STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada...

21
DAFTAR PUSTAKA 1. Amyx, J.W., Bass, Whiting, R.L. (1960), Petroleum Reservoir Engineering, Physical Properties , McGraw-Hill-Book Company. 2. William D. McCain, Jr. (1990), Petroleum Fluid , Penn-well publishes Company, Tulsa, Oklahoma. 3. Willhite, P.G. (1986), Water Flooding, SPE Text Book Series Volume 3, Richardson, TX. 4. Driscoll, Vance J., (1974), Recovery Optimization Through Infill Drilling Concept, Analysis, and Field Results, SPE 4977 5. Fanchi, John R., (2001), Principles of Applied Reservoir Simulation, Gulf Professional Publishing. 6. Permadi Asep. (2004), Diktat Teknik Reservoir, Diktat Kuliah, Teknik Perminyakan, Institut Teknologi Bandung. 7. Rahman, Budi. (2005), Studi Pengembangan Lapangan Jati Barang, Blok III, Formasi F dengan Menggunakan Injeksi Air, Laporan Tesis, Teknik Perminyakan, Institut Teknologi Bandung. 8. Febrianto, Listyawan (2007), Studi Pengembangan Reservoir Z-850 Lapangan X dengan Menggunakan Injeksi Air Sebagai Skenario Utama, Laporan Tesis, Teknik Perminyakan, Institut Teknologi Bandung.

Transcript of STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada...

Page 1: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

DAFTAR PUSTAKA

1. Amyx, J.W., Bass, Whiting, R.L. (1960), Petroleum Reservoir Engineering, Physical Properties, McGraw-Hill-Book Company.

2. William D. McCain, Jr. (1990), Petroleum Fluid, Penn-well publishes Company, Tulsa, Oklahoma.

3. Willhite, P.G. (1986), Water Flooding, SPE Text Book Series Volume 3, Richardson, TX.

4. Driscoll, Vance J., (1974), Recovery Optimization Through Infill Drilling Concept, Analysis, and Field Results, SPE 4977

5. Fanchi, John R., (2001), Principles of Applied Reservoir Simulation, Gulf Professional Publishing.

6. Permadi Asep. (2004), Diktat Teknik Reservoir, Diktat Kuliah, Teknik Perminyakan, Institut Teknologi Bandung.

7. Rahman, Budi. (2005), Studi Pengembangan Lapangan Jati Barang, Blok III, Formasi F dengan Menggunakan Injeksi Air, Laporan Tesis, Teknik Perminyakan, Institut Teknologi Bandung.

8. Febrianto, Listyawan (2007), Studi Pengembangan Reservoir Z-850 Lapangan X dengan Menggunakan Injeksi Air Sebagai Skenario Utama, Laporan Tesis, Teknik Perminyakan, Institut Teknologi Bandung.

