STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 -...

43
STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17 - 19 SSC 16 SETUP (pdf) 010 20 - 23 Stowage Locations for FD03 (GMT 321) (pdf) 013 --- FD03 Transfer Message (pdf - Electronic Only) 014 24 - 28 SSRMS DOUG Setup Notes for ULF2 (pdf) 015A 29 - 30 FD3 EVA Deltas (pdf) 016 31 FD2 MMT Summary (pdf) 017 32 - 34 HD Digital Camcorder Dnlk Procedure (pdf) 018 35 - 37 Exp 18 / STS-126 Joint Emergency Agreement (pdf) 019 38 - 42 FD03 RNDZ PACKAGE (pdf) Approved by FAO: J. Clevenger Last Updated: Nov 16 2008 1:19PM GMT JEDI (Joint Execute package Development and Integration), v2.04.0003

Transcript of STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 -...

Page 1: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

STS-126/ULF2 FD 03 Execute Package

MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17 - 19 SSC 16 SETUP (pdf) 010 20 - 23 Stowage Locations for FD03 (GMT 321) (pdf) 013 --- FD03 Transfer Message (pdf - Electronic Only) 014 24 - 28 SSRMS DOUG Setup Notes for ULF2 (pdf) 015A 29 - 30 FD3 EVA Deltas (pdf) 016 31 FD2 MMT Summary (pdf) 017 32 - 34 HD Digital Camcorder Dnlk Procedure (pdf) 018 35 - 37 Exp 18 / STS-126 Joint Emergency Agreement (pdf) 019 38 - 42 FD03 RNDZ PACKAGE (pdf)

Approved by FAO: J. Clevenger

Last Updated: Nov 16 2008 1:19PM GMT JEDI (Joint Execute package Development and Integration), v2.04.0003

Page 2: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

MSG 011A - FD03 FLIGHT PLAN REVISION

END OF PAGE 1 OF 12, MSG 011A

MSG INDEX 1 2 MSG NO. TITLE 3 004 SSC 16 SETUP (18-0213) 4

010 STOWAGE LOCATIONS FOR FD03 (18-0218) 5 011 FD03 FLIGHT PLAN REVISION 6 012 FD03 MISSION SUMMARY 7 013 FD03 TRANSFER MESSAGE 8

014 SSRMS DOUG SETUP NOTES FOR ULF2 (18-0212) 9

015 FD3 EVA DELTAS 10 016 FD2 MMT SUMMARY 11

017 HD DIGITAL CC DNLK PROCEDURE 12

018 EXP 18 / STS-126 JOINT EMERGENCY AGREEMENT (18-0221) 13 019 FD03 RNDZ PACKAGE 14 15 1. For today's cryo config, O2 tanks 1 and 2 will be active with dual heaters and H2 tanks 2 16

and 4 will be active with dual heaters. 17 18

R1 O2,H2 MANF VLV TK2 (two) - OP (tb-OP) 19 O2 TK1 HTRS A,B (two) - AUTO 20 21 A11 CRYO TK4 HTRS O2 A,B (two) – OFF 22 23

2. For your simo dump today, use SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) p. 24 5-2. MCC will TMBU FDA in steps B and K. Waste dump valve open time will be ~ 30 25 minutes and will dump the waste tank to 5%. Supply dump valve open time will be 20 26 minutes. 27

28 3. The Y-Y Condensate Hose and CWC for the Shuttle Condensate Collection are located 29

in MF57C. Report CWC serial number to MCC. 30 31 4. In an effort to categorize the brake line heaters' effect on the landing gear tire temps, we 32

are asking for a couple actions from you. First, we would like to improve the 33 thermal model of the nose landing gear. In order to do so, we will need to swap to TFL 34 129 every day for 3 minutes to gather temperature data not available in standard orbit 35 TFLs. You will see the two item entries required for this in your Flight Plan from FD3 36 through undocking. 37

38 Second, we would like you to activate two brake line heaters during the docked phase in 39 order to evaluate their effect on the tire temps. These heater actions will be added to 40 your Flight Plan on FD9 and then again post undocking. 41

42 5. MSG 017 should replace the HD Digital CC Dnlk procedure on pages 2-14 and 2-15 in 43

the Photo/TV Flight Supplement C/L. The updates include steps to configure color bars 44 and a black screen on the camcorder, which is used for pixel correction by the ground. 45

46 47 48 49 50

1

Page 3: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

MSG 011A - FD03 FLIGHT PLAN REVISION

END OF PAGE 2 OF 12, MSG 011A

1 6. DOUG targets for all of the operations on ULF2 are on board ISS and Msg 014 (ISS 18-2

0212) SSRMS DOUG Setup Notes for ULF2 is available to assist in DOUG setup if 3 desired for each of the Ops days. 4

5 7. The Elbow camera iris control sequence is exhibiting a failure, latching the first 6

Automatic Light Control "ALC" command. This failure is only in automatic iris settings. If 7 no image appears after nominal camera command sequence, push the pnl A7 "ALC" 8 button a second time. 9

10 8. Welcome to Station! This is just a friendly reminder that for the docked portion of the 11

mission, a message including stowage locations for all ISS activities will be uplinked and 12 printed on the Shuttle side at crew wake. The stowage locations include unstow and 13 restow information for all activities requiring ISS assets. Please feel free to call if you 14 have any questions. 15

16 9. REPLACE PAGES 3-20 THROUGH 3-29. 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

2

Page 4: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

FLT PLN/126/FLIGHT

D O C K I N G *

FD03

MNVR

NHNC4

TiΔ

ΔΔ

Δ

*1/21:09

FERGUSON

BOE

BOWEN

PIPER

KIMBROUGH

PETTIT

R1

R2/E

V3

R3/M

1

EV2

EV1

M2

MAGNUS

CHAMITOFF

FINCKE

LONCHAKOV

Δ RPM

REPL

ANNE

D

2-6

S T S - 1 2 6 U P I S S D N

13

1415

1617

1819

2021

2223

11/17

GMT 11/16/08 (321)

12

1314

1516

1718

1920

2122

23002/00

MET

Day 001

CDR

POST SLEEP

P T V 0 5

S E T U P

SLEEP

SIMO

INIT

ISS RNDZ OPS

APPROACH W/RPM

POST

RNDZ

PGSC

CONFG

SFTY

BRIEF

S S V - 2

! ! ! !

S S P T SO P C U @

P O S T

S L E E P

G R P B

P W R D N

G R P B

P W R U P

I M U

E X E R

F E S #H / O

R C S *

PLT

SLEEP

POST SLEEP

M C I U *

ISS RNDZ OPS

APPROACH W/RPM

M N V R

T E ASFTY

BRIEF

! ! !

G R P B

P W R U P

O B S S *

G R P B

P W R D N

PTV06

D O C K

A U D I O

MS1

OBSS

GRPL

SLEEP

APPROACH W/RPM

SFTY

BRIEF

ISS RNDZ OPS

W L E S

! ! ! !

POST SLEEP

EXERCISE

D S L V

D S L V

POST

SLEEP

MS2

EXERCISE

SLEEP

SIMO

TERM

APPROACH W/RPM

SFTY

BRIEF

EMU

RMVL

COND

CWC

S/U

S S V - 3

P T V O 4

S E T U P

PTVO4

OPS

INGR/EGR

! ! ! !

POST SLEEP

C N F G #

POST

SLEEP

D S L V

D S L V

POST

SLEEP

DIDB

R N D ZISS RNDZ OPS

MS3

SLEEP

APPROACH W/RPM

HATCH

LEAK CK

ODS

PREP

FOR

INGR

HATCH

OPEN

SFTY

BRIEF

EMU

RMVL

A H O Y

POST SLEEP

XFER

UPDATE

D S L V

D S L V

POST

SLEEP

DIDB

O 2 - I

O 2 - TEXERCISE

ISS

RNDZ

OPS

ISS

RNDZ

OPS

ISS RNDZ

OPS

MS4

POST SLEEP

ISS RNDZ OPS

APPROACH W/RPM

HATCH

LEAK CK

ODS

PREP

FOR

INGR

SFTY

BRIEF

HATCH

OPEN

! M A T

SLEEP

PTV06

L O GEXERCISE

A P C U #

A P C U *

P O S T

S L E E P

O B S S *

O I U - A

M D D K #

FE-2 EXP18

SLEEP

POST SLEEP

EXERCISE

P/TV02

DOCK

S/U

P/TV02 DOCK OPS

APPROACH W/RPM

SSC

SETUP

E Y ! !

