SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
01 33 00 SD-01 Preconstruction Submittals1.6Submittal Register
01 50 00 SD-01 Preconstruction Submittals1.4Construction site plan
01 78 00 SD-03 Product DataAs-Built Record of Equipmentand Materials
1.5.1Warranty Management Plan1.5.4Warranty Tags
Spare Parts DataSD-08 Manufacturer’s Instructions
1.4Preventative Maintenance1.4Condition Monitoring (Predictive
Testing)1.4Inspection1.5.1Instructions
SD-10 Operation and MaintenanceData
1.6Operation and MaintenanceManuals
SD-11 Closeout Submittals1.3.1Record Drawings
03 11 13.00 10 SD-03 Product Data1.2Design2.1Form Materials2.1.5Form Releasing Agents
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 2: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/2.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
03 11 13.00 10 SD-04 SamplesSample Panels
SD-06 Test Reports3.5Inspection
SD-07 CertificatesFiber Voids
03 20 00.00 10 SD-03 Product DataWelding
3.1.4.1Butt-SplicesMaterial
SD-06 Test ReportsMaterialTests, Inspections, andVerifications
SD-07 Certificates2.3Reinforcing Steel
Qualification of Steel BarButt-Splicers
03 31 01.00 10 SD-03 Product DataConcrete Mixture ProportionsBatch Plant:Concrete MixersConveying EquipmentPlacing Equipment
3.1.3Construction Joint TreatmentSD-06 Test Reports
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 3: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/3.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
03 31 01.00 10 3.3.2.2Quality of Aggregates3.3Tests and Inspections
SD-07 Certificates1.3Testing Technicians2.1.1Cementitious Materials
Admixture04 20 00 SD-02 Shop Drawings
1.4.4Detail DrawingsSD-03 Product DataLocal/Regional MaterialsEnvironmental Data
2.4.2CementSD-04 Samples
2.2Concrete Masonry Units (CMU)2.6Anchors, Ties, and Bar
Positioners2.10Expansion-Joint Materials2.7Joint Reinforcement1.4.3Portable Panel
SD-06 Test Reports3.21.1Field Testing of Mortar3.21.2Field Testing of Grout3.21.3Prism tests2.4.2Masonry Cement
SD-07 Certificates2.2Concrete Masonry Units (CMU)
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 4: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/4.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
04 20 00 2.6Anchors, Ties, and BarPositioners
2.10Expansion-Joint Materials2.7Joint Reinforcement2.4.2Masonry Cement2.4.1Admixtures for Masonry Mortar
Admixtures for Grout1.4.2Contamination
SD-08 Manufacturer’s Instructions2.4.2Masonry Cement
SD-10 Operation and MaintenanceDataPlastic IdentificationTake-Back Program
05 12 00 SD-02 Shop Drawings1.3.1Fabrication drawings
SD-03 Product Data2.4Shop primer2.3.1Welding electrodes and rods
SD-07 Certificates2.1Steel2.2Bolts, nuts, and washers
Welding procedures andqualifications
07 32 13 SD-02 Shop Drawings1.7.1Tile roofing system
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 5: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/5.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
07 32 13 SD-03 Product DataInsulated roof systemFastening systemInstallation details
SD-04 SamplesRoof tile
SD-06 Test ReportsManufacturer's tests
SD-07 CertificatesWorking in high Qualifications
SD-08 Manufacturer’s Instructions3.3Installation
08 11 16 SD-04 Samples1.5.1.1Finish sample
SD-08 Manufacturer’s Instructions2.1Doors and frames
08 51 13 SD-03 Product Data2.1Windows2.2.7.1Hardware2.2.2Fasteners1.8Window performance2.2.9Screens
Weatherstripping2.2.7Accessories2.2.3Adhesives
SD-04 Samples
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 6: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/6.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
08 51 13 1.3.1.1Finish SampleWindow Sample
SD-10 Operation and MaintenanceData
2.1Windows08 91 00 SD-04 Samples
1.4Wall louvers1.4Door louvers2.3Door louvers
09 24 23 SD-03 Product Data3.3Proportions and Mixing
SD-04 SamplesColored Stucco Finish Coat
1.3Sample Panel09 30 13 SD-03 Product Data
2.1TileCERAMIC: Commercial Traffic
2.2Setting-Bed2.4Mortar, Grout, and Adhesive
SD-04 Samples2.1Tile
CERAMIC04
2.4GroutSD-07 Certificates
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 7: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/7.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
09 30 13 2.1Tile2.4Mortar, Grout, and Adhesive
SD-08 Manufacturer’s Instructions3.5Maintenance Instructions
SD-10 Operation and MaintenanceData
3.2 GInstallationSD-11 Closeout SubmittalsAdhesives
