Request for Proposal 17-1646-RFP SUBJECT: Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time) RESPOND TO: Leslie Burke, Purchasing Agent Purchasing Department University of Northern British Columbia 3333 University Way Prince George, BC V2N 4Z9 SIGNATURE AT ISSUE:

Transcript of SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE:...

Page 1: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

Request for Proposal

17-1646-RFP

SUBJECT:

Install Foundation for Bus Shelter

DATE OF ISSUE: October 5, 2017

TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

RESPOND TO: Leslie Burke, Purchasing Agent Purchasing Department University of Northern British Columbia 3333 University Way Prince George, BC V2N 4Z9

SIGNATURE AT ISSUE:

Page 2: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

RECEIPT CONFIRMATION FORM

REQUEST FOR PROPOSAL

17-1646-RFP

____________________

Please complete this form and e-mail to: Purchasing Department University of Northern British Columbia 3333 University Way Prince George, BC V2N 4Z9 Attn: Leslie Burke, Purchasing Agent E-mail: [email protected]

Failure to return this form may result in no further communication regarding this

Request for Proposal.

COMPANY NAME:

ADDRESS:

CITY: PROV: POSTAL CODE:

CONTACT PERSON:

CONTACT CONTACT TELEPHONE: FAX:

EMAIL:

I have received a copy of the above noted Request for Proposal. ______ Yes, I intend to respond to this Request for Proposal.

______ No, I will not be responding.

Page 3: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

UNIVERSITY OF NORTHERN BRITISH COLUMBIA REQUEST FOR PROPOSAL

17-1646-RFP ___________________

1.0 INFORMATION AND INSTRUCTIONS

1.1 PURPOSE

The University of Northern British Columbia, hereinafter referred to as the

“University” or “UNBC” is in the final stages of selecting a good contractor to install

a concrete pad and screw piles on the University’s ceremonial loop as listed herein.

This Request for Proposal (RFP) states the instructions for submitting proposals, and the procedure and criteria by which a contractor will be selected.

1.2 DEFINITIONS

Hereinafter, each company receiving this RFP is referred to as a “Proponent”. A

Proponent’s submission in response to the RFP is referred to as a “Proposal”. The successful Proposal and the company whose Proposal is awarded is referred to as

the “Contractor”.

1.3 ISSUING OFFICE

University of Northern British Columbia Contracts & Supply Chain Management 3333 University Way Prince George, BC V2N 4Z9 Attention: Leslie Burke, Purchasing Agent

1.4 KEY DATES

Listed are the important events and the target dates and times by which the events are expected to be completed by unless stated as a must be completed by elsewhere in this document: A. Issue of Request for Proposal October 5, 2017 B. Return Receipt Confirmation Form immediately C. Proponent’s Inquiries, up to the end of October 12, 2017 D. University’s Answers, up to the end of October 16, 2017 E. Due Date for Submission of Proposals October 19, 2017 F. Contract Start Date, if any, anticipated for October 25, 2017

Page 4: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

1.5 CLOSING DATE AND TIME

Proposals, signed by the Proponent’s authorized representative, must be received by the Issuing Office, before 2:00 PM (1400 Hours) Pacific Time, October 19, 2017.

The University will not accept submissions of any Proposals after the closing

date and time. Any submissions received after the closing date and time shall

be considered disqualified and may be returned unopened to the Proponent

who submitted the RFP. Under no circumstances, regardless of weather

conditions, transportation delays, or any other circumstances, will late

submissions be accepted.

1.6 PROPOSAL SUBMISSION

Proposal MUST be submitted using the following method: The Proponent’s proposal is to be uploaded at:

https://unbc.bonfirehub.ca/opportunities/11085

It is strongly recommend that you give yourself sufficient time and at least TWO

(2) hours before Closing Time to begin the uploading process and to finalize your submission. File size limit is 100mb. Multiple files can be uploaded if exceeding this limit. When using Bonfire, each item of Requested Information is instantly sealed and will only be visible by the University after the Closing Time. Uploading large documents may take significant time, depending on the size of the file(s) and your Internet connection speed. You will receive an email confirmation receipt with a unique confirmation number once you finalize your submission. Minimum system requirements: Internet Explorer 8/9/10+, Google Chrome, or Mozilla Firefox. Javascript must be enabled. If assistance is required during the upload, contact Bonfire at [email protected] for technical questions related to your submission. You can also visit the help forum at https://bonfirehub.zendesk.com/hc

Hard Copy, Faxed or E-mailed proposal submissions will NOT be accepted.

THE SIGNATURE PAGE, SCHEDULE III MUST BE SIGNED AND ALL

INFORMATION MUST BE RECEIVED PRIOR TO THE CLOSING DATE AND

TIME.

