STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop...

26
STS-131/19A FD 06 Execute Package MSG Page(s) Title 031B 1 - 15 FD06 Flight Plan Revision 032A 16 - 17 FD06 Mission Summary 033 18 - 21 FD06 Transfer Message 034 22 FD05 MMT Summary 035A 23 FD 6 EVA Procedure Deltas 036 24 FD06 Crew Choice Downlink 037 --- FD06 PAO Event Summary for Naval Postgraduate School Educational Event 038 --- FD06 PAO Event Summary, Nebraska Public Radio, CBS Newspath, Radio, KETV-TV Approved by FAO: L. Rush Last Updated: Apr 10 2010 1:08 AM GMT JEDI (Joint Execute package Development and Integration), v3.0

Transcript of STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop...

Page 1: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

STS-131/19A FD 06 Execute Package MSG Page(s) Title

031B 1 - 15 FD06 Flight Plan Revision

032A 16 - 17 FD06 Mission Summary

033 18 - 21 FD06 Transfer Message

034 22 FD05 MMT Summary

035A 23 FD 6 EVA Procedure Deltas

036 24 FD06 Crew Choice Downlink

037 --- FD06 PAO Event Summary for Naval Postgraduate School Educational Event

038 --- FD06 PAO Event Summary, Nebraska Public Radio, CBS Newspath, Radio, KETV-TV

Approved by FAO: L. Rush Last Updated: Apr 10 2010 1:08 AM GMT JEDI (Joint Execute package Development and Integration), v3.0

 

Page 2: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

THIS PAGE INTENTIONALLY BLANK

Page 3: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

MSG 031B - FD06 FLIGHT PLAN REVISION

END OF PAGE 1 OF 15, MSG 031B

1 MSG INDEX 2 3 MSG NO. TITLE 4 031 FD06 Flight Plan Revision 5 032 FD06 Mission Summary 6 033 FD06 Transfer Message (23-0217) 7 034 FD05 MMT Summary 8 035 FD 6 EVA Procedure Deltas 9 036 FD06 Crew Choice Downlink (23-0221) 10 037 FD06 PAO Event Summary for Naval Postgraduate School Educational 11

Event (23-0219) 12 038 FD06 PAO Event Summary, Nebraska Public Radio, CBS Newspath, Radio, 13

KETV-TV (23-0220) 14 15 16 17 1. Cryo Config 18

19 Post-Sleep Cryo Config 20 21

For today's post-sleep cryo config, O2 tanks 1 and 2, and H2 tanks 1 and 5 will 22

be active. 23 24

R1 O2,H2 MANF VLV TK1 (two) - OP (tb-OP) 25

O2 TK2 HTRS A,B (two) – AUTO 26 27

A15 CRYO TK5 HTR O2 A – OFF 28 29

Pre-Sleep Cryo Config 30 31

√MCC for deltas prior to configuring for pre-sleep. 32 33

For tonight's cryo config, manifold 2 will be closed with O2 and H2 tanks 2 and 5 active. 34

35

A15 CYRO TK5 HTR O2 A - AUTO 36 37

R1 H2 TK2 HTRS A,B (two) - AUTO 38

O2,H2 TK1 HTRS A,B (four) - OFF 39

MANF VLV TK2 (two) - CL (tb-CL) 40 41 42 43 44 45 46 47 48 49

1

Page 4: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

MSG 031B - FD06 FLIGHT PLAN REVISION

END OF PAGE 2 OF 15, MSG 031B

2. Comm Loop Overview: FLIGHT DAY 6 1 S/G 1 & A/G 1 S/G 2 A/G 2 2 Rack Transfers EVA Tool/EMU activities Transfer 3 ISS Payloads All other STS Comm 4 Russian Ops 5 PAO Event 6 Educational Event 7 DPC 8 All other ISS Comm 9 10 11

3. PDRS Deltas - Due to a late change in the robotics choreography, please note the 12 following changes to your PDRS procedures: 13 14 OBSS MNVR TO EVA 2 VIEWING (FS1-9), step 1 note 15 - WAS: SSRMS is at the FD 6 Overnight Park position on MBS PDGF 1 16 - IS: SSRMS is at the JEM Clearance position on NODE 2 PDGF 17 18 OBSS MNVR TO MPLM VIEWING (FS 1-13), step 1 note 19 - WAS: SSRMS is at the FD7 Overnight Park postion on MBS PDGF 1 20 - IS: SSRMS is at the Port Clear (ONP) position on NODE 2 PDGF 21 22 23

4. FE-2 PFC - Stephanie - you are scheduled to set up a Private Family Conference in the 24 shuttle for Tracy using privatized A/G and a shuttle PGSC at 5/04:15. 25

26 27 5. Replace pages 2-18, 2-20, 2-22 and 3-56 through 3-65. 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

2

Page 5: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

FLT PLN/131/FLT

POINDEXTER

DUTTON

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

METCALF-

LINDENBURGER

FD05

β =

−13

FD06

RE

PLAN

NED

2-18

S T S - 1 3 1

17

1819

2021

2223

04/10

0102

0304

GMT 04/

09/10 (099)

06

0708

0910

1112

1314

1516

1718

MET

Day 004

CDR

SLEEP

P M C A / G

PRE

SLEE

PPOST SLEEP

PLT

SLEEP

PRE

SLEE

PPOST SLEEP

M C I U

MS1

SLEEP

PRE

SLEE

PPOST SLEEP

A S P R N

MS2

SLEEP

PRE

SLEE

PPOST SLEEP

MS3

L O GSLEEP

PRE

SLEE

PPOST SLEEP

MS4

X F E R

U P D A T

SLEEP

PRE

SLEE

PPOST SLEEP

L O G

MS5

SLEEP

PRE

SLEE

P

A S P R NL O GPST SLP

TDRS

W E ZDA

Y/NIGHT

ORBIT

6869

7071

7273

7475

BIAS -XLV -ZVV

ORB ATT

TDRS

AVAIL

NOTES

2-18

POINDEXTER

DUTTON

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

METCALF-

LINDENBURGER

FD05

β =

−13

FD06

RE

PLAN

NED

S T S - 1 3 1

17

1819

2021

2223

04/10

0102

0304

GMT 04/

09/10 (099)

06

0708

0910

1112

1314

1516

1718

MET

Day 004

CDR

SLEEP

P M C A / G

PRE

SLEE

PPOST SLEEP

PLT

SLEEP

PRE

SLEE

PPOST SLEEP

M C I U

MS1

SLEEP

PRE

SLEE

PPOST SLEEP

A S P R N

MS2

SLEEP

PRE

SLEE

PPOST SLEEP

MS3

L O GSLEEP

PRE

SLEE

PPOST SLEEP

MS4

X F E R

U P D A T

SLEEP

PRE

SLEE

PPOST SLEEP

L O G

MS5

SLEEP

PRE

SLEE

P

A S P R NL O GPST SLP

TDRS

W E ZDA

Y/NIGHT

ORBIT

6869

7071

7273

7475

ORB ATT

BIAS -XLV -ZVV

TDRS

AVAIL

NOTES

3

Page 6: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

FLT PLN/131/FLT

POINDEXTER

DUTTON

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

METCALF-

LINDENBURGER

FD06

β =

−11

RE

PLAN

NED

2-20

S T S - 1 3 1

05

0607

0809

1011

1213

1415

16GMT 04/

10/10 (100)

