STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada...
Transcript of STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada...
DAFTAR PUSTAKA
1. Amyx, J.W., Bass, Whiting, R.L. (1960), Petroleum Reservoir Engineering, Physical Properties, McGraw-Hill-Book Company.
2. William D. McCain, Jr. (1990), Petroleum Fluid, Penn-well publishes Company, Tulsa, Oklahoma.
3. Willhite, P.G. (1986), Water Flooding, SPE Text Book Series Volume 3, Richardson, TX.
4. Driscoll, Vance J., (1974), Recovery Optimization Through Infill Drilling Concept, Analysis, and Field Results, SPE 4977
5. Fanchi, John R., (2001), Principles of Applied Reservoir Simulation, Gulf Professional Publishing.
6. Permadi Asep. (2004), Diktat Teknik Reservoir, Diktat Kuliah, Teknik Perminyakan, Institut Teknologi Bandung.
7. Rahman, Budi. (2005), Studi Pengembangan Lapangan Jati Barang, Blok III, Formasi F dengan Menggunakan Injeksi Air, Laporan Tesis, Teknik Perminyakan, Institut Teknologi Bandung.
8. Febrianto, Listyawan (2007), Studi Pengembangan Reservoir Z-850 Lapangan X dengan Menggunakan Injeksi Air Sebagai Skenario Utama, Laporan Tesis, Teknik Perminyakan, Institut Teknologi Bandung.
LAMPIRAN A
LAJU ALIR LIQUID PER SUMUR
SEBAGAI ACUAN CONSTRAINT
UNTUK WORKOVER
LAMPIRAN A
Laju alir liquid per sumur sebagai acuan constraint untuk workover
PT – 05 PT – 06
PT – 12 PT – 15
PT – 16 PT – 23
T – 01 T – 02
T – 03 T – 05
T – 09 T – 14
T – 15 T – 21
T – 25 T – 27
T – 30 T – 35
LAMPIRAN B
PLOT LIQUID RATE PER SUMUR
SETELAH DILAKUKAN WORKOVER
LAMPIRAN B
Plot liquid rate per sumur setelah dilakukan workover
PT – 05 PT – 06
PT – 12 PT – 15
PT – 16 PT – 23
T – 01 T – 02
T – 03 T – 05
T – 09 T – 14
T – 15 T – 21
T – 25 T – 27
T – 30 T – 35
LAMPIRAN C
C1. PRODUKSI SUMUR PT-16 PADA SKENARIO VI
C2. PRODUKSI SUMUR HORIZONTAL T-27
PADA SKENARIO IX
LAMPIRAN C
C.1 Produksi Sumur PT-16 pada Skenario VI
PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf
Gas Rate SC PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irfGas Rate SC T-01 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irfGas Rate SC T-15 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irfCumulative Gas SC Timur-PRO PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irfGas Rate SC T-03 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irfCumulative Gas SC Timur-PRO Zona_1030B_XXX.fhf
Time (Date)
Gas
Rat
e SC
(ft3
/day
)
Cum
ulat
ive
Gas
SC
(ft3
)
1940 1950 1960 1970 1980 1990 2000 2010 2020 2030 20400.00e+0
1.00e+6
2.00e+6
3.00e+6
4.00e+6
5.00e+6
0.00e+0
2.00e+9
4.00e+9
6.00e+9
8.00e+9
C.2 Produksi Sumur Horizontal T-27 pada Skenario IX
T-27 PTT_1030B_timur+INJPERIPHERAL+WORKOVERGOODWELL+INFILL-1+HORIZONTALT-27.irf
