SAUDI BINLADEN GROUP - ABCD PAYMENT CERTIFICATE DEPARTMENT Project CORRECTIONAL FACILITIES P-1182, Dammam Subject AS-BUILT QUANTITIES Period As of 18 Feb 2016 NO DESCRIPTION Unit Total CONCRETE & BLOCKS (Main Works) 1 Plain Concrete Plain Concrete 20Mpa-SRC Thick = 50mm 1 m3 2,117.21 1 m3 26.51 Plain Concrete 20Mpa-SRC Thick = 100mm 2 453 Benayat m3 1,616.81 2 m3 40.90 5% Micro Silica 0.00 Mass concrete > 100mm 4 m3 50.60 2 Sub-structure Concrete works 30 Mpa-SRC (w/o S.O.G) Isolated Footing 1 453 Benayat m3 4,016.75 1 m3 96.52 Strip Footing 2 453 Benayat m3 2,268.59 2 m3 76.72 Tie Beams / Grade Beams 3 453 Benayat m3 2,387.26 3 m3 126.01 Column Neck 4 453 Benayat m3 276.17 4 m3 8.51 Wall Neck 5 453 Benayat m3 827.61 Slab On Grade 6 453 Benayat m3 7,268.25 6 m3 168.67 Vapour Barrier 300 micron Polyethylene under slab on grade 7 453 Benayat m3 64,758.76 7 m3 804.09 Damp Proofing 8 453 Benayat m3 49,500.30 8 m3 2,403.46 5% Micro Silica 3 Super Structure Concrete Works - 30Mpa OPC Column / Beams / Walls 453 Benayat 526 Dar Anan 526 Dar Anan 526 Dar Anan 526 Dar Anan 526 Dar Anan 526 Dar Anan 526 Dar Anan 526 Dar Anan 526 Dar Anan 526 Dar Anan

description

Progress Monitoring

Transcript of Subcontractors Progress Qtys To Date

Page 1: Subcontractors Progress Qtys To Date

SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project CORRECTIONAL FACILITIES P-1182, DammamSubject AS-BUILT QUANTITIESPeriod As of 18 Feb 2016

NO DESCRIPTION Unit Total CONCRETE & BLOCKS (Main Works)

1 Plain ConcretePlain Concrete 20Mpa-SRC Thick = 50mm

1 m3 2,117.21

1 m3 26.51

Plain Concrete 20Mpa-SRC Thick = 100mm

2 453 Benayat m3 1,616.81

2 m3 40.90

5% Micro Silica 0.00

Mass concrete > 100mm

4 m3 50.60

2 Sub-structure Concrete works 30 Mpa-SRC (w/o S.O.G)Isolated Footing

1 453 Benayat m3 4,016.75

1 m3 96.52

Strip Footing

2 453 Benayat m3 2,268.59

2 m3 76.72

Tie Beams / Grade Beams

3 453 Benayat m3 2,387.26

3 m3 126.01

Column Neck

4 453 Benayat m3 276.17

4 m3 8.51

Wall Neck

5 453 Benayat m3 827.61

Slab On Grade

6 453 Benayat m3 7,268.25

6 m3 168.67

Vapour Barrier 300 micron Polyethylene under slab on grade

7 453 Benayat m3 64,758.76

7 m3 804.09

Damp Proofing

8 453 Benayat m3 49,500.30

8 m3 2,403.46

5% Micro Silica

3 Super Structure Concrete Works - 30Mpa OPCColumn / Beams / Walls

453 Benayat526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

Page 2: Subcontractors Progress Qtys To Date

1 453 Benayat m3 6,327.00

1 m3 264.42

Column / Beams / Walls (with corbel)

2 453 Benayat m3 747.48

2 m3 17.57

Suspended Slab (Vary Thick)

3 453 Benayat m3 7,605.65

3 m3 132.91

Concrete Ramps, Step & Landing

4 453 Benayat m3 569.85

Fairface Finish or Concrete ramps, steps & landing 0.00

Concrete Screed

6 453 Benayat m3 444.49

6 m3 6.73

Concrete Parapet

Concrete Coping

8 453 Benayat Lm 8,502.87

8 Lm 1,443.42

1 Lm 220.50

Mechanical Pad

9 453 Benayat m3 9.07

4 Steel Reinforcement (3% allowable wastage) - Straight Reinforcement bars 8 & 10, 12, 14, 16mmSupply, Cut, Bend & Installation

1 453 Benayat ton 4,394.07

8 ton 140.02

Cut, Bend & Installation

Installation only

3 453 Benayat ton 11.12

5 Masonry WorksSupply & Installation of Blocks 200mm (CMU), Non fire rated

3.1 m2 6,470.4

1 m2 49,395.4

1 m2 98.6

Supply & Installation of Blocks 150mm (CMU), Non fire rated

3.2 295 Dar Anan m2 1,220.1

2 m2 14,809.7

2 553 Al Otaibi m2 85.2

Supply & Installation of Blocks 100mm (CMU), Non fire rated

3.3 295 Dar Anan m2 1,747.9

3 m2 20,890.9

3 553 Al Otaibi m2 56.8

3 m2 391.3

Additional Rate for Fire Rated Solid Block or / Filled Block

526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan560 Nahedh Al Monshri

526 Dar Anan

295 Dar Anan453 Benayat553 Al Otaibi

453 Benayat

453 Benayat

526 Dar Anan

Page 3: Subcontractors Progress Qtys To Date

3.4 295 Dar Anan m2 635.3

4 m2 2,496.9

4 553 Al Otaibi m2 85.2

Backing rod (3cm thick) & fire rated sealant above block walls

5 m2 793.5

6 Plastering WorksSupply & Installation of cement plaster (Interior)

m2 3,150.0

3.13 m2 17,271.4

1 m2 76,933.6

1 m2 18,256.4

1 m2 11,000.0

Elect/LC1 pcs 18.0

Supply & Installation of cement plaster (Exterior)

2.11 295 Dar Anan m2 7,837.2

2 m2 62,339.4

550 Marim Jalani m2 -

2 560 Nahedh Al Monshri m2 11,007.6

2 562 Awan Al Awarrd m2 6,317.0

Elect/LC2 pcs 21.0

Supply & Installation of G.I. groove 20mm in plaster (external)

2.15 295 Dar Anan Lm 5,388.3

3 Lm 26,703.6

2 560 Nahedh Al Monshri Lm 5,589.3

3 562 Awan Al Awarrd Lm 1,664.0

7 Concrete Works - ADDITIONAL WORKSExtra over for SOG from 20Mpa to 30Mpa

D1 m2 7,268.25

Supply & install precast lintel above openings

D2 Lm 8,183.18

6 Lm 1,102.36

Reinforced conc beams & post for blocks walls incl rebars

D3 Lm 1,066.02

Extra over for conc negative in walls for doors & windows

D5 pcs 730.00

453 Benayat

453 Benayat

214 Marim Jalani295 Dar Anan453 Benayat560 Nahedh Al Monshri562 Awan Al Awarrd

560 Nahedh Al Monshri

453 Benayat

560 Nahedh Al Monshri

453 Benayat

453 Benayat

453 Benayat526 Dar Anan

453 Benayat

453 Benayat

Page 4: Subcontractors Progress Qtys To Date

Supply & install reinf conc architrave around openings

D6 Lm 2,077.50

Supply & install PVC waterstop 10mm & 15mm

D7 Lm 146.70

5 Lm 94.50

Bituminous high grade fiber filler bd joint 20mm

D9 m2 2,795.99

8 Lm 471.93

Supply & install filling tie rod holes w/ non-shrink grout

D10pcs 18,974.00

pcs 33,762.30

12 pcs 1,584.00

Supply & install concrete screed (finishing works)

1 m2 2,511.78

Supply & install broom finish (interior)

2 m2 0.00

Extra over for hardener (broom fin)

3 m2 2,352.81

Concrete window sill incl forms & rebars

7 Lm 493.03

8 Masonry Works - ADDITIONAL WORKSSupply & Installation of tie beams & post

A1 Lm 116.6

Supply & Installation of insulation board 50mm

2.5 295 Dar Anan m2 1,979.3

A2 Lm 6,203.6

553 Al Otaibi m2 -

Extra over for supply & install 200mm filled blocks - 1201 only bet prison cells

A3 m2 2,708.4

Extra over for supply & install 200mm non-filled blocks (all bldgs)

A4 m2 46,687.0

Extra over for supply & install 150mm

A5 m2 2,518.6

Extra works for blocks Scaffolding & handling works above 4.5M

2.10 295 Dar Anan m2 74.7

453 Benayat

453 Benayat526 Dar Anan

453 Benayat (around SOG)526 Dar Anan

453 Benayat (tie beams)453 Benayat (walls)526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

453 Benayat

453 Benayat

453 Benayat

453 Benayat

453 Benayat

Page 5: Subcontractors Progress Qtys To Date

A6 Lm 1,349.2

Supply & Installation of Blocks 300mm (100+150+50 insulation), Non fire rated

2.2 295 Dar Anan m2 863.9

Supply & Installation of 200mm preinsulated blocks

2.9 295 Dar Anan m2 2,563.7

Extra over due to using load bearing blocks

E1 m2 85,096.0

Extra over for pre-insulated blocks walls

E2 m2 4,850.6

Supply & install rigid thermal insulation board for block walls

E3 m2 8,768.2

Blocks & plaster Ht=60cm around ducts open on roofs

9.4 Lm 2,511.6

Solid blocks for MH 60x60x80 incl plastering & waterproof

4 295 Dar Anan pcs 61.4

9 Plastering Works - ADDITIONAL WORKSSupply & Installation of cement plaster, (Exterior-parapet)

2.13 295 Dar Anan m2 1,903.9

Supply & install cement plaster to ceiling (external)

B4 m2 1,530.1

Extra over Scaffolding & handling works above 4.5M (interior plaster)

3.15 295 Dar Anan m2 530.6

B5 m2 387.3

Extra over Supply & Installation of G.I. groove 20mm in plaster (external)

C1 Lm 26,703.6

Extra over for supply & install for plaster to parapet coping (external)

C2 Lm 7,315.1

Extra over Scaffolding & handling works above 4.5M (exterior plaster)

2.14 295 Dar Anan m2 1,576.2

C4 m2 10,067.8

Extra over for slabs & beams for scaffolding & handling 4mtr and above

C5 m2 260.8

Supply & Installation of cement plaster to parapet coping (Exterior)

453 Benayat

453 Benayat

453 Benayat

453 Benayat

453 Benayat

453 Benayat

453 Benayat

453 Benayat

453 Benayat

453 Benayat

453 Benayat

Page 6: Subcontractors Progress Qtys To Date

2.16 295 Dar Anan Lm 2,236.3

Cement plaster on circular col Ø300, Ht=2.5mm

3.16 295 Dar Anan pcs 12.8

Supply & Installation of cement linear plaster inside openings

11 295 Dar Anan Lm 4,292.9

10 EXTERIOR WORKSFence Type 2 (foundation)

1 Lm 169.33

Watch Tower (B2602)