18

1920

2122

23005/00

0102

0304

0506

MET

Day 004

CDR

P A O E D U

E V E N TPRE SLEEP

P M C A / G

MEAL

I M UMPLM XFER

N 2 - I

N 2 - T

CWC

S/U

&FI

LL #

1

C W C

T E R M

EVA 2 PROC

RVW

IL ON

I S P

I N S T

I S P

I N S T

I S P

I N S T

C W C

X F E R

MPLM XFER

PRE

SLP

EXERCISE

ARED

MPLM XFER

M O 1 0 W

O M S *

PLT

P A O E D U

E V E N TFLTR INSP

PRE SLEEP

MEAL

SRMS

MNVR

EVA2

EVA 2 PROC

RVW

W C SMPLM X

FER

PRE

SLP

MPLM XFER

MPLM

XFE

REX

ERCI

SEAR

ED

MS1

PRE SLEEP

MASK

P/B

MEAL

E_LK

PREP

EXER

CISE

P A O

E V E N T

L I O H &

B A T T

I N S T

EVA 2 PROC

RVW

TOOL CONFIG

B S A - T

BSA

INIT

MS2

P A O E D U

E V E N TPRE SLEEP

MEAL

MPLM XFER

SRMS

MNVR

EVA2

EVA 2 PROC

RVW

TOOL

CONFIG

EXER

CISE

PRE

SLP

MPLM

XFER

MS3

M D D K

A E M #

M D D K

MEAL

P A O

E V E N T

PRE SLEEP

X F E R

T A G U P

MPLM XFER

EXERCISE

MPLM

PIVOT INST

EVA 2 PROC

RVW

MPLM

XFER

U L T R B A Y

S W PMP

LM X

FER

FE2

PFC

S/U

MS4

X F E R

U P D A T

EXERCISE

XFER

BRIEF

PRE SLEEP

MEAL

ER7 XFER

X F E R

T A G U P

WORF

XFE

RISP INSTALL

ISP INSTALL

ISP

INSTALL

WORF

PREP

MS5

PRE SLEEP

MASK

P/B

MEAL

E_LK

PREP

L I O H &

B A T T

I N S TEXERCISE

P A O

E V E N T

EVA 2 PROC

RVW

TOOL CONFIG

P S T S L P

MPLM XFER

MPLM

XFE

R

TDRS

W E ZDA

Y/NIGHT

ORBIT

7677

7879

8081

8283

BIAS -XLV -ZVV

ORB ATT

TDRS

AVAIL

*B POD HTR RCFG

#STATUS CHECK

NOTES

2-20

POINDEXTER

DUTTON

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

METCALF-

LINDENBURGER

FD06

β =

−11

RE

PLAN

NED

S T S - 1 3 1

05

0607

0809

1011

1213

1415

16GMT 04/

10/10 (100)

18

1920

2122

23005/00

0102

0304

0506

MET

Day 004

CDR

P A O E D U

E V E N TPRE SLEEP

P M C A / G

MEAL

I M UMPLM XFER

N 2 - I

N 2 - T

CWC

S/U

&FI

LL #

1

C W C

T E R M

EVA 2 PROC

RVW

IL ON

I S P

I N S T

I S P

I N S T

I S P

I N S T

C W C

X F E R

MPLM XFER

PRE

SLP

EXERCISE

ARED

MPLM XFER

M O 1 0 W

O M S *

PLT

P A O E D U

E V E N TFLTR INSP

PRE SLEEP

MEAL

SRMS

MNVR

EVA2

EVA 2 PROC

RVW

W C SMPLM X

FER

PRE

SLP

MPLM XFER

MPLM

XFE

REX

ERCI

SEAR

ED

MS1

PRE SLEEP

MASK

P/B

MEAL

E_LK

PREP

EXER

CISE

P A O

E V E N T

L I O H &

B A T T

I N S T

EVA 2 PROC

RVW

TOOL CONFIG

B S A - T

BSA

INIT

MS2

P A O E D U

E V E N TPRE SLEEP

MEAL

MPLM XFER

SRMS

MNVR

EVA2

EVA 2 PROC

RVW

TOOL

CONFIG

EXER

CISE

PRE

SLP

MPLM

XFER

MS3

M D D K

A E M #

M D D K

MEAL

P A O

E V E N T

PRE SLEEP

X F E R

T A G U P

MPLM XFER

EXERCISE

MPLM

PIVOT INST

EVA 2 PROC

RVW

MPLM

XFER

U L T R B A Y

S W PMP

LM X

FER

FE2

PFC

S/U

MS4

X F E R

U P D A T

EXERCISE

XFER

BRIEF

PRE SLEEP

MEAL

ER7 XFER

X F E R

T A G U P

WORF

XFE

RISP INSTALL

ISP INSTALL

ISP

INSTALL

WORF

PREP

MS5

PRE SLEEP

MASK

P/B

MEAL

E_LK

PREP

L I O H &

B A T T

I N S TEXERCISE

P A O

E V E N T

EVA 2 PROC

RVW

TOOL CONFIG

P S T S L P

MPLM XFER

MPLM

XFE

R

TDRS

W E ZDA

Y/NIGHT

ORBIT

7677

7879

8081

8283

ORB ATT

BIAS -XLV -ZVV

TDRS

AVAIL

NOTES

*B POD HTR RCFG

#STATUS CHECK

4

Page 7: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

FLT PLN/131/FLT

POINDEXTER

DUTTON

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

METCALF-

LINDENBURGER

FD06

β =

−9

10.2

DPRS

14.7

RPRS

10.2

DPRS

14.7

RPRS

10.2

DPRS

ISS A/L Campout at 10.2 psi

10.2

DPRS

ISS A/L Campout at 10.2 psi

FD07

ISS EXTERNAL SURVEY

RE

PLAN

NED

2-22

S T S - 1 3 1

17

1819

2021

2223

04/11

0102

0304

GMT 04/

10/10 (100)

06

0708

0910

1112

1314

1516

1718

MET

Day 005

CDR

SLEEP

P M C A / G

PRE

SLEE

PMPLM

XFER

POST SLEEP

POST SLEEP

I N H I B

P A D

I L O F F

PMC

S/G

PLT

SLEEP

POST SLEEP

HYG

BRK/

HATCH

CLS

EVA PREP

PRE

SLEE

P

MS1

SLEEP

POST

SLEEP

HYG

BRK/PREBREATHE

EVA PREP

MASK

P/B

PRE

SLEE

P

MS2

PRE

SLEE

PSLEEP

POST SLEEP

M C I U

MPLM

XFER

MS3

L O G

M D D K

SLEEP

POST SLEEP

PRE

SLEE

PEXER

MS4

X F E R

U P D A T

L O GSLEEP

POST SLEEP

PRE

SLEE

PMPLM

XFER

MS5

SLEEP

POST

SLEEP

HYG

BRK/PREBREATHE

EVA PREP

MASK

P/B

PRE

SLEE

P

TDRS

W E ZDA

Y/NIGHT

ORBIT

8485

8687

8889

9091

BIAS -XLV -ZVV

ORB ATT

TDRS

AVAIL

NOTES

2-22

POINDEXTER

DUTTON

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

METCALF-

LINDENBURGER

FD06

β =

−9

10.2

DPRS

14.7

RPRS

10.2

DPRS

14.7

RPRS

10.2

DPRS

ISS A/L Campout at 10.2 psi

10.2

DPRS

ISS A/L Campout at 10.2 psi

FD07

ISS EXTERNAL SURVEY

RE

PLAN

NED

S T S - 1 3 1

17

1819

2021

2223

04/11

0102

0304

GMT 04/

10/10 (100)

06

0708

0910

1112

1314

1516

1718

MET

Day 005

CDR

SLEEP

P M C A / G

PRE

SLEE

PMPLM

XFER

POST SLEEP

POST SLEEP

I N H I B

P A D

I L O F F

PMC

S/G

PLT

SLEEP

POST SLEEP

HYG

BRK/

HATCH

CLS

EVA PREP

PRE

SLEE

P

MS1

SLEEP

POST

SLEEP

HYG

BRK/PREBREATHE

EVA PREP

MASK

P/B

PRE

SLEE

P

MS2

PRE

SLEE

PSLEEP

POST SLEEP

M C I U

MPLM

XFER

MS3

L O G

M D D K

SLEEP

POST SLEEP

PRE

SLEE

PEXER

MS4

X F E R

U P D A T

L O GSLEEP

POST SLEEP

PRE

SLEE

PMPLM

XFER

MS5

SLEEP

POST

SLEEP

HYG

BRK/PREBREATHE

EVA PREP

MASK

P/B

PRE

SLEE

P

TDRS

W E ZDA

Y/NIGHT

ORBIT

8485

8687

8889

9091

ORB ATT

BIAS -XLV -ZVV

TDRS

AVAIL

NOTES

5

Page 8: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

FLT PLN/131/FLT

FD06

POIN

DEXT

ERDUTTON

METCALF-

LINDENBURGER

FD06 EZ ACTIVITIES:

TEP

C (O

RB O

PS,

CREW

SYS

TEMS

)

Chec

k St

atus

Check MDDK Duct S

cree

n H

ard

rebo

ot a

ll PGSCs not

shut down overni

ght,

exc

ept:

ST

S5 (

RPOP

2) a

nd S

TS6

(WLE

S)

REPL

ANNE

D

3-56

STS-

131/

19A

FD

23:00

00:00

01:00

02:00

GMT

Date

04/09

(099)

12:00

13:00

14:00

15:00

16:00

MET

Day 00

4W

EZ

T D R S

~

~

~

D / N

O R B 7 2 7 3 7 4

~ ~B I A S - X L V - Z V VS T S A T T

CDR

SLEE

P

~

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS)

~

PLT

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS2

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-56

FD06

POIN

DEXT

ERDUTTON

METCALF-

LINDENBURGER

FD06 EZ ACTIVITIES:

TEP

C (O

RB O

PS,

CREW

SYS

TEMS

)

Chec

k St

atus

Check MDDK Duct S

cree

n H

ard

rebo

ot a

ll PGSCs not

shut down overni

ght,

exc

ept:

ST

S5 (

RPOP

2) a

nd S

TS6

(WLE

S)

