Study Report SUMMER TRAINING 2015 512 ARMY BASE WORKSHOP By Mr Omkar V. Pattanshetti Mr Ashwin Dixit Mr Omkar Tunge -MIT College of Engineering, Pune

Transcript of Study Report 3

Page 1: Study Report 3

Study ReportSUMMER TRAINING 2015

512 ARMY BASE WORKSHOP

ByMr Omkar V. PattanshettiMr Ashwin DixitMr Omkar Tunge-MIT College of Engineering, Pune

Page 2: Study Report 3

Word of GratitudeWE FEEL GREAT HONOUR TO GET TRAINING AT 512 ARMY BASE WORKSHOP

DURING THE COURSE OF WHICH WE GOT THE OPPORTUNITY TO DEVELOP OUR EXPERTISE AND DEFINE OUR TECHNICAL AND PROFESSIONAL INTERESTS.

Page 3: Study Report 3

Weekly Summery of Training Phase 1

Week 1 : Mfg Gp Week 2 : EOD & ETH Week 3 : ARD, VRD & LSD

Phase 2 Week 4 : Mini-project

Page 4: Study Report 3

Phase 1• Goal : Practical Exposure to various engineering processes• Learning Value : Hands on experience • Daily report to DGM • Everyday working on a m/c

Page 5: Study Report 3

Week 1• Sections covered :

Moulding SectionMetal Smith SectionRubber Component SectionHeat Treatment PlantMachine Shop

Page 6: Study Report 3

Technical exposure• Sand Casting, pit furnace, • Hot forging, impact forging, open die forging, dies,

powered hammer • Heat treatment furnaces with vivid operating temperatures• Rubber mixing mill, steam vulcanizer, injection moulding

m/c, hydraulic press• Capstan lathe m/c, watch maker lathe m/c

Page 7: Study Report 3

We gained…• Learnt about various casting defects• Practically saw the forging• Learnt about practical procedures of various heat

treatments• Extra knowledge about rubber moulding• Hands on experience on Capstan lathe m/c

Page 8: Study Report 3

Food for thought by DGM • Is sand reused for mould making?• What are modern Trends in casting? • What is the material of hammers & dies?• How are high temperatures measured?• How is hardness of rubber is measured?

Page 9: Study Report 3

Scope for Improvement• Safety measures for workers • Maintenance of quenching bath • Installation of advanced furnace• Installation of laser cutting m/c

Page 10: Study Report 3

Week 2• Sections covered :

Material Testing Lab.Engine Overhaul Dept. (UTD-20)Engine Test HouseElectroplating Section

Page 11: Study Report 3

Technical exposure• Chemical analysis of alloys, physical testing of material,

calibration of measuring instruments• Diesel Engine • Engine testing• Electroplating, neutralisation of waste water• Universal & vertical milling m/c

Page 12: Study Report 3

We gained…• Learnt about physical testing & chemical analysis of material• Learnt about calibration of measuring instruments• Info about flow of process of engine overhauling• Learnt about dismantling, assembling of diesel engine &

reclamation of its various components • Deep info about major engine mountings such as FIE, Head Assy,

Pipelines, Engine block, Crankshaft & Connecting Rod• Practical exposure to testing procedures of the same are carried out

& to testing of various parameters of assembled engine• Learnt about processes in electroplating & effluent water plant

Page 13: Study Report 3

Food for thought by DGM• How are engine, motor & generator distinguished?• What are functional requirements of an injection system?• What is the need of electroplating?

Page 14: Study Report 3

Scope for Improvement• Maintenance of electroplating plant is necessary• Noise reduction measures need to be enhanced at ETH• Preservation of manuals by foreign manufacturers is

needed

Page 15: Study Report 3

Week 3• Sections covered :

Gearbox Assembly SectionTurret Line Armament SectionLock Smith Dept.

Page 16: Study Report 3

Technical exposure• Gear box assembly & testing• Basics of tank• Main Gun testing• Pipe bending, fitting, sheet metal work, welding, profile

cutting, shot blasting, painting

Page 17: Study Report 3

We gained…• Practical knowledge regarding a synchromesh gear-box

assembly• Learnt about parameters affecting transmission• Extra knowledge about working of turret, its operation and

assembly• Extra knowledge about main gun of BMP-2• Practical exposure to processes like pipe bending,

shearing of sheet metals, profile cutting, TIG welding, shot blasting, fitting of small components & painting

Page 18: Study Report 3

Food for thought by DGM• Can plastic be welded?• How does a pipe-bending m/c work? What are different

methods of tube bending?• What is rifle?• What is recoilless gun? How does it operate?

Page 19: Study Report 3

Scope for Improvement• Modern trends in welding, if installed, can be of great

advantage• For profile cutting, LASER cutting is advantageous

Page 20: Study Report 3

Phase 2MINI PROJECT

Page 21: Study Report 3

Design of Close loop water circulation system• Statement : To design & implement a close loop system to

recirculate the water wasted from boiler• Details : • Temperature of Steam before use - 140˚ C• Flow rate of water- 36 litre/min• Steam pressure- 7 kg/cm2

• Requirement : Condensation of steam• Concept of solution : Use of a Heat Exchanger

Page 22: Study Report 3

Proposed design 1.1

Courtesy- Thermax Ltd.

Page 23: Study Report 3

Proposed design 1.2

Page 24: Study Report 3

Proposed design 1.3

Heat exchange to feed water tank

Page 25: Study Report 3

Proposed design 1.4.1

Heat exchanger is installed in the sump tank

Page 26: Study Report 3

Proposed design 1.4.2

Heat exchanger in sump tank

Copper plate

Steam

Page 27: Study Report 3

Finalised design

Sump tank with Heat Exchanger

Page 28: Study Report 3

Close Loop

Page 29: Study Report 3

• Material requirement :• ½” dia. pipe 1.8m long• 1” dia. pipe 2.5m long• Elbows• Ball valve• Pump of head capacity 2.5m• Copper plate 1mm thick • Sump tank• Rivets