SFTY

BRIEF

IELK

ISS CDR

SLEEP

POST SLEEP

PW

S H U T TDPC

P/TV

RPM

VRFY

S/U

EXERCISE

CEVIS

EXERCISE RED

MIDDAY-MEAL

P R E P

8 0 0 M M

F I L M

R P M D L

P M A 2

C F G

HATCH

LEAK

CK ISS

HATCH

OPEN

! ! ! !

SFTY

BRIEF

R T R

OBSS

GRPL

FE-1

SLEEP

POST SLEEP

PWDPCC N F G

VELO

EXERCISE TVIS

MIDDAY-MEAL

T I M E R

T I M E R

P/TV

DOC

HATCH

LEAK

CK ISS

СОЖ

MNT

С О Г С

S M P L

! ! ! !

SFTY

BRIEF

IELK

FE-2

SLEEP

URN

CLCT

I N SPOST SLEEP

PWDPC

P/TV

RPM

VRFY

S/U

EXERCISE RED

EXERCISE CEVIS

MIDDAY-MEAL

P R E P

4 0 0 M M

F I L M

P M A 2

C F G

D E A C T

NUTR

STOW

D O C K

A U D I O

HATCH

OPEN

! ! !

SFTY

BRIEF

VCA

DAY/NIGHT

ORBIT

2526

2728

2930

3132

33

TDRS

W -171.0

E -46.0

Z -275.0

-ZLV -XVV

-ZLV +YVV

RNDZ

DKBIAS -XLV -ZVV

ORB ATT

@ACT

#OFF

*HEATER RCNFG

*FILTER CHK

*H/O

#GALLEY

O/N

#ACT

*DEACT

#STATUS CHECK

NOTES

2-6

D O C K I N G *

FD03

MNVR

NHNC4

TiΔ

ΔΔ

Δ

*1/21:09

FERGUSON

BOE

BOWEN

PIPER

KIMBROUGH

PETTIT

R1

R2/E

V3

R3/M

1

EV2

EV1

M2

MAGNUS

CHAMITOFF

FINCKE

LONCHAKOV

Δ RPM

REPL

ANNE

D

S T S - 1 2 6 U P I S S D N

13

1415

1617

1819

2021

2223

11/17

GMT 11/16/08 (321)

12

1314

1516

1718

1920

2122

23002/00

MET

Day 001

CDR

POST SLEEP

P T V 0 5

S E T U P

SLEEP

SIMO

INIT

ISS RNDZ OPS

APPROACH W/RPM

POST

RNDZ

PGSC

CONFG

SFTY

BRIEF

S S V - 2

! ! ! !

S S P T SO P C U @

P O S T

S L E E P

G R P B

P W R D N

G R P B

P W R U P

I M U

E X E R

F E S #H / O

R C S *

PLT

SLEEP

POST SLEEP

M C I U *

ISS RNDZ OPS

APPROACH W/RPM

M N V R

T E ASFTY

BRIEF

! ! !

G R P B

P W R U P

O B S S *

G R P B

P W R D N

PTV06

D O C K

A U D I O

MS1

OBSS

GRPL

SLEEP

APPROACH W/RPM

SFTY

BRIEF

ISS RNDZ OPS

W L E S

! ! ! !

POST SLEEP

EXERCISE

D S L V

D S L V

POST

SLEEP

MS2

EXERCISE

SLEEP

SIMO

TERM

APPROACH W/RPM

SFTY

BRIEF

EMU

RMVL

COND

CWC

S/U

S S V - 3

P T V O 4

S E T U P

PTVO4

OPS

INGR/EGR

! ! ! !

POST SLEEP

C N F G #

POST

SLEEP

D S L V

D S L V

POST

SLEEP

DIDB

R N D ZISS RNDZ OPS

MS3

SLEEP

APPROACH W/RPM

HATCH

LEAK CK

ODS

PREP

FOR

INGR

HATCH

OPEN

SFTY

BRIEF

EMU

RMVL

A H O Y

POST SLEEP

XFER

UPDATE

D S L V

D S L V

POST

SLEEP

DIDB

O 2 - I

O 2 - TEXERCISE

ISS

RNDZ

OPS

ISS

RNDZ

OPS

ISS RNDZ

OPS

MS4

POST SLEEP

ISS RNDZ OPS

APPROACH W/RPM

HATCH

LEAK CK

ODS

PREP

FOR

INGR

SFTY

BRIEF

HATCH

OPEN

! M A T

SLEEP

PTV06

L O GEXERCISE

A P C U #

A P C U *

P O S T

S L E E P

O B S S *

O I U - A

M D D K #

FE-2 EXP18

SLEEP

POST SLEEP

EXERCISE

P/TV02

DOCK

S/U

P/TV02 DOCK OPS

APPROACH W/RPM

SSC

SETUP

E Y ! !

SFTY

BRIEF

IELK

ISS CDR

SLEEP

POST SLEEP

PW

S H U T TDPC

P/TV

RPM

VRFY

S/U

EXERCISE

CEVIS

EXERCISE RED

MIDDAY-MEAL

P R E P

8 0 0 M M

F I L M

R P M D L

P M A 2

C F G

HATCH

LEAK

CK ISS

HATCH

OPEN

! ! ! !

SFTY

BRIEF

R T R

OBSS

GRPL

FE-1

SLEEP

POST SLEEP

PWDPCC N F G

VELO

EXERCISE TVIS

MIDDAY-MEAL

T I M E R

T I M E R

P/TV

DOC

HATCH

LEAK

CK ISS

СОЖ

MNT

С О Г С

S M P L

! ! ! !

SFTY

BRIEF

IELK

FE-2

SLEEP

URN

CLCT

I N SPOST SLEEP

PWDPC

P/TV

RPM

VRFY

S/U

EXERCISE RED

EXERCISE CEVIS

MIDDAY-MEAL

P R E P

4 0 0 M M

F I L M

P M A 2

C F G

D E A C T

NUTR

STOW

D O C K

A U D I O

HATCH

OPEN

! ! !

SFTY

BRIEF

VCA

DAY/NIGHT

ORBIT

2526

2728

2930

3132

33

TDRS

W -171.0

E -46.0

Z -275.0

ORB ATT

-ZLV -XVV

-ZLV +YVV

RNDZ

DKBIAS -XLV -ZVV

NOTES

@ACT

#OFF

*HEATER RCNFG

*FILTER CHK

*H/O

#GALLEY

O/N

#ACT

*DEACT

#STATUS CHECK

3

Page 5: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

FLT PLN/126/FLIGHT

FD03

FERGUSON

BOE

BOWEN

PIPER

KIMBROUGH

R1

R2/E

V3

R3/M

1

EV2

EV1

FERGUSON

BOE

BOWEN

PIPER

KIMBROUGH

R1

R2/E

V3

EV2

EV1

MAGNUS

CHAMITOFF

FINCKE

M2

LONCHAKOV

PETTIT

NO EXERCISE

(WHILE OBSS GRAPPLED BY SRMS & SSRMS)

REPL

ANNE

D

2-8

S T S - 1 2 6 U P I S S D N

01

0203

0405

0607

0809

1011

12GMT 11/17/08 (322)

