SUBJECT : DETAIL DESIGN CONSULTANCY (DDC) FOR ...

13
SUBJECT : DETAIL DESIGN CONSULTANCY (DDC) FOR ARCHITECTURAL, PLANNING, STRUCTURAL, BUILDING SERVICES AND E/M SERVICES FOR THE "CONSTRUCTION OF MODERN OFFICE BUILDING" ABOVE U/G STATION AT BHIKAJI CAMA PLACE (BCP). Reply of Pre-bid Queries Held on 15.1.14 I Nirman Consultants Pvt. Ltd ... 1 Eligibility Criteria-1.3.2 in notes-The inclusion of a LEED/TERI certified professional as a JV member with not less than 3% share. CLARIFICATION required— Can a registered Green building consultant /professional entity be part of the team as sub-consultant as the others (Like structural/MEP etc.) and be active member of the team throughout. , Point 3 of Clause 1.3.2 stands modified as " include a LEED/TERI certified consultant as JV/Consortium/Associate- Consultant...." 2 Clarification on LEED rating- 4 STAR as desired by DMRC or lesser as suggested by consultants. No Change 3 Clarity on the role of the consultant on the whole process of getting approvals of the project with various Delhi municipal authorities and the role of DMRC throughout. Obtaining requisite approvals will be in the scope of work of DDC. DMRC will bear statuary fee or charges and will render best possible help or assistance. DMRC will also share all available documents or knowledge in this regard. 4 Clarification on the whole process of PMC not being part of the NIT and only periodic supervision as & when by the consultant on scope of his work expected. PMC is not a part of the contract, only periodic supervision is required and as required from time to time by DMRC or DDC. 5 Clarification on the clause of- the consultant being financially being penalized on non deliverables of project schedule. (page 33) DDC will be liable for penalty/ damages, if delay is on his part for LD and duration as per schedule specified at Annex B4. 6 Clarification on the complete elimination on the deployment of dedicated construction team as asked for in NIT.(DCC team for the project) DDC will not be required to set up a site office / keep dedicated construction supervision team on site. The same (design architectural, structural, MEP etc.) team is expected to supervise except where additional input is indicated. NIT clause 1.3.2, b - Technical qualification criteria vi: ...and will not engage himself/herself in any other assignment during the currency of his/her assignment on the project. is deleted 7 Clarity on the information on project technical information (Current drawings/structural designs etc of station) which DMRC will share with Current drawings/structural drawings can be collected from DMRC's office i.e. 25 Ashoka Road.

Transcript of SUBJECT : DETAIL DESIGN CONSULTANCY (DDC) FOR ...

SUBJECT : DETAIL DESIGN CONSULTANCY (DDC) FOR ARCHITECTURAL, PLANNING, STRUCTURAL, BUILDING SERVICES AND E/M SERVICES FOR THE

"CONSTRUCTION OF MODERN OFFICE BUILDING" ABOVE U/G STATION AT BHIKAJI CAMA PLACE (BCP).

Reply of Pre-bid Queries Held on 15.1.14

I Nirman Consultants Pvt. Ltd ...

1 Eligibility Criteria-1.3.2 in notes-The inclusion of a LEED/TERI certified professional as a JV member with not less than 3% share. CLARIFICATION required— Can a registered Green building consultant /professional entity be part of the team as sub-consultant as the others (Like structural/MEP etc.) and be active member of the team throughout. ,

Point 3 of Clause 1.3.2 stands modified as " include a LEED/TERI certified consultant as JV/Consortium/Associate-Consultant...."

2 Clarification on LEED rating- 4 STAR as desired by DMRC or lesser as suggested by consultants.

No Change

3 Clarity on the role of the consultant on the whole process of getting approvals of the project with various Delhi municipal authorities and the role of DMRC throughout.

Obtaining requisite approvals will be in the scope of work of DDC. DMRC will bear statuary fee or charges and will render best possible help or assistance. DMRC will also share all available documents or knowledge in this regard.

4 Clarification on the whole process of PMC not being part of the NIT and only periodic supervision as & when by the consultant on scope of his work expected.

PMC is not a part of the contract, only periodic supervision is required and as required from time to time by DMRC or DDC.