For any and all Proposals, the University accepts no responsibility for non-receipt and delays in receipt caused by facsimile transmission and reception problems, equipment failure, or any other similar cause. Proposals will NOT be opened publicly. Proponents will be advised in writing as to whom the RFP is awarded to.

Proponents may not make modifications to their Proposals after the closing date and time, except as may be allowed by the University pursuant to Section 1.10.

Page 5: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

Amendments to a RFP may be done in Bonfire. Amendments must be received prior to the Closing Date and Time to be considered. The University assumes no

responsibilities and the Proponent assumes ALL risks for revisions. The resubmitted original or revised submission must be received by UNBC’s Contracts & Supply Chain Management department through Bonfire prior to the RFP closing. The University accepts no responsibility for non-receipt and delays in receipt caused by transmission and reception problems, equipment failure, or any other similar cause. SECTIONS 1.0, 2.0, and 3.0, SCHEDULES, addenda, appendices, specifications, terms and conditions, and any attachments hereto shall become part of any contract entered into between the successful proponent and the University. Proposals which contain qualifying conditions may be disqualified or rejected. The University may reproduce any of the Proponent’s Proposal and supporting documents for internal use or for any other purpose required by law. The University will not be obligated in any way by the Proponent’s Proposal. The University will not return any of the Proponent’s Proposal and supporting documents to the Proponent.

1.7 PROPOSAL COSTS

The Proponent has the sole responsibility for any costs associated with preparing and submitting its Proposal in response to the Request for Proposal.

In no event will the University be responsible for the costs of preparation or submission of any Proposal.

1.8 IRREVOCABLE OFFER

Proposals submitted to the University shall constitute a valid and irrevocable offer which is open for acceptance by the University from and after submission until the expiration of the 30th day following the Closing Date specified in Section 1.5.

The University reserves the right to accept the Proposal, which it deems most advantageous, and the right to reject any or all Proposals.

The University will not be liable under any contract in connection with this RFP, or the submission of Proposal, unless and until the University has accepted one or more Proposals.

1.9 INQUIRIES AND CHANGES

All inquiries with respect to this RFP MUST be submitted in writing and e-mailed by the end of October 12, 2017 to: [email protected] subject: 17-1646-RFP

Page 6: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

If e-mailing questions, use the RFP number in the subject. The questions received in this format and before the deadline along with the answers from the University of Northern British Columbia will be issued no later than October 16, 2017 in written form as an addendum. All Addendums will be posted on the UNBC Contracts & Supply Chain Management (Purchasing) website listed as “Active Tenders & RFP’s”. In the event the University’s server is not available, or for any other situation the University deems reasonable, then the addendums will be emailed to all parties registered as having returned the Receipt Confirmation Form.

Any Proponent who does not submit the RECEIPT CONFIRMATION may not be

sent any amendments or addenda.

It is the responsibility of each Proponent to inquire about and clarify any requirements of this RFP which are not understood.

The University shall not be responsible for, and the Proponent shall not rely upon, any instructions or information given to any Proponent other than in writing in accordance with the requirements of the Request for Proposal.

The RFP is not to be discussed with any other University employee except at the direction of the Purchasing Agent. Failure to do so could result in the rejection of the proposal.

Proponents must obtain their own information on all matters and things that may in any way influence them in making their Proposal and fixing prices.

Proponents must satisfy themselves in all respects as to the risks and obligations to be undertaken by them.

If a Proponent discovers any inconsistency, discrepancy, ambiguity, errors, or omissions in this RFP it must notify the University immediately in writing.

The University may, at any time, make and stipulate changes to this RFP.

The University may provide additional information, clarification or modification by written addenda. All addenda shall be incorporated into and become part of the RFP. The University shall not be bound by oral or other informal explanations or clarifications not contained in written addenda.

1.10 SELECTION PROCESS

Because the University bases any decision to award on the Proposals submitted, Proponents should include all requirements, terms or conditions it may have in their Proposal, and should not assume that any opportunity will exist to add such matters after the Proposal is submitted.

Page 7: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

If the University determines, in its sole discretion, that one or more Proponent is clearly more highly qualified than the others under consideration, it may decide to award directly to that Proponent. The University reserves the right, at its sole discretion, to negotiate with any Proponent as it sees fit, or with another Proponent or Proponents concurrently. In no event will the University be required to offer any modified terms to any other Proponent. The University shall incur no liability to any other Proponent as a result of such negotiations or modifications.

1.11 WITHDRAWAL OF PROPOSAL

Proposals may be withdrawn through Bonfire, provided such withdrawal is done prior to the Proposal closing date and time.

1.12 BASIS OF SELECTION

The University will not necessarily accept the lowest price or any Proposal. Any implication that the lowest or any Proposal will be accepted is hereby expressly negated.

The University will not be limited as to its criteria for evaluation of Proposals. The University may take into account whatever criteria and considerations it wishes to. These may include: 1.12.1 Any features or advantages which are unique to the Proponent’s Proposal,

which the University has not listed in Attachment A.