002/00

0102

0304

0506

0708

0910

1112

MET

Day 002

CDR

PRE SLEEP

SLEEP

PMC

A/G

PRE

SLEEP

MDDK XFER

X F E R

T A GM U S

EXER

T F L ^

PLT

SLEEP

OBSS

H/O

OBSS

H/O

FROM

SSRMS

O B S S *

PRE SLEEP

M U SEXERCISE

MS1

♣OBSS UNBRTH

U N G R P

H / OPRE SLEEP

SLEEP

X F E R

B R I E F

X F E R

T A G

D S L V

M U SMDDK XFER

PRE

SLEEP

MS2

SLEEP

PRE SLEEP

MDDK XFER

C N F G *

D S L V

DIDB

M O P

MS3

SLEEP

PRE SLEEP

P L Y B K

O P S

D S L V

MDDK XFER

EMU@

MS4

PRE SLEEP

SLEEP

OBSS

H/O

OBSS

H/O

FROM

SSRMS

O B S S *

M D D K #M U S

M O P

FE-2 EXP18

IELK

MDDK XFER

PWPW

SOKOL

LK CKDPCPMC

PRE SLEEP-ISS

SLEEP

ISS CDR

♣OBSS UNBRTH

U N G R P

H / O

J R N L

E N T R Y

PWPW

DPC

PRE SLEEP-ISS

SLEEP

FE-1

IELK

PWPW

SOKOL

LK CKDPC

PRE SLEEP-ISS

SLEEP

FE-2

V C AV D SIELK

SODF XFERDPC

PWPRE SLEEP-ISS

SLEEP

DAY/NIGHT

ORBIT

3334

3536

3738

3940

41

TDRS

W -171.0

E -46.0

Z -275.0

BIAS -XLV -ZVV

ORB ATT

♣OBSS GRPL

^129

*H/O

*GALLEY

MORNING

@XFER

#STATUS CHECK

NOTES

2-8

FD03

FERGUSON

BOE

BOWEN

PIPER

KIMBROUGH

R1

R2/E

V3

R3/M

1

EV2

EV1

FERGUSON

BOE

BOWEN

PIPER

KIMBROUGH

R1

R2/E

V3

EV2

EV1

MAGNUS

CHAMITOFF

FINCKE

M2

LONCHAKOV

PETTIT

NO EXERCISE

(WHILE OBSS GRAPPLED BY SRMS & SSRMS)

REPL

ANNE

D

S T S - 1 2 6 U P I S S D N

01

0203

0405

0607

0809

1011

12GMT 11/17/08 (322)

002/00

0102

0304

0506

0708

0910

1112

MET

Day 002

CDR

PRE SLEEP

SLEEP

PMC

A/G

PRE

SLEEP

MDDK XFER

X F E R

T A GM U S

EXER

T F L ^

PLT

SLEEP

OBSS

H/O

OBSS

H/O

FROM

SSRMS

O B S S *

PRE SLEEP

M U SEXERCISE

MS1

♣OBSS UNBRTH

U N G R P

H / OPRE SLEEP

SLEEP

X F E R

B R I E F

X F E R

T A G

D S L V

M U SMDDK XFER

PRE

SLEEP

MS2

SLEEP

PRE SLEEP

MDDK XFER

C N F G *

D S L V

DIDB

M O P

MS3

SLEEP

PRE SLEEP

P L Y B K

O P S

D S L V

MDDK XFER

EMU@

MS4

PRE SLEEP

SLEEP

OBSS

H/O

OBSS

H/O

FROM

SSRMS

O B S S *

M D D K #M U S

M O P

FE-2 EXP18

IELK

MDDK XFER

PWPW

SOKOL

LK CKDPCPMC

PRE SLEEP-ISS

SLEEP

ISS CDR

♣OBSS UNBRTH

U N G R P

H / O

J R N L

E N T R Y

PWPW

DPC

PRE SLEEP-ISS

SLEEP

FE-1

IELK

PWPW

SOKOL

LK CKDPC

PRE SLEEP-ISS

SLEEP

FE-2

V C AV D SIELK

SODF XFERDPC

PWPRE SLEEP-ISS

SLEEP

DAY/NIGHT

ORBIT

3334

3536

3738

3940

41

TDRS

W -171.0

E -46.0

Z -275.0

ORB ATT

BIAS -XLV -ZVV

NOTES

♣OBSS GRPL

^129

*H/O

*GALLEY

MORNING

@XFER

#STATUS CHECK

4

Page 6: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

FLT PLN/126/FLIGHT

03

FERGUSON

BOE

PETTIT

TRANSITION TO RNDZ C/L

at MET 01/15:35:00

< MNVR 1/14:20:00

FD03 EZ ACTIVITIES:

TEPC (ORB OPS, CREW SYS)

CHECK STATUS

√OCAC FILTER & MDDK DUCT SCREEN

HARD REBOOT ALL PGSCs EXCEPT:

STS-6(WLES),STS-3(KFX),

& OCA ROUTER.

REPL

ANNE

D

AA14 RCS/OMS HTR L POD B - OFF

A - AUTO

R POD B - OFF

A - AUTO

3-20

STS-

126

FD (

)

13:00

14:00

15:00

16:00

GMT

Date

11/16

(321)

12:00

13:00

14:00

15:00

16:00

MET

Day 001

WE

Z

T D R S

~

~~

D / N

D O R B 1 4 1 5 1 6

O R B 2 5 2 6 2 7

~ - Z L V - X V V - Z L V + Y V V ~S T S A T T

CDR

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)SL

EEP

~

SUPPLY/WASTE WATER DUMP

(ORB OPS, ECLS)

Initiate Supply/Waste Dump

Ref. MSG 011 Item 2

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L) ~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PRIORITY PWRUP GRP B

(ORB PKT, PRIOR PWRDN)

Steps 12 (IMU 1),10,9,6 (Triple G2),5

IMU STAR OF OPPTY ALIGN (ORB OPS,GNC)

RCS/OMS HEATER RECONFIG A

PLT

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

L17 Check MCIU filter screen

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L) ~

PRIORITY PWRUP GRP B

(ORB PKT, PRIOR PWRDN)

Steps 12 (IMU 1),10,9,6 (Triple G2),5

MS1

SLEEP

~

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L) ~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

DRY SALIVA CLCT(ORB OPS,SDBI)

DRY SALIVA CLCT(ORB OPS,SDBI)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

UPDATE

H2O WASTE

DUMP QTY

NOTES

3-20

03

FERGUSON

BOE

PETTIT

TRANSITION TO RNDZ C/L

at MET 01/15:35:00

< MNVR 1/14:20:00

FD03 EZ ACTIVITIES:

TEPC (ORB OPS, CREW SYS)

CHECK STATUS

√OCAC FILTER & MDDK DUCT SCREEN

HARD REBOOT ALL PGSCs EXCEPT:

STS-6(WLES),STS-3(KFX),

& OCA ROUTER.

REPL

ANNE

D

AA14 RCS/OMS HTR L POD B - OFF

A - AUTO

R POD B - OFF

A - AUTO

STS-

126

FD (

)

13:00

14:00

15:00

16:00

GMT

Date

11/16

(321)

12:00

13:00

14:00

15:00

16:00

MET

Day 001

WE

Z

T D R SD / N

D O R B 1 4 1 5 1 6

O R B 2 5 2 6 2 7

S T S A T T ~ - Z L V - X V V - Z L V + Y V V ~

CDR

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)SL

EEP

~

SUPPLY/WASTE WATER DUMP

(ORB OPS, ECLS)

Initiate Supply/Waste Dump

Ref. MSG 011 Item 2

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L) ~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PRIORITY PWRUP GRP B

(ORB PKT, PRIOR PWRDN)

Steps 12 (IMU 1),10,9,6 (Triple G2),5

IMU STAR OF OPPTY ALIGN (ORB OPS,GNC)

RCS/OMS HEATER RECONFIG

A

PLT

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

L17 Check MCIU filter screen

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L) ~

PRIORITY PWRUP GRP B

(ORB PKT, PRIOR PWRDN)

Steps 12 (IMU 1),10,9,6 (Triple G2),5

MS1

SLEEP

~

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L) ~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

DRY SALIVA CLCT(ORB OPS,SDBI)

DRY SALIVA CLCT (ORB OPS,SDBI)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

UPDATE

H2O WASTE

DUMP QTY

5

Page 7: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

FLT PLN/126/FLIGHT

03

BOWEN

PIPER KIMBROUGH MAGNUS

REPL

ANNE

D

SUPPLY/WASTE WATER DUMP

(ORB OPS, ECLS)

Terminate Supply/Waste Dump

Ref. MSG 011 Item 2

3-21

STS-

126

FD (

)

13:00

14:00

15:00

16:00

GMT

Date

11/16

(321)

12:00

13:00

14:00

15:00

16:00

MET

Day 001

WE

Z

T D R S

~

~~

D / N

D O R B 1 4 1 5 1 6

O R B 2 5 2 6 2 7

~ - Z L V - X V V - Z L V + Y V V ~S T S A T T

MS2

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

DRY SALIVA CLCT(ORB OPS,SDBI

)

DRY SALIVA CLCT(ORB OPS,SDBI

)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS3

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

DRY SALIVA CLCT (ORB OPS,SDBI

)