REPL

ANNE

DST

S-13

1/19

A FD

23:00

00:00

01:00

02:00

GMT

Date

04/09

(099)

12:00

13:00

14:00

15:00

16:00

MET

Day 00

4W

EZ

T D R SD / N

O R B 7 2 7 3 7 4

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

~

SLEE

P

~

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS)

PLT

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS2

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

6

Page 9: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

FLT PLN/131/FLT

FD06

MAST

RACC

HIO

WILSON

YAMAZAKI

ANDERSON

REPL

ANNE

D

3-57

STS-

131/

19A

FD

23:00

00:00

01:00

02:00

GMT

Date

04/09

(099)

12:00

13:00

14:00

15:00

16:00

MET

Day 00

4W

EZ

T D R S

~

~

~

D / N

O R B 7 2 7 3 7 4

~ ~B I A S - X L V - Z V VS T S A T T

MS1

SLEE

P

~

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS)

~

EVA

CREW

: TA

KE 1

ASP

IRIN

(325mg)

MS3

SLEEP LOGBOOK (SDBI 1634)

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS4

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP LOGBOOK (SDBI 1634)

MS5

SLEEP

~

EVA CREW: TAKE 1 ASPIRIN (325mg)

SLEEP LOGBOOK (SDBI 1634)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-57

FD06

MAST

RACC

HIO

WILSON

YAMAZAKI

ANDERSON

REPL

ANNE

DST

S-13

1/19

A FD

23:00

00:00

01:00

02:00

GMT

Date

04/09

(099)

12:00

13:00

14:00

15:00

16:00

MET

Day 00

4W

EZ

T D R SD / N

O R B 7 2 7 3 7 4

S T S A T T ~ ~B I A S - X L V - Z V V

MS1

~

SLEE

P

~

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS)

EVA

CREW

: TA

KE 1

ASP

IRIN

(325mg)

MS3

SLEEP LOGBOOK (SDBI 1634)

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP LOGBOOK (SDBI 1634)

MS5

~

SLEEP

EVA CREW: TAKE 1 ASPIRIN (325mg)

SLEEP LOGBOOK (SDBI 1634)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

7

Page 10: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

FLT PLN/131/FLT

FD06

POIN

DEXT

ERDUTTON

METCALF-

LINDENBURGER

AN2 REPRESS USING P/L N2 VLVS

(ORB OPS, ECLS)Steps 1,3-7

MCC will TMBU S/W FDA

REPL

ANNE

D

3-58

STS-

131/

19A

FD

03:00

04:00

05:00

06:00

GMT

Date

04/10

(100)

16:00

17:00

18:00

19:00

20:00

MET

Day 00

4W

EZ

T D R S

~

~

~

D / N

O R B 7 4 7 5 7 6 7 7

~ ~B I A S - X L V - Z V VS T S A T T

CDR

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS)

~

IMU

STAR

OF

OPPT

Y AL

IGN (O

RB OPS, GNC)

N2 R

EPRE

SS I

NIT

ASH

UTTL

E/IS

S H2

O CO

NTAI

NER FILL (HC)

(OR

B OP

S, E

CLS)

Per

form

EQU

IP P

REP,

WAT

ER T

RANS

FER

HOSE

PUR

GE, and

CWC

FIL

L #1

Ref

. MS

G 01

2

SHUT

TLE/

ISS

H2O

CONT

AINE

R FILL (HC)

(OR

B OP

S, E

CLS)

Per

form

FIL

L TE

RMIN

ATIO

N

MO10

W H

20 T

K N2

REG

INL

ET SYS 2 vlv - OP

PLT

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

OBSS MNVR TO EVA 2 VIEWING POSITION

(PDRS, OBSS NOMINAL)

Ref. MSG 031 item 3

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

EXERCISE

ARED AVAILABLE

~

L17 Check MCIU filter screen

MS2

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

OBSS MNVR TO EVA 2 VIEWING POSITION

(PDRS, OBSS NOMINAL)

Ref. MSG 031 item 3 EXERCISE

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

~

NOTES

3-58

FD06

POIN

DEXT

ERDUTTON

METCALF-

LINDENBURGER

AN2 REPRESS USING P/L N2 VLVS

(ORB OPS, ECLS)Steps 1,3-7

MCC will TMBU S/W FDA

REPL

ANNE

DST

S-13

1/19

A FD

03:00

04:00

05:00

06:00

GMT

Date

04/10

(100)

16:00

17:00

18:00

19:00

20:00

MET

Day 00

4W

EZ

T D R SD / N

O R B 7 4 7 5 7 6 7 7

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

~PO

ST-S

LEEP

ACT

IVIT

Y (

ORB

OPS,

CRE

W SY

S)

IMU

STAR

OF

OPPT

Y AL

IGN (O

RB OPS, GNC)

N2 R

EPRE

SS I

NIT

ASH

UTTL

E/IS

S H2

O CO

NTAI

NER FILL (HC)

(OR

B OP

S, E

CLS)

Per

form

EQU

IP P

REP,

WAT

ER T

RANS

FER

HOSE

PUR

GE, and

CWC

FIL

L #1

Ref

. MS

G 01

2

SHUT

TLE/

ISS

H2O

CONT

AINE

R FILL (HC)

(OR

B OP

S, E

CLS)

Per

form

FIL

L TE

RMIN

ATIO

N

MO10

W H

20 T

K N2

REG

INL

ET SYS 2 vlv - OP

PLT

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

OBSS MNVR TO EVA 2 VIEWING POSITION

(PDRS, OBSS NOMINAL)

Ref. MSG 031 item 3

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

~

EXERCISE

ARED AVAILABLE

L17 Check MCIU filter screen

MS2

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

OBSS MNVR TO EVA 2 VIEWING POSITION

(PDRS, OBSS NOMINAL)

Ref. MSG 031 item 3 EXERCISE

~

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

NOTES

8

Page 11: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

FLT PLN/131/FLT

FD06

MAST

RACC

HIO

WILSON

YAMAZAKI

ANDERSON

REPL

ANNE

D

Remove any other external devices

from the KFX machine then:

A31p DEVICE CHANGEOUT

(ORB OPS, PGSC) Steps 1-4, 9-11

B R

ef.

CONS

UMAB

LES

TRAC

KING CC

R

ef.

BATT

ERY

RECH

ARGE

CUE CARD

R

ecor

d Li

OH s

/n o

n Cu

e Card;

R

epor

t to

MCC

3-59

STS-

131/

19A

FD

03:00

04:00

05:00

06:00

GMT

Date

04/10

(100)

16:00

17:00

18:00

19:00

20:00

MET

Day 00

4W

EZ

T D R S

~

~

~

D / N

O R B 7 4 7 5 7 6 7 7

~ ~B I A S - X L V - Z V VS T S A T T

MS1

POST

-SLE

EP A

CTIV

ITY

(OR

B OP

S, C

REW

SYS)

~

EVA

SYST

EMS:

1.5

15 E

MU

METO

X/LI

OH/B

ATTE

RY R

EPLA

CEMENT B

MS3

MERLIN STATUS CK (Cue Card)

GLACIER STATUS CK

(Cue Card)

STL STATUS CK

(Cue Card)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

~

MS4

DAILY TRANSFER LIST UP

DATE

Ref. Transfer List &

MSG 033

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

2.110 WORF TRANSFER MPLM TO ISS

(ASSY OPS, TRANSFER)

Steps 2-end

Ref. MPLM Resupply Transfer

List: Items 127, 172, & 173

~

2.110 WORF TRANSFER MPLM TO ISS

(ASSY OPS, TRANSFER)

Steps 1.1-1.18

Ref. MPLM Return Transfer

List: Item 785

MS5

EVA SYSTEMS: 1.515 EMU

METOX/LIOH/BATTERY REPLACEMENT B

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

NOTES

3-59

FD06

MAST

RACC

HIO

WILSON

YAMAZAKI

ANDERSON

REPL

ANNE

D

Remove any other external devices

from the KFX machine then:

A31p DEVICE CHANGEOUT

(ORB OPS, PGSC) Steps 1-4, 9-11

B R

ef.

CONS

UMAB

LES

TRAC

KING CC

R

ef.