09 90 00 SD-03 Product Data2.1Coating2.1Manufacturer's Technical Data
Sheets3.3.5Sealant
SD-04 SamplesColorTextured Wall Coating SystemSample Textured Wall CoatingSystem Mock-Up
SD-08 Manufacturer’s InstructionsApplication instructions
3.7.2Mixing1.6.2Manufacturer's Material Safety
Data SheetsSD-10 Operation and MaintenanceData
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 8: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/8.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
09 90 00 2.1Coatings:09 96 00 SD-01 Preconstruction Submittals
1.3Material, Equipment and FixtureList
SD-03 Product Data2.1Heat-Resistant Coatings2.2Epoxy Coatings2.3Polyurethane Coatings2.4Chlorinated-Rubber Coatings
SD-04 Samples1.3Color Chips
SD-07 Certificates2.1Heat-Resistant Coatings2.2Epoxy Coatings2.3Polyurethane Coatings2.4Chlorinated-Rubber Coatings
10 21 13 SD-03 Product Data1.2Cleaning and Maintenance
Instructions2.6Colors And Finishes2.1.1Galvanized Steel Sheet2.1.2Anchoring Devices and
Fasteners2.1.4Hardware and Fittings2.1.3Brackets2.1.5Door Hardware
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 9: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/9.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
10 21 13 2.4Pilaster ShoesSD-04 Samples
2.6Colors and Finishes2.1.4Hardware and Fittings2.1.2Anchoring Devices and
FastenersSD-07 Certificates
1.5Warranty22 00 00 SD-02 Shop Drawings
3.7.1Plumbing SystemSD-03 Product Data
2.4Fixtures3.7.1Plumbing System
SD-06 Test Reports3.7Tests, Flushing and Disinfection
SD-07 Certificates1.3Materials and Equipment
SD-10 Operation and MaintenanceData
3.7.1Plumbing System23 00 00 SD-02 Shop Drawings
1.4.5Detail DrawingsSD-03 Product DataAir Vents, Penthouses, andGoosenecks
Ceiling Exhaust Fans
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 10: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/10.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
23 00 00 Air Handling Units2.10.1Room Fan-Coil Units
Test ProceduresDiagrams
SD-06 Test Reports3.8Performance Tests
SD-08 Manufacturer’s Instructions3.2Manufacturer's Installation
Instructions3.9.2Operation and Maintenance
TrainingSD-10 Operation and MaintenanceData
3.9.1Operation and MaintenanceManuals
23 07 00 SD-03 Product DataPipe Insulation Systems
SD-08 Manufacturer’s InstructionsPipe Insulation Systems
23 23 00 SD-02 Shop Drawings2.3Refrigerant Piping System
SD-03 Product Data2.3Refrigerant Piping System3.5Refrigerant Piping Tests3.4Demonstrations3.1Verification of Dimensions
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 11: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/11.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
23 23 00 SD-06 Test Reports3.5Refrigerant Piping Tests
SD-10 Operation and MaintenanceData
1.5Maintenance3.4Operation and Maintenance
Manuals23 81 00.00 20 SD-02 Shop Drawings
2.5.2Field-assembled refrigerantpiping
1.4.2Control system wiring diagramsSD-03 Product Data
2.2Air conditioners2.5Refrigerant piping and
accessories2.3Coatings for finned tube coils
SD-06 Test Reports3.8.3Start-up and initial operational
testsSD-08 Manufacturer’s Instructions
2.1Room air conditioners2.2Air conditioners2.5Refrigerant piping and
accessoriesSD-10 Operation and MaintenanceData
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 12: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/12.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
23 81 00.00 20 2.1Room air conditioners2.2Air conditioners
SD-11 Closeout Submittals1.4.4Posted operating instructions
26 05 00.00 40 SD-01 Preconstruction Submittals2.1Material, Equipment, and Fixture
ListsSD-03 Product Data
2.1.1Conduits and Raceways2.1.3Wire and Cable3.2.1.9Splices and Connectors2.1.4Switches2.1.5Receptacles2.1.6Outlets, Outlet Boxes, and Pull
Boxes2.1.8Circuit Breakers2.1.7Panelboards2.1.9Lamps and Lighting Fixtures2.1.12Dry-Type Distribution
TransformersSD-06 Test Reports
3.3Continuity Test3.3Phase-Rotation Tests3.3Insulation Resistance Test
SD-07 Certificates1.4Certification
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 13: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/13.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
26 05 00.00 40 SD-08 Manufacturer’s InstructionsPart 2Manufacturer's Instructions
26 05 19.00 10 SD-03 Product Data3.1Installation Instructions
SD-06 Test Reports3.2Tests, Inspections, and
Verifications26 05 71.00 40 SD-02 Shop Drawings
3.1Protective DevicesSD-03 Product Data