DRY SALIVA CLCT(ORB OPS,SDBI

)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP

~

FLIGHT SLEEP LOG

(ORB OPS, SDBI)

FE-2 (UP)

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EXERCISE

~

NOTES

3-21

03

BOWEN

PIPER KIMBROUGH MAGNUS

REPL

ANNE

D

SUPPLY/WASTE WATER DUMP

(ORB OPS, ECLS)

Terminate Supply/Waste Dump

Ref. MSG 011 Item 2

STS-

126

FD (

)

13:00

14:00

15:00

16:00

GMT

Date

11/16

(321)

12:00

13:00

14:00

15:00

16:00

MET

Day 001

WE

Z

T D R SD / N

D O R B 1 4 1 5 1 6

O R B 2 5 2 6 2 7

S T S A T T ~ - Z L V - X V V - Z L V + Y V V ~

MS2

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

DRY SALIVA CLCT(

ORB OPS,SDBI

)

DRY SALIVA CLCT (ORB OPS,SDBI

)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS3

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

DRY SALIVA CLCT (

ORB OPS,SDBI

)

DRY SALIVA CLCT (ORB OPS,SDBI

)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP

~

FLIGHT SLEEP LOG

(ORB OPS, SDBI)

FE-2 (UP)

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EXERCISE

~

NOTES

6

Page 8: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

FLT PLN/126/FLIGHT

03

< NH 1/16:08:15

< NC4 1/16:48:03

< Ti 1/18:31:09

RNDZ PET 00:00 (Ti)

at MET 01/18:31:09

FERGUSON

BOE

PETTIT

UPLINK

TFL 192

UPDATE

TFL 199

MPLM

PRESSURE

CHECk

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L)

REPL

ANNE

D

3-22

STS-

126

FD (

)

17:00

18:00

19:00

20:00

GMT

Date

11/16

(321)

16:00

17:00

18:00

19:00

20:00

MET

Day 001

WE

Z

T D R S

~

~~ ~

D / N

D O R B 1 2 3

O R B 2 8 2 9 3 0

~ ~R N D ZS T S A T T

CDR

~

PLT

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L)~

MS1

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L)~

NOTES

3-22

03

< NH 1/16:08:15

< NC4 1/16:48:03

< Ti 1/18:31:09

RNDZ PET 00:00 (Ti)

at MET 01/18:31:09

FERGUSON

BOE

PETTIT

UPLINK

TFL 192

UPDATE

TFL 199

MPLM

PRESSURE

CHECk

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L)

REPL

ANNE

DST

S-12

6 FD

(

)

17:00

18:00

19:00

20:00

GMT

Date

11/16

(321)

16:00

17:00

18:00

19:00

20:00

MET

Day 001

WE

Z

T D R SD / N

D O R B 1 2 3

O R B 2 8 2 9 3 0

S T S A T T ~ ~R N D Z

CDR

~

PLT

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L)~

MS1

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L)~

NOTES

7

Page 9: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

FLT PLN/126/FLIGHT

03

BOWEN

PIPER KIMBROUGH MAGNUS

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

P/TV02 DOCK

(PHOTO/TV, SCENES) Ops

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

ON MCC GO:SSPTS APCU 1 DEACT

A15 APCU 1 CONV - OFF

OUTPUT - OFF

MDDK STATUS CHECK (ASSY OPS, P/L)

EXERCISE

REPL

ANNE

D

BC5 DIRECT O2 vlv - CL

OCAC PWR - ON

SUPPLY/WASTE WATER DUMP

(ORB OPS, ECLS)

Terminate Supply/Waste Dump

Ref. MSG 011 Item 2

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

3-23

STS-

126

FD (

)

17:00

18:00

19:00

20:00

GMT

Date

11/16

(321)

16:00

17:00

18:00

19:00

20:00

MET

Day 001

WE

Z

T D R S

~

~~ ~

D / N

D O R B 1 2 3

O R B 2 8 2 9 3 0

~ ~R N D ZS T S A T T

MS2

EXERCISE

EMU REMOVAL

(EVA, AIRLOCK CONFIG)

Disconnect EMUs from AAPs

& Stow in Middeck

SHUTTLE CONDENSATE COLLECTION

(ORB OPS, ECLS)

Perform SETUP

Ref. MSG 011 Item 3

SSV OUTRATE - 3

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L)

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L)

MS3

EMU REMOVAL

(EVA, AIRLOCK CONFIG)

Disconnect EMUs from AAPs

& Stow in Middeck~

TRANSFER UPDATE

Ref. MSG 013

O2 REPRESS INIT

OCAC PWR - OFF

C5 DIRECT O2 vlv - OP

O2 REPRESS TERM on MCC GO B

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L)

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L)

MS4

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L)

EXERCISE

SSPTS APCU 1 ACT

A15 APCU 1 OUTPUT - ON

CONV - ON

SSP1 OIU PWR - OIU 1 ON (tb-UP)

FE-2 (UP)

EXERCISE

~

P/TV02 DOCK

(PHOTO/TV, SCENES)

Setup

NOTES

3-23

03

BOWEN

PIPER KIMBROUGH MAGNUS

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

P/TV02 DOCK

(PHOTO/TV, SCENES) Ops

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

ON MCC GO:SSPTS APCU 1 DEACT

A15 APCU 1 CONV - OFF

OUTPUT - OFF

MDDK STATUS CHECK (ASSY OPS, P/L)

EXERCISE

REPL

ANNE

D

BC5 DIRECT O2 vlv - CL

OCAC PWR - ON

SUPPLY/WASTE WATER DUMP

(ORB OPS, ECLS)

Terminate Supply/Waste Dump

Ref. MSG 011 Item 2

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

STS-

126

FD (

)

17:00

18:00

19:00

20:00

GMT

Date

11/16

(321)

16:00

17:00

18:00

19:00

20:00

MET

Day 001

WE

Z

T D R SD / N

D O R B 1 2 3

O R B 2 8 2 9 3 0

S T S A T T ~ ~R N D Z

MS2

EXERCISE

EMU REMOVAL

(EVA, AIRLOCK CONFIG)

Disconnect EMUs from AAPs

& Stow in Middeck

SHUTTLE CONDENSATE COLLECTION

(ORB OPS, ECLS)

Perform SETUP

Ref. MSG 011 Item 3

SSV OUTRATE - 3

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L)

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L)

MS3

EMU REMOVAL

(EVA, AIRLOCK CONFIG)

Disconnect EMUs from AAPs

& Stow in Middeck~

TRANSFER UPDATE

Ref. MSG 013

O2 REPRESS INIT

OCAC PWR - OFF

C5 DIRECT O2 vlv - OP

O2 REPRESS TERM on MCC GO B

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L)

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L)

MS4

RENDEZVOUS TIMELINE

(RNDZ, RENDEZVOUS T/L)

EXERCISE

SSPTS APCU 1 ACT

A15 APCU 1 OUTPUT - ON

CONV - ON

SSP1 OIU PWR - OIU 1 ON (tb-UP)

FE-2 (UP)

EXERCISE

~

P/TV02 DOCK

(PHOTO/TV, SCENES)

Setup

NOTES

8

Page 10: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

FLT PLN/126/FLIGHT

03

< D

OCKI

NG (

01/2

1:09

)RETURN TO FLIGHT PLAN

FERGUSON

BOE

PETTIT

D On MCC GO: A15 OPCU 1,2 CONV (two) - ON

R1 MN BUS TIE B - ON (tb-ON)

C - ON (tb-ON)

SSPTS ODS CONNECTOR VERIF

A15 ODS MATE X1,X2(two)-ON

√МCC then - OFF

C

UPLINK

β21 + MASK

Box 40,41,

60

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN)

Steps 6 (Single G2) & 12 (IMU 1)

06 STRK PWR -Z - OFF

UPLINK

β21 + MASK

Box 30,40,

41

UPLINK

TFL 184

REPL

ANNE

D

JOINT OPS: 6.103 HARDLINE AUDIO CONFIG

Steps 1,2,6,7

TOPPING FES DEACTIVATION

(ORB OPS, ECLS)

√DAP A/LVLH/VERN

MNVR (TRK) BIAS -XLV -ZVV

TG=2 BV=5 P=159 Y=355 OM=183

Init TRK, DAP:FREE >2 sec

Then: DAP:B12/AUTO/VERN

When in atttude, select DAP A

3-24

STS-

126

FD (

)

21:00

22:00

23:00

00:00

GMT

Date

11/16

(321)

20:00

21:00

22:00

23:00

00:00

MET

Day 001

WE

Z

T D R S

~

~

~ ~

D / N

D O R B 3 4 5 6

O R B 3 0 3 1 3 2 3 3

~ R N D Z D K ~B I A S - X L V - Z V VS T S A T T

CDR

P/TV05 ISS INTERNAL OPS (HC)

(PHOTO/TV, SCENES) Setup

APPROACH TIMELINE

(RNDZ, CUE CARD)

POST RNDZ PGSC CONFIG

Configure PGSCs SAFETY BRIEFING

SSV OUTRATE - 2

AHOY !!!