1 pcs 2.00

pcs 3.00

Dome & Minaret

3.1 pcs 1.00

Guard Room (B2501)

4.1 pcs 5.85

Gates (along precast fence)

13.1 pcs 0.50

526 Dar Anan

526 Dar Anan562 Awarrd (blocks & plaster only)

453 Benayat

453 Benayat

453 Benayat

Page 7: Subcontractors Progress Qtys To Date

100 201 202 400 500 601

108.35 135.81 83.50 87.49 35.47

104.82 143.92 49.75 21.95

456.57 644.09 612.03 145.12 51.52

171.18 202.10 112.26 115.87 54.22

22.58 32.27 13.62 16.50 5.04

12.92 10.67 10.49

380.50 493.50 299.70 232.88 101.33

3,710.08 4,794.93 1,764.61 2,450.90 1,294.48

2,726.83 2,088.40 2,353.95 1,438.11 796.27

Page 8: Subcontractors Progress Qtys To Date

417.46 486.29 385.41 253.82 15.69

38.58

511.56 1,144.23 471.07 146.05 25.26

20.84 50.63 22.12 34.96 35.28

24.30

448.60 455.82 286.30 247.71 111.00

Steel Reinforcement (3% allowable wastage) - Straight Reinforcement bars 8 & 10, 12, 14, 16mm

275.57 414.60 288.51 139.52 43.84

3,136.5 5,991.1 3,398.7 1,043.3 852.7

1,350.0 2,065.2 1,595.4 767.8 120.8

1,547.1 2,147.7 1,601.8 356.6 174.5

Page 9: Subcontractors Progress Qtys To Date

204.8 396.1 16.9 50.6

6,185.0 10,837.1 6,965.0 1,834.9 961.7

5,800.0

4,117.2 5,213.8 3,668.1 2,879.7 1,105.8

3,150.0

1,720.6 2,492.7 1,787.6 936.3 525.2

2,300.0

380.50 493.50 299.70 232.88 101.33

452.75 719.20 509.60 104.74 91.50

10.00 4.00 10.00 11.00

Page 10: Subcontractors Progress Qtys To Date

153.49 145.77 113.86 65.72 31.77

1,147.00 1,218.00 766.00 565.00 290.00

580.00 513.00 908.00 15.00

86.48

1,309.2 1,795.2 1,484.5 120.8

Extra over for supply & install 200mm filled blocks - 1201 only bet prison cells

3,136.5 5,991.1 3,398.7 1,043.3 852.7

Page 11: Subcontractors Progress Qtys To Date

94.5 63.7 12.2

Supply & Installation of Blocks 300mm (100+150+50 insulation), Non fire rated

6,033.6 10,204.0 6,595.9 2,167.7 1,148.0

306.6 167.0

88.8 69.1 43.4 10.6 24.7

122.6 75.8 82.3 15.7 10.0

Extra over Scaffolding & handling works above 4.5M (interior plaster)

8.8 83.6 6.0

Extra over Supply & Installation of G.I. groove 20mm in plaster (external)

1,720.6 2,492.7 1,787.6 936.3 525.2

Extra over for supply & install for plaster to parapet coping (external)

448.6 455.8 286.3 247.7 111.0

Extra over Scaffolding & handling works above 4.5M (exterior plaster)

791.2 2,169.2 1,583.7 662.2 48.6

Extra over for slabs & beams for scaffolding & handling 4mtr and above

53.8 181.7 25.3

Page 12: Subcontractors Progress Qtys To Date

1.00

Page 13: Subcontractors Progress Qtys To Date

602 700 800 901-1 901-2 901-3

25.94

18.00

44.71

55.79

5.02

97.09

815.49

647.55

Page 14: Subcontractors Progress Qtys To Date

51.90

91.68

2.27

145.53

48.91

717.9

5.8

43.2

Page 15: Subcontractors Progress Qtys To Date

1,808.5

1,186.1

678.8

849.2

530.9

436.32

97.09

98.90

Page 16: Subcontractors Progress Qtys To Date

41.15

274.00

72.49

717.9

Page 17: Subcontractors Progress Qtys To Date

766.8

370.3

12.5

149.2

436.3

145.5

384.9

41.99

Page 18: Subcontractors Progress Qtys To Date

187.0

230.4

Page 19: Subcontractors Progress Qtys To Date

901-4 901-5 902 903-1 903-2 1001

30.60

3.18

23.39

15.86

56.02

54.43

49.94

66.57

3.61

5.36

105.38

107.00

931.79

279.03

746.17

960.65

Page 20: Subcontractors Progress Qtys To Date

44.89

36.69

17.57

79.70

56.71

17.90

6.73

113.00

116.12

44.36

42.76

409.0

559.0

33.2

258.6

1.3

246.5

Page 21: Subcontractors Progress Qtys To Date

66.8

820.0

1,168.6

481.9

798.9

247.3

242.9

105.38

110.65

103.68

Page 22: Subcontractors Progress Qtys To Date

32.42

303.01

247.00

747.00

80.10 167.91

80.10 167.91

23.52

246.5

559.0

Page 23: Subcontractors Progress Qtys To Date

229.5

1,064.1

41.6

9.0

155.9

242.9

113.0

29.0

Page 24: Subcontractors Progress Qtys To Date

109.7

259.9

Page 25: Subcontractors Progress Qtys To Date

1002 1100 1201-1 1201-2 1201-3 1201-4

61.55 150.49 150.49 150.49 152.71

54.90 152.40 152.40 152.40 152.40

44.36 154.72 154.72 154.72 154.72

115.24 375.57 375.57 375.57 375.57

44.18 73.80 73.80 73.80 73.80

4.95 7.99 7.99 7.99 7.99

34.58 100.54 100.54 100.54 100.54

229.96 506.94 506.94 506.94 506.94

2,007.13 4,930.30 4,930.30 4,930.30 4,969.74

1,458.44 3,521.96 3,521.96 3,521.96 3,559.94

Page 26: Subcontractors Progress Qtys To Date

191.66 504.52 504.52 504.52 504.52

128.95 128.95 128.95 128.95

236.67 448.83 448.83 448.83 448.83

30.28 30.28 30.28 40.37

54.06 100.98 100.98 100.98

323.90 468.91 625.21 625.21 625.21

110.29 314.09 314.09 314.09 315.07

1,642.1 2,325.4 2,447.8 2,447.8 2,447.8

243.5 609.5 609.5 609.5 609.5

477.9 1,770.3 1,770.3 1,770.3 1,770.3

Page 27: Subcontractors Progress Qtys To Date

124.5 344.9 363.1 363.1 363.1

1,783.2 4,532.9 5,741.7 5,741.7

2,091.12 2,425.4 4,608.3 4,850.8 4,850.8

947.1 1,067.6 2,028.3 2,135.1 2,135.1

229.96 506.94 506.94 506.94 506.94

157.00 530.70 530.70 530.70 530.70

78.51 124.43 124.43 124.43 124.43

28.00 131.00 131.00 131.00 131.00

Page 28: Subcontractors Progress Qtys To Date

71.20 287.22 287.22 287.22 287.22

82.68 232.85 232.85 232.85 232.85

396.00 1,278.00 1,278.00 1,278.00 1,278.00

1,166.00 4,561.00 4,561.00 4,561.00 4,561.00

6.6 22.0 22.0 22.0 22.0

499.6 525.9 525.9 525.9

1,642.1 1,825.8 1,921.9 1,921.9 1,921.9

124.5 329.7 329.7 329.7 329.7

Page 29: Subcontractors Progress Qtys To Date

285.0 294.0 300.0 300.0

2,363.5 4,705.2 4,827.6 4,827.6 4,827.6

409.7 1,559.2 1,528.0 1,559.2 1,559.2

84.1 322.7 322.7 322.7 322.7

93.4 85.1 85.1

125.6 125.6

947.1 1,067.6 2,028.3 2,135.1 2,135.1

323.9 594.0 625.2 625.2

235.1 614.7 647.1 647.1

Page 30: Subcontractors Progress Qtys To Date
Page 31: Subcontractors Progress Qtys To Date

1201-5 1201-6 1201-7 1201-8 1201-9 1201-10

Page 32: Subcontractors Progress Qtys To Date

2,024.6

98.6

260.6

85.2

1,424.1

56.8

Page 33: Subcontractors Progress Qtys To Date

327.3

85.2

1,575.00 1,575.00

1,163.7

1,102.0

2.0 2.0 2.0

809.6

320.0

85.60

Page 34: Subcontractors Progress Qtys To Date

27.00

1,358.7

Page 35: Subcontractors Progress Qtys To Date

19.2

243.2

Page 36: Subcontractors Progress Qtys To Date

411.5

Page 37: Subcontractors Progress Qtys To Date

1201-11 1201-12 1201-13 1201-14 1201-15 1201-16

2.22 2.22

39.44 39.44

37.98 37.98

Page 38: Subcontractors Progress Qtys To Date

354.48 113.03

128.95 20.96

219.51 87.12

10.09 10.09

312.61

82.56 18.82

11.12

2,203.0 734.3

548.6 182.9

1,593.2 531.1

Page 39: Subcontractors Progress Qtys To Date

326.8 108.9

2.0

2.0

0.00 0.00

477.63 159.21

Page 40: Subcontractors Progress Qtys To Date

258.50 86.17

4,561.00 1,368.30

22.0

473.3 157.8

1,729.7 576.6

296.7 98.9

Page 41: Subcontractors Progress Qtys To Date

4,344.8 1,448.3

161.4

-

Page 42: Subcontractors Progress Qtys To Date
Page 43: Subcontractors Progress Qtys To Date

1201-17 1201-18 1201-19 1201-20 1201-21 1201-22

Page 44: Subcontractors Progress Qtys To Date
Page 45: Subcontractors Progress Qtys To Date

2.0 2.0 2.0

2.0 2.0 2.0 2.0

Page 46: Subcontractors Progress Qtys To Date
Page 47: Subcontractors Progress Qtys To Date
Page 48: Subcontractors Progress Qtys To Date
Page 49: Subcontractors Progress Qtys To Date

1201-23 1201-24 1202 1204-1 1204-2 1204-3

Page 50: Subcontractors Progress Qtys To Date
Page 51: Subcontractors Progress Qtys To Date

1.0 1.0 1.0

2.0 2.0

Page 52: Subcontractors Progress Qtys To Date
Page 53: Subcontractors Progress Qtys To Date

33.2

Page 54: Subcontractors Progress Qtys To Date
Page 55: Subcontractors Progress Qtys To Date