Time (Date)
Oil
Rat
e SC
(bbl
/day
)
1940 1950 1960 1970 1980 1990 2000 2010 2020 2030 20400
100
200
300
400
500
T-27 T-21 T-30 T-02 T-05 T-35 PT-06 PT-16
LAMPIRAN E
E1. LETAK DAN TITIK GRID PERFORASI SUMUR
PRODUKSI
E2. LETAK DAN TITIK GRID PERFORASI SUMUR
WORKOVER, INJEKSI, INFILL, DAN HORIZONTAL
LAMPIRAN E
E.1 Letak dan Titik Grid Perforasi Sumur Produksi
Tabel E.1. Letak dan Titik Grid Perforasi Sumur Produksi
Sumur Tgl Blok Panjang (m) Blok Atas (m) Blok Bawah (m)
1-Apr-37 30 42 3 1.948 1031.152 1033.112 PT-05
1-Sep-72 30 42 3 1.948 1031.152 1033.112
1-Apr-37 34 60 3 2.937 1039.992 1042.554 PT-06
1-Oct-72 34 60 3 2.937 1039.992 1042.554
31 63 1 5.007 1020.958 1025.275
31 63 2 5.007 1025.275 1029.591 1-Apr-37
31 63 3 5.007 1029.591 1033.907 PT-12
1-Sep-73 31 63 1 5.007 1020.958 1025.275
1-Apr-37 30 60 1 2.847 1018.561 1021.448
30 60 1 3.349 1018.561 1021.448
30 60 2 3.349 1021.448 1024.334 PT-15
1-Jan-75
30 60 3 3.349 1024.334 1027.221
1-Apr-37 36 56 2 2.168 1024.559 1026.769
36 56 2 2.464 1024.559 1026.769 PT-16 1-Aug-76
36 56 3 2.464 1026.769 1028.979
1-Apr-37 31 45 2 1.934 1018.102 1020.058
31 45 2 2.199 1018.102 1020.058 PT-23 1-Dec-74
31 45 3 2.199 1020.058 1022.014
1-Apr-37 42 46 2 3.292 1046.267 1049.562 T-01
1-Dec-37 42 46 2 3.292 1046.267 1049.562
1-Apr-37 42 61 2 1.975 1044.954 1046.890
42 61 1 2.232 1043.019 1044.954
42 61 2 2.232 1044.954 1046.890 T-02
1-Nov-37
42 61 3 2.232 1046.890 1048.825
1-Apr-37 37 42 2 1.705 1037.775 1039.471 T-03
1-Nov-37 37 42 2 1.705 1037.775 1039.471
T-05 1-Apr-37 36 71 2 3.320 1040.872 1044.273
1-Apr-37 43 68 2 3.206 1046.838 1050.210 T-09
1-Jan-39 43 68 2 3.206 1046.838 1050.210
1-Apr-37 32 66 3 4.873 1035.387 1040.117 T-14
1-Jul-39 32 66 3 5.491 1035.387 1040.117
1-Apr-37 43 55 2 3.524 1043.315 1046.875 T-15
1-Dec-39 43 55 2 3.524 1043.315 1046.875
1-Apr-37 39 71 2 5.164 1041.174 1046.233 T-21
1-May-41 39 71 2 5.164 1041.174 1046.233
1-Apr-37 32 70 2 2.528 1034.748 1037.292 T-25
1-Sep-41 32 70 2 2.528 1034.748 1037.292
1-Apr-37 38 68 1 3.408 1032.533 1035.799 T-27
1-Aug-41 38 68 2 3.409 1035.799 1039.065
1-Apr-37 40 69 1 3.293 1036.760 1040.099 T-30
1-Oct-41 40 69 2 3.297 1040.099 1043.438
1-Apr-37 39 65 2 2.382 1044.473 1046.874 T-35
1-Dec-44 39 65 1 2.384 1042.072 1044.473
Gambar E.1. Letak Sumur-Sumur Produksi pada Zona A Lapangan X
E.2 Letak dan Titik Grid Perforasi Sumur Workover, Injeksi,Infill, dan Horizontal
Tabel E.2 Letak dan Titik Grid Perforasi Sumur Workover, Injeksi, Infill, dan Horizontal
Sc Inj Blok Tgl WO Blok Tgl Inf Blok Tgl Hrz Blok Tgl
I - - - - - - - - - - - -
II - - - All All 1/1/08 - - - - - -
36 56 2 PT-16
36 56 3
T-01 42 46 2
T-14 32 66 3