SSPTS ODS CONNECTOR VERIF C

SSPTS OPCU ACT D

EXERCISE

~

JOINT OPS: 3.111 HANDOVER ATTITUDE

CONTROL ORBITER to CMGTA

PLT

APPROACH TIMELINE

(RNDZ, CUE CARD)

SAFETY BRIEFING

AHOY !!!

OBSS HANDOFF FROM SSRMS TO SRMS

(PDRS, OBSS NOMINAL) Steps 1 and 2

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN)

Steps 6 (Single G2) & 12 (IMU 1)

06 STRK PWR -Z - OFF

P/TV06 ROBOTICS OPERATIONS

(PHOTO/TV, SCENES)

Setup & Ops

MS1

ROBOTICS: 1.110 OBSS UNBERTH & HANDOFF

Steps 1-5.2

~

APPROACH TIMELINE

(RNDZ, CUE CARD)

SAFETY BRIEFING

WLES DOCK/UNDOCK RECOVERY (ORB OPS, WLES)

AHOY !!!

EXERCISE

NOTES

3-24

03

< D

OCKI

NG (

01/2

1:09

)RETURN TO FLIGHT PLAN

FERGUSON

BOE

PETTIT

D On MCC GO: A15 OPCU 1,2 CONV (two) - ON

R1 MN BUS TIE B - ON (tb-ON)

C - ON (tb-ON)

SSPTS ODS CONNECTOR VERIF

A15 ODS MATE X1,X2(two)-ON

√МCC then - OFF

C

UPLINK

β21 + MASK

Box 40,41,

60

PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN)

Steps 6 (Single G2) & 12 (IMU 1)

06 STRK PWR -Z - OFF

UPLINK

β21 + MASK

Box 30,40,

41

UPLINK

TFL 184

REPL

ANNE

D

JOINT OPS: 6.103 HARDLINE AUDIO CONFIG

Steps 1,2,6,7

TOPPING FES DEACTIVATION

(ORB OPS, ECLS)

√DAP A/LVLH/VERN

MNVR (TRK) BIAS -XLV -ZVV

TG=2 BV=5 P=159 Y=355 OM=183

Init TRK, DAP:FREE >2 sec

Then: DAP:B12/AUTO/VERN

When in atttude, select DAP A

STS-

126

FD (

)

21:00

22:00

23:00

00:00

GMT

Date

11/16

(321)

20:00

21:00

22:00

23:00

00:00

MET

Day 001

WE

Z

T D R SD / N

D O R B 3 4 5 6

O R B 3 0 3 1 3 2 3 3

S T S A T T ~ R N D Z D K ~B I A S - X L V - Z V V

CDR

P/TV05 ISS INTERNAL OPS (HC)

(PHOTO/TV, SCENES) Setup

APPROACH TIMELINE

(RNDZ, CUE CARD)

POST RNDZ PGSC CONFIG

Configure PGSCs SAFETY BRIEFING

SSV OUTRATE - 2

AHOY !!!

SSPTS ODS CONNECTOR VERIF C

SSPTS OPCU ACT D

EXERCISE

~

JOINT OPS: 3.111 HANDOVER ATTITUDE

CONTROL ORBITER to CMGTA

PLT

APPROACH TIMELINE

(RNDZ, CUE CARD)

SAFETY BRIEFING

AHOY !!!

OBSS HANDOFF FROM SSRMS TO SRMS

(PDRS, OBSS NOMINAL) Steps 1 and 2

PRIORITY PWRDN GRP B

(ORB PKT, PRIOR PWRDN)

Steps 6 (Single G2) & 12 (IMU 1)

06 STRK PWR -Z - OFF

P/TV06 ROBOTICS OPERATIONS

(PHOTO/TV, SCENES)

Setup & Ops

MS1

ROBOTICS: 1.110 OBSS UNBERTH & HANDOFF

Steps 1-5.2

~

APPROACH TIMELINE

(RNDZ, CUE CARD)

SAFETY BRIEFING

WLES DOCK/UNDOCK RECOVERY (ORB OPS, WLES)

AHOY !!!

EXERCISE

NOTES

9

Page 11: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

FLT PLN/126/FLIGHT

03

BOWEN

PIPER KIMBROUGH MAGNUS

REPL

ANNE

D

3-25

STS-

126

FD (

)

21:00

22:00

23:00

00:00

GMT

Date

11/16

(321)

20:00

21:00

22:00

23:00

00:00

MET

Day 001

WE

Z

T D R S

~

~

~ ~

D / N

D O R B 3 4 5 6

O R B 3 0 3 1 3 2 3 3

~ R N D Z D K ~B I A S - X L V - Z V VS T S A T T

MS2

APPROACH TIMELINE

(RNDZ, CUE CARD)

SAFETY BRIEFING

P/TV04 INGRESS/EGRESS

(PHOTO/TV, SCENES)

Setup

P/TV04 INGRESS/EGRESS

(PHOTO/TV, SCENES)

Ops

AHOY!!!

GALLEY OVRNIGHT CONFIG (ORB OPS,ECLS)

DIDB FILL

FILL 8 DIDBs FROM GALLEY

REMOVE GAS

DISPOSE OF FILL TOOL IN WET TRASH

~

MS3

APPROACH TIMELINE

(RNDZ, CUE CARD)

POST DOCKING HATCH LEAK CHECK

(RNDZ, APDS)

A/L PREP FOR INGRESS

-AIRLOCK FAN ACTIVE

(RNDZ, APDS)

JOINT OPS: 2.104 HATCH OPENING

& SHUTTLE/ISS DUCT INSTALLATION

√MCC-H complete with step 1

Perform step 2-15

SAFETY BRIEFING

AHOY!!!

DIDB FILL

FILL 8 DIDBs FROM GALLEY

REMOVE GAS

DISPOSE OF FILL TOOL IN WET TRASH

MS4

APPROACH TIMELINE

(RNDZ, CUE CARD)

POST DOCKING HATCH LEAK CHECK

(RNDZ, APDS)

A/L PREP FOR INGRESS

-AIRLOCK FAN ACTIVE

(RNDZ, APDS)

SAFETY BRIEFING

JOINT OPS: 2.104 HATCH OPENING

& SHUTTLE/ISS DUCT INSTALLATION

√MCC-H complete with step 1

Perform step 2-15

AHOY!!!

P/TV06 ROBOTICS OPERATIONS

(PHOTO/TV, SCENES)

Setup & Ops

OBSS HANDOFF FROM SSRMS TO SRMS

(PDRS, OBSS NOMINAL) Steps 1 & 2

FE-2 (UP)

APPROACH TIMELINE

(RNDZ, CUE CARD)

SSC 16 SETUP

Ref. MSG 004 AH

OY!!!

SAFETY BRIEFING

IELK INSTALL & C/O

Ref. Middeck Transfer List:

Item 23,23.1

Ref. MPLM Return Transfer List:

Item 767

~

NOTES

3-25

03

BOWEN

PIPER KIMBROUGH MAGNUS

REPL

ANNE

DST

S-12

6 FD

(

)

21:00

22:00

23:00

00:00

GMT

Date

11/16

(321)

20:00

21:00

22:00

23:00

00:00

MET

Day 001

WE

Z

T D R SD / N

D O R B 3 4 5 6

O R B 3 0 3 1 3 2 3 3

S T S A T T ~ R N D Z D K ~B I A S - X L V - Z V V

MS2

APPROACH TIMELINE

(RNDZ, CUE CARD)

SAFETY BRIEFING

P/TV04 INGRESS/EGRESS

(PHOTO/TV, SCENES)

Setup

P/TV04 INGRESS/EGRESS

(PHOTO/TV, SCENES)

Ops

AHOY!!!