BATT

ERY

RECH

ARGE

CUE CARD

R

ecor

d Li

OH s

/n o

n Cu

e Card;

R

epor

t to

MCC

STS-

131/

19A

FD

03:00

04:00

05:00

06:00

GMT

Date

04/10

(100)

16:00

17:00

18:00

19:00

20:00

MET

Day 00

4W

EZ

T D R SD / N

O R B 7 4 7 5 7 6 7 7

S T S A T T ~ ~B I A S - X L V - Z V V

MS1

~PO

ST-S

LEEP

ACT

IVIT

Y (

ORB

OPS,

CRE

W SY

S)

EVA

SYST

EMS:

1.5

15 E

MU

METO

X/LI

OH/B

ATTE

RY R

EPLA

CEMENT B

MS3

MERLIN STATUS CK (Cue Card)

GLACIER STATUS CK

(Cue Card)

STL STATUS CK

(Cue Card)

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

~

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

MS4

DAILY TRANSFER LIST UP

DATE

Ref. Transfer List &

MSG 033

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

2.110 WORF TRANSFER MPLM TO ISS

(ASSY OPS, TRANSFER)

Steps 2-end

Ref. MPLM Resupply Transfer

List: Items 127, 172, & 173

2.110 WORF TRANSFER MPLM TO ISS

(ASSY OPS, TRANSFER)

Steps 1.1-1.18

Ref. MPLM Return Transfer

List: Item 785

MS5

EVA SYSTEMS: 1.515 EMU

METOX/LIOH/BATTERY REPLACEMENT B

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

NOTES

9

Page 12: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

FLT PLN/131/FLT

FD06

POIN

DEXT

ERDUTTON

METCALF-

LINDENBURGER

REPL

ANNE

D

CN2 REPRESS USING P/L N2 VLVS

(ORB OPS, ECLS)

on MCC go, perform steps 8-13

MCC will TMBU S/W FDA

D A14 RCS/OMS HTR L POD - A OFF

- B AUTO

S&M:

1.2

47 I

NTEG

RATE

D ST

OWAGE

PLAT

FORM

(IS

P) I

NSTA

LL S

teps

1 (

if r

equi

red)

, 2-3.5.

Ref.

MPL

M Re

turn

Tra

nsfe

r List Items:

758,

759,

760,

763,

&764

S&M:

1.2

47 I

NTEG

RATE

D ST

OWAGE

PLAT

FORM

(IS

P) I

NSTA

LL S

teps

1 (

if r

equi

red)

, 2-3.5.

Ref.

MPL

M Re

turn

Tra

nsfe

r List Items:

758,

759,

760,

763,

&764

3-60

STS-

131/

19A

FD

07:00

08:00

09:00

10:00

GMT

Date

04/10

(100)

20:00

21:00

22:00

23:00

00:00

MET

Day 00

4W

EZ

T D R S

~

~

~

D / N

O R B 7 7 7 8 7 9

~ ~B I A S - X L V - Z V VS T S A T T

CDR

MEAL

N2 R

EPRE

SS T

ERM

(On

MCC

GO) C

CWC

TRAN

SFER

Tra

nsfe

r CW

C to ISS

TRAN

SFER

OPS

Ref

. MP

LM T

rans

fer Lists

and

MSG

033

E

XERC

ISE

ARED

AVA

ILABLE

RCS/

OMS

POD

HTR

RECO

NFIG

D

PLT

FILTER CLEANING

(IFM, SCHEDULED MAINTENANCE)

Inspect filters and clean

as necessary

MEAL

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

EXERCISE

ARED AVAILABLE

~

MS2

MEAL

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

~

EVA 2 TOOL CONFIG

(EVA, TIMELINES)

Ref. CONSUMABLES TRACKING

CUE CARD

Ref. MSG 035

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

~

NOTES

3-60

FD06

POIN

DEXT

ERDUTTON

METCALF-

LINDENBURGER

REPL

ANNE

D

CN2 REPRESS USING P/L N2 VLVS

(ORB OPS, ECLS)

on MCC go, perform steps 8-13

MCC will TMBU S/W FDA

D A14 RCS/OMS HTR L POD - A OFF

- B AUTO

S&M:

1.2

47 I

NTEG

RATE

D ST

OWAGE

PLAT

FORM

(IS

P) I

NSTA

LL S

teps

1 (

if r

equi

red)

, 2-3.5.

Ref.

MPL

M Re

turn

Tra

nsfe

r List Items:

758,

759,

760,

763,

&764

S&M:

1.2

47 I

NTEG

RATE

D ST

OWAGE

PLAT

FORM

(IS

P) I

NSTA

LL S

teps

1 (

if r

equi

red)

, 2-3.5.

Ref.

MPL

M Re

turn

Tra

nsfe

r List Items:

758,

759,

760,

763,

&764

STS-

131/

19A

FD

07:00

08:00

09:00

10:00

GMT

Date

04/10

(100)

20:00

21:00

22:00

23:00

00:00

MET

Day 00

4W

EZ

T D R SD / N

O R B 7 7 7 8 7 9

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

MEAL

N2 R

EPRE

SS T

ERM

(On

MCC

GO) C

CWC

TRAN

SFER

Tra

nsfe

r CW

C to ISS

TRAN

SFER

OPS

Ref

. MP

LM T

rans

fer Lists

and

MSG

033

E

XERC

ISE

ARED

AVA

ILABLE

RCS/

OMS

POD

HTR

RECO

NFIG

D

PLT

FILTER CLEANING

(IFM, SCHEDULED MAINTENANCE)

Inspect filters and clean

as necessary

MEAL

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

~

EXERCISE

ARED AVAILABLE

MS2

MEAL ~

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

EVA 2 TOOL CONFIG

(EVA, TIMELINES)

Ref. CONSUMABLES TRACKING

CUE CARD

Ref. MSG 035

~

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

NOTES

10

Page 13: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

FLT PLN/131/FLT

FD06

MAST

RACC

HIO

WILSON

YAMAZAKI

ANDERSON

REPL

ANNE

D

EVA

SYS:

1.6

05 B

SA B

ATTE

RY RECHARGE

TER

M Re

f. C

ONSU

MABL

ES T

RACKING CUE CARD

TRANSFER OPS

Ref. MPLM Transfer Lists and MSG 033

B R

ef.

CONSUMABLES TRACKING CC

R

ef.

BATTERY RECHARGE CUE CARD

R

ecor

d LiOH s/n on Cue Card;

R

epor

t to MCC

3-61

STS-

131/

19A

FD

07:00

08:00

09:00

10:00

GMT

Date

04/10

(100)

20:00

21:00

22:00

23:00

00:00

MET

Day 00

4W

EZ

T D R S

~

~

~

D / N

O R B 7 7 7 8 7 9

~ ~B I A S - X L V - Z V VS T S A T T

MS1

MEAL

EVA

SYST

EMS:

1.3

05 E

QUIP

MENT

LOCK

PRE

P O

mit

DRIN

K BA

G FI

LL R

ef.

MSG

035

for

CCA

P

UBLI

C AF

FAIR

S EV

ENT

ISS

KU A

VAIL

(09

:51-

10:30)

Re

f. M

SG 0

38

EVA

SYST

EMS:

1.5

15 E

MU

METO

X/LI

OH/B

ATTE

RY R

EPLA

CEMENT B

EVA

2 TO

OL C

ONFI

G (

EVA,

TIM

ELIN

ES)

Ref

. CO

NSUM

ABLE

S TR

ACKI

NG

CU

E CA

RD R

ef.

MSG

035

Ref

. MP

LM R

esup

ply

Tran

sfer

Li

st:

Item

214

EVA

SYS:

1.6

05 B

SA B

ATTE

RY RECHARGE

INI

TIAT

E R

ef.

CONS

UMAB

LES

TRAC

KING CUE CARD

Ref

. BA

TTER

Y RE

CHAR

GE C

UE CARD

MS3

MEAL

PUBLIC AFFAIRS EVENT

ISS KU AVAIL (09:51-10:30)

Ref. MSG 038

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

~

MS4

MEAL

2.104 RACK TRANSFER FROM MPLM TO

ISS (ER7, CQ2, MARES)

(ASSY OPS, TRANSFER)

Perform for EXPRESS-7

Ref. MPLM Resupply Transfer

List: Items 116 & 176

2.110 WORF TRANSFER MPLM TO ISS

(ASSY OPS, TRANSFER)

Steps 2-end

Ref. MPLM Resupply Transfer

List: Items 127, 172, & 173

~

UNSTOW ISP from NOD3F5

TRANSFER ISP to MPL1S3 then:

S&M: 1.247 INTEGRATED STOWAGE

PLATFORM (ISP) INSTALL

Steps 1.2-end

Ref. MPLM Return Transfer

List: Items 758,759,760,763,&764

UNSTOW ISP from NOD3F5

TRANSFER ISP to MPL1S3 then:

S&M: 1.247 INTEGRATED STOWAGE

PLATFORM (ISP) INSTALL

Steps 1.2-end

Ref. MPLM Return Transfer

List: Items 758,759,760,763,&764

~

MS5

MEAL

EVA SYSTEMS: 1.305 EQUIPMENT

LOCK PREP

Omit DRINK BAG FILL

Ref. MSG 035 for CCA

EVA SYSTEMS: 1.515 EMU

METOX/LIOH/BATTERY REPLACEMENT B

PUBLIC AFFAIRS EVENT

ISS KU AVAIL (09:51-10:30)

Ref. MSG 038

EVA 2 TOOL CONFIG

(EVA, TIMELINES)

Ref. CONSUMABLES TRACKING

CUE CARD

Ref. MSG 035

Ref. MPLM Resupply Transfer

List: Item 214

~

NOTES

3-61

FD06

MAST

RACC

HIO

WILSON

YAMAZAKI

ANDERSON

REPL

ANNE

D

EVA

SYS:

1.6

05 B

SA B

ATTE

RY RECHARGE

TER

M Re

f. C

ONSU

MABL

ES T

RACKING CUE CARD

TRANSFER OPS

Ref. MPLM Transfer Lists and MSG 033

B R

ef.