1204-4 1301 1302 1400 1500 1601-1

87.60 142.14 144.71 145.41

82.80 135.90 87.73

86.42 103.63 193.90 195.29

159.34 309.44

62.58 110.02 228.42 206.28

7.87 10.66 29.59 18.42

59.49 137.77

291.29 555.22 570.51 473.56

2,906.47 4,697.51 4,228.68 2,914.77

2,392.98 3,864.57 3,492.22 2,604.85

Page 56: Subcontractors Progress Qtys To Date

259.18 482.69 220.92 197.08

7.24

399.28 452.05 173.83 498.71

113.48

11.51

354.00 550.70 480.00 480.70

169.30 273.41 179.92 251.31

343.1 2,710.2 3,094.0 2,893.9

264.8 1,073.1 394.3 1,529.7

541.4 1,738.9 360.9 742.1

Page 57: Subcontractors Progress Qtys To Date

46.6 456.1

58.3

4,160.6 4,019.7 6,807.2

645.0

1.0

4,036.6 5,384.9 2,901.4

1,750.0

2,328.6 2,117.9 695.0

900.0

291.29 555.22 570.51 473.56

236.55 593.10 322.30 668.00

74.19 415.60

81.00 62.00

Page 58: Subcontractors Progress Qtys To Date

203.85 308.90

128.90 235.73 188.80 105.57

658.00 1,709.00 1,758.00 605.00

2,167.00 4,058.00

713.5

343.1 2,710.2 3,094.0 2,893.9

181.2 498.8

Page 59: Subcontractors Progress Qtys To Date

1,149.2 5,522.2 3,849.2 5,165.7

667.6

530.5 1,622.5

68.6 183.9 56.6 87.6

544.0 28.0 4.3

2,328.6 2,117.9 695.0

550.7 480.0 480.7

419.6 407.0 282.7

Page 60: Subcontractors Progress Qtys To Date
Page 61: Subcontractors Progress Qtys To Date

1601-2 1601-3 1601-4 1601-5 1601-6 1602

Page 62: Subcontractors Progress Qtys To Date

480.00

3.65

2,572.6

883.5

65.5 101.0

Page 63: Subcontractors Progress Qtys To Date

5,627.5 4,341.5

8,940.0

7,056.0 3,598.0

1,163.7 905.1

3,050.0

3,040.0 1,855.0

809.6 629.7

744.9

756.0 456.0

518.70

Page 64: Subcontractors Progress Qtys To Date

364.48

364.48

204.40

620.6

Page 65: Subcontractors Progress Qtys To Date

634.4

810.0 607.5

54.19 42.15

243.2 189.16

Page 66: Subcontractors Progress Qtys To Date

411.5 338.9

7.20 5.60

1,558.0 1,339.9

Page 67: Subcontractors Progress Qtys To Date

1603 1701 1702 1900 2001 2002

133.88 97.84

68.09

245.26 161.38

256.62 154.23

29.61 14.22

473.02 324.76

2,670.84 3,034.46

3,448.06 2,237.00

Page 68: Subcontractors Progress Qtys To Date

269.81 204.30

395.71 265.77

31.60 56.12

552.00 403.60

4.74 4.33

235.04 161.72

3,142.4 2,387.1

1,121.2 632.9

936.4 628.0

Page 69: Subcontractors Progress Qtys To Date

3,402.8 3,615.2

3,597.9 2,618.9

1,499.0 1,062.9

473.02 324.76

339.25 317.70

Page 70: Subcontractors Progress Qtys To Date

119.60 89.56

1,071.00 628.00

533.9

3,142.4 2,387.1

Page 71: Subcontractors Progress Qtys To Date

5,199.9 3,648.0

1,577.1

104.1 67.4

17.4 26.1

1,499.0 1,062.9

552.0 403.6

523.9 386.5

Page 72: Subcontractors Progress Qtys To Date
Page 73: Subcontractors Progress Qtys To Date

2003 2004 2005 (1~3) 2006 2007-1 2007-2

Page 74: Subcontractors Progress Qtys To Date

2.01 8.19 8.19

158.10 97.60 97.60

1.87 2.91 2.91

778.5 52.0 52.0

42.8

7.4 37.2 37.2

Page 75: Subcontractors Progress Qtys To Date

1,028.6 496.8 400.5

114.0 114.0

0.5 0.5

681.4 393.3 393.3

545.9 241.0 241.0

62.73 54.72 54.72

Page 76: Subcontractors Progress Qtys To Date

53.23

53.23

19.26 43.20 43.20

Page 77: Subcontractors Progress Qtys To Date

87.7 310.9 310.9

138.6

41.0 66.2 66.2

84.2 63.5 63.5

Page 78: Subcontractors Progress Qtys To Date

141.3 88.6 88.6

99.3 158.8 127.4

Page 79: Subcontractors Progress Qtys To Date

2007-3 2007-4 2008-1 2008-2 2100 2201

71.62

1.67

57.25

11.47

134.48

38.69

113.38

44.03

8.73

3.15

230.51

41.03

2,324.82

241.69

1,690.42

691.45

Page 80: Subcontractors Progress Qtys To Date

154.89

8.19 8.19 7.35 7.35 12.02

250.27

47.51

21.17

201.26

97.60 97.60 97.60 97.60

140.87

2.91 2.91 2.76 2.76 29.80

52.0 52.0 47.5 47.5

2,009.8

119.6

37.2 37.2

84.4

Page 81: Subcontractors Progress Qtys To Date

496.8 496.8 524.2 555.7

3,413.4

114.0 114.0 580.0

1.0 0.5

393.3 393.3 393.3 393.3

2,389.1

660.0

241.0 241.0 305.0 305.0

659.7

430.0

230.51

347.60

54.72 54.72 26.82 26.82

Page 82: Subcontractors Progress Qtys To Date

75.50

168.92

512.00

421.00

399.27 399.27

399.27 399.27

43.20 43.20 14.40 14.40

2,009.8

Page 83: Subcontractors Progress Qtys To Date

310.9 310.9 354.2 354.2

2,213.8

644.1

67.5

243.4

66.2 66.2 62.5 66.2

37.6

659.7

201.3

63.5 63.5 63.5 63.5

370.4

Page 84: Subcontractors Progress Qtys To Date

88.6 88.6 88.4 88.4

158.8 158.8 56.4 56.4

Page 85: Subcontractors Progress Qtys To Date

2202 2301 2302 2400 2501-1 2501-2

83.11

59.98

145.51

116.68

12.73

247.42

2,583.56

1,768.38

Page 86: Subcontractors Progress Qtys To Date

134.67

35.95

219.49

12.09

51.68

395.00

122.63

1,771.7

97.7

58.4

Page 87: Subcontractors Progress Qtys To Date

2,840.4

2,450.0

1,240.0

247.42

279.90

Page 88: Subcontractors Progress Qtys To Date

97.53

499.00

1,771.7

Page 89: Subcontractors Progress Qtys To Date

1,927.7

546.0

49.1

96.9

1,240.0

395.0

236.8

Page 90: Subcontractors Progress Qtys To Date

1.00 1.00

Page 91: Subcontractors Progress Qtys To Date

2501-3 2501-4 2501-5 2501-6 2501-7 2501-8

Page 92: Subcontractors Progress Qtys To Date
Page 93: Subcontractors Progress Qtys To Date
Page 94: Subcontractors Progress Qtys To Date
Page 95: Subcontractors Progress Qtys To Date
Page 96: Subcontractors Progress Qtys To Date

0.85 1.00 1.00 1.00

Page 97: Subcontractors Progress Qtys To Date

2501-9 2502 2602-1 2602-2 2602-3 2602-4

Page 98: Subcontractors Progress Qtys To Date
Page 99: Subcontractors Progress Qtys To Date
Page 100: Subcontractors Progress Qtys To Date
Page 101: Subcontractors Progress Qtys To Date
Page 102: Subcontractors Progress Qtys To Date

1.00

1.00 1.00

Page 103: Subcontractors Progress Qtys To Date

2602-5 2602-6 2602-7 2602-8 2602-9 2602-10

Page 104: Subcontractors Progress Qtys To Date
Page 105: Subcontractors Progress Qtys To Date
Page 106: Subcontractors Progress Qtys To Date
Page 107: Subcontractors Progress Qtys To Date
Page 108: Subcontractors Progress Qtys To Date

1.00

Page 109: Subcontractors Progress Qtys To Date

2602-11 2602-12 2602-13 2602-14 2700 2800

Page 110: Subcontractors Progress Qtys To Date
Page 111: Subcontractors Progress Qtys To Date
Page 112: Subcontractors Progress Qtys To Date
Page 113: Subcontractors Progress Qtys To Date
Page 114: Subcontractors Progress Qtys To Date

1.00

Page 115: Subcontractors Progress Qtys To Date

2900 3000 3100 3201 3202A-1 3202A-2

5.65 5.65

15.52 15.52

2.65 2.65

40.05 40.05

5.35 5.59

1.20 1.30

12.68 13.70

26.31 26.31

322.00 322.00

276.75 283.82

Page 116: Subcontractors Progress Qtys To Date

14.35 14.35

29.64 29.64

52.60 52.60

23.70 23.76

247.7 247.7

Page 117: Subcontractors Progress Qtys To Date

351.8 351.8

383.0

1.0 2.5

284.0 284.0

650.0

1.0

120.6 120.6

540.0

26.31 26.31

18.00 18.00

Page 118: Subcontractors Progress Qtys To Date

35.33 35.33

182.00 194.00

133.79

133.79

247.7 247.7

Page 119: Subcontractors Progress Qtys To Date

247.7 247.7

143.0 143.0

120.6 120.6

52.6 52.6

Page 120: Subcontractors Progress Qtys To Date
Page 121: Subcontractors Progress Qtys To Date

3202A-3 3202A-4 3202A-5 3202A-6 3202A-7 3202A-8

5.65 5.65

15.52 15.52

2.65 2.65

40.05 40.05

8.72 8.24

2.54 2.35

26.88 24.86

26.31 26.31

322.00 322.00

375.64 361.52

Page 122: Subcontractors Progress Qtys To Date

14.35 14.35

0.40 0.40

29.64 29.64

52.60 52.60

0.00 51.80

47.70 47.70 47.70

24.93 24.82

0.23 0.23

104.1 104.1

247.7 247.7

Page 123: Subcontractors Progress Qtys To Date

84.9 84.9

337.2 337.2

351.8 351.8

201.3 201.3

284.0 284.0

120.6 120.6

120.6 120.6

26.31 26.31

18.00 18.00

19.71 19.71

Page 124: Subcontractors Progress Qtys To Date

35.33 35.33

348.00 325.00

133.79

133.79

5.75 5.75

247.7 247.7

19.2 19.2

Page 125: Subcontractors Progress Qtys To Date

135.8 135.8

247.7 247.7

143.0 143.0

21.4 21.4

120.6 120.6

52.6 52.6

10.7 10.7

Page 126: Subcontractors Progress Qtys To Date

52.6 52.6

44.5 44.5

Page 127: Subcontractors Progress Qtys To Date

3202A-9 3202A-10 3202A-11 3202A-12 3202A-13 3202B-1

5.22

21.66

9.63

1.06

29.00

2.65

3.40

22.09

32.83

5.43

15.41

0.97

3.92

24.05

20.64

249.62

174.13

189.47

439.30

Page 128: Subcontractors Progress Qtys To Date

8.86

26.09

19.61

19.73

42.80

51.80

13.43

20.10

104.1

Page 129: Subcontractors Progress Qtys To Date

84.9

270.4

330.0

346.0

257.4

320.0 320.0

320.0

100.8

120.0 120.0

132.0

24.05

0.00

19.71

Page 130: Subcontractors Progress Qtys To Date

9.32

129.00

416.00

133.79 91.74

133.79 91.74

5.75

19.2

Page 131: Subcontractors Progress Qtys To Date

135.8

-

100.8

42.8

Page 132: Subcontractors Progress Qtys To Date
Page 133: Subcontractors Progress Qtys To Date