GALLEY OVRNIGHT CONFIG

(ORB OPS,ECLS)

DIDB FILL

FILL 8 DIDBs FROM GALLEY

REMOVE GAS

DISPOSE OF FILL TOOL IN WET TRASH

~

MS3

APPROACH TIMELINE

(RNDZ, CUE CARD)

POST DOCKING HATCH LEAK CHECK

(RNDZ, APDS)

A/L PREP FOR INGRESS

-AIRLOCK FAN ACTIVE

(RNDZ, APDS)

JOINT OPS: 2.104 HATCH OPENING

& SHUTTLE/ISS DUCT INSTALLATION

√MCC-H complete with step 1

Perform step 2-15

SAFETY BRIEFING

AHOY!!!

DIDB FILL

FILL 8 DIDBs FROM GALLEY

REMOVE GAS

DISPOSE OF FILL TOOL IN WET TRASH

MS4

APPROACH TIMELINE

(RNDZ, CUE CARD)

POST DOCKING HATCH LEAK CHECK

(RNDZ, APDS)

A/L PREP FOR INGRESS

-AIRLOCK FAN ACTIVE

(RNDZ, APDS)

SAFETY BRIEFING

JOINT OPS: 2.104 HATCH OPENING

& SHUTTLE/ISS DUCT INSTALLATION

√MCC-H complete with step 1

Perform step 2-15

AHOY!!!

P/TV06 ROBOTICS OPERATIONS

(PHOTO/TV, SCENES)

Setup & Ops

OBSS HANDOFF FROM SSRMS TO SRMS

(PDRS, OBSS NOMINAL) Steps 1 & 2

FE-2 (UP)

APPROACH TIMELINE

(RNDZ, CUE CARD)

SSC 16 SETUP

Ref. MSG 004 AH

OY!!!

SAFETY BRIEFING

IELK INSTALL & C/O

Ref. Middeck Transfer List:

Item 23,23.1

Ref. MPLM Return Transfer List:

Item 767

~

NOTES

10

Page 12: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

FLT PLN/126/FLIGHT

03

FERGUSON

BOE

PETTIT

NO EXERCISE

WHILE OBSS

GRAPPLED BY

SRMS & SSRMS

REPL

ANNE

D

ROBOTICS: 1.110 OBSS UNBERTH & HANDOFF

Steps 1-5.2

SM SPEC 62

ITEM 1 -EXEC

Wait 3 MINUTES

ITEM 2 -EXEC

RESUME

E

3-26

STS-

126

FD (

)

01:00

02:00

03:00

04:00

GMT

Date

11/17

(322)

00:00

01:00

02:00

03:00

04:00

MET

Day 002

WE

Z

T D R S

~

~~ ~

D / N

D O R B 6 7 8

O R B 3 3 3 4 3 5

~ ~B I A S - X L V - Z V VS T S A T T

CDR

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PRIVATE MEDICAL CONFERENCE (A/G)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√ Hum Seps for H2O Accumulation

MIDDECK XFER

Ref. Middeck Transfer List

TRANSFER TAGUP

Coordinate with xfer counterpart

MUS LOG (ASSY OPS, PAYLOADS)

EXERCISE

~

TFL 129 FOR NLG

E

PLT

OBSS HANDOFF FROM SSRMS TO SRMS

(PDRS, OBSS NOMINAL)Steps 6-8

OBSS HANDOFF FROM SSRMS TO SRMS

(PDRS, OBSS NOMINAL)Step 9

OBSS HANDOFF FROM SSRMS TO SRMS

(PDRS, OBSS NOMINAL) Steps 3-5

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MUS LOG

(ASSY OPS, PAYLOADS)

EXERCISE

MS1

~

ROBO: 1.110 OBSS UNBERTH & HANDOFF

Steps 5.3-9

ROBO: 1.111 OBSS RELEASE AT HANDOFF

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

TRANSFER BRIEF

Call down status to MCC

TRANSFER TAGUP

Coordinate with xfer counterpart

MUS LOG (ASSY OPS, PAYLOADS)

MIDDECK XFER

Ref. Middeck Transfer List

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

3-26

03

FERGUSON

BOE

PETTIT

NO EXERCISE

WHILE OBSS

GRAPPLED BY

SRMS & SSRMS

REPL

ANNE

D

ROBOTICS: 1.110 OBSS UNBERTH & HANDOFF

Steps 1-5.2

SM SPEC 62

ITEM 1 -EXEC

Wait 3 MINUTES

ITEM 2 -EXEC

RESUME

E

STS-

126

FD (

)

01:00

02:00

03:00

04:00

GMT

Date

11/17

(322)

00:00

01:00

02:00

03:00

04:00

MET

Day 002

WE

Z

T D R SD / N

D O R B 6 7 8

O R B 3 3 3 4 3 5

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PRIVATE MEDICAL CONFERENCE (A/G)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√ Hum Seps for H2O Accumulation

MIDDECK XFER

Ref. Middeck Transfer List

TRANSFER TAGUP

Coordinate with xfer counterpart

MUS LOG (ASSY OPS, PAYLOADS)

EXERCISE

~

TFL 129 FOR NLG

E

PLT

OBSS HANDOFF FROM SSRMS TO SRMS

(PDRS, OBSS NOMINAL)Steps 6-8

OBSS HANDOFF FROM SSRMS TO SRMS

(PDRS, OBSS NOMINAL)Step 9

OBSS HANDOFF FROM SSRMS TO SRMS

(PDRS, OBSS NOMINAL) Steps 3-5

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MUS LOG

(ASSY OPS, PAYLOADS)

EXERCISE

MS1

~

ROBO: 1.110 OBSS UNBERTH & HANDOFF

Steps 5.3-9

ROBO: 1.111 OBSS RELEASE AT HANDOFF

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

TRANSFER BRIEF

Call down status to MCC

TRANSFER TAGUP

Coordinate with xfer counterpart

MUS LOG (ASSY OPS, PAYLOADS)

MIDDECK XFER

Ref. Middeck Transfer List

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

11

Page 13: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

FLT PLN/126/FLIGHT

03

BOWEN

PIPER KIMBROUGH MAGNUS

MIDDECK XFER

Ref. Middeck Transfer List

NO EXERCISE

WHILE OBSS

GRAPPLED BY

SRMS & SSRMS

REPL

ANNE

D

MIDDECK XFER

Ref. MSG013

Ref. MIDDECK TRANSFER LIST:

Items 5,5.1,5.1.1,13,13.1-13.4,

24,25,29,46,46.1,46.2,716

3-27

STS-

126

FD (

)

01:00

02:00

03:00

04:00

GMT

Date

11/17

(322)

00:00

01:00

02:00

03:00

04:00

MET

Day 002

WE

Z

T D R S

~

~~ ~

D / N

D O R B 6 7 8

O R B 3 3 3 4 3 5

~ ~B I A S - X L V - Z V VS T S A T T

MS2

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

√ All EVA drink bags fills complete

THEN: GALLEY MORNING CONFIG

(ORB OPS, ECLS

)

DIDB FILL

FILL 8 DIDBs FROM GALLEY

REMOVE GAS

DISPOSE OF FILL TOOL IN WET TRASH

~

MOP QUESTIONNAIRE

(ASSY OPS, PAYLOADS)

MS3

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

CANNON G1 HD DIGITAL CC DNLK

Ref. MSG 017

KU TDRW (02:15-02:51)

EMU TRANSFER TO ISS

Ref. MIDDECK TRANSFER LIST:

Items 51,52

MS4

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

OBSS HANDOFF FROM SSRMS TO SRMS

(PDRS, OBSS NOMINAL) Steps 6-8

OBSS HANDOFF FROM SSRMS TO SRMS

(PDRS, OBSS NOMINAL)Step 9

OBSS HANDOFF FROM SSRMS TO SRMS

(PDRS, OBSS NOMINAL)Steps 3-5

MDDK STATUS CHECK (ASSY OPS, P/L)

MUS LOG (ASSY OPS, PAYLOADS)

MOP QUESTIONNAIRE

(ASSY OPS, PAYLOADS)

FE-2 (UP)

IELK INSTALL & C/O

Ref. Middeck Transfer List:

Item 23,23.1

Ref. MPLM Return Transfer List:

Item 767

~

MIDDECK XFER

Ref. Middeck Transfer List

PREP WORK

PREP WORK

SOKOL LEAK CHECK

DAILY PLANNING CONFERENCE (DPC)

PRIVATE MEDICAL CONFERENCE (A/G)

PRE SLEEP-ISS

~

NOTES

3-27

03

BOWEN

PIPER KIMBROUGH MAGNUS

MIDDECK XFER

Ref. Middeck Transfer List

NO EXERCISE

WHILE OBSS

GRAPPLED BY

SRMS & SSRMS

REPL

ANNE

D

MIDDECK XFER

Ref. MSG013

Ref. MIDDECK TRANSFER LIST:

Items 5,5.1,5.1.1,13,13.1-13.4,

24,25,29,46,46.1,46.2,716

STS-

126

FD (

)

01:00

02:00

03:00

04:00

GMT

Date

11/17

(322)

00:00

01:00

02:00

03:00

04:00

MET

Day 002

WE

Z

T D R SD / N

D O R B 6 7 8

O R B 3 3 3 4 3 5

S T S A T T ~ ~B I A S - X L V - Z V V

MS2

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

√ All EVA drink bags fills complete

THEN: GALLEY MORNING CONFIG

(ORB OPS, ECLS

)

DIDB FILL

FILL 8 DIDBs FROM GALLEY

REMOVE GAS

DISPOSE OF FILL TOOL IN WET TRASH

~

MOP QUESTIONNAIRE

(ASSY OPS, PAYLOADS)

MS3

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

CANNON G1 HD DIGITAL CC DNLK

Ref. MSG 017

KU TDRW (02:15-02:51)

EMU TRANSFER TO ISS

Ref. MIDDECK TRANSFER LIST:

Items 51,52

MS4

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

OBSS HANDOFF FROM SSRMS TO SRMS

(PDRS, OBSS NOMINAL) Steps 6-8

OBSS HANDOFF FROM SSRMS TO SRMS

(PDRS, OBSS NOMINAL)Step 9

OBSS HANDOFF FROM SSRMS TO SRMS

(PDRS, OBSS NOMINAL)Steps 3-5

MDDK STATUS CHECK (ASSY OPS, P/L)

MUS LOG

(ASSY OPS, PAYLOADS)

MOP QUESTIONNAIRE

(ASSY OPS, PAYLOADS)

FE-2 (UP)

IELK INSTALL & C/O

Ref. Middeck Transfer List:

Item 23,23.1

Ref. MPLM Return Transfer List:

Item 767

~

MIDDECK XFER

Ref. Middeck Transfer List

PREP WORK

PREP WORK

SOKOL LEAK CHECK

DAILY PLANNING CONFERENCE (DPC)

PRIVATE MEDICAL CONFERENCE (A/G)

PRE SLEEP-ISS

~

NOTES

12

Page 14: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

FLT PLN/126/FLIGHT

03

FERGUSON

BOE

PETTIT

REPL

ANNE

D

3-28

STS-

126

FD (

)

05:00

06:00

07:00

08:00

GMT

Date

11/17

(322)

04:00

05:00

06:00

07:00

08:00

MET

Day 002

WE

Z

T D R S

~

~

~

D / N

D O R B 8 9 1 0 1 1

O R B 3 6 3 7 3 8

~ ~B I A S - X L V - Z V VS T S A T T

CDR

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

PLT

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS1

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

DRY SALIVA CLCT (ORB OPS,SDBI)

NOTES

3-28

03

FERGUSON

BOE

PETTIT

REPL

ANNE

DST

S-12

6 FD

(

)

05:00

06:00

07:00

08:00

GMT

Date

11/17

(322)

04:00

05:00

06:00

07:00

08:00

MET

Day 002

WE

Z

T D R SD / N

D O R B 8 9 1 0 1 1

O R B 3 6 3 7 3 8

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

PLT

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS1

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

DRY SALIVA CLCT (ORB OPS,SDBI)

NOTES

13

Page 15: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

FLT PLN/126/FLIGHT

03

BOWEN

PIPER KIMBROUGH MAGNUS

REPL

ANNE

D

3-29

STS-

126

FD (

)

05:00

06:00

07:00

08:00

GMT

Date

11/17

(322)

04:00

05:00

06:00

07:00

08:00

MET

Day 002

WE

Z

T D R S

~

~

~

D / N

D O R B 8 9 1 0 1 1

O R B 3 6 3 7 3 8

~ ~B I A S - X L V - Z V VS T S A T T

MS2

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

DRY SALIVA CLCT(ORB OPS,SDBI

)

MS3

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

DRY SALIVA CLCT(ORB OPS,SDBI

)

MS4

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

FE-2 (UP)

PRE SLEEP-ISS

~

SLEEP

~

NOTES

3-29

03

BOWEN

PIPER KIMBROUGH MAGNUS

REPL

ANNE

DST

S-12

6 FD

(

)

05:00

06:00

07:00

08:00

GMT

Date

11/17

(322)

04:00

05:00

06:00

07:00

08:00

MET

Day 002

WE

Z

T D R SD / N

D O R B 8 9 1 0 1 1

O R B 3 6 3 7 3 8

S T S A T T ~ ~B I A S - X L V - Z V V

MS2

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

DRY SALIVA CLCT (

ORB OPS,SDBI

)

MS3

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

DRY SALIVA CLCT (

ORB OPS,SDBI

)

MS4

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP

~

FE-2 (UP)

PRE SLEEP-ISS

~

SLEEP

~

NOTES

14

Page 16: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

MSG 012 - FD03 MISSION SUMMARY

Good Morning Endeavour!! 1 2 3 4 5 6 7 8 9

10

All of you did an awesome job yesterday! Have a great rendezvous day! YOUR CURRENT ORBIT IS: 132 X 114 NM NOTAMS: 11

12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

NOTAMS - ONE CHANGE ILM – RWY 06/24 CLOSED. EDW – EDT IN USE FOR STS-126. EDW ELS DAY / VFR ONLY. EDW – LAKEBED RUNWAY 15/33 ELS ONLY. OTHER LAKEBED RWYS RED. NOR – LAKEBED RUNWAYS GREEN. DOV – RWY 14/32 CLOSED. HAW – RWY 13 THLD DISPLACED, 9,019’ USABLE. AMB – RWY 15/33 CLOSED. YHZ – RWY 05/23 CLOSED. YYT – RWY 16/34 CLOSED. IKF – NOT USABLE. NO AGREEMENT. BEN – NOT RECOMMENDED/NOT SUPPORTED. ZZA – FIRST 600M (~2,000’) OF RWY 30L NOT AVAILABLE. 10,200’ REMAINING. NEXT 2 PLS OPPORTUNITIES: 29

30 31 32 33 34

EDT04L ORB 33 – 2/00:24 FEW250 7 040/07P9 EDT04L ORB 49 – 3/00:50 SKC 7 040/07P9 OMS TANK FAIL CAPABILITY: 35

36 37 38 39 40

L OMS FAILS: NO R OMS FAILS: NO LEAKING OMS PRPLT BURN: 41

42 43 44 45 46

L OMS LEAK: ALWAYS BURN RETROGRADE R OMS LEAK: ALWAYS BURN RETROGRADE OMS QUANTITIES(%) 47

48 49 50 51

L OMS OX = 33.8 R OMS OX = 34.0 FU = 33.5 FU = 33.8 Subtract interconnect counter for current OMS quantities.

END OF PAGE 1 OF 2, MSG 012 15

Page 17: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

MSG 012 - FD03 MISSION SUMMARY

DELTA V AVAILABLE: 1 2 3 4

OMS 311 FPS ARCS (TOTAL ABOVE QTY1) 28 FPS 5

6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21

TOTAL IN THE AFT 339 FPS ARCS (TOTAL ABOVE QTY2) 57 FPS FRCS (ABOVE QTY 1) 39 FPS AFT QTY 1 86 % AFT QTY 2 48 %

SYSTEM FAILURE IMPACT WORK AROUND

EPS Fuel Cell 1 H2 flowmeter is erratic. (SPEC 69 FUEL CELLS, FC 1 FLOW H2).

Loss of insight into Fuel Cell 1 H2 flow.

None. MCC has additional insight into the health of Fuel Cell 1. Onboard FDA has been inhibited.