5 Clarification on the clause of- the consultant being financially being penalized on non deliverables of project schedule. (page 33)

DDC will be liable for penalty/ damages, if delay is on his part for LD and duration as per schedule specified at Annex B4.

6 Clarification on the complete elimination on the deployment of dedicated construction team as asked for in NIT.(DCC team for the project)

• •

DDC will not be required to set up a site office / keep dedicated construction supervision team on site. The same (design architectural, structural, MEP etc.) team is expected to supervise except where additional input is indicated. NIT clause 1.3.2, b - Technical qualification criteria vi: ...and will not engage himself/herself in any other assignment during the currency of his/her assignment on the project. is deleted

7 Clarity on the information on project technical information (Current drawings/structural designs etc of station) which DMRC will share with

Current drawings/structural drawings can be collected from DMRC's office i.e. 25 Ashoka Road.

consultants to understand further details. 8 Clarification on the formation of a JV purely for this

project with the JV team .not having worked prior to this on any other project ever.

Refer Clause 1.3.2 of the tender document.

9 The time extension if being allowed to be notified. Prospective Consultants are advised to watch official website of DMRC for addendums, corrigendum, queries response time extension if any etc.

10 Clarity on the Cost of the model (base size 6'x4') to be fixed as common to all / should be paid separately by DMRC to each final tenderers..

Refer Clause 8 at Page 14 of the Vol. 2 Scope of work. The consultant can make layout model with cover of approx. size 3' x 4' but then a detail model with cover of building block would be required, so consultant to assess appropriate size(s) and quote accordingly. Fee is inclusive of model with cover.

II Rajinder Kumar Associates (RKA)

11 LEED /Green Buildings are designed by us along with specialist sub-consultants. In this case will the sub-consultant be JV Partner? (P.age 3 of NIT — Notes.3)

Refer item No. 1 above.

12 Does this mean that the key personnel shall be committed only to this project? (Page 4 of NIT — b(vi))

Refer item No. 6 Above.

13 Construction Supervision Team is same as the personnel working on the project? They shall make only periodic supervision at site? (Page 6 of NIT)

DO

14 Scope includes Interior Design?

As per clause 3.6.2) Architectural Services c; however flooring, ceiling, partition and associated services etc. is included but furniture design in lease area is excluded.

15 Page 8 of Vol. 1/ITT says 2 stage processes with total three packages. However, on Page 12 6.1 says that all the three packages shall have to submitted now. Please clarify if Concept Design and Financial Packages have to be submitted now together with Technical Package.

The technical and financial bid will be invited together at first instance. The technical bid will be opened on the date of submission. The financial bid of only prequalified DCC will be opened, in the presence of those who wish to be present. See addendum on the website containing revised ITT: 8R,9R,10R,12R & 14R

16 Can we include the project in our general Professional Indemnity Insurance (PII) and submit certificate to DMRC. Buying additional policy will cost more. (Page 16 vii of Vol. 1/ITT)

Yes, but subject to certification by insurance company that name of the contract together with amount of Pll as per Clause 36 of GCC should be included in policy and

17 Liability of DDC to DMRC should be covered in PLI Limit. (Page 33 of Vol. 1/GCC,SCC)

Not agreed.

III Incubis Consultants (India) Private Limited

18 Date of Submission of Tender. (vol-1/NIT page2 Para 1.2) Suggestions- Should be at least 15 clear days from issue of Addendum/ Clarifications in response to queries

Prospective Consultants are advised to watch official website of DMRC for addendums, corrigendum, queries response or time extension if any etc.

19 In case of a Consortium - the methodology of calculation of (%) participation of each partner to be advised. (vol-1/NIT page2 Para 1.3(iii).2 & 3) Suggestions- Should be substituted by "The role and scope of work undertaken by each partner should be clearly defined and active participation throughout the Project duration has to be ensured.

No change.

20 The methodology of calculation of (3%) participation of LEED Consultant to be advised. (vol-1/NIT page3 Para 1.3(iii) 2 Note 3) Suggestions- As above

Refer item No. 1 above

21 Clients (particularly in the Private Sector) treat their bill of quantities and costs as confidential and in any case the Designers may not have access to such information. (vol-1/NIT page 4 Para 4) Suggestions- a. Delete "bill of quantities". (b.) clarify that Payment details are required only in respect of the Design Consultant - and not for ant Contractors/ other agencies retained by the Client.