1.12.2 The Proponent’s relevant experience, qualifications and success in providing a service of the type described in Attachment A.

1.12.3 The Proponent’s price. 1.12.4 The quality of the Proposal, specifically: Proposals shall be prepared in a

straight forward manner, and shall describe the Proponent’s offering(s) in a format that is reasonably consistent, comprehensible, and appropriate to the purpose.

1.12.5 The contractual terms proposed by the Proponent which would govern any

contractual relationship with the University. 1.13 RIGHT TO REJECT

The University reserves the right to reject any or all proposals and to accept any proposal it considers advantageous. Any Proposal may not necessarily be accepted if the University determines, at its sole discretion and after appropriate investigation and evaluation, that the proposal is to be cancelled.

Page 8: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

1.14 CONTRACTUAL OBLIGATION

Mandatory Contractual Provisions (Mandatory Provisions) that will govern any subsequent contract issue are outlined in this Request for Proposal. The Proponent’s Proposal is automatically deemed to include the Proponent’s agreement to the Mandatory Provisions unless the Proponent expressly and specifically provides otherwise in its Proposal.

Mandatory Provisions are listed in Section 3.0. The Proponent may not modify any Mandatory Provisions in its Proposal. If the Proponent has any Mandatory Provision or wished to incorporate or use any Proponent standard terms and conditions, the Proponent shall append such materials to its Proposal and indicate thereon such Mandatory Provisions. The Proponent’s Mandatory Provisions will also be considered as part of the selection process.

1.15 CONTRACT PROVISIONS BY REFERENCE

The University’s acceptance of the Proponent’s Proposal by issuance of a

University Service Contract (Agreement) shall create a contract between the University and such Proponent containing all specifications, terms and conditions in the Proposal except as amended in the Agreement. Any exceptions taken by the Proponent which are not included in the Agreement will not form part of the Agreement.

In the event of a conflict between the terms and conditions of the Request for Proposal and information submitted by a Proponent, the terms and conditions of this Request for Proposal and the Agreement will govern.

1.16 CONFIDENTIALITY

The Proponent acknowledges that the University is a public body subject to British Columbia’s Freedom of Information and Protection of Privacy Act (the Act). The Proponent shall review the Act and determine the portions of records which are exempted from disclosure under the Act. The Proponent shall clearly mark “Confidential” all information regarding the items and conditions, financial and/or technical aspects of the Proponent’s Proposal, which in the Proponent’s opinion are of a proprietary or confidential nature at the relevant item or page.

If the University receives a request for information under the Act which includes information provided by the Proponent, the University will give the Proponent notice of such request and the Proponent will respond to such notice within 20 days or less. If the Proponent does not respond to the notice from the University, the University will proceed to process the request for information. The University shall use all reasonable efforts to hold all information marked “Confidential” by the Proponent in strict confidence but shall not be liable for any inadvertent disclosure.

Page 9: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

If the University’s response to a request under the Act is appealed to the Office of the Information and Privacy Commissioner, the Proponent shall have the burden of proof the business information cannot be released to the applicant as per section 57 (3) of the Act. The Proponent shall be responsible for all costs related to maintaining the confidentiality of its records.

If the University declares and marks certain information about the University to be received by the Proponent as “Confidential”, the Proponent must not disclose such “Confidential” information to any third parties unless authorized to do so in writing by the University.

The Proponent and The University agree that the reciprocal obligations of confidentiality will survive the termination of any Agreement that might arise between the parties.

Page 10: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

2.0 SUBMISSION OF PROPOSAL

2.1 COSTS

2.1.1 All prices must be quoted taxes excluded. 2.1.2 Each Proponent shall provide separate prices for:

Ground preparation: includes excavation of soil, installation of gravel, and compaction of gravel.

Screw piles.

Drainage work: includes installation of vertical culverts and drainage gravel.

Furthermore, each Proponent shall provide separate prices for the following optional additional work:

Concrete pad.

Landscaping.

2.1.3 Any charges not specified in the above which will or may be invoiced to the University by the Proponent in performing the work proposed. In addition, the Proponent shall clearly indicate any known possibility for unanticipated charges to the University, other than the Proponent’s charges specified in its Proposal, as well as make any suggestions for cost savings in any area.

2.1.4 All equipment, materials, and supplies must be supplied by the proponent,

unless otherwise specified and if to be charged to the University, must be included in the proposal price.

Page 11: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

3.0 MANDATORY CONTRACTUAL PROVISIONS

The following terms and conditions are mandatory and shall be deemed to be incorporated.

3.1 THE UNIVERSITY’S AUTHORIZED REPRESENTATIVES

The only persons who are or shall be authorized to speak or act for the University in any way with respect to any Agreement resulting from this RFP are those whose positions or names will be specifically designated.