3202B-2 3202B-3 3202B-4 3202B-5 3202B-6 3202B-7

Page 134: Subcontractors Progress Qtys To Date

38.70

70.3

Page 135: Subcontractors Progress Qtys To Date

53.3

280.6 280.6 280.6

260.0 67.6 260.0 260.0

108.6 108.6 108.6

Page 136: Subcontractors Progress Qtys To Date

91.74 91.74 91.74

91.74 91.74 91.74

17.0

Page 137: Subcontractors Progress Qtys To Date

116.6

Page 138: Subcontractors Progress Qtys To Date
Page 139: Subcontractors Progress Qtys To Date

3202B-8 3202B-9 3203 3204 3205 3206

1.46

1.71

3.14

4.98

0.43

4.57

59.32

57.13

Page 140: Subcontractors Progress Qtys To Date

4.49

4.20

22.40

38.70

3.16

54.9

Page 141: Subcontractors Progress Qtys To Date

59.2

280.6

108.1

260.0

62.4

108.6

4.57

2.80

Page 142: Subcontractors Progress Qtys To Date

5.90

45.00

91.74 28.48

91.74 28.48

54.9

Page 143: Subcontractors Progress Qtys To Date

54.9

62.4

22.4

Page 144: Subcontractors Progress Qtys To Date
Page 145: Subcontractors Progress Qtys To Date

3207 3208 3209 3210 L.S. 1 L.S. 2

Page 146: Subcontractors Progress Qtys To Date

21.00

50.2

Page 147: Subcontractors Progress Qtys To Date
Page 148: Subcontractors Progress Qtys To Date

50.2

Page 149: Subcontractors Progress Qtys To Date

50.2

Page 150: Subcontractors Progress Qtys To Date
Page 151: Subcontractors Progress Qtys To Date

L.S. 3 L.S. 4 L.S. 5 L.S. 6 L.S. 7 L.S. 8

4.71 7.80

14.66 29.23

54.62 54.62

156.03 156.03

Page 152: Subcontractors Progress Qtys To Date

54.37 84.98

8.96

8.01 16.21

160.8 230.5

Page 153: Subcontractors Progress Qtys To Date
Page 154: Subcontractors Progress Qtys To Date

49.30 45.20

Page 155: Subcontractors Progress Qtys To Date
Page 156: Subcontractors Progress Qtys To Date
Page 157: Subcontractors Progress Qtys To Date

L.S. 9 L.S. 10 L.S. 11 L.S. 12 L.S. 13 L.S. 14

Page 158: Subcontractors Progress Qtys To Date
Page 159: Subcontractors Progress Qtys To Date
Page 160: Subcontractors Progress Qtys To Date
Page 161: Subcontractors Progress Qtys To Date
Page 162: Subcontractors Progress Qtys To Date
Page 163: Subcontractors Progress Qtys To Date

L.S. 15 L.S. 16 Gas tank Fence ADB .

.

.

2.13 2.16 .

.

.

.

4.23 4.36 16.72 .

.

.

.

.

21.60 .

.

.

.

10.13 11.07 39.99 .

.

.

.

.

.

.

.

.

.

.

.

26.31 26.26 24.92 .

.

.

.

.

48.98 49.80 93.00 .

.

.

.

.

.

.

.

.

Page 164: Subcontractors Progress Qtys To Date

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

7.85 7.94 5.96 .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

Page 165: Subcontractors Progress Qtys To Date

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

Page 166: Subcontractors Progress Qtys To Date

.

.

.

.

51.05 52.75 42.90 .

.

.

.

.

.

147.35 148.65 .

182.00 .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

Page 167: Subcontractors Progress Qtys To Date

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

Page 168: Subcontractors Progress Qtys To Date

.

.

.

.

.

.

.

.

.

169.33 .

.

.

.

.

0.50

Page 169: Subcontractors Progress Qtys To Date

SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project CORRECTIONAL FACILITIES P-1182, DammamSubject AS-BUILT QUANTITIESPeriod As of 18 Feb 2016

NO DESCRIPTION Unit TotalROOF WATERPROOFINGSupply & apply complete roofing waterproofing system using APP Bituminuos Waterproofing Membrane

1 Light weight foam concrete (excl cement)1 160 Hazem m2 3,667.18 1 m2 17,202.09

2 Light weight foam concrete (incl) cement2 m2 59,725.53 2 m2 21,860.71

1 m2 -

3 Sand cement mortar cant strip 800x800mm3 123 Ameel Lm 17,688.20 9 160 Hazem Lm 1,343.60 3 322 Cretec Lm 7,998.88 9 510 Kabbani Lm 6,730.27

4 Solvent base primer ASTM D414 123 Ameel m2 45,825.38 2 160 Hazem m2 3,775.30 4 322 Cretec m2 21,223.12 2 510 Kabbani m2 18,771.39

5 4mm Single layer bituminous membrane5 123 Ameel m2 46,902.85 3 160 Hazem m2 3,675.30 4 322 Cretec m2 21,223.12 3 510 Kabbani m2 17,765.14

6 250 micron Separation layer polyethylene6 123 Ameel m2 48,735.27 4 160 Hazem m2 991.78 6 322 Cretec m2 22,010.45 4 510 Kabbani m2 17,769.94

7 Thermal insulation7 123 Ameel m2 48,155.27 5 160 Hazem m2 1,566.78 7 322 Cretec m2 22,010.45 5 510 Kabbani m2 17,769.94

8 Protection layer of non-woven geotextile Alyaf 180gr/m28 123 Ameel m2 47,735.27 6 160 Hazem m2 1,994.73 8 322 Cretec m2 22,010.45 6 510 Kabbani m2 17,769.94

9 50mm thick Crushed gravel screened at 20-30mm size9 123 Ameel m2 302.51

510 Kabbani

123 Ameel322 Cretec510 Kabbani

Page 170: Subcontractors Progress Qtys To Date

10 400x400x40mm Cement tiles 10 123 Ameel m2 46,777.19 8 160 Hazem m2 -

10 322 Cretec m2 24,595.48 8 510 Kabbani m2 17,769.94

11 APP bituminuos membrane skirting to roof parapet11 123 Ameel Lm 17,688.20 10 160 Hazem Lm 1,336.60 11 322 Cretec Lm 7,998.88 10 510 Kabbani Lm 6,760.87

12 Upper end of membrane w/ alumininum flashing & sealant12 123 Ameel Lm 18,118.64 11 160 Hazem Lm 410.30 12 322 Cretec Lm 7,998.88 11 510 Kabbani Lm 6,730.27

13 Treatment of drains & pipes13 123 Ameel pcs 3,356.19 12 160 Hazem pcs 73.00 13 322 Cretec pcs 1,358.28 12 510 Kabbani pcs 2,156.50

1 WET AREAS1.1 Liquid membrane Dura shield

1.1 m2 6,222.33 1.1 160 Hazem m2 517.07 2 m2 557.29

1.2 Ditto, to wall & upstands1.2 160 Hazem Lm 548.74 3 510 Kabbani Lm 909.44

1.3 Treatment of drains & pipes1.3 123 Ameel pcs 1,217.95 1.3 160 Hazem pcs 122.00 4 510 Kabbani pcs 238.00

2 TANK WATERPROOFING WORK (Basement)2.1 One coat primer & 2 layer 4+3mm thick (hor & vert)

2.1 123 Ameel m2 11,045.87 2 510 Kabbani m2 7,070.53

2.2 Supply & protection of layer of Non-woven geotextile2.2 123 Ameel m2 5,374.31 3 510 Kabbani m2 5,230.00

2.3 Ditto, to wall & upstands

2.4 Treatment of drains & pipes2.4 123 Ameel pcs 132.00

Protection board 4mm Armorproof (for external wall)6 510 Kabbani m2 1,793.29

123 Ameel

510 Kabbani

Page 171: Subcontractors Progress Qtys To Date

Upper end of membrane w/ alumininum flashing & sealant8 510 Kabbani Lm 305.50

3 EXTERNAL FLOOR WATER PROOFING (Electrical rooms boxes/ftg for tanks & foundation basement)3.1 Double layer modified bituminuos membrane

3.2 Protection boards 9mm around basement Lm -

3.3 MS40 protection board around wall3.3 m2 5,631.20

4 INTERNAL WATER TANK (Pitch Tar Epoxy Coating)4.1 Apply 2 consecutive coats of 500micron

4.1 123 Ameel m2 3,787.46

5 UNDERGROUND INTERNAL TANK (Epoxy Coat)5.1 Apply 2 consecutive coats of 600micron

5.1 123 Ameel m2 2,580.78

3 Epoxy Coating (Masterseal 180 or Noticoat EP 405)3.5 Application of epoxy coats on floors, walls & ceiling

3.5 123 Ameel m2 16,460.53

123 Ameel

Page 172: Subcontractors Progress Qtys To Date

100 201 202 400 500 601

Supply & apply complete roofing waterproofing system using APP Bituminuos Waterproofing Membrane

2,273.70 515.74 2,895.15 1,718.79 1,378.34 910.25

605.02 146.78 930.78

566.18 354.50 345.84

2,273.70 515.74 2,895.15

1,718.79 1,378.34 910.25

2,273.70 515.74 2,895.15

1,718.79 1,378.34 910.25

2,273.70 515.74 2,895.15

1,718.79 1,378.34 910.25

2,273.70 515.74 2,895.15

1,718.79 1,378.34 910.25

2,273.70 515.74 2,895.15

1,718.79 1,378.34 910.25

302.51

Page 173: Subcontractors Progress Qtys To Date

2,273.70 515.74 2,895.15

1,718.79 1,378.34 910.25

605.02 146.78 930.78

566.18 354.50 345.84

605.02 146.78 930.78

566.18 354.50 345.84

182.00 81.00 182.00

157.00 150.00 28.00

295.69 122.93 85.32

96.00 44.00

Page 174: Subcontractors Progress Qtys To Date

EXTERNAL FLOOR WATER PROOFING (Electrical rooms boxes/ftg for tanks & foundation basement)

Page 175: Subcontractors Progress Qtys To Date

602 700 800 901-1 901-2 901-3

450.20 450.20

582.63 566.50 473.81 473.95

271.20 169.69 151.20 151.20

184.82 126.60

582.63 473.81 450.20 450.20

473.95 563.05

582.63 473.81 450.20 450.20

473.95 563.05

582.63 473.81 473.81 473.81

473.95 563.05

582.63 473.81 473.81 473.81

473.95 563.05

582.63 473.81 473.81 473.81

473.95 563.05

Page 176: Subcontractors Progress Qtys To Date

582.63 473.81 473.81 473.81

473.95 563.05

271.20 169.69 151.20 151.20

184.82 126.60

271.20 169.69 178.62 178.62

184.82 126.60

79.00 29.00 12.00 12.00

23.00 57.00

95.98 66.79 41.90 29.32 29.32

62.20 52.55 52.55

22.00 10.00 10.00 10.00

Page 177: Subcontractors Progress Qtys To Date
Page 178: Subcontractors Progress Qtys To Date