Agreed

22 The following requirement needs to be amended "An undertaking from the key personnel must be furnished that he/she will be available for entire duration of the project assignment and will not engage. himself/herself in any other assignment during the currency of his/her assignment on the project." (vol-1/NIT page4 Para 6(b)(vi)) Suggestions- Delete "and will not engage himself/herself in any other assignment during the currency of his/her assignment on the project."

Refer item no. 6 & 12 above.

23 It has been clarified during the Pre-bid meeting that the Scope does not include "Project Management Consultancy"; "Supervision of Contractors"; "checking/certification of Bills" and "On-Site Deployment/Supervision etc." (vol-1/NIT page6 Para 1.4 (b)) Suggestions- Delete this entire table under "(b) Construction supervision team:" and state that members of the DDC Team under the aforesaid Para 1.4(b) will be available for periodic supervision and to attend meetings at Site during execution of the Project."

Refer item No. 4 & 6 above.

24 v. Liquidated Damages. vi 'Duration of Liability' for the whole of the Works.

Refer item No. 5 above.

Suggestions-These provisions to be deleted as PMC and Contract Supervision are excluded. Such conditions are not appropriate to such a design contract. Furthermore "Performance Security" - Appendix 3 - serves the purpose. Existing (overall including other projects)

Professional Indemnity Insurance (PII) of the Bidders will be accepted. (vol-1/ITT pagel6 APPENDIX-1) Suggestions-Project Specific Pll should not be insisted upon - as this is very expensive.

Refer S. No. 16 above.

25 BANK GUARANTEE FOR TENDER SECURITY. (vol-1/ITT page 18-19 APPENDIX-2) PERFORMANCE SECURITY. (vol-1/ITT page 18-19 APPENDIX-3) Suggestions-Please confirm that in case of a Consortium this BG will state that "Party A - along with Party B, Party C - comprise the consortium -with Party A *being the Lead Participant" - suitable drafts may please be provided.

Not Agreed, point 5.2 of ITT may be followed.

26 Approvals and Completion from Statutory Authorities — Available. (vol-2/Scope page 23-24 Para 3.6.15) Suggestions- DDC Scope should be limited to provision of all required drawings and documentation; attending meetings/ providing clarifications and supplementary information etc. Furthermore it is best if the PMC/ Contractor.

Refer 3 above

Please provide list and copies of approvals from Statutory Authorities already available with DMRC (this may be made available to shortlisted consultants) Suggestions- Is EIA a part of the scope? - Please clarify

Refer 7 above.

IV Design Forum of Architects 27 ITT — Clause No. 6.1.1 — Please clarify do we need

to submit all the three proposals on 30th January or only technical proposal has to be submitted

Refer item No. 15 above.

28 In case, we are submitting tender as a single firm and hiring consultants for various services; do we need to provide credentials of all the sub consultants.

Yes.

29 The construction supervision as mentioned in the NIT is limited to periodic site supervision and attending site meetings only. No staff shall be deployed on the site and PMC shall not be in the scope of work.

Refer item No. 4 & 6 above.

30 The Building has to be compliant of Green building norms or Green Building certification is necessary

Certification is not compulsory but benefit of green to be incorporated in the

to obtain. building & development. 31 The list of any special approvals that is required. DDC is regarded as renowned

consultant with in depth knowledge of Delhi so DDC to advice. DMRC will share all available documents or knowledge in this regard.

32 As mentioned in NIT clause No. 4, can we provide certificates of professional association certified by client mentioning the cost of overall project?

Yes, see 21 above.

33 Please confirm whether all the pages including NIT, ITT SCC, GCC, Performance Guarantee forms etc. have to be signed and stamped along with the technical proposal.

Yes.

34 Performa of undertaking from key personnel regarding his availability for the entire project.

DDC to provide an Authorization letter of the key personnel.

V Gian P. Mathur & Associates Pvt. Ltd. 35 Technical Package has to include vide 2.1.1 (P-9),

Vol. 1 general approach and methodology proposed for carrying out the services covered in the scope of work including relevant information. Science the office building is to be leased out vide Para 1.2 (P-1) Scope of work. Therefore it will be helpful if lease requirement is elaborated to the extent possible.