CONSUMABLES TRACKING CC

R

ef.

BATTERY RECHARGE CUE CARD

R

ecor

d LiOH s/n on Cue Card;

R

epor

t to MCC

STS-

131/

19A

FD

07:00

08:00

09:00

10:00

GMT

Date

04/10

(100)

20:00

21:00

22:00

23:00

00:00

MET

Day 00

4W

EZ

T D R SD / N

O R B 7 7 7 8 7 9

S T S A T T ~ ~B I A S - X L V - Z V V

MS1

MEAL

EVA

SYST

EMS:

1.3

05 E

QUIP

MENT

LOCK

PRE

P O

mit

DRIN

K BA

G FI

LL R

ef.

MSG

035

for

CCA

P

UBLI

C AF

FAIR

S EV

ENT

ISS

KU A

VAIL

(09

:51-

10:30)

Re

f. M

SG 0

38

EVA

SYST

EMS:

1.5

15 E

MU

METO

X/LI

OH/B

ATTE

RY R

EPLA

CEMENT B

EVA

2 TO

OL C

ONFI

G (

EVA,

TIM

ELIN

ES)

Ref

. CO

NSUM

ABLE

S TR

ACKI

NG

CU

E CA

RD R

ef.

MSG

035

Ref

. MP

LM R

esup

ply

Tran

sfer

Li

st:

Item

214

EVA

SYS:

1.6

05 B

SA B

ATTE

RY RECHARGE

INI

TIAT

E R

ef.

CONS

UMAB

LES

TRAC

KING CUE CARD

Ref

. BA

TTER

Y RE

CHAR

GE C

UE CARD

MS3

MEAL

PUBLIC AFFAIRS EVENT

ISS KU AVAIL (09:51-10:30)

Ref. MSG 038

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

~

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

MS4

MEAL

2.104 RACK TRANSFER FROM MPLM TO

ISS (ER7, CQ2, MARES)

(ASSY OPS, TRANSFER)

Perform for EXPRESS-7

Ref. MPLM Resupply Transfer

List: Items 116 & 176

~2.110 WORF TRANSFER MPLM TO ISS

(ASSY OPS, TRANSFER)

Steps 2-end

Ref. MPLM Resupply Transfer

List: Items 127, 172, & 173

UNSTOW ISP from NOD3F5

TRANSFER ISP to MPL1S3 then:

S&M: 1.247 INTEGRATED STOWAGE

PLATFORM (ISP) INSTALL

Steps 1.2-end

Ref. MPLM Return Transfer

List: Items 758,759,760,763,&764

~

UNSTOW ISP from NOD3F5

TRANSFER ISP to MPL1S3 then:

S&M: 1.247 INTEGRATED STOWAGE

PLATFORM (ISP) INSTALL

Steps 1.2-end

Ref. MPLM Return Transfer

List: Items 758,759,760,763,&764

MS5

MEAL

EVA SYSTEMS: 1.305 EQUIPMENT

LOCK PREP

Omit DRINK BAG FILL

Ref. MSG 035 for CCA

EVA SYSTEMS: 1.515 EMU

METOX/LIOH/BATTERY REPLACEMENT B

PUBLIC AFFAIRS EVENT

ISS KU AVAIL (09:51-10:30)

Ref. MSG 038

EVA 2 TOOL CONFIG

(EVA, TIMELINES)

Ref. CONSUMABLES TRACKING

CUE CARD

Ref. MSG 035

Ref. MPLM Resupply Transfer

List: Item 214

~

NOTES

11

Page 14: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

FLT PLN/131/FLT

FD06

POIN

DEXT

ERDUTTON

METCALF-

LINDENBURGER

REPL

ANNE

D

E WCS Filter Check

WCS CRADLE - AUTO

INIBIT

Inspect hose block

filter,

change if req'd

WCS CRADLE - AUTO

S&M:

1.2

47 I

NTEG

RATE

D ST

OWAGE

PLAT

FORM

(IS

P) I

NSTA

LL S

teps

1 (

if r

equi

red)

, 2-3.5

Ref.

MPL

M Re

turn

Tra

nsfe

r List Items:

758,

759,

760,

763,

&764

3-62

STS-

131/

19A

FD

11:00

12:00

13:00

14:00

GMT

Date

04/10

(100)

00:00

01:00

02:00

03:00

04:00

MET

Day 00

5W

EZ

T D R S

~

~

~ ~

D / N

O R B 8 0 8 1 8 2

~ ~B I A S - X L V - Z V VS T S A T T

CDR

TRAN

SFER

OPS

Ref

. MP

LM T

rans

fer Lists

and

MSG

033

EVA

2 BR

IEFI

NG C

ARD

(EV

A, T

IMEL

INES)

EVA

2 P

roce

dure

Rev

iew,

R

ef.

MSG

013

Ref

. MS

G 03

5

ILLU

MINA

TOR

OPS (C

ue C

ard, TV)

ILL

UMIN

ATOR

ON

- A,

D

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)~

TRAN

SFER

OPS

Ref

. MP

LM T

rans

fer Lists

and

MSG

033

PLT

EVA 2 BRIEFING CARD

(EVA, TIMELINES)

EVA 2 Procedure Review,

Ref. MSG 013

Ref. MSG 035WCS FILTER CHECK E

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS2

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

~

EVA 2 BRIEFING CARD

(EVA, TIMELINES)

EVA 2 Procedure Review,

Ref. MSG 013

Ref. MSG 035

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-62

FD06

POIN

DEXT

ERDUTTON

METCALF-

LINDENBURGER

REPL

ANNE

D

E WCS Filter Check

WCS CRADLE - AUTO

INIBIT

Inspect hose block

filter,

change if req'd

WCS CRADLE - AUTO

S&M:

1.2

47 I

NTEG

RATE

D ST

OWAGE

PLAT

FORM

(IS

P) I

NSTA

LL S

teps

1 (

if r

equi

red)

, 2-3.5

Ref.

MPL

M Re

turn

Tra

nsfe

r List Items:

758,

759,

760,

763,

&764

STS-

131/

19A

FD

11:00

12:00

13:00

14:00

GMT

Date

04/10

(100)

00:00

01:00

02:00

03:00

04:00

MET

Day 00

5W

EZ

T D R SD / N

O R B 8 0 8 1 8 2

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

TRAN

SFER

OPS

Ref

. MP

LM T

rans

fer Lists

and

MSG

033

EVA

2 BR

IEFI

NG C

ARD

(EV

A, T

IMEL

INES)

EVA

2 P

roce

dure

Rev

iew,

R

ef.

MSG

013

Ref

. MS

G 03

5

ILLU

MINA

TOR

OPS (C

ue C

ard, TV)

ILL

UMIN

ATOR

ON

- A,

D ~PR

E-SL

EEP

ACTI

VITY

(OR

B OP

S, C

REW

SYS)

TRAN

SFER

OPS

Ref

. MP

LM T

rans

fer Lists

and

MSG

033

PLT

EVA 2 BRIEFING CARD

(EVA, TIMELINES)

EVA 2 Procedure Review,

Ref. MSG 013

Ref. MSG 035WCS FILTER CHECK E

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS2

~

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

EVA 2 BRIEFING CARD

(EVA, TIMELINES)

EVA 2 Procedure Review,

Ref. MSG 013

Ref. MSG 035

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

12

Page 15: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

FLT PLN/131/FLT

FD06

MAST

RACC

HIO

WILSON

YAMAZAKI

ANDERSON

MERLIN STATUS CK (Cue Card)

GLACIER STATUS CK

(Cue Card)

STL STATUS CK

(Cue Card)

REPL

ANNE

D

3-63

STS-

131/

19A

FD

11:00

12:00

13:00

14:00

GMT

Date

04/10

(100)

00:00

01:00

02:00

03:00

04:00

MET

Day 00

5W

EZ

T D R S

~

~

~ ~

D / N

O R B 8 0 8 1 8 2

~ ~B I A S - X L V - Z V VS T S A T T

MS1

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)~

EXER

CISE

EVA

2 BR

IEFI

NG C

ARD

(EV

A, T

IMEL

INES

) E

VA 2

Pro

cedu

re R

evie

w R

ef.

