Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

18
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B2 “Overhead Lines” Activity Report Presented by: Zibby Kieloch (Manitoba Hydro)

description

Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg. SC B2 “Overhead Lines” Activity Report Presented by: Zibby Kieloch (Manitoba Hydro). SC B2 Overhead Lines Subject Area. - PowerPoint PPT Presentation

Transcript of Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

Page 1: Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

1

Study Committee Representatives Annual MeetingOctober 19, 2008

Winnipeg

SC B2 “Overhead Lines”Activity Report

Presented by: Zibby Kieloch (Manitoba Hydro)

Page 2: Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

2

SC B2 Overhead Lines

Subject Area

• Design, construction and operation of overhead lines including the mechanical and electrical (in cooperation with SC C3 & SC C4) design of line components (conductors, ground wires, insulators, accessories, structures and their foundations).

• Validation tests, studies of in service performance, assessment of the state of line components and elements.

• Maintenance, refurbishment, upgrading, and uprating of overhead lines.

Page 3: Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

3

SC B2 Overhead Lines

Membership

• 24 Regular Country Members (including Canada)• 12 Observer Country Members

Canadians On SC B2

• 32 Canadians in various groups (total number of technical experts from all countries: 200+)

• 4 new Canadian experts added last year• Canada is represented on all but one Working Group• Mr. Normand Bell (Hydro-Quebec) – SC B2 Secretary• 3 Canadians as Convenors of Working Groups

Page 4: Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

4

SC B2 Overhead Lines

Structure - General

New structure introduced in 2008:

• Convenor and Secretary

• 7 New Advisory Groups:

• 4 Technical

• 3 Supporting: Strategic, Customer, Publications &

Tutorials

• Disbanded most of the existing Working Groups (upon

completion of work)

• Created 22 new Working Groups with narrow focus

• Eliminated existing Task Force groups

Page 5: Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

5

SC B2 Overhead Lines

Structure - Technical Groups

AG B2.04 Electrical Performance Advisory Group

• TF B2.20 “Management of risks due to load-flow

capacity increases in transmission overhead lines”

• WG B2.26 “A guide to evaluating and accepting new

types of overhead conductor including those running at

high temperature”

• WG B2.36 “Guide for application of direct real time

monitoring systems on overhead transmission lines”

• WG B2.38 “Evaluation of high surge impedance load

solutions for increased natural capacity for OHL”

Page 6: Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

6

SC B2 Overhead Lines

Structure - Technical Groups

AG B2.05 Towers, Foundations and Insulators Advisory

Group

• WG B2.08 “Transmission Line Structures” (soon to be

disbanded and replaced by 2 new Working Groups)

• WG B2.21 “Arc protection and diagnosis for composite

string insulators ”

• WG B2.23 “Geotechnical and structural design of the

foundations of HV & UHV Lines ”

Page 7: Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

7

SC B2 Overhead Lines

Structure - Technical Groups

AG B2.06 Mechanical Behaviour Of Conductors and

Fittings Advisory Group

• WG B2.25 “Preparatory studies on specifications for

revision of IEC testing of self damping and conductor

fatigue characteristics (new IEC Spec.), for high

temperature fittings (IEC 61284), for tests on spacers

(IEC 61854) and on dampers (IEC 61897)”

• WG B2.30 “Engineering guidelines relating to fatigue

endurance capability of conductor/clamp systems”

• WG B2.31 “Modeling of aeolian vibration of single

conductors”

Page 8: Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

8

SC B2 Overhead Lines

Structure - Technical Groups

AG B2.06 Mechanical Behaviour Of Conductors and

Fittings Advisory Group (cont’d)

• WG B2.32 “Assessing the performance of aged fittings:

testing, acceptance criteria & recommendations for HV &

UHV lines”

• WG B2.33 “Guidelines for cable cart/trolley (cycling)

safety on old conductors (earthwires) equipped with

aircraft warning markers (and other fittings)”

Page 9: Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

9

SC B2 Overhead Lines

Structure - Technical Groups

AG B2.07 Asset Management, Reliability and

Availability Advisory Group

• WG B2.16 “Meteorology for overhead lines” (soon to be

disbanded and replaced by a new Working Group)

• WG B2.22 “Mechanical security of overhead lines with

effective failure containment measures: design loading

cases and strategies for effective anti-cascading supports”

• JWG B2/B3.27 “Live-Line Maintenance - A

Management Perspective”