901-4 901-5 902 903-1 903-2 1001

450.06

473.81 473.81 473.81 473.81 2,767.20

178.62 178.62 189.60 189.60

152.06

473.81 473.81 473.81 473.81

450.06

473.81 473.81 473.81 473.81

450.06

473.81 473.81 473.81 473.81

450.06

473.81 473.81 473.81 473.81

450.06

473.81 473.81 473.81 473.81

450.06

Page 179: Subcontractors Progress Qtys To Date

473.81 473.81 473.81 473.81

450.06

178.62 178.62 189.60 189.60

152.06

178.62 178.62 189.60 189.60

152.06

29.00 29.00 66.00 66.00

52.00

66.79 66.79 66.87 142.00

53.22

81.04

22.00 22.00

168.00

Page 180: Subcontractors Progress Qtys To Date
Page 181: Subcontractors Progress Qtys To Date

1002 1100 1201-1 1201-2 1201-3 1201-4

1,060.05

1,143.05 1,491.03 1,491.03 1,491.03

459.80 643.72

444.36 493.48

1,143.05 1,491.03

1,491.03 1,060.05

1,143.05 1,491.03

1,491.03 1,060.05

1,143.05 1,491.03

1,491.03 1,060.05

1,143.05 1,491.03

1,491.03 1,060.05

1,143.05 1,491.03

1,491.03 1,060.05

Page 182: Subcontractors Progress Qtys To Date

1,143.05 1,491.03

1,491.03 1,060.05

459.80 643.72

444.36 493.48

459.80 643.72

444.36 493.48

83.00 84.60

120.00 158.00

110.84

66.00

Page 183: Subcontractors Progress Qtys To Date
Page 184: Subcontractors Progress Qtys To Date

1201-5 1201-6 1201-7 1201-8 1201-9 1201-10

1,467.64 1,467.64 965.00 2,446.06

1,491.03 3,444.51 987.63 1,491.03

643.72 643.72

444.36 523.48 523.48 409.09 932.48

1,491.03 1,491.03

1,491.03 1,467.64 1,467.64 965.00 2,446.06

1,491.03 1,491.03

1,491.03 1,467.64 1,467.64 965.00 2,446.06

1,491.03 1,491.03

1,491.03 1,467.64 1,467.64 965.00 2,446.06

1,491.03 1,491.03

1,491.03 1,467.64 1,467.64 965.00 2,446.06

1,491.03 1,491.03

1,491.03 1,467.64 1,467.64 965.00 2,446.06

Page 185: Subcontractors Progress Qtys To Date

1,491.03 1,491.03

1,491.03 1,467.64 1,467.64 965.00 2,446.06

643.72 643.72

444.36 538.78 538.78 409.09 932.48

643.72 643.72

444.36 523.48 523.48 409.09 932.48

125.49 125.49

120.00 168.00 168.00 175.00 328.00

184.30

280.28

463.30

44.55

70.00

Page 186: Subcontractors Progress Qtys To Date
Page 187: Subcontractors Progress Qtys To Date

1201-11 1201-12 1201-13 1201-14 1201-15 1201-16

1,436.60 2,446.06

1,491.03 1,491.03

643.72 550.60

444.36 932.48

1,491.03 1,436.60

1,491.03 2,446.06

100.00 1,491.03 1,336.60

1,491.03 2,446.06

1,000.00 1,491.03 436.60

1,491.03 2,446.06

420.00 1,491.03 1,016.60

1,491.03 2,446.06

1,491.03 1,436.60

1,491.03 2,446.06

Page 188: Subcontractors Progress Qtys To Date

1,491.03 1,491.03

1,491.03 2,446.06

643.72 550.60

444.36 932.48

643.72 275.30

444.36 932.48

84.60 26.00

120.00 328.00

243.33 223.79

84.64 365.10

67.00

Page 189: Subcontractors Progress Qtys To Date
Page 190: Subcontractors Progress Qtys To Date

1201-17 1201-18 1201-19 1201-20 1201-21 1201-22

2,446.06 2,441.02

1,118.27 2,485.05

500.81 1,170.40

932.48 935.61

1,160.02 2,485.05

2,446.06 2,441.02

1,160.02 2,485.05

2,446.06 2,441.02

1,160.02 1,686.11

787.33 2,446.06 2,421.60

1,160.02 1,686.11

787.33 2,446.06 2,421.60

1,160.02 1,686.11

787.33 2,446.06 2,421.60

Page 191: Subcontractors Progress Qtys To Date

1,160.02 1,686.11

787.33 2,446.06 2,421.60

500.81 1,170.40

932.48 935.61

500.81 1,170.40

932.48 935.61

77.00 141.00

328.00 244.00

92.15 614.34 399.32

21.60 5.40 135.00

Page 192: Subcontractors Progress Qtys To Date
Page 193: Subcontractors Progress Qtys To Date

1201-23 1201-24 1202 1204-1 1204-2 1204-3

2,485.05 3,048.77 1,799.13 1,799.13

1,170.40 1,170.40 816.67 154.19

2,485.05 2,485.05 1,799.13 619.08

2,485.05 2,485.05 1,799.13 619.08

2,485.05 2,485.05 1,799.13 619.08

2,485.05 2,485.05 1,799.13 619.08

2,485.05 2,485.05 1,799.13 619.08

Page 194: Subcontractors Progress Qtys To Date

2,485.05 2,485.05 1,799.13 619.08

1,170.40 1,170.40 816.67 154.19

1,170.40 1,170.40 816.67 154.19

141.00 141.00 262.00 4.01

614.34 534.48 434.54

135.00 5.40 64.00

Page 195: Subcontractors Progress Qtys To Date
Page 196: Subcontractors Progress Qtys To Date

1204-4 1301 1302 1400 1500 1601-1

1,799.13 2,394.76 2,070.15 1,184.29

816.67 744.83

491.92

1,799.13 1,035.08

1,184.29 1,006.25

1,799.13 2,070.15

1,184.29

1,799.13 2,070.15

1,184.29

1,799.13 2,070.15

1,184.29

1,799.13 2,070.15

1,184.29

Page 197: Subcontractors Progress Qtys To Date

1,799.13 2,070.15

1,184.29

816.67 744.83

491.92

816.67 744.83

491.92

262.00 125.00

58.96

434.54 221.36

64.00 88.00

Page 198: Subcontractors Progress Qtys To Date
Page 199: Subcontractors Progress Qtys To Date

1601-2 1601-3 1601-4 1601-5 1601-6 1602

2,012.50

2,070.15 2,070.15 1,180.57 2,094.42 2,131.21

744.83 756.26 271.13

649.65 661.06 744.83

2,070.15 2,070.15 1,180.57

2,094.42 2,131.21 2,012.50

2,070.15 2,070.15 1,180.57

2,094.42 2,131.21 2,012.50

2,070.15 2,070.15 1,180.57

2,094.42 2,131.21 2,012.50

2,070.15 2,070.15 1,180.57

2,094.42 2,131.21 2,012.50

2,070.15 2,070.15 1,180.57

2,094.42 2,131.21 2,012.50

Page 200: Subcontractors Progress Qtys To Date

2,070.15 2,070.15 1,180.57

2,094.42 2,131.21 2,012.50

744.83 756.26 271.13

649.65 661.06 744.83

744.83 756.26 271.13

649.65 661.06 744.83

125.00 130.00 117.00

84.02 85.50 149.00

221.36

88.00

Page 201: Subcontractors Progress Qtys To Date
Page 202: Subcontractors Progress Qtys To Date

1603 1701 1702 1900 2001 2002

1,254.52 155.32 2,368.80 1,624.67 1,233.06

618.98

67.92 1,126.73 610.09 586.18

1,254.52

155.32 1,942.42 1,413.46 1,233.06

1,254.52

155.32 1,942.42 1,413.46 1,233.06

1,254.52

155.32 1,942.42 1,413.46 1,233.06

1,254.52

155.32 1,942.42 1,413.46 1,233.06

1,254.52

155.32 1,942.42 1,413.46 1,233.06

Page 203: Subcontractors Progress Qtys To Date

1,254.52

155.32 1,942.42 1,413.46 1,233.06

618.98

67.92 1,126.73 610.09 586.18

618.98

67.92 1,126.73 610.09 586.18

42.00

5.00 35.26 180.00 52.00

Page 204: Subcontractors Progress Qtys To Date
Page 205: Subcontractors Progress Qtys To Date

2003 2004 2005 (1~3) 2006 2007-1 2007-2

336.00 439.00

1,251.20 1,611.84

589.04 315.14 150.00 135.00

1,251.20 551.78 336.00 439.00

1,251.20 551.78 336.00 439.00

1,251.20 883.85 451.67

1,251.20 883.85 451.67

1,251.20 883.85 451.67

Page 206: Subcontractors Progress Qtys To Date

1,251.20 883.85 451.67

589.04 315.14 150.00 135.00

589.04 315.14 135.00

28.00 20.00 5.00 8.00

199.07 178.59 173.20

296.80

46.00 53.00 25.00

Page 207: Subcontractors Progress Qtys To Date
Page 208: Subcontractors Progress Qtys To Date

2007-3 2007-4 2008-1 2008-2 2100 2201

216.85 1,221.49

101.40 648.88

216.85 1,221.49

216.85 1,221.49

216.85 1,221.49

216.85 1,221.49

216.85 1,221.49

Page 209: Subcontractors Progress Qtys To Date

216.85 1,221.49

101.40 648.88

101.40 648.88

31.00 79.54

80.00

25.00

55.00

Page 210: Subcontractors Progress Qtys To Date

4.00

Page 211: Subcontractors Progress Qtys To Date

2202 2301 2302 2400 2501 2502

1,512.10 133.48

609.02 55.60 7.00

8.00

1,512.10 133.48 108.12

1,512.10 133.48 108.12

1,512.10 133.48

7.82

1,512.10 133.48

7.82

1,512.10 133.48 2.95

7.82

Page 212: Subcontractors Progress Qtys To Date

1,512.10 133.48

7.82

609.02 55.60

8.00

609.02 55.60

8.00

120.00 19.00

0.50

172.84 39.20

16.82

Page 213: Subcontractors Progress Qtys To Date

84.04 39.20

Page 214: Subcontractors Progress Qtys To Date

2602-1 2602-2 2602-3 2602-4 2602-5 2602-6

Page 215: Subcontractors Progress Qtys To Date
Page 216: Subcontractors Progress Qtys To Date
Page 217: Subcontractors Progress Qtys To Date