MSG

013

Ref

. MS

G 03

5

MS3

AEM UNIT#1 CK (Cue Card)

AEM UNIT#2 CK

(Cue Card)

TRANSFER TAGUP

Coordinate with transfer

counterparts

EXERCISE

S&M: 1.261 RSP/RSR ROTATE DOWN

Steps 1-3 for Pivot Pins on

MPL1F4, A4, and F2 RSPs.

Steps 4-end to rotate an RSP

down, as required.

Ref. S&M: 1.262 RSP/RSR ROTATE UP

as required.

Ref. MPLM Return Transfer

List: Items 102 & 213

EVA 2 BRIEFING CARD

(EVA, TIMELINES

) EVA 2 Procedure Review

Ref. MSG 013

Ref. MSG 035

MS4

EXERCISE

~

TRANSFER BRIEF

Call down status to MCC

Ratty Comm (02:55-02:58)

and (03:28-03:38)

TRANSFER TAGUP

Coordinate with transfer

counterparts

UNSTOW ISP from NOD3F5

TRANSFER ISP to MPL1S3 then:

S&M: 1.247 INTEGRATED STOWAGE

PLATFORM (ISP) INSTALL

Steps 1.2-end

Ref. MPLM Return Transfer

List: Items 758,759,760,763,&764

~

INTEGRATED STOWAGE PLATFORM (ISP) REMOVAL

(MPLM RESUPPLY TRANSF

ER, PROCEDURES

)TRANSFER ISP to MPL1P3 then:

1.247 INTEGRATED

STOWAGE PLATFORM (ISP)

INSTALL

Steps 1.2-end

Ref. MPLM Return Transfer

List: Items 758,759,760,763,&764

MS5

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EXERCISE

EVA 2 BRIEFING CARD

(EVA, TIMELINES

) EVA 2 Procedure Review

Ref. MSG 013

Ref. MSG 035

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

~

NOTES

3-63

FD06

MAST

RACC

HIO

WILSON

YAMAZAKI

ANDERSON

MERLIN STATUS CK (Cue Card)

GLACIER STATUS CK

(Cue Card)

STL STATUS CK

(Cue Card)

REPL

ANNE

DST

S-13

1/19

A FD

11:00

12:00

13:00

14:00

GMT

Date

04/10

(100)

00:00

01:00

02:00

03:00

04:00

MET

Day 00

5W

EZ

T D R SD / N

O R B 8 0 8 1 8 2

S T S A T T ~ ~B I A S - X L V - Z V V

MS1

~PR

E-SL

EEP

ACTI

VITY

(OR

B OP

S, C

REW

SYS)

EXER

CISE

EVA

2 BR

IEFI

NG C

ARD

(EV

A, T

IMEL

INES

) E

VA 2

Pro

cedu

re R

evie

w R

ef.

MSG

013

Ref

. MS

G 03

5

MS3

AEM UNIT#1 CK (Cue Card)

AEM UNIT#2 CK

(Cue Card)

TRANSFER TAGUP

Coordinate with transfer

counterparts

EXERCISE

S&M: 1.261 RSP/RSR ROTATE DOWN

Steps 1-3 for Pivot Pins on

MPL1F4, A4, and F2 RSPs.

Steps 4-end to rotate an RSP

down, as required.

Ref. S&M: 1.262 RSP/RSR ROTATE UP

as required.

Ref. MPLM Return Transfer

List: Items 102 & 213

EVA 2 BRIEFING CARD

(EVA, TIMELINES

) EVA 2 Procedure Review

Ref. MSG 013

Ref. MSG 035

MS4

~

EXERCISE

TRANSFER BRIEF

Call down status to MCC

Ratty Comm (02:55-02:58)

and (03:28-03:38)

TRANSFER TAGUP

Coordinate with transfer

counterparts~

UNSTOW ISP from NOD3F5

TRANSFER ISP to MPL1S3 then:

S&M: 1.247 INTEGRATED STOWAGE

PLATFORM (ISP) INSTALL

Steps 1.2-end

Ref. MPLM Return Transfer

List: Items 758,759,760,763,&764

INTEGRATED STOWAGE PLATFORM (ISP) REMOVAL

(MPLM RESUPPLY TRANSF

ER, PROCEDURES

)TRANSFER ISP to MPL1P3 then:

1.247 INTEGRATED

STOWAGE PLATFORM (ISP)

INSTALL

Steps 1.2-end

Ref. MPLM Return Transfer

List: Items 758,759,760,763,&764

MS5

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EXERCISE

EVA 2 BRIEFING CARD

(EVA, TIMELINES

) EVA 2 Procedure Review

Ref. MSG 013

Ref. MSG 035

~

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 033

NOTES

13

Page 16: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

FLT PLN/131/FLT

FD06

POIN

DEXT

ERDUTTON

METCALF-

LINDENBURGER

SSRMS WALKOFF

TO MBS PDGF 1

~

REPL

ANNE

D

CREW WAKEUP AT 05/15:00

3-64

STS-

131/

19A

FD

15:00

16:00

17:00

18:00

GMT

Date

04/10

(100)

04:00

05:00

06:00

07:00

08:00

MET

Day 00

5W

EZ

T D R S

~

~~ ~

D / N

O R B 8 2 8 3 8 4 8 5

~ ~B I A S - X L V - Z V VS T S A T T

CDR

P

UBLI

C AF

FAIR

S EVENT

ISS

KU A

VAIL

(14

:35-15:19)

Re

f. M

SG 0

37

SLEE

P

~

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S) A

ir Q

uali

ty R

epor

t

L9

PAYL

OAD

STAT

ION

A/G

(two) - OFF

PRIV

ATE

MEDI

CAL

CONF

ERENCE VIA A/G 2

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

~

PLT

PUBLIC AFFAIRS EVENT

ISS KU AVAIL (14:35-15:19)

Ref. MSG 037

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS2

PUBLIC AFFAIRS EVENT

ISS KU AVAIL (14:35-15:19)

Ref. MSG 037

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS) SL

EEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-64

FD06

POIN

DEXT

ERDUTTON

METCALF-

LINDENBURGER

SSRMS WALKOFF

TO MBS PDGF 1

~

REPL

ANNE

D

CREW WAKEUP AT 05/15:00

STS-

131/

19A

FD

15:00

16:00

17:00

18:00

GMT

Date

04/10

(100)

04:00

05:00

06:00

07:00

08:00

MET

Day 00

5W

EZ

T D R SD / N

O R B 8 2 8 3 8 4 8 5

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

P

UBLI

C AF

FAIR

S EVENT

ISS

KU A

VAIL

(14

:35-15:19)

Re

f. M

SG 0

37

~

SLEE

P

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S) A

ir Q

uali

ty R

epor

t

L9

PAYL

OAD

STAT

ION

A/G

(two) - OFF

PRIV

ATE

MEDI

CAL

CONF

ERENCE VIA A/G 2

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

~PR

E-SL

EEP

ACTI

VITY

(OR

B OP

S, C

REW

SYS)

PLT

PUBLIC AFFAIRS EVENT

ISS KU AVAIL (14:35-15:19)

Ref. MSG 037

~

SLEEP

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS2

PUBLIC AFFAIRS EVENT

ISS KU AVAIL (14:35-15:19)

Ref. MSG 037

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

14

Page 17: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

FLT PLN/131/FLT

FD06

MAST

RACC

HIO

WILSON

YAMAZAKI

ANDERSON

REPL

ANNE

D

CREW WAKEUP AT 05/15:00

L9 PAYLOAD STATION AUDIO A/G (two) - OFF

NETMEETING VIDEO CONFERENCING

(ORB OPS, PGSC)

Private Family Conference Setup F

F Omit Steps 1.2 and 3. Use A/G 2 for audio

Inform MCC which PGSC will be used.

3-65

STS-

131/

19A

FD

15:00

16:00

17:00

18:00

GMT

Date

04/10

(100)

04:00

05:00

06:00

07:00

08:00

MET

Day 00

5W

EZ

T D R S

~

~~ ~

D / N

O R B 8 2 8 3 8 4 8 5

~ ~B I A S - X L V - Z V VS T S A T T

MS1

SLEE

P

~

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

~

EVA

SYST

EMS:

1.2

06 1

0.2

PSIA

CAMP

OUT

MASK

PRE

BREA

THE

Ref

. Co

nsum

able

s Tr

acki

ng

Cu

e Ca

rd

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

MS3

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

EXERCISE

~

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS5

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EVA SYSTEMS: 1.206 10.2 PSIA

CAMPOUT MASK PREBREATHE

Ref. Consumables Tracking

Cue Card

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

3-65

FD06

MAST

RACC

HIO

WILSON

YAMAZAKI

ANDERSON

REPL

ANNE

D

CREW WAKEUP AT 05/15:00

L9 PAYLOAD STATION AUDIO A/G (two) - OFF

NETMEETING VIDEO CONFERENCING

(ORB OPS, PGSC)

Private Family Conference Setup F

F Omit Steps 1.2 and 3. Use A/G 2 for audio

Inform MCC which PGSC will be used.