Page 2: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

LAMPIRAN A

LAJU ALIR LIQUID PER SUMUR

SEBAGAI ACUAN CONSTRAINT

UNTUK WORKOVER

Page 3: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

LAMPIRAN A

Laju alir liquid per sumur sebagai acuan constraint untuk workover

PT – 05 PT – 06

PT – 12 PT – 15

PT – 16 PT – 23

Page 4: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

T – 01 T – 02

T – 03 T – 05

T – 09 T – 14

Page 5: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

T – 15 T – 21

T – 25 T – 27

T – 30 T – 35

Page 6: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

LAMPIRAN B

PLOT LIQUID RATE PER SUMUR

SETELAH DILAKUKAN WORKOVER

Page 7: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

LAMPIRAN B

Plot liquid rate per sumur setelah dilakukan workover

PT – 05 PT – 06

PT – 12 PT – 15

PT – 16 PT – 23

Page 8: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

T – 01 T – 02

T – 03 T – 05

T – 09 T – 14

T – 15 T – 21

Page 9: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

T – 25 T – 27

T – 30 T – 35

Page 10: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

LAMPIRAN C

C1. PRODUKSI SUMUR PT-16 PADA SKENARIO VI

C2. PRODUKSI SUMUR HORIZONTAL T-27

PADA SKENARIO IX

Page 11: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

LAMPIRAN C

C.1 Produksi Sumur PT-16 pada Skenario VI

PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf

Gas Rate SC PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irfGas Rate SC T-01 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irfGas Rate SC T-15 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irfCumulative Gas SC Timur-PRO PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irfGas Rate SC T-03 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irfCumulative Gas SC Timur-PRO Zona_1030B_XXX.fhf

Time (Date)

Gas

Rat

e SC

(ft3

/day

)

Cum

ulat

ive

Gas

SC

(ft3

)

1940 1950 1960 1970 1980 1990 2000 2010 2020 2030 20400.00e+0

1.00e+6

2.00e+6

3.00e+6

4.00e+6

5.00e+6

0.00e+0

2.00e+9

4.00e+9

6.00e+9

8.00e+9

Page 12: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

C.2 Produksi Sumur Horizontal T-27 pada Skenario IX

T-27 PTT_1030B_timur+INJPERIPHERAL+WORKOVERGOODWELL+INFILL-1+HORIZONTALT-27.irf

Time (Date)

Oil

Rat

e SC

(bbl

/day

)

1940 1950 1960 1970 1980 1990 2000 2010 2020 2030 20400

100

200

300

400

500

T-27 T-21 T-30 T-02 T-05 T-35 PT-06 PT-16

Page 13: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

LAMPIRAN E

E1. LETAK DAN TITIK GRID PERFORASI SUMUR

PRODUKSI

E2. LETAK DAN TITIK GRID PERFORASI SUMUR

WORKOVER, INJEKSI, INFILL, DAN HORIZONTAL

Page 14: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

LAMPIRAN E

E.1 Letak dan Titik Grid Perforasi Sumur Produksi

Tabel E.1. Letak dan Titik Grid Perforasi Sumur Produksi

Sumur Tgl Blok Panjang (m) Blok Atas (m) Blok Bawah (m)