T-15 43 55 2
38 68 1 T-27
38 68 2
39 65 1
III - - -
T-35 39 65 2
1/1/08 - - - - - -
1 33 74 1 1/1/08 36 56 2 1/1/08
2 40 76 1 1/1/08
PT-16
36 56 3 1/1/08
3 46 72 1 1/1/08 T-01 42 46 2 1/1/08
4 46 60 1 1/1/08 T-14 32 66 3 1/1/08
5 40 62 1 1/1/08 T-15 43 55 2 1/1/08
6 33 61 1 1/1/08 38 68 1 1/1/08 T-27
38 68 2 1/1/08
39 65 1 1/1/08
IV
T-35
39 65 2 1/1/08
- - - - - -
1 39 71 1 1/1/08 36 56 2 1/1/08 V
2 40 69 1 1/1/08
PT-16
36 56 3 1/1/08
- - - - - -
3 41 66 1 1/1/08 T-01 42 46 2 1/1/08
4 33 71 1 1/1/08 T-14 32 66 3 1/1/08
5 35 67 1 1/1/08 T-15 43 55 2 1/1/08
6 36 63 1 1/1/08 38 68 1 1/1/08
7 37 60 1 1/1/08 T-27
38 68 2 1/1/08
8 37 60 1 1/1/08 39 65 1 1/1/08
9 31 63 1 1/1/08 T-35
39 65 2 1/1/08
10 32 58 1 1/1/08
11 34 53 1 1/1/08
12 30 67 1 1/1/08
1 39 71 1 1/1/08 36 56 2 1/1/08
2 40 69 1 1/1/08
PT-16
36 56 3 1/1/08
3 41 66 1 1/1/08 T-01 42 46 2 1/1/08
4 36 67 1 1/1/08 T-14 32 66 3 1/1/08
5 37 65 1 1/1/08 T-15 43 55 2 1/1/08
6 38 62 1 1/1/08 38 68 1 1/1/08
7 32 70 1 1/1/08 T-27
38 68 2 1/1/08
8 31 63 1 1/1/08 39 65 1 1/1/08
VI
9 40 52 1 1/1/08 T-35
39 65 2 1/1/08
- - - - - -
1 34 74 1 1/1/08 36 56 2 1/1/12
2 41 74 1 1/1/08
PT-16
36 56 3 1/1/12
3 45 71 1 1/1/08 T-01 42 46 2 1/1/12
T-14 32 66 3 1/1/12
T-15 43 55 2 1/1/12
38 68 1 1/1/12
VII
T-27 38 68 2 1/1/12
- - - - - -
39 65 1 1/1/12 T-35
39 65 2 1/1/12
1 34 74 1 1/1/08 36 56 2 1/1/12 1 38 74 2 1/1/12
2 41 74 1 1/1/08
PT-16
36 56 3 1/1/12
3 45 71 1 1/1/08 T-01 42 46 2 1/1/12
T-14 32 66 3 1/1/12
T-15 43 55 2 1/1/12
38 68 1 1/1/12 T-27
38 68 2 1/1/12
39 65 1 1/1/12
VIII
T-35 39 65 2 1/1/12
- - -
1 34 74 1 1/1/08 36 56 2 1/1/12 1 38 74 2 1/1/12 38 68 2 1/1/12
2 41 74 1 1/1/08
PT-16
36 56 3 1/1/12 38 70 2 1/1/12
3 45 71 1 1/1/08 T-01 42 46 2 1/1/12
1
38 69 2 1/1/12
T-14 32 66 3 1/1/12
T-15 43 55 2 1/1/12
38 68 1 1/1/12 T-27
38 68 2 1/1/12
39 65 1 1/1/12
IX
T-35 39 65 2 1/1/12
1 34 75 1 1/1/08 PT-06 34 60 3 1/6/11 1 32 52 3 1/1/22
2 39 75 1 1/1/08 31 63 1 1/6/11
3 43 73 1 1/1/08 31 63 2 1/6/11
4 36 51 1 1/1/08
PT-12
31 63 3 1/6/11
X
PT- 36 56 2 1/6/11
- - -
16 36 56 3 1/6/11
42 61 1 1/6/11
42 61 2 1/6/11 T-02
42 61 3 1/6/11
T-15 43 55 2 1/6/11
38 68 1 1/6/11 T-27
38 68 2 1/6/11
39 65 1 1/6/11 T-35
39 65 2 1/6/11
1 34 75 1 1/1/08 PT-06 34 60 3 1/6/11 1 32 52 3 1/6/08
2 39 75 1 1/1/08 31 63 1 1/6/11 2 34 40 3 1/6/08
3 43 73 1 1/1/08 31 63 2 1/6/11
4 36 51 1 1/1/08
PT-12
31 63 3 1/6/11
5 49 45 1 1/1/08 36 56 2 1/6/11
6 33 37 1 1/1/08
PT-16
36 56 3 1/6/11
42 61 1 1/6/11
42 61 2 1/6/11 T-02
42 61 3 1/6/11
T-15 43 55 2 1/6/11
38 68 1 1/6/11 T-27
38 68 2 1/6/11
39 65 1 1/6/11
XI
T-35 39 65 2 1/6/11
- -
-
Indeks : Sc = Skenario Inf = Sumur Infill
Inj = Sumur Injeksi Hrz = Sumur Horizontal
WO = Workover