STS-

131/

19A

FD

15:00

16:00

17:00

18:00

GMT

Date

04/10

(100)

04:00

05:00

06:00

07:00

08:00

MET

Day 00

5W

EZ

T D R SD / N

O R B 8 2 8 3 8 4 8 5

S T S A T T ~ ~B I A S - X L V - Z V V

MS1

~

SLEE

P

~PR

E-SL

EEP

ACTI

VITY

(OR

B OP

S, C

REW

SYS)

EVA

SYST

EMS:

1.2

06 1

0.2

PSIA

CAMP

OUT

MASK

PRE

BREA

THE

Ref

. Co

nsum

able

s Tr

acki

ng

Cu

e Ca

rd

PRE-

SLEE

P AC

TIVI

TY (

ORB

OPS,

CRE

W SY

S)

MS3

~

SLEEP

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

~

EXERCISE

~

SLEEP

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS5

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA SYSTEMS: 1.206 10.2 PSIA

CAMPOUT MASK PREBREATHE

Ref. Consumables Tracking

Cue Card

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

15

Page 18: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

MSG 032A - FD06 MISSION SUMMARY

1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

Discovery, Congratulations on a superb EVA1. We are all glad you do not have to do Focused Inspection today. The MMT decided to extend the mission by a day, making it 14+0. The MMT also cleared the TPS for entry. Enjoy your transfer activities today! YOUR CURRENT ORBIT IS: 191 X 182 NM NOTAMS (ADDED MRN, DELETED HNL)

EDW - EDT 22R/04L IN USE. EDW 22/04 CLOSED FOR CONSTRUCTION. EDW - LAKEBED RWYS RED. NOR - LAKEBED RWYS GREEN. FOK - RWY 06/24 CLOSED. DOV - RWY 32 REIL OTS. FMH - RWY 23 ALS OTS. YYT - TACAN UYT23 AZIMUTH OTS. JTY - RWY 18 ALS OTS. MYR - RWY 18/36 CLOSED FROM 0340 - 0930 GMT. KKI - TACAN RIY92 OTS. MRN - RWY 02/20 CLOSED FROM 1430 - 1830 GMT. IKF - NOT USABLE. NO AGREEMENT. BEN - NOT RECOMMENDED/NOT SUPPORTED.

NEXT 2 PLS OPPORTUNITIES: 26

27 28 29 30

EDT22R ORB 79 – 4/23:16 SCT250 7 230/08P13 NOR23 ORB 94 – 5/22:06 SCT120 BKN250 7 160/04P06 OMS TANK FAIL CAPABILITY: 31

32 33 34 35

L OMS FAILS: NO R OMS FAILS: NO LEAKING OMS PRPLT BURN: 36

37 38 39 40

L OMS LEAK: ALWAYS BURN RETROGRADE R OMS LEAK: ALWAYS BURN RETROGRADE OMS QUANTITIES(%) 41

42 43 44 45 46 47 48 49 50 51

L OMS OX = 34.08 R OMS OX = 35.28 FU = 33.60 FU = 35.21

END OF PAGE 1 OF 2, MSG 032A 16

Page 19: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

MSG 032A - FD06 MISSION SUMMARY

END OF PAGE 2 OF 2, MSG 032A

1 DELTA V AVAILABLE: 2

3 4

OMS 372 FPS ARCS (TOTAL ABOVE QTY1) 31 FPS 5

6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

TOTAL IN THE AFT 403 FPS ARCS (TOTAL ABOVE QTY2) 64 FPS FRCS (ABOVE QTY 1) 30 FPS AFT QTY 1 81 % AFT QTY 2 43 % THERE ARE NO FAILURE/IMPACT/WORK AROUNDS FOR TODAY.

17

Page 20: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

MSG 033 (23-0217) - FD06 TRANSFER MESSAGE Page 1 of 71

1 2 3 4 5 6 7 8 9

10 11 12 13 14

Good Morning Naoko and Steph, Great day yesterday! I think you’ll really appreciate having transferred the second ZSR yesterday, which should give you a bit more flexibility when stowing resupply items today. With focused inspection not required, we’ve added several more hours of MPLM transfer to today’s schedule. In addition you’ll complete the rack transfers today by moving WORF and ER7 to ISS and installing the ISPs in the MPLM for return. The Transfer List Excel file, FD06_Transfer_List_STS131.xls, locations are:

• Shuttle: C:\OCA-up\transfer (KFX machine) • Station: K:\OCA-up\transfer

Transfer Notes 15

16

18 19 20 21

23 24

25 26

27 28 29

31 32 33

35 36 37 38 39

41 42 43 44 45 46 47 48 49 50

• MPLM Rack Rotations: Steph, for today’s MPLM Pivot Pin install, remember to 17

reference the MPLM Resupply Transfer Book, PROCEDURES tab, 1.261 RSP/RSR ROTATE DOWN. In addition, you’ll need MPLM Resupply Item 102 from NOD2O2 and the pivot pin launched in your MPLM Kit.

• WORF Rack Prep: Naoko, we have added the remainder of the WORF Rack Prep to 22 this morning’s timeline. In addition, the following are a couple tools that can be substituted for the missing 3/16” Hex Head, 3/8” Drive:

• 3/8" to 1/4" Adapter with 3/16” Hex Head, 1/4” Drive - located in the ISS Tool Box, Drawer 2 at NOD1D4_G2.

• 6" Long, 3/16" Ball Tip Hex Head, 3/8" Drive - located in the Tool Page (b/c PERS3302M) at NOD2S1.

• MPLM Return Layouts: As promised, we have uplinked your MPLM Rack, M-bag, and 30

Foam Return layouts today. Considering this is a rather large uplink, we have provided you with additional time for your Transfer Update this morning.

• WHC Trash Bagging: You’ll notice in today’s transfer list updates that we have included 34 extra instructions on MPLM Return items 629, 630, 632, and 633. A few of these WHC trash items have been identified as Tox Level 2. Therefore, you will need to double-bag items 629, 632, and 633. For item 630, we unfortunately need you to retrieve a couple items from inside the 3.0 CTB, double-bag them, and restow them in the 3.0 CTB.

• MPLM GLA Scavenge: We have been informed that you will only need to remove and 40 transfer the Lamp Housing Assemblies (LHAs) from the MPLM instead of the entire General Luminaire Assemblies (GLAs). The Baseplate Ballast Assemblies (BBAs) will be needed for the launch-on-need MPLM configuration; therefore, they will need to return in the MPLM. Your transfer list has been updated to reflect this, and the FD7, FD9, and FD10 scavenge activities will be updated as well.

Page 1 of 71, MSG 033 (23-0217) 18

Page 21: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

MSG 033 (23-0217) - FD06 TRANSFER MESSAGE Page 2 of 71

1 FD06 Choreography (in timeline order) 2

12

15

17

20

22

24

26

28 29 30

• Item 717: Transfer Silver Biocide Syringe Kit (s/n 1006) to middeck prior to first silver 3 CWC fill. 4

• Item 766: Transfer LAB Window Flexhose Cover and temp stow in MPLM following LAB 5 Window Cover Removal activity. 6

• Item 431.2: Stow LADA Root Module Return Kits in Bag 431 following the БИО-5-7 DEINSTL activity. 8

• Item 785: Stow WORF Launch Bolts ziplock in MPLM following WORF Rack Prep. 9

• Item 171: Remove handrail (qty 1) from WORF rack-front prior to transferring rack. 10

• Item 127: Retrieve WORF Closeout Seals and Lower Restraints prior to WORF XFER 11 activity.

• Items 172 and 173: Transfer WORF rack and Knee Braces from MPL1P2 to LAB1D3. 13

• Items 786 and 787: Stow RSR/ZSR launch brackets and pip pins in ziplock with other 14 RSR/ZSR hardware for return.

• Items 174 and 175: Remove handrails (qty 2) from EXPRESS Rack 7 rack-front prior to 16 transferring rack.

• Items 116 and 176: Transfer EXPRESS Rack 7 from MPL1P3 to LAB1P2. 18

• Item 425.1: Stow Post-flight Analysis Packets (qty 2) in bag 425 following WPA 19 Wastewater Offload activity.

• Item 763: Remove MPL1P3 knee braces (qty 2) and stow in MPL1A4_A1 for return prior 21 to ISP install at P3.

• Items 758, 759, 760, 763, and 764: Transfer ISP racks (qty 3) from NOD3F5 to 23 MPL1S2, P3, and P2.