It is hereby declared and agreed by the Proponent that all the information in the Proposal submitted to the University by the Proponent has been prepared on the basis of its own knowledge of the nature of the work to be performed or of the goods to be supplied, the location, quality, and character of the equipment and facilities needed, as well as general and local conditions and all other such matters which can affect the Proponent’s performance under any Agreement between the parties that might result from the Proponent’s Proposal.

The Proponent further agrees that it does not rely upon any information given or statements made by representatives of the University with regard to the Proponent’s Proposal or work to be performed.

3.2 AMENDMENTS

No amendment of a contract resulting from this proposal process shall be effective unless it is reduced to writing and executed by the University’s Contract Administrator and by the individual signing the Proponent’s Proposal.

3.3 NOTICES

All notices provided hereunder shall be given in writing and delivered in person, by facsimile, by courier or by registered or certified mail, return receipt requested addressed as follows: If to the University: Contracts & Supply Chain Management University of Northern British Columbia 3333 University Way Prince George, BC V2N 4Z9 Fax No. (250) 960-5507

The person signing the Proponent’s Proposal in response to the University’s RFP, at the Proponent’s address indicated in such Proposal; or to such other person or address as either may designate for itself in writing and provide to the other. Notice shall be deemed given when delivered the third business day following the day such notice is deposited in the mail, or upon facsimile transmission. In the event of any interruption in the ordinary postal service, any such notice shall be delivered or sent by facsimile transmission and not mailed.

Page 12: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

3.4 INDEMNITY

The Contractor hereby agrees to indemnify and save harmless the University, its successors, assigns and authorized representatives and each of them from and against losses, claims, damages, actions and causes of action (collectively referred to as “Claims”) that the University may sustain, incur, suffer or be put to at any time either before or after the expiration or termination of this Agreement, that arise out of errors, omissions or negligent acts of the Contractor or their subcontractors, servants, agents or employees under this Agreement, excepting always that this indemnity does not apply to the extent, if any, to which the Claims are caused by errors, omissions or the negligent acts of the Institution, its other contractors, assigns and authorized representatives or any other person.

3.5 INSURANCE

The Contractor is required to carry insurance as outlined in Appendix "I", Insurance

Requirements, attached hereto and forming a part hereof. The Contractor must supply proof of the aforementioned insurance coverage before commencing the work and before any payments will be made by the University to the Contractor.

3.5.1 OTHER INSURANCE

The Contractor shall provide, maintain and pay for any additional insurance

required to be provided by law, or which he considers necessary to cover risks not otherwise covered by insurance specified in the RFP document.

3.6 WORKERS’ COMPENSATION The Contractor shall carry full employee liability insurance for the whole of the work in

accordance with the Worker's Compensation Act.

The Contractor warrants and represents that it shall comply with the relevant Workers’ Compensation Board requirements.

The Contractor is responsible for complying with Workers Compensation Board and the Ministry of Labour laws, policies and procedures. The presence or risk of hazards to the health or safety of people in the vicinity of the work must be identified and actions must be taken to protect workers and other persons from such hazards.

3.7 APPLICABLE REGULATIONS

All equipment provided shall comply with all applicable provincial and federal regulations.

Page 13: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

The Agreement will not operate as a permit, license, approval or other statutory authority which the Contractor may be required to obtain from the Province or any of its agencies in order to provide the Services.

3.8 GOVERNING LAW

Any Agreement resulting from this Request for Proposal shall be governed by and interpreted in accordance with the laws of The Province of British Columbia.

3.9 ASSIGNMENT AND SUBCONTRACTING

Any Agreement made as a result of this RFP may not be assigned or transferred by either party to such agreement without the prior written approval of the University.

The Contractor will not without the prior written consent of the University:

a) assign, either directly or indirectly, this Agreement or any right of the Contractor under this Agreement;

b) subcontract any obligation of the Contractor under this Agreement; or c) without being released from any of its responsibilities hereunder, assign the

Agreement to any affiliate or wholly-owned subsidiary of Contractor.

No subcontract entered into by the Contractor will relieve the Contractor from any of these obligations under this Agreement or impose any obligation or liability upon the University to any such subcontractor. The Contractor shall require all subcontractors to be bound by the same terms and conditions as provided for in the contract between the Contractor and the University.

3.10 INDEPENDENT CONTRACTOR

3.10.1 The Contractor will be an independent contractor and not the servant, employee or agent of the University. 3.10.2 The Contractor will not in any manner whatsoever commit or purport to commit the University to the payment of any money to any person, firm or corporation. 3.10.3 The University may, from time to time, give such instructions to the Contractor as it considers necessary in connection with the provision of the Services but the Contractor will not be subject to the control of the University in respect of the manner in which such instructions are carried out. 3.10.4 The Contractor shall have complete control of the work and shall effectively

direct and supervise the work so as to ensure conformance with the Agreement. The Contractor shall be solely responsible for safety at the place of the work and for compliance with the rules, regulations and practices required by safety legislation, including full compliance with all Workplace Hazardous Materials Information Systems (WHMIS) regulations.