Refer 1.7 The design implication of BCP station: of Vol. 2 Scope of work

36 DDC team comprising of minimum no. of key personnel has been stated under Para 1.4 (P-6), Volume-1. Can the staff stated at S. No. 7, 8, 9 (Plumbing, Electrical, TERI) be Associate Consultant.

Yes.

37 Para 2.2 (P-7), Vol-2 states that it shall be absolute responsibility of DDC to get drawings approved from authorities including liasoning. Does that include approval fee also or technical support only.

Only official statutory fees and charges shall be borne by DMRC.

38 Liability of DDC to DMRC under Para 11 (P-33) Volume-I may please be elaborated /defined.

No change.

39 Liquidated damage defined under Appendix B-4, Vol-3, is in general 0.1% per week of each activity which is generally not followed in case of Consultancy.

Refer item No. 24 above.

VI Jain & Associates 40 You may kindly consider LEED / GRIHA rating

agency as Associate subconsultant, as allowed in case of PH & Elec. consultant.

Refer point No. 1 above.

41 As an Experience Certificate you may consider Completion certificate and 26AS statement only. These itself are sufficient.

Not agreed.

42 Point 3 & 4 of 2.1 on page 9 of Vol. I may be clubbed.

No Change.

VII Basant Collaborations 43 TENDER DOCUMENT VOLUME —1

PAGE No —1 Q1 - It is in the scope of work of DDC to firm up the tentative areas* What is the total area of Land Proposed for Project? Request you to provide us the soft copy of the Plan? Please share the sanctioned drawings from MCD and other agencies relevant to the Project. This is absolutely necessary to ascertain the Cost to be incurred For Sanction of Drawings Q2 - "The BCP Office Project" is to be most modern and designed as Green Building system of TERI (GRIHA) with green and energy savings advantages arising out of it say: electricity, HVAC, water cycle, interior space and exterior environment etc. You have clarified in the Pre-bid meeting on 15.2.14 that the certification for the same is not required? And the building is to be designed as per Griha norms only. Please confirm. Q3 - Preparation of Project information memorandum (PIM) for information of bidders bringing out the salient features of the proposal and details of services and drawings for handing over to the lessee We feel it should be part of PMC and request for it to be deleted. However, If only basic information in terms of Layout and Elevation views are to be furnished then it is fine. Kindly clarify the scope in detail. Q4 - The Architectural, Structure, Civil, M/E and building services design approvals architectural, structural and engineering drawings, tender documentation and periodic site visit are in the scope of DDC. We feel sanctions should be in the scope of Architect for only preparation of Sanction drawings. However, if it is the norm of DMRC for Architects to get the relevant sanctions, then option drawings for start of construction should be in the scope. We request all completions to be in the scope of Contractors. However, Architects to assist them in terms of furnishing the relevant drawings needed

for completion.

Refer item No. 7 above.

Refer 30 above

DDC is to provide information for PIM like rendered plans, area statement, construction costs or graphic building design in 3D, specifications, context etc. Even in normal routine this is in scope of work of architect. So no change. DDC also to prepare handing over drawing with area etc.

Refer 3 above

PAGE — 2 1.3.1 (i) in the case of a JV or Consortium, all members of the Group shall be jointly and

Not agreed.

severally liable for the performance of whole

contract. We request/feel only prime consultant should be liable for the performance. Kindly clarify.

All the proofs are required for the primary consultant, JV as well as the sub/ associate -consultant tied up for various works.

Refer item No. 6 & 12 above.

No change.

PAGE — 4 (b) v) The Consultant / Architect are required to attach the requisite satisfactory documents of educational qualification; design experience for key team personnel's as proof towards pre- qualification, along with their application. Failure to submit the same may result into rejecting the application. DMRC reserves the right to cross check the information furnished and may obtain confidential report from their previous clients. DMRC reserves the right to reject any or all applications at any stage without assigning any reason, thereof. We presume the same is required for Primary/main consultant only and not for their specialized consultants .Please clarifies. (b) vi) An undertaking from the key personnel must be furnished that he / she will be available for entire duration of the project assignment and will not engage himself / herself in any other assignment during the currency of his / her assignment on the project. You have clarified that they can do other works but should be present for the Project as and when required. Please confirm. (b) viii) in case the consultant intends to replace any of the key personnel during the pendency of the contract, he needs to get approval of DMRC for the same.

