March 6, 2014
Client: Dr. Michael Hinchey
Group Name:LifeSub Engineering
Group Number: M14
Group Members:
Ajanthan Asokan
William Barkhouse
Matthew Browne
Stephen Handrigan
![Page 2: Submarine Evacuation System for Offshore Structures](https://reader031.fdocuments.in/reader031/viewer/2022012919/56813e08550346895da7e8fa/html5/thumbnails/2.jpg)
2
AgendaProject OverviewPrototype Design
Evolution Structural Material Control
Analysis Lifting Finite Element Analysis (FEA) Motion (Flow3D)
Control Codes & SequenceTesting MethodsDeployment StrategiesMoving ForwardQuestionsMarch 6, 2014
![Page 3: Submarine Evacuation System for Offshore Structures](https://reader031.fdocuments.in/reader031/viewer/2022012919/56813e08550346895da7e8fa/html5/thumbnails/3.jpg)
3
Project Overview
March 6, 2014
Current Problem Lifeboats – Exposed to Hazards Freefall – Uncontrolled
Proposed Solution Deployable Submarine
Project GoalsDevelop and Test Automated
Submarine PrototypeDevelop and Test Deployment
Options Identify Design RequirementsProve Operational ViabilityMake Recommendations on Full-
scale Development
![Page 4: Submarine Evacuation System for Offshore Structures](https://reader031.fdocuments.in/reader031/viewer/2022012919/56813e08550346895da7e8fa/html5/thumbnails/4.jpg)
4
Prototype Design Evolution
March 6, 2014
StructuralLifting HookTail SweepPropeller Shroud
MaterialPrevious – 6” OD
Aluminum Round StockCurrent
Hull – 6” ID, PVC Pipe Endcaps – Solid Round
Stock ABS Shroud – RP ABS
Phase 1
Phase 2
![Page 5: Submarine Evacuation System for Offshore Structures](https://reader031.fdocuments.in/reader031/viewer/2022012919/56813e08550346895da7e8fa/html5/thumbnails/5.jpg)
Prototype Design Evolution
March 6, 2014 5
ControlsExperimental Circuit (Breadboard)
Initial code testingPrinted Circuit Board (PCB)
Fine-tuning with prototype equipment Execute submarine control
![Page 6: Submarine Evacuation System for Offshore Structures](https://reader031.fdocuments.in/reader031/viewer/2022012919/56813e08550346895da7e8fa/html5/thumbnails/6.jpg)
6
Analysis: Lifting
March 6, 2014
Applied Load: 125 (N)
Maximum Lift Acceleration: 1 (m/s2)
Lifting Hook – ¼” x 20 UNC Nylon
Maximum Stress due to Bending
Lifting Angle Limit: 10° (S.F. 2)
Torque Requirement: 1 (N-m)
End Cap Fasteners - 4 x ¼ x 28 UNC Nylon
Utilization: 2% of Yield Strength
Torque Requirement: 1 (N-m)
10°
![Page 7: Submarine Evacuation System for Offshore Structures](https://reader031.fdocuments.in/reader031/viewer/2022012919/56813e08550346895da7e8fa/html5/thumbnails/7.jpg)
7
Finite Element Analysis (FEA)Quarter Model Hydrostatic Analysis
Boundary ConditionsRoller Side BoundariesFixed at Nose
SetupPressure: 60 kPa (~6m)Mesh: 6mm curvature
ResultsLimiting Safety Factor: 11.47Max Deflection: 35.2 µm
March 6, 2014
MIN: 11.47 S.F.
![Page 8: Submarine Evacuation System for Offshore Structures](https://reader031.fdocuments.in/reader031/viewer/2022012919/56813e08550346895da7e8fa/html5/thumbnails/8.jpg)
8
Motion Analysis: Flow3D
March 6, 2014
ConditionsPreset amount of ballastFully submergedStill waterExclude buoyancy controlUniform density
SetupAcceleration: 0.1 m/s2 downwardsDisp. Mass: 11.2 kg; Mass: 11.31 kgHollow body with point mass
Result: COG ~10mm below COB
4 ft
5.2 ft
2.8 ft
![Page 9: Submarine Evacuation System for Offshore Structures](https://reader031.fdocuments.in/reader031/viewer/2022012919/56813e08550346895da7e8fa/html5/thumbnails/9.jpg)
9
Motion Analysis: Flow3D
March 6, 2014
![Page 10: Submarine Evacuation System for Offshore Structures](https://reader031.fdocuments.in/reader031/viewer/2022012919/56813e08550346895da7e8fa/html5/thumbnails/10.jpg)
10
Control Codes
March 6, 2014
Speed Control CodeVarying thruster
RPM
Depth Control CodeMaintain desired
depth band
Roll & Pitch CodeContinual monitoring
of roll and pitch
PotentiometerReplicates sensor
ThrusterReplicates
thruster± 2.5 V
Stepper MotorReplicates PumpBallast Control
![Page 11: Submarine Evacuation System for Offshore Structures](https://reader031.fdocuments.in/reader031/viewer/2022012919/56813e08550346895da7e8fa/html5/thumbnails/11.jpg)
Code Sequence
March 6, 2014 11
+ θ
- θ
+ Φ
- Φ
Z2
Z1
+ Z
![Page 12: Submarine Evacuation System for Offshore Structures](https://reader031.fdocuments.in/reader031/viewer/2022012919/56813e08550346895da7e8fa/html5/thumbnails/12.jpg)
12
Testing Methods
March 6, 2014
Static CommissioningWater Tight Hull TestExternal Ballast System
Pressure Test
Dynamic CommissioningDepth Driven Ballast TestRotation Driven Thrust
Test Pitch Roll Depth
![Page 13: Submarine Evacuation System for Offshore Structures](https://reader031.fdocuments.in/reader031/viewer/2022012919/56813e08550346895da7e8fa/html5/thumbnails/13.jpg)
13
Deployment Strategies
March 6, 2014
1. Vertical Deployment Propeller-down launch Underwater Avoid GBS interference
2. Horizontal Launch Release bay filled with
water Exit from enclosed
piping
3. Horizontal Docking Connect with GBS
1.
2.
3.
![Page 14: Submarine Evacuation System for Offshore Structures](https://reader031.fdocuments.in/reader031/viewer/2022012919/56813e08550346895da7e8fa/html5/thumbnails/14.jpg)
14
Moving ForwardRefine Flow3D Model using an upgraded version of
Flow3D
Complete construction and fabrication
Continue optimizing control codes
Perform testing and analysis
Phase 3 Decision: Develop general recommendations for full-scale
implementation