Study of the Economical and Technical Viability to Implant a Data Network (Catalonia's Territory)

15
STUDY OF THE ECONOMICAL AND TECHNICAL VIABILITY TO IMPLANT A DATA NETWORK Group 8: Marco Ros, Adrià López, Sergio Soria, Manuel Torres, David López. onCAT

description

The OnCAT Project’s main objective is to provide connectivity to the entire territoryof Catalonia. Previously, is necessary to analyse the viability of the implementation andmake an action plan composed of the different stages of the projectThe first stage is focused on the core and aggregation networks’ design. This isthe stage we studied in this first delivery, which aims to define specifications anddetails of it. The second stage, which defines the access network, will be studied on thefinal delivery of the project. The available budget for the project’s design,implementation and operation starting is about 250M €.This document is structured in some sections that define the different designingparts that we have to take in account. Starting with the calculations requireddetermining the traffic in the regions of the territory and the technological solutionschosen, following the definition of topologies and equipment used, and ending with thebudgeting of the project.

Transcript of Study of the Economical and Technical Viability to Implant a Data Network (Catalonia's Territory)

Page 1: Study of the Economical and Technical Viability to Implant a Data Network (Catalonia's Territory)

STUDY OF THE ECONOMICAL AND TECHNICAL VIABILITY TO IMPLANT A DATA

NETWORK

Group 8: Marco Ros, Adrià López, Sergio Soria, Manuel Torres, David López.

onCAT

Page 2: Study of the Economical and Technical Viability to Implant a Data Network (Catalonia's Territory)

Presentation scheme Introduction Topology and equipment used

Backbone Barcelona Lleida Tarragona Girona

Municipality links to regional nodes Protection Synchronization Budget

Page 3: Study of the Economical and Technical Viability to Implant a Data Network (Catalonia's Territory)

Introduction GOAL: improve communications in Catalonia

designing a fibre optical network through SDH technology.

Three types of customers:

Residential

Enterprise

Administration Population of Catalonia Traffic oversize of 25% The majority of nodes are

placed in regional capital

Page 4: Study of the Economical and Technical Viability to Implant a Data Network (Catalonia's Territory)

Physical Network Design

TOTAL FIBER USED IN CATNIX NETWORK

7475,4 KM

MUNICIPALITY-NODE TOTAL LINKS 4592,5 KM

NODE-NODE RING TOTAL LINKS 2882,9 KM

Interesting facts:• 7475,4 Km of fibre

(2882,9 Km of rings and 4592,5 Km of municipalities)

• 10 DxC

• 47 ADM

• 431 LTM

• 26 DWDM

• 14 AO

• 2 PRC

• 5 SSU

Page 5: Study of the Economical and Technical Viability to Implant a Data Network (Catalonia's Territory)

Backbone topology and equipment

Lleida(Segrià)

Girona(Gironès)

Tarragona(Tarragonès)

Sabadell(Vallès

Occidental)

Sant Feliu(Baix

Llobregat)

OMS 1600

OMS 2430

OMS 2430

OMS 3255

Important points:

• Two equal equipment in each node.

• Barcelona is connected to the backbone with two nodes.

Page 6: Study of the Economical and Technical Viability to Implant a Data Network (Catalonia's Territory)

Barcelona topology and equipment

Link Speed

≈ 10,5Gbps

Link Speed

≈ 11Gbps

Link Speed

≈ 10Gbps

Link Speed ≈ 6,5Gbps

Link Speed

≈ 19Gbps

Important points:

• 4 links to access the CATNix node. Distributed traffic.

• Barcelona City is divided in two rings.

• Two nodes are the gateways to the network’s Backbone (Sant Feliu & Sabadell).

• Our main goal is to distribute the traffic.