1-Apr-37 30 42 3 1.948 1031.152 1033.112 PT-05

1-Sep-72 30 42 3 1.948 1031.152 1033.112

1-Apr-37 34 60 3 2.937 1039.992 1042.554 PT-06

1-Oct-72 34 60 3 2.937 1039.992 1042.554

31 63 1 5.007 1020.958 1025.275

31 63 2 5.007 1025.275 1029.591 1-Apr-37

31 63 3 5.007 1029.591 1033.907 PT-12

1-Sep-73 31 63 1 5.007 1020.958 1025.275

1-Apr-37 30 60 1 2.847 1018.561 1021.448

30 60 1 3.349 1018.561 1021.448

30 60 2 3.349 1021.448 1024.334 PT-15

1-Jan-75

30 60 3 3.349 1024.334 1027.221

1-Apr-37 36 56 2 2.168 1024.559 1026.769

36 56 2 2.464 1024.559 1026.769 PT-16 1-Aug-76

36 56 3 2.464 1026.769 1028.979

1-Apr-37 31 45 2 1.934 1018.102 1020.058

31 45 2 2.199 1018.102 1020.058 PT-23 1-Dec-74

31 45 3 2.199 1020.058 1022.014

1-Apr-37 42 46 2 3.292 1046.267 1049.562 T-01

1-Dec-37 42 46 2 3.292 1046.267 1049.562

Page 15: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

1-Apr-37 42 61 2 1.975 1044.954 1046.890

42 61 1 2.232 1043.019 1044.954

42 61 2 2.232 1044.954 1046.890 T-02

1-Nov-37

42 61 3 2.232 1046.890 1048.825

1-Apr-37 37 42 2 1.705 1037.775 1039.471 T-03

1-Nov-37 37 42 2 1.705 1037.775 1039.471

T-05 1-Apr-37 36 71 2 3.320 1040.872 1044.273

1-Apr-37 43 68 2 3.206 1046.838 1050.210 T-09

1-Jan-39 43 68 2 3.206 1046.838 1050.210

1-Apr-37 32 66 3 4.873 1035.387 1040.117 T-14

1-Jul-39 32 66 3 5.491 1035.387 1040.117

1-Apr-37 43 55 2 3.524 1043.315 1046.875 T-15

1-Dec-39 43 55 2 3.524 1043.315 1046.875

1-Apr-37 39 71 2 5.164 1041.174 1046.233 T-21

1-May-41 39 71 2 5.164 1041.174 1046.233

1-Apr-37 32 70 2 2.528 1034.748 1037.292 T-25

1-Sep-41 32 70 2 2.528 1034.748 1037.292

1-Apr-37 38 68 1 3.408 1032.533 1035.799 T-27

1-Aug-41 38 68 2 3.409 1035.799 1039.065

1-Apr-37 40 69 1 3.293 1036.760 1040.099 T-30

1-Oct-41 40 69 2 3.297 1040.099 1043.438

1-Apr-37 39 65 2 2.382 1044.473 1046.874 T-35

1-Dec-44 39 65 1 2.384 1042.072 1044.473

Page 16: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

Gambar E.1. Letak Sumur-Sumur Produksi pada Zona A Lapangan X

Page 17: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

E.2 Letak dan Titik Grid Perforasi Sumur Workover, Injeksi,Infill, dan Horizontal

Tabel E.2 Letak dan Titik Grid Perforasi Sumur Workover, Injeksi, Infill, dan Horizontal