2602-7 2602-8 2602-9 2602-10 2602-11 2602-12

Page 218: Subcontractors Progress Qtys To Date
Page 219: Subcontractors Progress Qtys To Date
Page 220: Subcontractors Progress Qtys To Date

2602-13 2602-14 2700 2800 2900 3000

243.18 2,638.62

88.20 469.44

243.18 2,638.62

243.18 2,638.62

243.18 2,638.62

243.18 2,638.62

243.18 2,638.62

Page 221: Subcontractors Progress Qtys To Date

243.18

2,585.03

88.20 469.44

88.20 469.44

20.00 145.00

64.44 21.45 145.34 556.59

19.00 10.00 71.00 38.00

183.43

Page 222: Subcontractors Progress Qtys To Date

183.43

Page 223: Subcontractors Progress Qtys To Date

3100 3201 3202A-1 3202A-2 3202A-3 3202A-4

1,903.90 161.35 161.35

265.60 51.60

51.80 16.20

1,903.90 161.35

161.35

1,903.90 161.35

161.35

1,903.90 161.35

161.35 16.40

1,903.90 161.35

161.35 16.40

1,903.90 161.35

161.35 16.40

Page 224: Subcontractors Progress Qtys To Date

1,903.90 161.35

161.35 16.40

265.60 51.60

51.80 16.20

265.60 51.60

51.80 16.20

168.00 2.00

1.00 1.00

173.88

55.00

46.80

Page 225: Subcontractors Progress Qtys To Date
Page 226: Subcontractors Progress Qtys To Date

3202A-5 3202A-6 3202A-7 3202A-8 3202A-9 3202A-10

157.00 157.00

161.35 161.35

51.60 51.60 51.00 51.00

161.35 161.35 157.00 157.00

161.35 161.35 157.00 157.00

161.35 161.35 157.00 157.00

161.35 161.35 157.00 157.00

161.35 161.35 157.00 157.00

Page 227: Subcontractors Progress Qtys To Date

161.35 161.35 161.35

51.60 51.60 51.00 51.00

51.60 51.60 51.60

2.00 5.00 2.00 2.00

Page 228: Subcontractors Progress Qtys To Date
Page 229: Subcontractors Progress Qtys To Date

3202A-11 3202A-12 3202A-13 3202B-1 3202B-2 3202B-3

161.35 161.35 108.07

51.60 51.60

41.60

161.35 161.35

108.07

161.35 161.35

108.07

161.35 161.35

108.07

161.35 161.35

108.07

161.35 161.35

108.07

Page 230: Subcontractors Progress Qtys To Date

161.35 161.35

108.07

51.60 51.60

41.60

51.60 51.60

41.60

2.00 2.00

1.00

Page 231: Subcontractors Progress Qtys To Date
Page 232: Subcontractors Progress Qtys To Date

3202B-4 3202B-5 3202B-6 3202B-7 3202B-8 3202B-9

108.07 108.07 108.07 108.07 108.07

41.60 41.60 41.60 41.60 41.60

108.07 108.07 108.07 108.07 108.07

108.07 108.07 108.07 108.07 108.07

108.07 108.07 108.07 108.07 108.07

108.07 108.07 108.07 108.07 108.07

108.07 108.07 108.07 108.07 108.07

Page 233: Subcontractors Progress Qtys To Date

108.07 108.07 108.07 108.07 108.07

41.60 41.60 41.60 41.60 41.60

41.60 41.60 41.60 41.60 41.60

2.00 2.00 2.00 2.00 2.00

Page 234: Subcontractors Progress Qtys To Date
Page 235: Subcontractors Progress Qtys To Date

3203 3204 3205 3206 3207 3208

215.18 26.00

406.76

75.80 20.80 177.23

57.60 215.18 26.00

406.76

215.18 26.00 406.76

215.18 26.00 406.76

215.18 21.00 406.76

215.18 26.00 406.76

Page 236: Subcontractors Progress Qtys To Date

28.16

406.76

75.80 20.80 177.23

21.60

177.23

4.00 2.00 27.00

12.24

3.00

120.59 2,671.33 2,201.44

120.59 1,997.35 1,532.25

Page 237: Subcontractors Progress Qtys To Date

737.99 669.19

3,787.46

266.00 4,285.77

Page 238: Subcontractors Progress Qtys To Date

3209 3210 Water Tank MH's LPG Tank 1 LPG Tank 2

Page 239: Subcontractors Progress Qtys To Date

300.00 266.00 1,644.95 93.34 5,252.24

300.00 5,205.00

1,644.95 93.34

Page 240: Subcontractors Progress Qtys To Date

301.50

266.00

11,908.76

Page 241: Subcontractors Progress Qtys To Date

LPG Tank 3 L.S. 1 L.S. 2 L.S. 3 L.S. 4 L.S. 5

Page 242: Subcontractors Progress Qtys To Date

100.00 199.97 275.70 270.70 455.20 335.75

100.00 57.38 61.16 67.96 136.68 70.71

10.00 10.00 10.00 10.00 10.00

Page 243: Subcontractors Progress Qtys To Date

163.49 214.54 183.76 279.92 292.13

100.50 121.78 135.47 296.10 126.38

Page 244: Subcontractors Progress Qtys To Date

L.S. 6 L.S. 7 L.S. 8 L.S. 9 L.S. 10 L.S. 11

Page 245: Subcontractors Progress Qtys To Date

248.84 413.89 227.44 272.72 315.49 272.20

67.96 136.68 71.73 65.28 87.98 72.48

8.00 10.00 8.00 8.00 10.00 10.00

Page 246: Subcontractors Progress Qtys To Date

161.90 313.46 160.18 207.44 233.16 199.72

116.53 296.86 119.59 112.67 191.83 136.33

Page 247: Subcontractors Progress Qtys To Date

L.S. 12 L.S. 13 L.S. 14 L.S. 15 L.S. 16 Gas tank

Page 248: Subcontractors Progress Qtys To Date

433.66 209.64 507.36 269.03 236.65

94.83 65.94 120.66 68.71 61.16

10.00 8.00 10.00

Page 249: Subcontractors Progress Qtys To Date

340.95 143.70 381.18 200.33 175.49

176.51 130.18 279.63 127.90 112.52

Page 250: Subcontractors Progress Qtys To Date

Fence curbstone ..........

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

Page 251: Subcontractors Progress Qtys To Date

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

Page 252: Subcontractors Progress Qtys To Date

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

Page 253: Subcontractors Progress Qtys To Date

SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project CORRECTIONAL FACILITIES P-1182, DammamSubject AS-BUILT QUANTITIESPeriod As of 18 Feb 2016

NO DESCRIPTION Unit Total 1 PAINTING WORKS

INTERNALFLOOR

Epoxy coating system16-2 m2 1,261.9

WALLEmulsion (acrylic)

17-1214 Marim Jalani m2 17,126.5 214 Marim Jalani (elect rms) m2 877.6

4.4 m2 -

10.1 m2 4,483.0

1 m2 1,512.1

Epoxy coating system16-1 214 Marim Jalani m2 9,680.2

Vetonit repair4.7 295 Dar Anan m2 -

Extra over for wall ht >4.5m16-5 214 Marim Jalani m2 300.1

CEILINGAnti-bacterial Paint

Emulsion

18-2214 Marim Jalani m2 7,989.8 214 Marim Jalani - HCS m2 1,377.6 214 Marim Jalani (elect rms) m2 65.1

5.1 295 Dar Anan m2 27.4 2 560 Nahedh Al Monshri m2 666.1

Extra over for wall ht >4.5m

16-6214 Marim Jalani m2 2,673.0 214 Marim Jalani - HCS m2 246.0

METAL DOORS & WINDOWSBar Grill Door (BGD)

15-1 214 Marim Jalani m2 4,281.0

Access Door (AD)15-2 214 Marim Jalani m2 257.9

Hollow Metal Door (HMD)15-3 214 Marim Jalani m2 4,116.8

Full Putty Works

214 Marim Jalani

295 Dar Anan453 Benayat560 Nahedh Al Monshri

Page 254: Subcontractors Progress Qtys To Date

15-4 214 Marim Jalani m2 4,921.0

Bar Grill Window17-3 214 Marim Jalani pcs 1,204.4

Louver Window17-4 214 Marim Jalani pcs 32.2

ADDITIONAL WORKSElectrical rooms (exterior)

18-1 214 Marim Jalani pcs 6.3

Low current rooms (interior)18-2 214 Marim Jalani pcs 7.9

Building electrical rooms (interior)18-3 214 Marim Jalani pcs 15.3

EXTERNALWALL

Texturedm2 93,444.0

16-4 m2 3,158.4

3.2 m2 1,126.1

Maytas m2 12,699.0

Repair works

m2 148,083.4

Scaffolding for textured painting works above 4.5m Ht3.3 295 Dar Anan Lm 137.7

Textured on Parapet coping3.5 295 Dar Anan Lm 251.1

2 TILING WORKSINTERNAL

FLOORCeramic tile 100x100 (install only)

1.40 m2 43.4

Ceramic tile 200x200 (install only)1.50 295 Dar Anan m2 80.0

Ceramic tile 300x300 (install only)1.60 295 Dar Anan m2 648.3

Terrazzo tile 400x400x40 (supply/install only)1.12 295 Dar Anan m2 807.7

1 m2 985.7

Terrazzo tile 400x400x40, pattern (supply/install only)1.13 295 Dar Anan m2 186.6

197 Al Tawakl214 Marim Jalani295 Dar Anan

197 Al Tawakl

295 Dar Anan

553 Al Otaibi (install only)

Page 255: Subcontractors Progress Qtys To Date

Terrazzo border W=100 (supply/install only)1.15 295 Dar Anan Lm 261.9

Terrazzo border W=200 (supply/install only)1.16 295 Dar Anan Lm 77.5

Terrazzo tread 40mmx300, riser 20mmx1501.17 295 Dar Anan Lm 3.3

BASECeramic tile 100x400 (install only)

3 553 Al Otaibi Lm 735.3 Ceramic cove base (install only)

2.1 295 Dar Anan Lm 253.2 Terrazzo skirting 100x200mm (supply/install)

2.2 295 Dar Anan Lm 833.5

WALLCeramic tile 100x100 (install only)

3.8 295 Dar Anan m2 164.7

Ceramic tile 200x200 (install only)3.9 295 Dar Anan m2 1,132.7 2 553 Al Otaibi m2 118.8