• Items 102 and 213: Install pivot pins on MPL1F2, F4, and A4 RSPs to allow RSP 25 rotations.

• Item 214: Transfer Radiator Stowage Beams (Inboard and Outboard) from MPL1S1_D2 27 for EVA 2 prep.

FD06 Transfer Get-aheads 31

32

Get-ahead Activity Nominally scheduled

Scavenge MPL1PA3 LHA in preparation for transferring TeSS to MPL1A3 (call MCC-H first to have RPC opened).

FD07

Transfer TeSS to MPL1A3.

FD07

33 34 35 36 37 38 39 40 41 42

Page 2 of 71, MSG 033 (23-0217) 19

Page 22: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

MSG 033 (23-0217) - FD06 TRANSFER MESSAGE Page 3 of 71

1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

Please incorporate uplink pages as follows (we’ve listed the updates in the order they printed out for you): In the Middeck Transfer List RETURN tab Replace the following pages:

Return 2 Return 3 Return 8

In the MPLM Resupply Transfer List MPLM GLA tab Replace the following page: Resupply 13 In the MPLM Resupply Transfer List A3 RSP tab Replace the following page:

Resupply 17 In the MPLM Resupply Transfer List A4 RSP tab Replace the following pages: Resupply 18

Resupply 19 In the MPLM Resupply Transfer List F1 RSP tab Replace the following page: Resupply 20

In the MPLM Resupply Transfer List F2 RSP tab Replace the following page:

Resupply 21 In the MPLM Resupply Transfer List F3 RSP tab Replace the following page:

Resupply 22 In the MPLM Resupply Transfer List S2 RSR tab Replace the following page:

Resupply 35 In the MPLM Resupply Transfer List S4 RSR tab Replace the following pages:

Resupply 39 Resupply 40

In the MPLM Resupply Transfer List ENDCONE tab Replace the following pages:

Resupply 41 Resupply 43

Page 3 of 71, MSG 033 (23-0217) 20

Page 23: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

MSG 033 (23-0217) - FD06 TRANSFER MESSAGE Page 4 of 71

Page 4 of 71, MSG 033 (23-0217)

1 2 3 4 5 6 7 8 9

10 11 12 13

In the MPLM Return Transfer List LAYOUTS tab Add the following pages:

L-2 thru L-48 In the MPLM Return Transfer List RETURN tab Replace the following pages:

Return 17 Return 18 Return 21 Return 22 Return 28

FD07 Choreography (in timeline order) 14

16

18

20

22

26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

• Item 162: Transfer Glacier from MPL1F3_H1 and install at LAB1O1_G1 per GLACIER 15 XFER activity.

• Items 761 and 762: Transfer LAB1O1_G1 and J1 lockers to MPL1F1_H1 & A3_K1 17 following GLACIER XFER activity.

• Items 132 and 146: Transfer HRF 8PU Stowage Drawers from MPL1A4_A1 and 19 MPL1F2_A1 to COL1A4_D1 and COL1A4_G1 respectively per HRF2 Rack Reconfig.

• Item 103: Scavenge MPL1PA3 LHA prior to stowing TeSS pieces for return - call MCC 21 to open RPC.

• Items 652 and 654: Transfer TeSS per TeSS Transfer from ISS to MPLM. 23

• Deploy fences on F1 and F3 RSPs. 24

• Return M-bags temp-stowed in A1 inter-rack bungee jail to F1and F3 RSP locations. 25 Have a nice day and let us know if you have any questions! - The STS-131 Transfer Team

21

Page 24: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

MSG 034 - FD05 MMT SUMMARY

1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39

40

41

42

43

44

45

46

47

48

49

The MMT met to review the DAT summary, mission progress, and late inspection plans. The MMT concurred with the DAT recommendation to consider the TPS cleared for entry. Discovery continues to perform well, and in order to accommodate the docked late inspection, the MMT concurred with the recommendation to extend the mission by one day. In addition, the team was very happy with the success of yesterday’s EVA. Damage Assessment Team: The DAT has completed their thorough analysis of the remaining TPS areas of interest. The damage to the Left OMS pod tile is shallow and very minor. It will not be an issue for entry. A debris transport analysis was performed on the FRCS gap filler. If the gap filler liberates between M6 and M2.5, there is a small chance it could contact windows #1 or #2 at a very low angle of incidence. Given the low mass and low angle of incidence, there is very little chance such contact would damage the thermal pane. Finally, the effects of the missing tile on the Rudder/Speedbrake were analyzed. As expected, the highest heating loads and temperatures are during ascent. The predicted temperatures during entry are only negligibly higher than ambient and will not be an issue during entry. Docked Late Inspection: It was decided to extend the docked phase of the mission by one day in order to accommodate the addition of the docked late inspection. Flight Day 11 will be very similar to the pre-flight plan, Flight Day 12 will be the new docked late inspection day, and Flight Day 13 will be undock day. The docked late inspection procedures are those that were prepared for STS-134/ULF5. Those procedures were verified by the team and have been executed several times on the ground by previously flown crew members. The procedures are in good shape, and the plan is to uplink them as soon as FD09 with the intention of providing plenty of time for review and any comments. There are a few instances of tight clearances, but the viewing angles and assets for all of these cases will provide you with all the insight needed to assure safe operations. You will get all of the details in separate direction from the team, but in order to expedite the downlink process, the team will have several imagery collection updates to improve the ISS downlink efficiency. As part of the late inspection and undocking plan, the team assessed the remainder of the free flight portion of the mission being executed without the Ku antenna. The ground is making an extra effort to maximize uplink of procedures and information prior to undock. Additionally it was determined that in the very unlikely event that the late inspection uncovers MMOD damage which requires a repair, the repair could be successfully executed and verified without the orbiter Ku antenna capability.

END OF PAGE 1 OF 1, MSG 034 22

Page 25: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

23-0215A (MSG 035A): FD06 EVA Procedure Deltas Page 1 of 1   

END OF PAGE 1 OF 1, 23-0215A (MSG 035A)

ULF4 Get Aheads 1 The ULF-4 EVA team has come up with a few get-aheads they would like you to consider 2 performing on Z1, including relocating the end of a cable bundle, connecting 2 electrical 3 connectors and verifying the status of the SGANT attachment bolts. We are gathering the 4 details in a briefing package and will uplink them when we have the full story. If, after 5 reviewing that briefing package, you believe the tasks are feasible, we will add them to 6 EVA 3 in place of other get aheads. 7  8 Rick's Comm Cap 9 Due to the moisture build up in Rick's comm cap, we would like to use the backup. This is 10 in Rick's ECOK, labeled MT 2, s/n 1198. 11  12 Battery Charging CC Delta 13 We have found a typo on the Battery Recharge Cue Card. In the lower left corner of Post 14 EVA 1 and Post EVA 2, the battery charger indicated as BC2 CH3 should actually be BC3 15 CH3. 16  17 EVA Checklist Pen and Inks 18 1. Update both FS CC 10-16 & Battery Recharge Cue Card as follows: 19  Was: BC2 CH3 20  Is: BC3 CH3 21  22 2. Due to the tasks accomplished on EVA1, please update the EVA2 Detailed Procedures 23 as follows: 24  FS7-63 EV1 Column 25  Delete Steps 6 and 7 26  27 3. To protect for the EVA tool relocate get-ahead task on EVA2 or EVA3, please keep the 28 crewlock bag configured from EVA 1 and perform the following pen & inks: 29  30 FS 7-60 (EVA 2 Tool Config) and FS 7-95 (EVA 3 Tool Config): 31 

• Add C/L bag with Lg/sm RET with the following tools for Tool Relocate: 32 o Hammer 33 o Vise Grips 34 o Probe (Verify no sheath) 35 o Pin Straightener 36 

FS 7-61 (EVA 2 Tool Config) and FS 7-96 (EVA 3 Tool Config): 37 

• Delete the following tools from the Staging Bag (moved to C/L bag for Tool 38 Relocate): 39 

o Hammer 40 o Vise Grips 41 o Probe 42 o Pin Straightener 43 

23

Page 26: STS-131/19A · MSG 031B - FD06 FLIGHT PLAN REVISION END OF PAGE 2 OF 15, MSG 031B 1 2. Comm Loop Overview: FLIGHT DAY 6 2 S/G 1 & A/G 1 S/G 2 A/G 2 3 Rack Transfers EVA Tool/EMU activities

MSG 036  (23‐0221) ‐ FD06 CREW CHOICE DOWNLINK 

Page 1 of 1 

Page 1 of 1, MSG 036 (23‐0221) 

1

TDRS AOS LOS Delta (min) Notes W-TDW 05/04:35 05/04:58 23 E-TDE 05/05:03 05/05:18 15

W-TDW 05/05:49 05/06:33 44 2

Note: Please notify MCC-H 10 minutes prior to the event to allow for ground network 3

configuration. 4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

24