Same as above. PAGE — 5 T4 (a) Financial data for latest last five audited financial years has to be submitted by the tenderer in Appendix — 18 of FOT along with audited balance sheets. Appendix — 18 of FOT is not available in the Tender Document. Kindly provide the same to fill the Tender.

Appendix — 18 of FOT is linked as Annexure-6 to FOT at page number 29a

PAGE — 6 & 7 1.4 (b) Construction supervision team You have clarified this is not required and only periodic supervision as mutually agreed upon is in

the Scope of DDC.

Refer item No. 6 & 12 above.

PAGE — 8 INSTRUCTIONS TO TENDERERS 1 PROPOSAL 1.1 The proposal should clearly specify who will be

the lead member in the joint venture, consortium or and responsible for communication with DMRC. Is there any specific format of a form to be filled or a simple letter of communication on letterhead is 0.K? Please clarify.

Refer item No. 34. An undertaking for the same has to be submitted by the Agency.

PAGE — 9 - STAGE — I 2 TECHINICAL PACKAGE 2.1.1 The technical Proposal should cover in detail the following (a-j) This is probably required in the second phase of submission after one has qualified after Technical evaluation. However, even in Second stage, we presume it is only for prime consultants and not for

their individual consultants. Please clarify.

No change. For prime as well as individual consultants.

PAGE — 10 4 FINANCIAL PACKAGE 4.2 The financial proposal, which is Volume-3 of the Tender documents, shall be separately completed and submitted in a separate sealed envelope. The Lump Sum prices entered into the Form of Tender should include all costs associated with the contract. These will cover remuneration for staff, transportation, equipment, printing of documents, surveys, etc. We feel the Soil Investigation and Survey work is not in the scope of DDC so request survey to be

deleted from here.

Survey & soil investigation not in the scope of DDC

PAGE — 11 5.2 — 5.3 Bank Guarantee, Demand Draft, FDR We would be providing Bank Guarantee in the name of Prime consultant and other J.V. member's names are not required. Please clarify. 5.4 The Tender security of the tenderer will be returned upon receipt of a Performance Guarantee and signing of the Contract as required herein. We feel performance Guarantee is for PMC only, and not for DDC. However, if it is a norm of DMRC then request to deduct 10% as retention from Each RA bill of DDC in place of performance guarantee. Otherwise the upfront expenditure for a DDC is

very steep. Please clarify.

Not agreed, clause 5.2 of ITT may be followed.

No change.

PAGE —12 Failure to submit a Performance Guarantee . We feel performance Guarantee is for PMC only, and not for DDC. However, if it is a norm of DMRC then request to deduct 10% as retention from Each RA bill of DDC in place of performance guarantee. Otherwise the upfront expenditure for a DDC is

No change.

very steep. Please clarify.

6.1.1 Stage 1 — It was clarified in the pre-bid meeting that only TECHNICAL PACKAGE INCLUDING TENDER SECURITY to be submitted on 30.01.2015.the design scheme and financial bid is not be submitted. Please confirm. Stage 2 —It was clarified in the pre-bid meeting that CONCEPT DESIGN PACKAGE and FINANCIAL PACKAGE is to be submitted after technical evaluation of shortlisted tenderers on a date which will be informed by DMRC at a later stage. Please

confirm.

Yes, refer 15 above.

Yes, refer 15 above.

PAGE —15 10 PERFORMANCE GUARANTEE We feel performance Guarantee is for PMC only, is it applicable to DDC also. We request to deduct 10% as retention from Each RA bill of DDC in

place of performance guarantee.

No change.

