsea

Page 6: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

Pazflor Block 17 Angola field development

1987-90 – North Sea – DISPS project in JV with BP (Diverless Subsea Production System) 1992 – North Sea – Ellon – Subsea tie back to Dunbar (flowline loop design)

1993 – North Sea – Start up of Lille Frigg (HP/HT gas field: 670 bar, 125°C) 1995-97 – North Sea – HOST R&D Project (Hinge Over Subsea Template) Target: Develop a modularized Subsea Production System for 2 500m WD Partners: Total (Elf), Mobil, Shell, Statoil, KOS

Production Manifold Choke Removal Tool Subsea Development

Ellon / Dunbar

Template config Hybrid config Cluster config

The basis of future Subsea Developments

Avant-Hier : les premiers pas du subsea

6 TOTAL SA - R&D Deep Offshore – LR

Page 7: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

Plateau: 130 kbopd First oil : June 2007 WD = 1350 m

Angola B17 - Rosa

Plateau: 250 kbopd First oil : Dec 2001 WD = 1350 m

Angola B17 - Girassol

Plateau: 240 kbopd First oil : Dec 2006 WD = 1200-1500 m

Angola B17 - Dalia

7 TOTAL SA - R&D Deep Offshore – LR

Hier : les grands développements subsea (TOTAL)

Page 8: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

Hier : les grands développements subsea (TOTAL)

Plateau: 225 kbopd First oil : March 2009 WD = 1320 m

Nigeria - Akpo

Plateau: 90 kbopd First oil : April 2008 WD = 600 m

Congo – Moho-Bilondo

Plateau: 160 kbopd First oil (e) : 2014 WD = 1100-1400 m

Angola B17 - CLOV

Plateau: 180 kbopd First oil (e) : Q1 2012 WD = 750-850 m

Nigeria - Usan

8 TOTAL SA - R&D Deep Offshore – LR

Page 9: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

• EXXONMOBIL – Angola – Kizomba (2004) – WD 1400 m

• SHELL – Nigeria – Bonga (2005) – WD 1000 m

• ANADARKO – US GoM – Independance Hub (2007) – WD 2800 m

• PETROBRAS – Bresil – Jubarte (2006) – WD 1500 m

• BP – US GoM - Thunder Horse (2008) – WD 1800 m

• CHEVRON – Nigeria – Agbami (2008) – WD 1500 m

9 TOTAL SA - R&D Deep Offshore – LR

Hier : les grands développements subsea (autres opérateurs)

Page 10: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

Pazflor Block 17 Angola field development

Aujourd’hui : les longs tie-backs ‘simples’

Boucle de production

Séparation G/L

Boucle hybride

Chauffage électrique

10 TOTAL SA - R&D Deep Offshore – LR

Page 11: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

Pazflor Block 17 Angola field development

Aujourd’hui : les longs tie-backs ‘simples’

11 TOTAL SA - R&D Deep Offshore – LR

Page 12: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

Transport & Test des SSU en Norvège (Février 2010)

Installation des séparateurs en Angola (Février 2011)

Aujourd’hui : Pazflor et la séparation G/L

Construction des 3 séparateurs a Arles

Construction des 8 Pompes en Norvège

Démarrage du 1er séparateur le 3 sept. 2011

Installation des pompes en Angola (Août 2011)

12 TOTAL SA - R&D Deep Offshore – LR

Page 13: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

• Oil

• Water Depth : 3000 m

• Operator : Shell

• Partners : BP / Chevron

• Separation Gas/Liquid

• Platform : SPAR

• Production Capacity : 100 kbopd

• Production Start : 2010 (Great White)

Aujourd’hui : Perdido et la séparation G/L

13 TOTAL SA - R&D Deep Offshore – LR

Page 14: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

Aujourd’hui : Chinook et le pompage à la mudline par ESP

• Oil

• Water Depth : 2500-2700 m

• Operator : Petrobras

• Partners : Devon/Total

• Platform : FPSO (1st in GoM) disconnectable

• Production Start : end 2011

• Production Capacity : 80 kbopd

• Boosting by 2 ESPs (400 DP)

• Tie-back length : 8 km / 19 km

14 TOTAL SA - R&D Deep Offshore – LR

Page 15: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

Aujourd’hui : Lianzi et la ligne simple chauffée

• Oil

• Water Depth : 1000m

• Operator : Chevron

• Partners : Total

• Platform : Compliant Tower (BBLT)

• Production Start : 2012

• Tie-Back Length : 43km

• Heating DEH (Direct Electrical Heating)

15 TOTAL SA - R&D Deep Offshore – LR

Page 16: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

Aujourd’hui : GIRRI et les MPPs de Rosa (Bloc 17 - Angola)