Sc Inj Blok Tgl WO Blok Tgl Inf Blok Tgl Hrz Blok Tgl

I - - - - - - - - - - - -

II - - - All All 1/1/08 - - - - - -

36 56 2 PT-16

36 56 3

T-01 42 46 2

T-14 32 66 3

T-15 43 55 2

38 68 1 T-27

38 68 2

39 65 1

III - - -

T-35 39 65 2

1/1/08 - - - - - -

1 33 74 1 1/1/08 36 56 2 1/1/08

2 40 76 1 1/1/08

PT-16

36 56 3 1/1/08

3 46 72 1 1/1/08 T-01 42 46 2 1/1/08

4 46 60 1 1/1/08 T-14 32 66 3 1/1/08

5 40 62 1 1/1/08 T-15 43 55 2 1/1/08

6 33 61 1 1/1/08 38 68 1 1/1/08 T-27

38 68 2 1/1/08

39 65 1 1/1/08

IV

T-35

39 65 2 1/1/08

- - - - - -

1 39 71 1 1/1/08 36 56 2 1/1/08 V

2 40 69 1 1/1/08

PT-16

36 56 3 1/1/08

- - - - - -

Page 18: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

3 41 66 1 1/1/08 T-01 42 46 2 1/1/08

4 33 71 1 1/1/08 T-14 32 66 3 1/1/08

5 35 67 1 1/1/08 T-15 43 55 2 1/1/08

6 36 63 1 1/1/08 38 68 1 1/1/08

7 37 60 1 1/1/08 T-27

38 68 2 1/1/08

8 37 60 1 1/1/08 39 65 1 1/1/08

9 31 63 1 1/1/08 T-35

39 65 2 1/1/08

10 32 58 1 1/1/08

11 34 53 1 1/1/08

12 30 67 1 1/1/08

1 39 71 1 1/1/08 36 56 2 1/1/08

2 40 69 1 1/1/08

PT-16

36 56 3 1/1/08

3 41 66 1 1/1/08 T-01 42 46 2 1/1/08

4 36 67 1 1/1/08 T-14 32 66 3 1/1/08

5 37 65 1 1/1/08 T-15 43 55 2 1/1/08

6 38 62 1 1/1/08 38 68 1 1/1/08

7 32 70 1 1/1/08 T-27

38 68 2 1/1/08

8 31 63 1 1/1/08 39 65 1 1/1/08

VI

9 40 52 1 1/1/08 T-35

39 65 2 1/1/08

- - - - - -

1 34 74 1 1/1/08 36 56 2 1/1/12

2 41 74 1 1/1/08

PT-16

36 56 3 1/1/12

3 45 71 1 1/1/08 T-01 42 46 2 1/1/12

T-14 32 66 3 1/1/12

T-15 43 55 2 1/1/12

38 68 1 1/1/12

VII

T-27 38 68 2 1/1/12

- - - - - -

Page 19: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

39 65 1 1/1/12 T-35

39 65 2 1/1/12

1 34 74 1 1/1/08 36 56 2 1/1/12 1 38 74 2 1/1/12

2 41 74 1 1/1/08

PT-16

36 56 3 1/1/12

3 45 71 1 1/1/08 T-01 42 46 2 1/1/12

T-14 32 66 3 1/1/12

T-15 43 55 2 1/1/12

38 68 1 1/1/12 T-27

38 68 2 1/1/12

39 65 1 1/1/12

VIII

T-35 39 65 2 1/1/12

- - -

1 34 74 1 1/1/08 36 56 2 1/1/12 1 38 74 2 1/1/12 38 68 2 1/1/12

2 41 74 1 1/1/08

PT-16

36 56 3 1/1/12 38 70 2 1/1/12

3 45 71 1 1/1/08 T-01 42 46 2 1/1/12

1

38 69 2 1/1/12

T-14 32 66 3 1/1/12

T-15 43 55 2 1/1/12

38 68 1 1/1/12 T-27

38 68 2 1/1/12

39 65 1 1/1/12

IX

T-35 39 65 2 1/1/12

1 34 75 1 1/1/08 PT-06 34 60 3 1/6/11 1 32 52 3 1/1/22

2 39 75 1 1/1/08 31 63 1 1/6/11

3 43 73 1 1/1/08 31 63 2 1/6/11

4 36 51 1 1/1/08

PT-12

31 63 3 1/6/11

X

PT- 36 56 2 1/6/11

- - -

Page 20: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur

16 36 56 3 1/6/11

42 61 1 1/6/11

42 61 2 1/6/11 T-02

42 61 3 1/6/11

T-15 43 55 2 1/6/11

38 68 1 1/6/11 T-27

38 68 2 1/6/11

39 65 1 1/6/11 T-35

39 65 2 1/6/11

1 34 75 1 1/1/08 PT-06 34 60 3 1/6/11 1 32 52 3 1/6/08

2 39 75 1 1/1/08 31 63 1 1/6/11 2 34 40 3 1/6/08

3 43 73 1 1/1/08 31 63 2 1/6/11

4 36 51 1 1/1/08

PT-12

31 63 3 1/6/11

5 49 45 1 1/1/08 36 56 2 1/6/11

6 33 37 1 1/1/08

PT-16

36 56 3 1/6/11

42 61 1 1/6/11

42 61 2 1/6/11 T-02

42 61 3 1/6/11

T-15 43 55 2 1/6/11

38 68 1 1/6/11 T-27

38 68 2 1/6/11

39 65 1 1/6/11

XI

T-35 39 65 2 1/6/11

- -

-

Indeks : Sc = Skenario Inf = Sumur Infill

Inj = Sumur Injeksi Hrz = Sumur Horizontal

WO = Workover

Page 21: STUDI PENGEMBANGAN RESERVOIR Z-850 · PDF fileLAMPIRAN C C.1 Produksi Sumur PT-16 pada Skenario VI PT-16 PTT_1030B_timur+workoverallgoodwell+injeksipattern1.irf Gas Rate SC PT-16 PTT_1030B_timur