SUBSEA CONTROL SYSTEM TIE- BACKS TO LATE-LIFE ASSETS · Managing the unknown SUBSEA CONTROL SYSTEM...

10
Managing the unknown SUBSEA CONTROL SYSTEM TIE- BACKS TO LATE-LIFE ASSETS

Transcript of SUBSEA CONTROL SYSTEM TIE- BACKS TO LATE-LIFE ASSETS · Managing the unknown SUBSEA CONTROL SYSTEM...

Managing the unknown

SUBSEA CONTROL SYSTEM TIE-

BACKS TO

LATE-LIFE ASSETS

Proprietary Information.

Copyright © Viper Innovations Ltd. All Rights Reserved

SUBSEA CONTROL TIE-BACKS

SCM

#1

SCM

#2

SCM

#3

SCM

#4

SCM

#5

UTA

SCM

#7SCM

#6

SCM

#8

KHUMBU

PLATFORM

MAKALU

LHOTSE

SAGARMATHA

SCM

#9

SCM

#10

SCM

#9

SCM

#10

PUMORI

How will the legacy

system react to the new

load?

Proprietary Information.

Copyright © Viper Innovations Ltd. All Rights Reserved

THE UNKNOWNS

SCM

#1

SCM

#2

SCM

#3

SCM

#4

SCM

#5

SCM

#6

SCM

#7

SCM

#8

HPU reservoir

capacity

requirement?

Insulation

Resistance?

Additional LP

accumulation?Subsea comms

bandwidth?

Electrical tie-in

points at UTA?

Control fluid

contamination

at SCMs ?

MCS capacity

for addition

well pages?

Operating

System future-

proofing?

Sub-system

redundancy?What pre-

charge pressure

is left?

ESD closure

time? Control fluid

leakage?

Component

fault history?

Proprietary Information.

Copyright © Viper Innovations Ltd. All Rights Reserved

ANSWERING THE QUESTIONS

SCM

#1

SCM

#2

SCM

#3

SCM

#4

SCM

#5

SCM

#6

SCM

#7

SCM

#8

HPU reservoir

capacity

requirement?

Insulation

Resistance?Additional LP

accumulation?

Subsea comms

bandwidth?

Electrical tie-in

points at UTA?

Control fluid

contamination

at SCMs ?

MCS capacity

for addition

well pages?

Operating

System future-

proofing?

Sub-system

redundancy?

What pre-

charge pressure

is left?

ESD closure

time?

Control fluid

leakage?

Component

fault history?

From Analysis From Integrity Management

Proprietary Information.

Copyright © Viper Innovations Ltd. All Rights Reserved

THE UNCERTAINTY BALANCE

Design

ConservatismDegradation

New

infrastructure

required

CAPEX

Proprietary Information.

Copyright © Viper Innovations Ltd. All Rights Reserved

THE UNCERTAINTY BALANCE

Design

Conservatism

Degradatio

n

Unexpected

breakdown &

production loss

OPEX

Proprietary Information.

Copyright © Viper Innovations Ltd. All Rights Reserved

ADDRESSING THE CAPACITY QUESTIONS

❖ Validation of the electrical and hydraulic analyses with real-world input / output data.

❖ Refining the software models to quantify the actual operational headroom.

❖ Interface and set-up optimisation.

Proprietary Information.

Copyright © Viper Innovations Ltd. All Rights Reserved

ADDRESSING THE INTEGRITY QUESTIONS

• Systematic collection of data.

• Turn data in meaningful KPIs.

• Record fault history.

• Record the maintenance & repair history.

• Compile all the information in one place.

• Identify and monitor threats levels.

Proprietary Information.

Copyright © Viper Innovations Ltd. All Rights Reserved

Threat

Monitoring

THE PRIZE

Informed investment decisions based on the best use of the available evidence.

Adaptive Analysis

www.viperinnovations.com

Enabling Subsea Assets to

Work Better for Longer