Page 14: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

3.10.5 All work on campus is to be coordinated with the UNBC Assistant Director

Facilities, or his designate. Forty-eight (48) hours prior to the commencement of work, the Contractor will need to fill out a Work Permit available through the University’s Facilities department.

3.11 CONFLICT

The Contractor will not perform a service for or provide advice to any person, firm or corporation where the performance of the service or the provision of the advice may or does, in the reasonable opinion of the University, give rise to a conflict of interest between the obligations of the Contractor to the University under this Agreement and the obligations of the contractor to such other person, firm or corporation.

3.12 REJECTED WORK 3.12.1 Defective work, whether the result of poor workmanship, use of defective products, or damage through carelessness or other act or omission of the Contractor and whether incorporated in the work or not, which

has been rejected by the University as failing to conform to the Agreement shall be removed promptly from the University by the Contractor and replaced or re-executed promptly in accordance with the Agreement at the Contractor's expense.

3.12.2 If, in the opinion of the University, it is not expedient to correct defective work

or work not performed in accordance with the Agreement, the University may deduct from the monies otherwise due to the Contractor the difference in value between the work as performed and that called for by the Agreement. The amount which will be deducted will be determined in the first instance by the University.

3.13 CHANGES IN THE SCOPE OF WORK

Prior to the commencement of the services, the University reserves the right without

invalidating the Agreement to make changes by altering, adding to, or deducting from the work. All such work shall be executed under the conditions of the Agreement. Any changes in the work must be initiated by written order and the contract sum will be adjusted as follows:

3.13.1 The contract sum adjustments shall be made on the basis of the prices as

agreed to by both parties. All changes in the work must be authorized in writing by the Director of Facilities Management or designate with the contract sum adjustments confirmed by the UNBC Contracts & Supply Chain Management department n the form of an addendum.

3.13.2 The Value of a change shall be determined in one or more of the following

methods:

Page 15: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

a) by estimate and acceptance in a lump sum; b) by unit prices set out in the Agreement; and/or c) by cost and a fixed or percentage fee. 3.13.3 The value of work performed in the change shall be included for payment with

the regular invoice for payment. 3.14 TERMINATION BY THE UNIVERSITY

Time is of the essence in any Agreement resulting from this proposal. The

University reserves the right to invoke all available remedies for non-performance. Periods of performance may be extended at the discretion of the University Purchasing Agent or Contract Administrator if agreed to in writing by both parties.

The Agreement resulting from this RFP may be terminated in whole or in part by the

University on immediate notice to the Contractor without further obligation: 3.14.1 if the Contractor defaults in the performance or observance of any term or

condition of this Agreement and in each case such default remains unremedied for a period of TWENTY-FOUR (24) hours after notice from the University, or in the case of a default which cannot reasonably be remedied within such period, the Contractor fails to take immediately and diligently carry out, steps to remedy such default in accordance with instructions of the University.

3.15 TERMINATION BY EITHER PARTY

This Agreement may be terminated by either party, on seven (7) days written notice to the other.

3.16 CONSEQUENCES OF TERMINATION If this Agreement is terminated as herein provided, the following provisions shall apply:

3.16.1 The Contractor shall cease forthwith the provision of Service and all its operations at the University under this Agreement;

3.16.2 The University shall pay to the Contractor the amounts due to the Contractor

(if any)

3.17 FORCE MAJEURE

The University shall not be liable for any damage, breach of contract, or breach of covenant contained in this contract, due to causes beyond control of the University, and in particular, (but not so as to restrict the generality of the foregoing) it shall not be liable for damages or breach caused by act of God, acts of military or civil authorities, war, riot or civil disobedience, fire, explosion, strikes, lock outs or other

Page 16: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

labour unrest, including picketing, (whether lawful or not), nor shall it be liable for damages or breaches of covenant or contract caused by its being unable to obtain

labour, materials, or facilities, and the University shall not, in any event, under any circumstances whatever, be liable for consequential damage or special damages to any person arising by reason of any of the aforesaid matters.

It is further expressly agreed by the parties that should legislation and/or budgetary

direction of the Ministry of Advanced Education or Ministry of Finance or other duly constituted governmental authority adversely affect either party to this Agreement so as to frustrate the intent of this Agreement, or any part thereof, then this Agreement may, at the option of the party deeming itself adversely affected, be at an end and void, and, in such case neither party shall assess any Agreement or bring action for damages arising therefrom.

In any event, should the University be of the opinion that this Agreement cannot

continue due to circumstances beyond its control and jurisdiction, it shall thereupon be, at the option of the University, terminated and at an end and no action of any sort shall be taken against the University as a result thereof.