Page 10: Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

10

SC B2 Overhead Lines

Structure - Technical Groups

AG B2.07 Asset Management, Reliability and

Availability Advisory Group (cont’d)

• WG B2.29 “Anti- and de-icing systems for HV and UHV

overhead lines”

• WG B2.34 “The impact of line configurations on electric

and magnetic fields, radio interference and audible noise

for 800 and 1000 kV OHL”

• WG B2.39 “Validation of design guidelines implemented

for High Intensity Winds (HIW)”

Page 11: Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

11

SC B2 Overhead Lines

Structure - Technical Groups

AG B2.07 Asset Management, Reliability and

Availability Advisory Group (cont’d)

• WG B2.40 “Calculations of the electrical distances

between live parts and obstacles for OHL: Preparatory

studies for revision of IEC standards (IEC 61865, IEC

60826, EN 50341)”

Page 12: Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

12

SC B2 Overhead Lines

Structure - Technical Groups

Special Technical Groups

• JWG B2/B4/C1.17 “Impacts of HVDC Lines on

Economics of HVDC Projects”

• JTF B2/D2.18 “Overhead lines geographical and asset

information system”

• JWG B2/C1.19 “Increasing capacity of overhead lines -

needs and solutions”

Page 13: Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

13

SC B2 Overhead Lines

Meetings

CIGRÉ 2008 Paris Session

• Working Group Meetings: August 22-28, 2008

• SC B2 Open Session: August 26, 2008

2 Preferential Subjects:

“Increasing capacity of overhead lines”

“Solutions to improve the availability of overhead lines”

27 Technical Papers

• Technical Meeting: August 27, 2008

• Administrative Meeting: August 28, 2008

Page 14: Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

14

SC B2 Overhead Lines

Meetings

Next SC Meeting

• October 2009 in Seoul, Korea

Page 15: Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

15

SC B2 Overhead Lines

Main Achievements in 2007-2008

Publications:

SC B2 was the most productive among all 16 CIGRÉ

Study Committees. A total of 11 Electra articles and 10

Technical Brochures were produced in 2007-2008.

• TB 322 / ELT 232_3 “State of the art of conductor galloping”

• TB 324 / ELT 232_4 “Sag-tension calculations for overhead lines”

• ELT 232_2 “Generic specification for an ideal load control device”

• TB 333 / ELT 234_3 “Guide for the establishment of naturally

polluted insulator testing stations”

• TB 331 / ELT 234_4 “Considerations relating to the use of high-

temperature conductors”

Page 16: Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

16

SC B2 Overhead Lines

Main Achievements in 2007-2008

Publications (cont’d):• TB 332 / ELT 234_5 “Fatigue endurance capability of

conductor/clamp systems - update of present knowledge”

• TB 344 / ELT 237_5 “Big storm events - what we have learned”

• TB 345 / ELT 237_6 “Alternating current (AC) resistance of

helically stranded conductors”

• TB 348 / ELT 238_4 “Tower top geometry and mid span clearances”

• TB 350 / ELT 238_5 “How overhead lines (OHL) respond to

localized high intensity winds - basic understanding”

• TB 353 / ELT 239_3 “Guidelines for increased utilization of existing

overhead transmission lines”

Page 17: Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

17

SC B2 Overhead Lines

Expected Key Deliverables in 2009-2010

Expected Publications:• “Guidelines for evaluating special topographical effects in

determining wind speed for design of overhead lines”

• “Probabilistic design of foundations”

• “Failure load of OHL steel towers considering the variation of

mechanical properties”

• “Innovative solutions for overhead line supports”

• “Comparison of general practices for lattice tower design and

detailing”

• “Discrepancies between predicted and measured values of load in

members of towers during tests; influence of the hyperstatic modeling

on the behaviour of transmission line lattice structures”

Page 18: Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg

18

SC B2 Overhead Lines

Expected Key Deliverables in 2009-2010

Expected Publications (cont’d):• “Improvement on the methodology of tower testing”

• “Large overhead line crossings”

• “Impacts of HVDC Lines on Economics of HVDC Projects”

• “Guidelines for cable cart/trolley (cycling) safety on old conductors

(earthwires) equipped with aircraft warning markers (and other

fittings)”

• “Assessing the performance of aged fittings: - Testing, acceptance

criteria & recommendations for HV & UHV Lines”

• “Aeolian Vibrations of Single Conductors Strung at Relatively High

Tensile Load. Application to HV & UHV Lines”