2.2Enclosures2.3Circuit Breakers3.1Control Devices2.7Indicating Instruments
SD-06 Test Reports3.2Dielectric Tests3.2Final Test Reports
SD-08 Manufacturer’s Instructions3.1Protective Devices
SD-10 Operation and MaintenanceData
2.3Circuit Breakers26 08 00 SD-06 Test Reports
3.1Acceptance tests and inspections1.4.3Acceptance test and inspections
procedure
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 14: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/14.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
26 09 23.00 40 SD-03 Product Data2.1.1Photoconductive Control Devices3.1Installation Drawings2.1.1Light-Sensitive Control Devices
Lighting Contactor2.2.2Photocell Switch2.2.3Occupancy Sensors1.3Motion Sensors
SD-06 Test Reports3.2System Operation Tests
26 20 00 SD-02 Shop Drawings2.14Panelboards2.17Transformers2.4Busway2.5Cable trays2.24Wireways3.1.10.1Marking strips
SD-03 Product Data2.13Receptacles2.14.3Circuit breakers2.11Switches2.17Transformers2.15Enclosed circuit breakers
CATV outlets2.20.3Grounding Busbar2.25Surge protective devices
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 15: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/15.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
26 20 00 SD-06 Test Reports3.5.2600-volt wiring test3.5.5Grounding system test3.5.3Transformer tests3.5.4Ground-fault receptacle test
SD-09 Manufacturer’s FieldReports
2.27.1Transformer factory tests26 24 16.00 40 SD-02 Shop Drawings
2.1.1Detail Drawings2.1.1Outline Drawings
SD-03 Product Data1.3Panelboards2.1.1Panelboards
SD-06 Test Reports3.2Continuity Tests3.2Insulation Tests
SD-07 Certificates1.4Statements
SD-08 Manufacturer’s Instructions1.3Panelboards2.1.1Panelboards
26 28 01.00 10 SD-03 Product Data2.10Fault Current Analysis2.10Protective Device Coordination
Study
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 16: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/16.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
26 28 01.00 10 2.1Equipment1.4.1System Coordinator3.3.5Protective Relays3.2Installation
SD-06 Test Reports3.3Field Testing
SD-07 Certificates1.6Devices and Equipment
26 28 21.00 40 SD-02 Shop Drawings2.1Connection Diagrams2.1Fabrication Drawings2.1Installation Drawings
SD-03 Product Data2.1Equipment and Performance
Data2.3.1Contacts2.3.2Indicating Lights2.3.3Terminal Board2.2.2Enclosures2.5Accessories
SD-06 Test Reports1.3Qualification Testing1.3Operation Tests
SD-08 Manufacturer’s Instructions2.3.2Automatic Transfer Switch
26 32 14.00 10 SD-02 Shop Drawings
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 17: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/17.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
26 32 14.00 10 1.4.3Detailed Drawings3.10Acceptance
SD-03 Product Data2.4Manufacturer's Catalog3.9Instructions1.4.2Experience3.2General Installation3.1Site Visit
SD-05 Design Data2.8Sound Limitations2.14Generator2.5.4Integral Main Fuel Storage Tank
Power Factor2.7.2Heat Exchanger2.18.5Time-Delay on Alarms2.7Cooling System1.2.5Vibration Isolation
SD-06 Test Reports3.5.6Performance Tests3.5Onsite Inspection and Tests
SD-07 Certificates1.2.5Vibration Isolation3.4Prototype Tests1.2.6Reliability and Durability2.11Emissions2.8Sound limitations
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 18: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/18.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
26 32 14.00 10 2.14.1Current Balance2.3Materials and Equipment2.27Factory Inspection and Tests3.5.4Inspections2.7Cooling System
SD-10 Operation and MaintenanceData
1.6.1Operation Manual1.6.2Maintenance Manual1.6.3Extra Materials
26 33 53.00 20 SD-02 Shop Drawings1.6.1UPS Drawings1.6.2UPS Installation
SD-03 Product Data2.3UPS Module2.9Factory Testing2.2UPS System
Spare PartsSD-06 Test Reports
1.6.4Factory Test Plan1.6.5Performance Test Plan2.9Factory Tests1.6.7Performance Tests Report1.6.6Factory Tests Report
SD-09 Manufacturer’s FieldReports
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 19: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/19.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
26 33 53.00 20 3.2.2Initial Inspection and Tests3.2.3Performance Tests
SD-10 Operation and MaintenanceData
1.10.1UPS Operation and MaintenanceSD-11 Closeout Submittals
3.1Installation26 41 00.00 40 SD-02 Shop Drawings
1.4.1Overall lightning protectionsystem
1.4.1Each major componentSD-03 Product Data