3.18 PAYMENT

Payment is to be n/30 receipt of services or invoice date, whichever is the later, The University reserves the right to withhold all or a portion of the payment should services fail to meet the satisfaction of the University’s Director of Facilities Management. Payment would be held until such time as the University’s requests to the standards set out in this proposal are met.

3.19 NON-OWNED EQUIPMENT

The Contractor is responsible for the receipt and storage on campus, of all his

materials required for the Agreement and will be responsible also for its security and safety. The University will make no payments in compensation for the Contractor's materials or equipment stolen, lost or damaged during the term of the Agreement.

3.20 SITE PREPARATION AND REQUIREMENTS

The installation requirements and site services required, including environmental conditions must also be specified in the Proposal.

The Contractor is responsible to provide all the information necessary for a proper site

preparation. 3.21 PROPERTY AND EQUIPMENT DAMAGE

The Contractor shall protect the University's property and equipment from damage and is responsible for reporting any damages to the University’s Assistant Director Facilities or his designate. The Contractor shall be responsible for damage which may arise as the result of his operations under the contract except damage which

Page 17: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

occurs as the result of acts or omissions by the University. Other contractor's work or equipment destroyed or damaged by such actions of the Contractor shall be made good promptly at the Contractor's expense. The Contractor is responsible for the costs, as determined by the University, associated with repairing or replacing the fixtures or any property.

In the event the Contractor causes damages, invoice payment shall be held or reduced until such time as the matter is corrected. Should the fix require the Contractors services beyond the scheduled contract end, the contract term will be considered extended until such time as the fix is completed to the satisfaction of the Director Facilities Management. The contractor will coordinate with the University’s Assistant Director Facilities or his designate making every effort to expedite the fix.

3.22 STANDARD CARE When working on campus, all safety precautions and WCB regulations must be

adhered to. The work area must be kept in a safe and tidy manner while working and upon completion. The contractor is to make effort so as not to disturb or disrupt other faculty, staff, students or contractors within the vicinity.

3.23 SAFETY . Before commencing work, a copy of the Contractor’s Safety policy and program

must be approved by UNBC Risk & Safety and Facilities. The Contractor shall be responsible for safety at all times during the

performance of its obligations resulting from this contract and will be required to abide by the laws and regulations and all work practices prescribed by law and the University with respect to access to the University’s property, including specifically those relating to matters of safety and the environment

Page 18: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

ATTACHMENT A

WORK SPECIFICATIONS

UNBC is looking for an experienced contractor to carry out the installation of a foundation

for a bus shelter at the Prince George campus.

A commitment to sustainability that, at a minimum, matches and evolves with the University’s operations and expectations is an asset. 1.0 INTRODUCTION The UNBC Ceremonial Loop is the primary bus stop location for UNBC. Passengers waiting for transit are exposed to the elements in an area with little cover and few wind breaks. UNBC requires a bus stop shelter capable of protecting transit users as they wait for the bus.

2.0 PROJECT DESCRITION This project will construct a small and enclosed shelter on the east side of the ring road near the existing bus stop. The shelter will be a wood and glass superstructure supported on screw piles with a concrete pad for the interior. The wood and glass superstructure will be designed and constructed by the UNBC Masters of Engineering in Integrated Wood Design program and installed by the UNBC Facilities Management department. This superstructure is not part of this contract. The screw piles will be sleeved with PVC pipe to create a slip joint between the piles and concrete pad. The design reduces the risk of frost heave damage and removes the need for expensive drainage work. The concrete pad, screw piles, and ground works are the scope for this RFP. 3.0 SCOPE OF WORK All construction must be done in accordance with the detailed design provided and must comply with specified regulatory design codes and UNBC standards. The following is a list of tasks which will need to be completed to fully implement this scope of work. The Contractor will be required to:

3.1 Attend a site orientation with UNBC Facilities Management personnel;

3.2 Coordinate the project schedule and safety procedures with UNBC Facilities Management and Safety Department personnel;

3.3 Provide a jobsite safety plan and the materials and workforce to carry out that plan for the protection of their workforce, UNBC personnel, and the general public at the UNBC work site. It is expected that this will include construction barricades and caution tape around the worksite;

Page 19: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

3.4 Provide all the materials, equipment, and workforce required to install the ground preparation, screw piles, and drainage, plus the concrete pad and landscaping if UNBC chooses those options, as per the drawings (see Appendix II);

3.5 Implement the jobsite safety plan; isolation and lock out procedures will be performed by UNBC Facilities Department staff;