Ceramic corner cove 200x200 (install only)3.11 295 Dar Anan Lm 831.0

553 Al Otaibi Lm -

Page 256: Subcontractors Progress Qtys To Date

100 201 202 400 500 601

3,246.2 4,017.9 406.1 92.8 105.9 22.3

4,483.0

75.0

140.0

350.0 353.7

7.7 15.8 1.6

134.4 216.4 71.4 21.6 21.0

Page 257: Subcontractors Progress Qtys To Date

1.4

2,371.7 2,921.0 2,122.2 1,881.0 738.6 1,716.0

3,162.2 3,894.6 2,829.6 2,508.0 984.8 2,745.6

554.1 257.5

Page 258: Subcontractors Progress Qtys To Date

494.5 109.9

118.8

Page 259: Subcontractors Progress Qtys To Date

602 700 800 901-1 901-2 901-3

80.4 343.0 343.0 24.6 44.1 44.1

210.0 226.1

382.5 135.1 189.1

2.5 9.0 9.0

37.2 42.6 38.4 38.4 38.4

Page 260: Subcontractors Progress Qtys To Date

465.0 457.8 502.8 502.8

586.6

417.3

620.0 712.8 610.4 670.4 670.4

28.8

32.0

224.2

123.6

Page 261: Subcontractors Progress Qtys To Date

148.2

3.3

309.2

99.3

104.5

177.3

Page 262: Subcontractors Progress Qtys To Date

901-4 901-5 902 903-1 903-2 1001

343.0 259.6 308.0 44.1 45.6

226.1 23.0 50.0

189.1 112.5 136.1

9.0 10.5

15.1

38.4 38.4 39.6 37.8 37.8

Page 263: Subcontractors Progress Qtys To Date

149.5

2.1 23.1

0.7

83.8 384.0

441.8 543.7 598.5

234.6 512.0

13.3

2.9

70.9 174.1

Page 264: Subcontractors Progress Qtys To Date

130.9

34.4

50.4

60.2

11.1

60.0

Page 265: Subcontractors Progress Qtys To Date

1002 1100 1201-1 1201-2 1201-3 1201-4

4.8 16.0 16.0 16.0

95.0 106.9 106.9

Page 266: Subcontractors Progress Qtys To Date

61.5

9.1 42.0 42.0 42.0

0.7

1,076.4 1,470.0 2,663.5 3,196.2 3,196.2 3,196.2

1,435.2 1,960.0 4,261.6 4,261.6 4,261.6 4,261.6

Page 267: Subcontractors Progress Qtys To Date
Page 268: Subcontractors Progress Qtys To Date

1201-5 1201-6 1201-7 1201-8 1201-9 1201-10

608.1 608.1 68.1 106.0

1,950.0

706.7 1,099.3 344.4 344.4

564.2 564.2 246.0

300.0 300.0 300.0

16.0 16.0 11.8 11.8

118.8

Page 269: Subcontractors Progress Qtys To Date

250.0 250.0 250.0 250.0

42.0 42.0 47.4 47.4

0.7 0.7 0.7 0.7

0.7 0.7 0.7

1.4 1.4 1.4 1.4

266.4 3,196.2 3,196.2 799.1 3,196.2 3,196.2

4,261.6 4,261.6 4,261.6 4,261.6 4,261.6 4,261.6

Page 270: Subcontractors Progress Qtys To Date
Page 271: Subcontractors Progress Qtys To Date

1201-11 1201-12 1201-13 1201-14 1201-15 1201-16

390.9 608.1 68.1 106.0

1,275.0 2,100.0

35.3 76.0

706.7 1,099.3 344.4

362.7 564.2

180.0 300.0 300.0

11.8 11.8 15.1 15.1

71.3 118.8 118.8

Page 272: Subcontractors Progress Qtys To Date

250.0 125.0 125.0 250.0

47.4 47.4 47.4 60.0

3,196.2 3,196.2 3,196.2 3,196.2

4,261.6 4,261.6 4,261.6 4,261.6

Page 273: Subcontractors Progress Qtys To Date
Page 274: Subcontractors Progress Qtys To Date

1201-17 1201-18 1201-19 1201-20 1201-21 1201-22

564.6 106.0

2,025.0

48.8

1,099.3 344.4

564.2

249.0 300.0 300.0

16.8 16.8

118.8 59.4 118.8 118.8

Page 275: Subcontractors Progress Qtys To Date

250.0 250.0 250.0 250.0 250.0 250.0

47.4 47.4 42.0 42.0 42.0 42.0

0.7 0.7 0.7 0.7

0.7 0.7 0.7 0.7

266.4 1,065.4 1,598.1

2,495.2 2,079.3

2,130.8 2,258.6 2,599.6

Page 276: Subcontractors Progress Qtys To Date
Page 277: Subcontractors Progress Qtys To Date

1201-23 1201-24 1202 1204-1 1204-2 1204-3

152.0 152.0

300.0 300.0 288.0 288.0 288.0

16.8 16.8 5.7

118.8 118.8 90.7 70.6

Page 278: Subcontractors Progress Qtys To Date

250.0 250.0 240.0 240.0 240.0

42.0 42.0 49.0 49.0 49.0

0.7

0.7 0.7 0.5 0.7

0.7 0.5 0.7

2,054.4 327.8 1,966.8

1,663.5 3,326.9 980.3

4,108.8 1,835.7 2,622.4

Page 279: Subcontractors Progress Qtys To Date
Page 280: Subcontractors Progress Qtys To Date

1204-4 1301 1302 1400 1500 1601-1

1,615.0

1,415.0

500.0

53.5

288.0

4.6

90.7 240.0

Page 281: Subcontractors Progress Qtys To Date

240.0

49.0 13.9 35.0 11.2

0.5

0.7

655.6 1,684.2 2,326.2 2,907.8

2,221.8

2,622.4 2,245.6 3,101.6 3,877.1

Page 282: Subcontractors Progress Qtys To Date
Page 283: Subcontractors Progress Qtys To Date

1601-2 1601-3 1601-4 1601-5 1601-6 1602

452.2

3.4

240.0 168.0 240.0 162.0

Page 284: Subcontractors Progress Qtys To Date

11.2 12.6 12.6 11.2

0.7 0.7 0.7 0.7 0.7

1,904.4 1,904.4 1,904.4 1,904.4

2,539.2 2,539.2 2,539.2 2,539.2

343.8

63.0

Page 285: Subcontractors Progress Qtys To Date

113.6

77.5

274.0

Page 286: Subcontractors Progress Qtys To Date

1603 1701 1702 1900 2001 2002

Page 287: Subcontractors Progress Qtys To Date

7.7 3.5

1.3 0.9

1,863.6 1,482.0

2,484.8 1,976.0 3,146.0

Page 288: Subcontractors Progress Qtys To Date
Page 289: Subcontractors Progress Qtys To Date

2003 2004 2005 (1~3) 2006 2007-1 2007-2

70.2 38.4 0.6 1.2

Page 290: Subcontractors Progress Qtys To Date

1.4

39.8

98.9

Page 291: Subcontractors Progress Qtys To Date

92.6

5.2

125.6

141.4

Page 292: Subcontractors Progress Qtys To Date

2007-3 2007-4 2008-1 2008-2 2100 2201

343.0

101.5

1.2 1.2 9.0 9.0

Page 293: Subcontractors Progress Qtys To Date

501.6 1,438.8

262.2 262.2 262.2

668.8 1,918.4

42.4 42.4 42.4

59.0 58.9 58.9

Page 294: Subcontractors Progress Qtys To Date
Page 295: Subcontractors Progress Qtys To Date

2202 2301 2302 2400 2501-1 2501-2

15.1 1.8 1.8

Page 296: Subcontractors Progress Qtys To Date

1,368.0 1,156.2 191.0 48.6 48.6

1,824.0 1,541.6 254.6 81.0 81.0

Page 297: Subcontractors Progress Qtys To Date
Page 298: Subcontractors Progress Qtys To Date

2501-3 2501-4 2501-5 2501-6 2501-7 2501-8

1.8 1.8 1.8 1.8 1.8 1.8

Page 299: Subcontractors Progress Qtys To Date

48.6 48.6 48.6 48.6 48.6 48.6

81.0 81.0 81.0 81.0 81.0 81.0

Page 300: Subcontractors Progress Qtys To Date
Page 301: Subcontractors Progress Qtys To Date

2501-9 2502 2602-1 2602-2 2602-3 2602-4

15.4

9.8

1.2 1.2 1.2 1.2

Page 302: Subcontractors Progress Qtys To Date

133.2 133.2 133.2 133.2

222.0 222.0 222.0 222.0

Page 303: Subcontractors Progress Qtys To Date
Page 304: Subcontractors Progress Qtys To Date

2602-5 2602-6 2602-7 2602-8 2602-9 2602-1

14.0

14.0

1.2 1.2 1.2 1.2 1.2 1.2

Page 305: Subcontractors Progress Qtys To Date

133.2 133.2 133.2 133.2 133.2 133.2

222.0 222.0 222.0 222.0 222.0 222.0

2.5 2.8

17.4 19.4

Page 306: Subcontractors Progress Qtys To Date

40.2 44.7

13.7 15.2

Page 307: Subcontractors Progress Qtys To Date

2602-11 2602-12 2602-13 2602-14 2700 2800

1.2 1.2 1.2

Page 308: Subcontractors Progress Qtys To Date

133.2 133.2 133.2 270.2

222.0 222.0 222.0 1,080.8

Page 309: Subcontractors Progress Qtys To Date
Page 310: Subcontractors Progress Qtys To Date

2900 3000 3100 3201 3202A-1 3202A-2

450.0

152.6

71.6

51.6 39.6 14.4 14.4

Page 311: Subcontractors Progress Qtys To Date

2.1 2.1

371.2 854.0 346.8 163.2 163.2

1,484.8 1,366.4 462.4 272.0 272.0

648.3

33.1

Page 312: Subcontractors Progress Qtys To Date

218.8

22.4

862.5

452.3

Page 313: Subcontractors Progress Qtys To Date

3202A-3 3202A-4 3202A-5 3202A-6 3202A-7 3202A-8

238.0 238.0 238.0 238.0

-

152.6 152.6

-

110.6 110.6 110.6 110.6

- 71.6 71.6

14.4 14.4 14.4 14.4 14.4 14.4

Page 314: Subcontractors Progress Qtys To Date

2.1 2.1 2.1 2.1 2.1

163.2 163.2 163.2

175.0

201.3

272.0 272.0 272.0

10.7

52.6

Page 315: Subcontractors Progress Qtys To Date
Page 316: Subcontractors Progress Qtys To Date

3202A-9 3202A-10 3202A-11 3202A-12 3202A-13 3202B-1

238.0 189.0

152.6 152.6 152.6

110.6 73.5

71.6 71.6 71.6

14.4 14.4 14.4 14.4 14.4 10.8

Page 317: Subcontractors Progress Qtys To Date

2.1 2.1 2.1 2.1 2.1 0.7

163.2 163.2 145.5

175.0

152.4

272.0 272.0 242.6

Page 318: Subcontractors Progress Qtys To Date
Page 319: Subcontractors Progress Qtys To Date

3202B-2 3202B-3 3202B-4 3202B-5 3202B-6 3202B-7

189.0

119.3 119.3 119.3 119.3

73.5

47.3 47.3 47.3 47.3

10.8 10.8 10.8 10.8 10.8 10.8

Page 320: Subcontractors Progress Qtys To Date

0.7 0.7 0.7 0.7

145.8 145.8 145.5 145.5 145.5

243.0 243.0 242.6 242.6 242.6

Page 321: Subcontractors Progress Qtys To Date
Page 322: Subcontractors Progress Qtys To Date