2.2.1Air Terminals2.3Main and Secondary Conductors2.2.2Ground Rods2.4Clamp-Type Connectors2.5Lightning Protection Components2.1Hardware2.1Accessories
SD-06 Test Reports3.6.1Grounding system test3.6.2Lightning protection system
inspectionSD-07 CertificatesUL listing or label or Equivalent
3.6.3Certificates
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 20: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/20.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
26 51 00 SD-03 Product DataLED lighting fixturesLED lamps
2.7Lighting contactor2.8Photocell switch2.10LED Exit signs
LED Emergency lightingequipment
2.12Occupancy sensorsSD-06 Test Reports
3.2Operating test27 10 00 SD-02 Shop Drawings
1.6.1.1Telecommunications drawings1.6.1.2Telecommunications Space
DrawingsSD-03 Product Data
2.4Telecommunications cabling2.5.6Patch panels2.6Telecommunications
outlet/connector assemblies2.5.3Equipment support frame
SD-06 Test Reports3.5.1Telecommunications cabling
testingSD-07 Certificates
1.6.2.1Telecommunications Contractor
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 21: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/21.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
27 10 00 1.6.2.3Manufacturer Qualifications1.6.3Test plan
SD-10 Operation and MaintenanceData
1.10.1Telecommunications cabling andpathway system
SD-11 Closeout Submittals1.10.2Record Documentation
28 23 23.00 10 SD-02 Shop Drawings1.4.2.4Graphics1.3.3As-built Drawings
SD-03 Product Data1.4CCTV Technical Data Packages3.6.9Software Updates
SD-06 Test Reports1.4.2Performance Verification Test1.3.2Test Procedures and Reports
SD-08 Manufacturer’s Instructions1.4.3Group V Technical Data Package
SD-10 Operation and MaintenanceData
1.4.2.1Operation and MaintenanceManuals
3.4.2Operator's Training ReportSD-11 Closeout Submittals
1.4.2.3Data Entry
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 22: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/22.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
31 00 00 SD-01 Preconstruction Submittals3.5Shoring1.3.2Dewatering Work Plan
SD-03 Product Data3.9Utilization of Excavated Materials1.3.1.2Rock Excavation
Opening of any Excavation orBorrow Pit
Shoulder ConstructionSD-06 Test Reports
3.17TestingBorrow Site Testing
SD-07 Certificates3.17Testing
31 23 00.00 20 SD-01 Preconstruction Submittals1.5.1Shoring and Sheeting Plan1.5.2Dewatering work plan
SD-06 Test ReportsBorrow Site Testing
3.12.2.1Fill and backfill3.12.2.2Select material3.12.2.3Density tests
32 16 13 SD-03 Product Data2.1Concrete
SD-06 Test Reports3.8Field Quality Control
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 23: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/23.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
33 11 00 SD-03 Product Data2.1.1Piping Materials2.1Water distribution main2.2Water service line
Corporation stops2.1.2.2Valve boxes2.2.2.2Valve boxes
SD-06 Test Reports2.2.2.4Disinfection
SD-07 Certificates2.1Water distribution main2.2Water service line
Displacement Type MetersCompound Type Meters
SD-08 Manufacturer’s Instructions1.3Delivery, storage, and handling
Installation33 30 00 SD-01 Preconstruction Submittals
Existing ConditionsSD-02 Shop Drawings
1.4.1Drawings2.3.1Precast concrete manhole2.3.3.1Frames, covers, and gratings
SD-03 Product Data2.1Pipeline materials
SD-06 Test Reports
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
![Page 24: SUBMITTAL REGISTER TBD - USEmbassy.gov€¦ · Concrete Masonry Units (CMU) 2.2 Anchors, Ties, and Bar 2.6 Positioners Expansion-Joint Materials 2.10 Joint Reinforcement 2.7 Portable](https://reader030.fdocuments.in/reader030/viewer/2022041010/5eb725a761ff5808f63cf887/html5/thumbnails/24.jpg)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 24 PAGES
TBD
PSIB DEA/BUCARAMANGA
33 30 00 2.4ReportsSD-07 CertificatesGaskets
33 71 02 SD-03 Product DataLow voltage cableLow voltage cable terminationsSealing Material
2.11.2Manhole frames and covers2.11.3Handhole frames and covers
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:SCHEDULE DATES
CONTRACTORACTION
APPROVING AUTHORITY
ACTIVITY NO
TRANSMITTAL NO
SPEC SECT
DESCRIPTION
ITEM SUBMITTED
PARAGRAPH
#
CLASSIFICATION
GOVT OR A/E REVWR SUBMIT
APPROVALNEEDED
BY
MATERIALNEEDED
BY
ACTION CODE
DATEOF
ACTION
DATE FWDTO APPR
AUTH/
DATE RCDFROM
CONTR
DATE FWDTO OTHERREVIEWER
DATE RCDFROM OTHREVIEWER
ACTION CODE
DATEOF
ACTION
MAILEDTO
CONTR/
DATE RCDFRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)