3.6 Locate and field mark the construction area;

3.7 Underground services locates will be the responsibility of UNBC and are not part of this scope.

3.8 Break ground and excavate at the construction site;

3.9 Prepare ground works, install screw piles, and install drainage; supply and installation of underground electrical will be by UNBC;

a) Drainage pit will be a 6’ long by 700mm diameter culvert buried vertically in the ground and filled with drain rock. The top lip of the culvert will be exposed and extend 6” higher than the finished grade b) Culvert will be 6’ long, 700mm diameter, 68 x 13 profile, galvanized with a 50 year rating. Top edge of culvert to be factory galvanized or painted with galvanized paint c) Drain rock will be 3” with no fines. Culvert to be filled with drain rock to 10” below top of culvert

3.10 Supply, construct, and install concrete pad formworks and reinforcement if

UNBC chooses to include the concrete pad option;

3.11 Contact the engineer for site inspections and perform adjustments as requested by the engineer;

3.12 Supply, pour, and finish the concrete after the UNBC retained engineer has given the approval to do so, if UNBC chooses to include the concrete pad option;

3.13 Remove formworks after the concrete has sufficiently solidified as per the drawings (Appendix II), if UNBC chooses to include the concrete pad option;

3.14 Backfill the concrete pad, place topsoil (minimum 2” depth) and plant grass seed over disturbed areas if UNBC chooses to include the concrete pad and landscaping options;

3.15 Clean up the work site of all construction materials and barricades required for the safety plan; and

3.16 Dispose appropriately of the construction waste.

Page 20: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

4.0 SCOPE OF SUPPLY BY OWNER UNBC will:

4.1 Retain an engineering firm to design the foundation and carry out field reviews (Scouten and Associates);

4.2 Retain an underground services location firm to locate underground services;

4.3 Apply for and cover the cost of the City of Prince George building permit;

4.4 Arrange temporary relocation of the bus stop during construction;

4.5 Supply and install electrical wire and conduit for lighting to the shelter;

4.6 Design, supply and erect the wood and glass superstructure. Superstructure will be attached to the screw piles by bolting through the columns to the screw pile cap, by UNBC.

5.0 SCHEDULE

All work is desired to be completed by December 1, 2017. Include with proposal submission (Schedule IV) a schedule indicating the proposed date when the work at UNBC would start and the construction duration (days).

Page 21: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

SCHEDULE I

PROPONENT’S SUBMISSION CHECKLIST

REQUEST FOR PROPOSAL

17-1646-RFP

1, Schedule II Price List

2. Schedule III Proposal Signature(s)

3. Schedule IV Construction Schedule & Subcontractors

REMINDER

The Proponent’s Proposal must be submitted on or before the closing date and time

using Bonfire (see Section 1.6).

Failure to sign the proposal will result in disqualification.

Page 22: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

SCHEDULE II

ITEMIZED PRICE LIST

REQUEST FOR PROPOSAL

17-1646-RFP

____________________

Proposals shall be itemized as indicated.

NOTE 1: Pricing below must be submitted in Canadian Funds, landed, taxes out.

NOTE 2: All cost must be listed below. The University will not pay for any charges not

included in the proponent’s proposal.

NOTE 3: Prices below are to reflect the work as outlined in Attachment A.

NOTE 4: Having examined all of the Proposal documents and all addendums, if any, the

signatory (Proponent) offers to the University of Northern British Columbia

(University) to execute the work for the project as listed herein for pricing

excluding taxes of:

Ground preparation $_______________

Screw piles $_______________

Drainage work $_______________

SubTotal Not-to-Exceed Price $_______________

Tax(es) $_______________

Total Not-to-Exceed Price $_______________

Optional Additional Work:

Concrete pad $_______________

Tax(es) $_______________

Total Not-to-Exceed Price $_______________

Landscaping $_______________

Tax(es) $_______________

Total Not-to-Exceed Price $_______________

Other Costs to the University, if any, not included above:

Proposal Expiry Date:__________________________________________________

(Note: Must be 30 days Minimum)

Page 23: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

SCHEDULE III

PROPOSAL SIGNATURE(S)

17-1646-RFP We, ____________________________, having examined the Request for Proposal and all other information and documents included in the Request for Proposal, do hereby offer and agree to provide the services as described herein.

THIS PAGE MUST BE RETURNED WITH YOUR PROPOSAL, FAILURE TO DO SO WILL RESULT

IN THE PROPOSAL BEING DISQUALIFIED.