3202B-8 3202B-9 3203 3204 3205 3206

101.5 238.5

238.0

119.3

105.0

27.4 47.3

10.8 10.8 16.2

Page 323: Subcontractors Progress Qtys To Date

0.7 0.7

145.5 145.5 269.0 61.2

138.1

242.6 242.6 358.7 81.6

21.6

Page 324: Subcontractors Progress Qtys To Date
Page 325: Subcontractors Progress Qtys To Date

3207 3208 3209 3210 L.S. 1 L.S. 2

445.0 298.0 178.9

105.0

5.4

Page 326: Subcontractors Progress Qtys To Date

2.1

339.2 453.0

678.4 604.0

Page 327: Subcontractors Progress Qtys To Date
Page 328: Subcontractors Progress Qtys To Date

L.S. 3 L.S. 4 L.S. 5 L.S. 6 L.S. 7 L.S. 8

Page 329: Subcontractors Progress Qtys To Date
Page 330: Subcontractors Progress Qtys To Date
Page 331: Subcontractors Progress Qtys To Date

L.S. 9 L.S. 10 L.S. 11 L.S. 12 L.S. 13 L.S. 14

Page 332: Subcontractors Progress Qtys To Date
Page 333: Subcontractors Progress Qtys To Date
Page 334: Subcontractors Progress Qtys To Date

L.S. 15 L.S. 16 Gas tank Fence curbstone

Page 335: Subcontractors Progress Qtys To Date
Page 336: Subcontractors Progress Qtys To Date
Page 337: Subcontractors Progress Qtys To Date

SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project CORRECTIONAL FACILITIES P-1182, DammamSubject AS-BUILT QUANTITIESPeriod As of 18 Feb 2016

NO DESCRIPTION Unit Total JOINERY

1 AluminumWindows

m2 1,044.52

Curtain walls130 United Arab Aluminum m2 86.65

Shutter130 United Arab Aluminum m2 1.86

Door130 United Arab Aluminum m2 0.87

2 MetalWindows

5.1 pcs 430.00

130 United Arab Aluminum

453 Benayat

Page 338: Subcontractors Progress Qtys To Date

100 201 202 400 500 601

143.09 225.73 175.73 37.79 13.10 13.23

31.54 4.23 26.88 17.28

0.17

2.00

Page 339: Subcontractors Progress Qtys To Date

602 700 800 901-1 901-2 901-3

20.93 28.85 24.98 1.38 9.18 9.18

Page 340: Subcontractors Progress Qtys To Date

901-4 901-5 902 903-1 903-2 1001

9.18 9.82 11.23 9.82 10.98 1.94

3.00

Page 341: Subcontractors Progress Qtys To Date

1002 1100 1201-1 1201-2 1201-3 1201-4

0.53 0.38

13.00 60.00 60.00 60.00 60.00

Page 342: Subcontractors Progress Qtys To Date

1201-5 1201-6 1201-7 1201-8 1201-9 1201-10

Page 343: Subcontractors Progress Qtys To Date

1201-11 1201-12 1201-13 1201-14 1201-15 1201-16

36.00 24.00

Page 344: Subcontractors Progress Qtys To Date

1201-17 1201-18 1201-19 1201-20 1201-21 1201-22

Page 345: Subcontractors Progress Qtys To Date

1201-23 1201-24 1202 1204-1 1204-2 1204-3

Page 346: Subcontractors Progress Qtys To Date

1204-4 1301 1302 1400 1500 1601-1

1.60 15.84

0.48 0.48

34.00 50.00 12.00

Page 347: Subcontractors Progress Qtys To Date

1601-2 1601-3 1601-4 1601-5 1601-6 1602

1.76 15.84 1.76 15.84 1.76 1.06

Page 348: Subcontractors Progress Qtys To Date

1603 1701 1702 1900 2001 2002

0.64 2.56 12.96 12.96

4.61 1.15

0.76 0.34

11.00 5.00

Page 349: Subcontractors Progress Qtys To Date

2003 2004 2005 (1~3) 2006 2007-1 2007-2

13.20 12.96 1.78

Page 350: Subcontractors Progress Qtys To Date

2007-3 2007-4 2008-1 2008-2 2100 2201

2.37 4.03

0.15

Page 351: Subcontractors Progress Qtys To Date

2202 2301 2302 2400 2501-1 2501-2

2.64 3.62 0.54 1.42 0.93 0.93

0.87

Page 352: Subcontractors Progress Qtys To Date

2501-3 2501-4 2501-5 2501-6 2501-7 2501-8

0.93 0.93 0.93 0.93 0.93 0.93

Page 353: Subcontractors Progress Qtys To Date

2501-9 2502 2602-1 2602-2 2602-3 2602-4

0.93 2.08 2.08 2.08 2.08

Page 354: Subcontractors Progress Qtys To Date

2602-5 2602-6 2602-7 2602-8 2602-9 2602-10

2.08 2.08 2.08 2.08 2.08 2.08

Page 355: Subcontractors Progress Qtys To Date

2602-11 2602-12 2602-13 2602-14 2700 2800

2.08 2.08 2.08 2.08 9.46 20.40

0.14 0.30

Page 356: Subcontractors Progress Qtys To Date

2900 3000 3100 3201 3202A-1 3202A-2

29.52 24.82 38.64

Page 357: Subcontractors Progress Qtys To Date

3202A-3 3202A-4 3202A-5 3202A-6 3202A-7 3202A-8

Page 358: Subcontractors Progress Qtys To Date

3202A-9 3202A-10 3202A-11 3202A-12 3202A-13 3202B-1

Page 359: Subcontractors Progress Qtys To Date

3202B-2 3202B-3 3202B-4 3202B-5 3202B-6 3202B-7

Page 360: Subcontractors Progress Qtys To Date

3202B-8 3202B-9 3203 3204 3205 3206

Page 361: Subcontractors Progress Qtys To Date

3207 3208 3209 3210 L.S. 1 L.S. 2

Page 362: Subcontractors Progress Qtys To Date

L.S. 3 L.S. 4 L.S. 5 L.S. 6 L.S. 7 L.S. 8

Page 363: Subcontractors Progress Qtys To Date

L.S. 9 L.S. 10 L.S. 11 L.S. 12 L.S. 13 L.S. 14

Page 364: Subcontractors Progress Qtys To Date

L.S. 15 L.S. 16 Gas tank Fence curbstone ................

Page 365: Subcontractors Progress Qtys To Date

SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project CORRECTIONAL FACILITIES P-1182, DammamSubject AS-BUILT QUANTITIESPeriod As of 18 Feb 2016

NO DESCRIPTION Unit Total GREENHOUSE BUILDING

1 Design, Supply & Installation of Green HouseFooting

1 lot 3.00

Greenhouse structure2 148 USMS pcs 2.91

Cooling system3 148 USMS pcs 1.80

148 USMS

Page 366: Subcontractors Progress Qtys To Date

2005-1 2005-2 2005-3

1.00 1.00 1.00

0.97 0.97 0.97

0.60 0.60 0.60

Page 367: Subcontractors Progress Qtys To Date

SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project CORRECTIONAL FACILITIES P-1182, DammamSubject AS-BUILT QUANTITIESPeriod As of 18 Feb 2016

NO DESCRIPTION Unit Total EXTERIOR WORKS

1 Plants

2 Miscellaneous WorksDrainage gravel

Palms m2 227.30 Trees m2 1,037.00 grass, shrubs, GC m2 889.00

m2 2,153.30 Filter Membrane

363 USMSPalms m2 757.50 Trees m2 3,629.40 grass m2 664.00 shrubs, GC m2 1,114.00

Soil Mix363 USMSPalms m3 340.90 Trees m3 1,037.00 grass m3 33.20 shrubs, GC m3 55.70

Excavation & Hauling363 USMSPalms m3 386.30 Trees m3 1,244.40

Gravel Mulching363 USMSPalms m2 - Trees m2 -

3 Irrigation WorksSub-main pipeline incl necessary fittings

363 USMS75mm Lm 477.00 63mm Lm 1,939.50 50mm Lm - 32mm Lm 129.00

Lateral pipeline incl necessary fittings363 USMS40mm Lm 349.50 32mm Lm 1,739.50 25mm Lm 796.50 20mm Lm 1,407.50

363 USMS

Page 368: Subcontractors Progress Qtys To Date

Conduits pipeline incl necessary fittings363 USMS110mm Lm 663.00 90mm Lm 154.00 75mm Lm 55.00 63mm Lm 361.00 50mm Lm 1,140.00

Irrigation wire363 USMSAWG-14 Lm 5,326.00

Page 369: Subcontractors Progress Qtys To Date

PC 05

227.30 1,037.00 889.00

757.50 3,629.40 664.00 1,114.00

340.90 1,037.00 33.20 55.70

386.30 1,244.40

477.00 1,939.50

129.00

349.50 1,739.50 796.50 1,407.50

Page 370: Subcontractors Progress Qtys To Date

663.00 154.00 55.00 361.00 1,140.00

5,326.00

Page 371: Subcontractors Progress Qtys To Date

SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project CORRECTIONAL FACILITIES P-1182, DammamSubject AS-BUILT QUANTITIESPeriod As of 18 Feb 2016

NO DESCRIPTION Unit Total 1 EXTERIOR WORKS

Precast curbstone364 USMS (straight & curved) Lm 20,520 295 Dar anan (straight) Lm - 295 Dar anan (curved) Lm -

Broom finish B2364 USMS m2 2,948

Broom finish B5364 USMS m2 1,374

Interlock tiles, sandy color 6cm thick364 USMS m2 460

Interlock triple hexagonal tiles 8cm thick364 USMS m2 1,890

Concrete edger 20x10x8364 USMS Lm 155

Precast tiles 40x40x4 cm (cement tiles)364 USMS m2 1,921

Page 372: Subcontractors Progress Qtys To Date

20,520.00

2,948.00

1,374.00

460.00

1,890.00

155.00

1,921.00

Page 373: Subcontractors Progress Qtys To Date

Page 373 of 373

SAUDI BINLADIN GROUPProject CORRECTIONAL FACILITIES P1182, Dammam Subject SUBCONTRACTOR TO DATE PAYMENT Date As of 23 Feb 2016

Subcontractor PC Amount Remarks

123 Al Ameel PC09 10,328,033.40 130 United Arab Alum PC03 1,466,350.60 148 USMS PC03 841,861.77 160 Al Hazem PC04 290,997.89 191 Al Manhal PC01 61,880.00 214 Marim Jalani PC05 2,759,385.31 295 Dar Anan PC03 4,099,835.15 322 Cretec PC07 3,575,286.41 Final363 USMS PC05 855,488.91 364 USMS PC05 2,499,665.00 453 Benayat PC23 78,120,069.42 510 Kabbani PC11 2,629,417.25 526 Dar Anan PC03 1,990,555.39 550 Tawakl Modern PC04 1,580,987.18 553 Otaibi PC01 98,293.29 560 Al Monsrhri PC04 1,306,096.75 562 Awan Al Award PC05 777,539.39

Contract No.