PAGE — 16 ii) We feel performance Guarantee is for PMC only, and not for DDC. However, if it is a norm of DMRC then request to deduct 10% as retention from Each RA bill of DDC in place of performance guarantee. Otherwise the upfront expenditure for a DDC is very steep. Please clarify. v) and vi) Liquidated damages and defects liability period. It was discussed in the pre-bid that liquidated damages would be deleted from DDC Scope. Kindly confirm vii) Is professional indemnity to be GENERAL as for all projects of the Office or a Project specific indemnity is to be taken which is having quite a steep premium? Request to allow general

indemnity.

No change.

Refer item No. 5 & 24 above.

PAGE — 32 iii) In the event of any defect coming to the notice of DMRC within the period of the Defects Liability Period as described in Clause 12 herein and in the eventuality of the DDC failing to rectify the same, DMRC will forfeit the amount of the Performance Guarantee. We feel performance Guarantee is for PMC only, and not for DDC. However, if it is a norm of DMRC then request to deduct 10% as retention from Each RA bill of DDC in place of performance guarantee. Otherwise the upfront expenditure for a DDC is

very steep. Please clarify.

No change.

PAGE — 40

1. Definitions The Project is "Contract : : Comprehensive

Yes. The same shall be treated as corrected and replaced with Detail Design Consultant (DDC) for Detailed Design of: Architectural, Planning, Structural, Building Services and E/M Services for the "Construction of Modern Office" Above underground Metro Station at Bhikaji Cama Palace

Project Management Consultancy Including Design, construction supervision and Project Management for Construction of Multi-Storey Residential Complex along with Recreational Facilities at Plot No. F-21B Sector-50, Noida. We feel the scope of work and project mentioned as highlighted in blue is clerical errors which need

to be corrected. 44 TENDER DOCUMENT VOLUME — 2

PAGE No — 6 2.1) Design Stage g) The DDC shall involve itself in all investigations.

This is not part of DDC. Please confirm. DDC to independently verify information provided by DMRC, whenever required.

PAGE No — 7 o) Getting all statutory approvals from local, statutory bodies shall be responsibilities of DDC. 2.2) Approval Stage: b) It shall be absolute responsibility of the DDC to obtained approval of detailed submission. d) It shall be absolute responsibility of DDC of get the drawings approved from all such authorities. e) It shall be absolute responsibility of the DDC to obtained approval to concept from DUAC or any other authority required for go ahead to the proposal. He shall prepare all drawing presentation and model for the same and all cost on this account shall be deemed to include in the fee. We feel sanctions should be in the scope of Architect for only preparation of Sanction drawings. However, if it is the norm of DMRC for Architects to get the relevant sanctions, then option drawings for start of construction should be in the scope. We request all completions to be in the scope of Contractors. However, Architects to assist them in terms of furnishing the relevant drawings needed

for completion.

Refer 3 & 24 above

PAGE No — 11 PAGE No —13 3.6.3) Lease Support Services a) Graphic drawing of high quality for marketing of spaces. Presentation quality drawings, presentation model and 3-D graphics of interior and exterior for marketing objectives and brochure. We presume this is an error as brochures are not

in scope of DDC. Please confirm.

No change.

PAGE No —16 3.6.6) We presume structure design Inputs of UG station will be provided to DDC by DMRC i.e. soft

Yes.

copy of design analysis and calculation. PAGE No — 17 n) All responsibilities concerning with the stability of Structure, Structure drawings, compatibility with architecture drawings, etc. lies with DDC. A Structural Stability Certificate in line with DMRC's requirement/project requirement is also to be finished by the consultant. This is required (Only for Upper part) not for Base part. Please clarify.

Yes, but DDC to assess the load bearing capacity etc.

PAGE No — 21 3.6.14) g) Construction Methods and Temporary Works These shall be incorporated in monthly reports to be submitted by DDC. We feel it is a part of PMC and not DDC and request the same be deleted.

No change.

PAGE No — 22 h) Site meetings DDC shall attend weekly site meetings It was clarified in pre-bid meeting that only periodic supervision is required. As mutually agreed upon. Kindly confirm. 3.6.15) Approvals and Completion from Statuary Authorities with occupancy certificate, data, documentation for approval and as built drawings. b) It shall be absolute responsibility of DDC to get the completion drawings approved from all such authorities. All requisite data's / details required by the authorities for approval of submission drawings shall be provided by DDC including liaison with various authorities and obtaining approvals from them. We feel sanctions should be in the scope of Architect for only preparation of Sanction drawings. However, if it is the norm of DMRC for Architects to get the relevant sanctions, then option drawings for start of construction should be in the scope. We request all completions to be in the scope of Contractors. However, Architects to assist them in terms of furnishing the relevant drawings needed for completion.

