Study Group Ralph David Abernathy Blvd Complete Street June 22, 2017 @atlantabeltline @atlantabeltline @atlantabeltline

Transcript of Study Group - beltlineorg-wpengine.netdna-ssl.com

Page 1: Study Group - beltlineorg-wpengine.netdna-ssl.com

Study Group

Ralph David Abernathy Blvd

Complete Street

June 22, 2017

@atlantabeltline

@atlantabeltline

@atlantabeltline

Page 2: Study Group - beltlineorg-wpengine.netdna-ssl.com

• Framework for a multi-use trail and transit corridor in the heart of the region

• Links many of Atlanta’s historical landmarks and cultural destinations

• Connects four historic rail corridors

Page 3: Study Group - beltlineorg-wpengine.netdna-ssl.com

Bringing 45 Neighborhoods Together

22 MILES

of transit

46 MILES

of streetscapes and complete streets

33

MILES of urban trails

1,300 ACRES

of new greenspace

700 ACRES

of renovated greenspace

1,100 ACRES

of environmental clean-up

$10-20B in economic development

28,000 new housing units

5,600 affordable units

48,000 construction

jobs

30,000 permanent

jobs

CORRIDOR-

WIDE public art,

historic preservation,

and arboretum

Page 4: Study Group - beltlineorg-wpengine.netdna-ssl.com

Organizational Structure

Project Sponsors

Private

Non-profit Redevelopment

Corporation

(Implementation Agent)

Public

Redevelopment Authority

(TAD oversight)

Private Non-profit

501c3 Partner

Page 6: Study Group - beltlineorg-wpengine.netdna-ssl.com

Atlanta BeltLine Planning Area

• 15,000 acres

• 22% of the City of Atlanta population

• 19% of the City’s land

Page 7: Study Group - beltlineorg-wpengine.netdna-ssl.com

Atlanta BeltLine Planning Area

• 15,000 acres

• 22% of the City of Atlanta population

• 19% of the City’s land

Page 8: Study Group - beltlineorg-wpengine.netdna-ssl.com

Ralph David

Abernathy Blvd (SR139)

• 1.2 miles from

Cascade Avenue

to MLK Jr. Drive

• MARTA West

Lake Station,

Lionel Hampton

Trail, Westview

Cemetery,

Westside Trail

Westview Drive

Westside Trail

West End Trail

Westside Trail

MARTA West Lake

Station

Page 9: Study Group - beltlineorg-wpengine.netdna-ssl.com

Project

Overview

Visioning Concept

Development Detailed Design

Construction

T

O

N

I

G

H

T

Concurrent GDOT Project

Page 10: Study Group - beltlineorg-wpengine.netdna-ssl.com

Complete

Street

• A transportation

corridor for users

of all modes and

abilities.

• A foundation for a

safe, vibrant, and

livable community.

• For everyone.

Page 11: Study Group - beltlineorg-wpengine.netdna-ssl.com

Corridor

Visioning Plan

• Based on public comments from April meeting

• Entire Corridor

– Aspirational

– Unconstrained

Page 12: Study Group - beltlineorg-wpengine.netdna-ssl.com

Corridor

Visioning Plan

Page 13: Study Group - beltlineorg-wpengine.netdna-ssl.com

Corridor

Visioning Plan

Page 14: Study Group - beltlineorg-wpengine.netdna-ssl.com

Corridor

Visioning Plan

Page 15: Study Group - beltlineorg-wpengine.netdna-ssl.com

Corridor

Visioning Plan

Page 16: Study Group - beltlineorg-wpengine.netdna-ssl.com

Corridor

Visioning Plan

Tonight:

• Gain input on preferences with the plan

• Gain input on what features to implement with the

constrained construction budget

• Gain input on what

areas to prioritize

Page 17: Study Group - beltlineorg-wpengine.netdna-ssl.com

Breakout

Session

Purpose:

• To help you to better understand the

specifics of the concept

• Gain your input on features

• Gain input on priorities

Instructions…

Page 18: Study Group - beltlineorg-wpengine.netdna-ssl.com

Next

Steps

• Review, understand and distill all

comments

• Develop conceptual plans, based on the

comments, of what to construct

• Schedule the next public meeting

– Aug/Sept timeframe

– Focus: Design Concept Development

Page 19: Study Group - beltlineorg-wpengine.netdna-ssl.com

Questions? Thank you!