MPP module installed complete with Pump Units (2off)

MPPS to be installed in 3 lifts

MPP module ~290T

Support & Leveling Structure ~120T

Foundation ~130T

16 TOTAL SA - R&D Deep Offshore – LR

Page 17: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

Rosa (B17) - Angola

King - GoM

Penguin A-E - UK

Machar - UK

Chinook - GoM

Aspen - GoM

Tyrihans - Norway

Manatee - GoM

Europa - GoM

Herschel (Nakika) - GoM

Ladybug - GoM

Habanero - GoM

Oregano - GoM Macaroni - GoM

Marshall - GoM

Madison - GoM

Kepler (Nakika) - GoM

Crosby - GoM

Silvertip (Perdido) - GoM

Acacia (B17) - Angola

Cascade - GoM

Tobago (Perdido) - GoM

Great White (Perdido) - GoM

Marte (B31) - Angola

Plutao (B31) - Angola

Saturno (B31) - Angola

Venus (B31) - Angola

Galio (B18) - Angola

Lianzi (ZIC) - Angola

-3000

-2500

-2000

-1500

-1000

-500

0 0 10 20 30 40 50 60 70

TIE-

BAC

K D

EPTH

(m)

TIE-BACK LENGTH (km)

Troll C pilot - Norway

Tordis IOR - Norway

CLOV (B17) - Angola

BC-10 - Brazil

Pazflor (B17) - Angola

Topacio

Ceiba – Equat. Guinea

Development in progress

Innovative technology

Single Line with G/L Separation and Hybrid Pump

Boosting with ESP

Single Line with G/L Separation and ESP in Caisson

Single Line with Direct Electrical Heating

Boosting with MPP

Single Line with Service Line (hybrid loop)

HC/Water Separation

ExxonMobil Statoil ATP Shell

Total Petrobras BP Chevron Hess

Marlim - Brazil

R&D DOP - June 2011

Aujourd’hui : longs tie-backs

17 TOTAL SA - R&D Deep Offshore – LR

Page 18: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

Demain 1 : les longs tie-backs complexes (champs huile)

WEC

SWIMMER

SPRINGS

18 TOTAL SA - R&D Deep Offshore – LR

Page 19: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

Demain 1 : les longs tie-backs complexes (champs huile)

3 briques essentielles

SPRINGS (traitement et injection d’eau de mer)

Pipes chauffés (PIP Heat tracing, ECS, DEH)

Séparation G/L et pompage

19 TOTAL SA - R&D Deep Offshore – LR

Le challenge : le développement des technos mais aussi la capacité à les combiner

Page 20: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

Pazflor Block 17 Angola field development

Demain 2 : le subsea to shore (champs à huile)

Full Autonomous Subsea Plant

20 TOTAL SA - R&D Deep Offshore – LR

Page 21: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

Pazflor Block 17 Angola field development

Conclusion

Nous sommes encore au début de l’ère du subsea; les enjeux sont importants, tous les IOC sont présents.

Les briques à développer sont :

Séparation Gaz/Liquide et Eau/Hydrocarbures

Pompage sous-marin et la compression sous-marine

Traitement et Injection d’eau de mer en sous-marin

Chauffage des lignes de production

Systèmes tout électriques

Stockage et injection de produits chimiques en sous-marin

Inspection et maintenance des équipements sous-marins

Bateaux de pose de grande capacité

Génération d’énergie en local

C’est par l’art de combiner ces différentes briques que nous serons capables de développer les champs du futur.

21 TOTAL SA - R&D Deep Offshore – LR

Page 22: Subsea : Way to Future Fully Autonomous Plant · 2019. 4. 15. · 1967 – Gabon – AGM7: first subsea production well (1 200m tie-back to platform) 1968 – Bay of Biscay – Elf

DISCLAIMER and COPYRIGHT RESERVATION

The TOTAL GROUP is defined as TOTAL S.A. and its affiliates and shall include the party making the presentation.

Disclaimer

This presentation may include forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995 with respect to the financial condition, results of operations, business, strategy and plans of TOTAL GROUP that are subject to risk factors and uncertainties caused by changes in, without limitation, technological development and innovation, supply sources, legal framework, market conditions, political or economic events.

TOTAL GROUP does not assume any obligation to update publicly any forward-looking statement, whether as a result of new information, future events or otherwise. Further information on factors which could affect the company’s financial results is provided in documents filed by TOTAL GROUP with the French Autorité des Marchés Financiers and the US Securities and Exchange Commission.

Accordingly, no reliance may be placed on the accuracy or correctness of any such statements.

Copyright

All rights are reserved and all material in this presentation may not be reproduced without the express written permission of the TOTAL GROUP.

22 TOTAL SA - R&D Deep Offshore – LR