LEGAL/REGISTERED NAME OF FIRM: __________________________________________________________________________ AUTHORIZING SIGNATURE: __________________________________________________ __________________________________________________ Print Name Official Capacity/Title of Individual Signing: __________________________________________________________________________ Address: ______________________________________________________________ City: _________________________________________________ Province or State: _________________ Postal or Zip Code: ___________ Date: _________________________________________________ Contact Information of person to be contacted regarding clarifications (if any), award and non-award: Name: _________________________________________________ Telephone: _________________ Email ______________________________________ Duly authorized officers of the Contractor(s) shall properly execute the Proposal as follows: If the Contractor is a corporation, the proposal shall be signed in the name of the corporation by a duly authorized officer of the corporation, with the designation of hislher official capacity, and attested properly. The proposal shall show the place in which the corporation is chartered. If the Contractor is an individual, he or she shall sign the proposal in person or by representative and be witnessed, stating the name or style, if any, under which he or she is doing business. If the signing is by representative, his or her power of attorney or other authorization shall be stated, and a certified copy thereof shall be attached to the Proposal. If the Contractor is a joint venture or partnership, the proposal shall be signed by each of the persons or firms, which is a party to the joint venture agreement. A certified copy of the joint venture agreement shall be attached to the Proposal. A joint venture will not be accepted unless the joint venture agreement or some other signed and legally binding instrument is certified and attached to the proposal, containing provisions for one of the parties to the joint venture to be in full direction of the project and to exercise this direction through a single individual, to be appointed Manager of Operations with the consent of all parties to the joint venture agreement.

Page 24: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

SCHEDULE IV

CONSTRUCTION

SCHEDULE & SUBCONTRACTORS

17-1646-RFP Provide a proposed schedule including start date and construction duration (days). For any subcontractors being used, provide the name of the company and note the service being provided.

Page 25: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

APPENDIX I

INSURANCE

17-1646-RFP

The Contractor shall, without limiting its obligations or liabilities herein and at its own expense, provide and maintain the following insurances with insurers licensed in British Columbia and in forms and amounts acceptable to the Owner:

(a) Commercial General Liability Insurance in an amount not less than Two Million Dollars ($2,000,000.00) inclusive per occurrence against bodily injury and property damage. The Owner is to be added as an additional insured under this policy. Any deductible applicable to property damage shall not exceed Five Thousand Dollars ($5,000.00) or such other reasonable deductible. Such insurance shall include, but not be limited to: .01 Products and Completed Operations Liability (Twenty-Four (24) months);

.02 Owner’s and Contractor’s Protective Liability;

.03 Blanket Written Contractual Liability;

.04 Contingent Employer’s Liability;

.05 Personal Injury Liability;

.06 Non-Owned Automobile Liability;

.07 Cross Liability;

.08 Employees as Additional Insureds;

.09 Broad Form Property Damage; .10 Elevator and Hoist Liability;

.11 Operation of Attached Machinery; and where such further risk exists:

.12 Shoring, Blasting, Excavating, Underpinning, Demolition, Pile driving and Caisson Work, Work Below Ground Surface, Tunneling and Grading, as applicable;

.13 Limited Pollution Liability in an amount not less than Two Million Dollars ($2,000,000.00);

.14 Broad Form Tenants Legal Liability

This insurance shall be maintained continuously from commencement of the Work until the date of final certificate for payment is issued or when the insured project is completed and accepted by or on behalf of the Owner, whichever occurs first, plus with respect to completed operations cover a further period of twenty-four (24) months.

(b) Property insurance which shall cover, on a replacement cost basis, all property, of every description, to be used in the construction of the Work, against “All Risks” of physical loss or damage, including earthquake and flood, while such property is being transported to the site, and thereafter throughout erection, installation and testing and such insurance shall be maintained until Substantial Performance of the Work. Such policy of insurance shall extend to protect the interest of the Owner, and shall contain a waiver of subrogation against the Owner. Any deductible shall not exceed Five Thousand Dollars ($5,000.00) or such other reasonable deductible for each and every occurrence except for the peril of flood, which may include a maximum deductible of Twenty Five Thousand Dollars ($25,000.00), and earthquake, which may include a maximum deductible of Ten Percent (10%) based upon the total project value insured.

Page 26: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

(c) Automobile Liability Insurance The Contractor (or Contractor’s Subcontractors) shall provide, maintain and pay for Automobile Liability Insurance in respect of all owned or leased vehicles if used directly or indirectly in the performance of the Work, subject to limits of not less than Two Million Dollars ($2,000,000.00) inclusive per occurrence. The insurance shall be placed with such company or companies and in such form and deductibles as may be acceptable to Owner.

Page 27: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)

APPENDIX II

Item Dwg Title Revision 1. S-100 BUS SHELTER FOUNDATIONS – GENERAL NOTES D 2. S-101 BUS SHELTER FOUNDATIONS – PLAN, SECTION AND DETAILS D 3. S-102 BUS SHELTER FOUNDATIONS – HELICAL PILE DETAILS C 5. SK-01 UNBC BUS SHELTER Site Plan Proposed Location 2 A

Page 28: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)
Page 29: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)
Page 30: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)
Page 31: SUBJECT: Install Foundation for Bus Shelter · Install Foundation for Bus Shelter DATE OF ISSUE: October 5, 2017 TO RESPOND BY: October 19, 2017 @ 1400 Hours (2:00 PM Pacific Time)