OMS 3240

OMS 3240

OMS 3255

OMS 3255

Barcelona City 1

Barcelona City 2

East Ring

West Ring

OMS

1654

OMS

1664

OMS

1664

OMS

1664

Page 7: Study of the Economical and Technical Viability to Implant a Data Network (Catalonia's Territory)

Lleida topology and equipment

OMS 1664

OMS 1664

OMS 1664

OMS 1664

OMS 1664

OMS 1664

OMS 1664 OMS

1664

OMS 1664

OMS 1664

OMS 1664

OMS 1600Link Speed

≈ 8 Gbps

Important points:

• Point-to-point in links between Vielha and Pont de Suert, Mollerussa and Borges Blanques and Pont de Suert and Tremp.

• The node allocated in Lleida is connected to Girona and Tarragona.

• The nodes allocated in Mollerussa and Tremp work like a ADM too.

Page 8: Study of the Economical and Technical Viability to Implant a Data Network (Catalonia's Territory)

Tarragona topology and equipment

OMS 1664

OMS 1664

OMS 1664

OMS 1664

OMS 1664

OMS 2430

Important points:• One node per each

capital of region.• The node allocated

in Tarragona is connected to Barcelona.

OMS 1664

OMS 1664

OMS 1664

OMS 1664

Link Speed ≈ 12 Gbps

Page 9: Study of the Economical and Technical Viability to Implant a Data Network (Catalonia's Territory)

Girona topology and equipment

Link Speed ≈ 10 Gbps

OMS 1664

OMS 1664

OMS 1664

OMS 1664

OMS 1664

OMS 1664

OMS 1240

OMS 2430

Important points:

• Point-to-point in link between Puigcerdà and Ripoll.

• The node allocated in Girona is connected to Barcelona.

• The node allocated in Ripoll works like a ADM too.

Page 10: Study of the Economical and Technical Viability to Implant a Data Network (Catalonia's Territory)

Municipality links to regional nodes

ACerdanyola del

Vallès

BSalou

CCervera

13,5 Km 10,4 Km 9,8 Km

4066,5 Mbps 1597,28 Mbps 208,8 Mbps

2 x LTM Marconi OMS 870 + DWDM Marconi

3000

LTM Marconi OMS 870

ADM Marconi OMS 860

Page 11: Study of the Economical and Technical Viability to Implant a Data Network (Catalonia's Territory)

Network protection

Lleida

Girona

Tarragona

Barcelona

Four-Fibre MS-SPRing

Two-Fibre MS-SPRing

Two-Fibre MS-SPRing

Two-Fibre MS-SPRing

Two-Fibre MS-SPRing

Page 12: Study of the Economical and Technical Viability to Implant a Data Network (Catalonia's Territory)

Synchronization Follow recommendations ITU-T G.803 Synchronization is carried across the network using the

STM-N signals Each network device will select the highest quality timing

reference clock, chosen by the synchronization status messages (SSM) SSM: SDH/SONET protocol that communicates information about

the quality of the timing source Hierarchical Master-Slave synchronization. Equipment Required

2 PRC (Primary Reference Clock) 5 SSU (Synchronization supply unit)

SSU-T SSU-L

47 SEC (SDH Equipment Clock)

Page 13: Study of the Economical and Technical Viability to Implant a Data Network (Catalonia's Territory)

Synchronization

Page 14: Study of the Economical and Technical Viability to Implant a Data Network (Catalonia's Territory)

BudgetBUDGET

OPTICAL FIBRE (RINGS) 41,78 M. €

LLEIDA 14,52 M. €

TARRAGONA 6,31 M. €

GIRONA 7,84 M. €

BARCELONA 3,20 M. €

BACKBONE 9,88 M. €

OPTICAL FIBRE (MUNICIPALITIES) 99,35 M. €

TYPE A 0,46 M. €

TYPE B 4,78 M. €

TYPE C 94,11 M. €

NETWORK EQUIPMENT 12,43 M.€

TOTAL BUDGET 153, 57 M. €

Page 15: Study of the Economical and Technical Viability to Implant a Data Network (Catalonia's Territory)

?Thank you for your attention