Refer 4 above

Refer 3 above

PAGE No — 26 6.1) The Employer's representative, and shall be housed in Delhi. All work by DDC shall be performed in Delhi unless otherwise approved by DMRC in advance. Team will be headed by a Project Manager assisted by Dy. Project Managers of different disciplines along with other engineers. It was clarified in the Pre-bid meeting that this part Refer 4 & 6 above

Prcpp, , Devoupo DeparuT

of PMC and not DDC. The same may please be deleted.

PAGE No — 34 5) Weekly Progress Meetings DDC will attend weekly progress meetings with DMRC. The DDC will be required to produce: An updated copy of the computerized project schedule and a design chart showing scheduled and actual start and finish dates and estimated percentage completion for each major activity. It was clarified in the Pre-bid meeting that this part of PMC and not DDC. The same may please be deleted. It was clarified in pre-bid meeting that only periodic supervision is required as mutually agreed upon.

Kindly confirm.

No change. Please refer to item No. 4 & 6 above.

45 TENDER DOCUMENT VOLUME - 3 All the points to be clarified in Volume 3 have already been queried in Volume 1 and 2 and the same to be addressed and deleted by your kind self for relevant points for deletion and

amendment. , .

VII 46

Maxim Design & DecorPvt. Ltd

Technical, conceptual and financial bids have to be deposited on 30th of Jan.?

See 15 above

47 Or only technical bid have to be deposited? DO 48 If only technical bid has to be submitted than we

have to submit the security deposit of Rs.2,50,000/- or Rs.21,000/- as tender fee is sufficient ?

No change. Tender security has to be submitted along with technical submission.

Enarch Consultants (P) Ltd 49 In this connection, it is requested to supply soft

copy of foundation plan & layout Plan of underground station along with framing plan for devising useful concept plan to be submitted with tender. The plans supplied are not legible for preparing concept plan.

Will be supplied to shortlisted bidders. Refer 7 above.

50 Further, the scope of DDC during supervision needs more clarification as to who will provide the Quality Control services, measurement & payment of works. We understand that this is not included in the services of the DDC. However a clarification in this regard will remove any doubts and disagreements created due to different assertion in the tender document.

Refer 4 & 6 above

51 Lastly, we would like you to indicate the process of evaluation after opening of Financial Bid.

Refer to 7 EVALUATION PROCEDURE And 7.2.3 Evaluation criteria of the design concept . resentation of Vol. 1 ITT ia • e 13

Yes, provided the office/mall component of the Airports/ Metro Stations/ Mixed Use Developments/Malls is in accordance with the prescribed prequalification criteria.

52

rea we Group =

The 'Similar nature work' shall be the one of an office or Commercial project of 4 storey or above R.C.C. framed construction.(page 3 note 1)Clarification- We understands that Airports/ Metro Stations/ Mixed Use Developments/Malls are covered under commercial projects and are eligible

for evaluation. 53 Volume-1 Yes. It was available and downloadable,

in case of any difficulty can be collected from DMRC's office i.e. 25 Ashoka Road.

DMRC has no such policy.

• Notice inviting Tender (NIT) • Instructions to Tenderers (ITT) • Form of Tender (FOT) • General Conditions of Contract(GCC) • Special conditions of Contract (SCC) • Location Plan & Basic concept Plan

Volume-2 • Scope of work

Volume-3 • Financial package

Additional Information required: Only volume-1 Nit document is available.

Kindly provide link to download the other documents also.

CREATIVE CONSORTIUM 54 We have gone through the tender document and

observed that there is no preferential treatment for MSME registered firm.

As per latest Public Procurement Policy of various organizations for Micro & small Enterprises (MSEs) order 2012 to encourage participation of MSEs in various procurements and for that certain benefits & preferential treatment likes exemption in Earnest money and also in Tender fee are available to these units.

Through this letter we want to confirm from you if your organization is giving any preferential/exemption for MSME registered firm.