INST/COMM Elbow Camera Automatic Light Control (ALC) command sequence

Additional command needed to activate automatic iris control

After Elbow Camera selection and standard iris control “ALC” – “AVG”, push “ALC” a second time to activate iris.

22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

END OF PAGE 2 OF 2, MSG 012 16

Page 18: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

MSG 004 (18-0213) – SSC 16 SETUP Page 1 of 3

Page 1 of 3, MSG 004 (18-0213)

OBJECTIVE: 1 This will convert Aft Flight Deck laptop to SSC Client. 2 3 UNSTOW: 4 A31p 60 GB Hard Drive P/N: SEG33115359-301 S/N: 1326 5 A31p UltraPort Camera P/N: SEG33115371-301 6 Wireless Network Card P/N: 1F15983-1 7 8 9

SETUP AFT FLIGHT DECK PCS AS SSC16 10 1. √Aft Flight Deck PCS pwr – OFF 11

12 2. Swap hard drive with A31P 60GB hard drive (s/n 1326) (Refer to 2.405 13

A31P 60 GB HARD DRIVE CHANGEOUT, steps 4 through 14 (POC: 14 NOMINAL: THINKPAD), then: 15

16 3. Temp stow original hard drive 17

18 4. Open small cover above Interposer (Refer to Figure 1) 19

20 Figure 1 - A31p UltraPort Camera Position 21

22 5. Move and hold Release Latch towards angled side of A31p UltraPort 23

camera. Align metal legs below A31p Ultraport camera with holes inside 24 Interposer and place camera on Interposer (Refer to Figures 1 and 2) 25

26 Figure 2 - A31p UltraPort Camera 27 28

6. Release latch to properly secure A31p UltraPort camera. 29 30 7. √A31p UltraPort camera properly secured and does not disconnect. 31 8. Rotate lens so that lens is directed towards user. (Refer to Figure 2) 32

Interposer

Lens

Release Latch

Aft Flight Deck PCS

17

Page 19: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

MSG 004 (18-0213) – SSC 16 SETUP Page 2 of 3

Page 2 of 3, MSG 004 (18-0213)

1 9. Insert Wireless Network Card into top-most PCMCIA card slot 2

3 10. Aft Deck PCS pwr – ON (Henceforth referred to as SSC16) 4

5 11. Log into SSC16 as crewmember 6

For appropriate logon information, refer to {5.202 SSC USER LOGON 7 ACCOUNTS} (POC: REFERENCE: OPS LAN) 8

9 12. Verify connectivity to ISS_AP1 or ISS_AP2 (Refer to Figure 3) 10

11 13. √Signal strength > 2 (Refer to Figure 3) 12

13

14 Figure 3: Netgear Wireless Assistant 15

16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

SSC16

18

Page 20: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

MSG 004 (18-0213) – SSC 16 SETUP Page 3 of 3

Page 3 of 3, MSG 004 (18-0213)

1 *********************************************************************** 2 If Netgear monitor does not appear or low to no connectivity 3 Eject Wireless Network Card from PCMCIA slot 4 5 RJ-45 Ethernet cable →|← SSC16 Ethernet port 6 7 sel Start > Settings > Control Panel 8 9 Double-click Network Connection 10 11 Right-click Local Area Connection (Refer to Figure 4) 12 13 sel Enable (Refer to Figure 4) 14 15

16 Figure 4: Network Connections 17 18 Open PingMaster and verify connectivity to OpsLAN 19 20 Close all windows 21 *********************************************************************** 22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

**

**

**

**

**

**

**

**

**

**

**

**

**

**

**

**

*

19

Page 21: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

18-0

218

(MSG

010

) - S

tow

age

Loca

tions

for F

D03

(GM

T 32

1)

Pag

e 1

of 4

P

age

1 of

4, 1

8-02

18 (M

SG

010

)

Con

tent

s:

Tim

elin

e Pr

oced

ures

: N

UTR

/REP

-FE2

UR

N-C

LT

NU

TR/R

EP-F

E2 U

RN

-INS

N

UTR

/REP

-FE2

UR

N-S

TW

ISS-

HAT

CH

LEA

K C

HEC

K IS

S-H

ATC

H O

PEN

Ta

sklis

t Pro

cedu

res:

P/

TV-D

CS

D2X

-CLN

S&

M-L

AB1S

3-PR

EP

S&M

-LAB

1P4-

PREP

S&

M-L

AB1D

4-PR

EP

Tim

elin

e Pr

oced

ures

: N

UTR

/REP

-FE2

UR

N-C

LT

NU

TR/R

EP-F

E2 U

RN

-INS

NU

TR/R

EP-F

E2 U

RN

-STW

2.

003

NU

TRIT

ION

UR

INE

CO

LLEC

TIO

N W

ITH

REP

OSI

TOR

Y Ty

pe: S

tand

ard

IMS

Plan

: No

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

Cre

w P

ref

Kap

ton

Tape

1"

528-

4135

3-1

- -

2

Tem

p St

ow

Zipl

ock

-

- -

Siz

e is

cre

w p

ref,

use

to

gath

er d

ry tr

ash.

3

Dew

ar A

SE

Pou

ch

0329

8 03

J M

EFD

AP0

3J

4

JPM

1D4_

B1

W

hite

Glo

ves

0329

1-1

Any

Any

Ty

pe:

Res

tow

IM

S Pl

an: N

o 5

Stag

e fo

r Tra

sh

HR

F U

rine

Con

tain

men

t Bag

S

DD

4610

7234

-306

-

- P

er C

CD

6

JPM

1D4

Dew

ar 1

, Tra

y B

, S

ectio

n 4

Sam

ples

-

- -

Bun

dled

with

Kap

ton

Tape

.

7 JP

M1F

1_D

2 1.

0 C

TB: H

RF,

S/N

10

36, B

/C 0

0292

1J

Urin

e C

olle

ctio

n K

it S

JG46

1164

35-3

03

- H

RF0

7943

J

8 JP

M1F

5_G

1 1.

0 C

TB, S

/N 1

246,

B

/C 0

1058

2J

Sam

ple

Tube

Dis

pens

er

SE

G46

1169

31-3

31

- H

RF0

5472

J

20

Page 22: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

18-0

218

(MSG

010

) - S

tow

age

Loca

tions

for F

D03

(GM

T 32

1)

Pag

e 2

of 4

P

age

2 of

4, 1

8-02

18 (M

SG

010

)

ISS-

HA

TCH

LEA

K C

HEC

K

2.10

2 PO

ST D

OC

KIN

G H

ATC

H L

EAK

CH

ECK

- IS

S Ty

pe: S

tand

ard

IMS

Plan

: No

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

VA

J-78

-1 5

ft 68

3-17

111-

1 -

0000

2677

J

2 M

PE

V In

tern

al S

ampl

ing

Ada

pter

(IS

A)

97M

5583

0-1

2 00

0002

M

3

NO

D1D

0 0.

5 C

TB: I

SA/

Mul

timet

er it

ems

for

ULF

-2, S

/N 1

240,

B

/C 0

1042

1J

I

SA

Sco

pem

eter

Pre

ssur

e P

robe

15

25,7

60M

MH

GA

/ 30

PSIA

00

5023

4399

91

0000

09M

A

ttach

ed to

MP

EV

ISA

4 M

ultim

eter

Kit

1011

8-10

018-

04

1017

-

5

LAB

1P6

M

ultim

eter

87

-

0007

2526

K La

bele

d “V

’ger

” 6

Cre

w P

ref

Ear

plug

s 28

-00-

05

- -

IS

S-H

ATC

H O

PEN

2.

104

HA

TCH

OPE

NIN

G A

ND

SH

UTT

LE/IS

S D

UC

T IN

STA

LLA

TIO

N

Type

: Sta

ndar

d IM

S Pl

an: N

o #

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1

Nitr

ile G

love

s A

ssy

SE

G33

1168

07-3

01

- -

Sub

stitu

te fo

r Rub

ber

Glo

ves

if no

ne fo

und.

2

NO

D1O

4_C

1 0.

5 C

TB: R

ubbe

r G

love

s, S

/N 1

159,

B

/C 0

0660

8J

Dee

rski

n G

love

s 52

8-41

517-

2 -

-

3

Tow

el

- -

-

4

Cre

w P

ref

Flas

hlig

ht

5

DO

CKI

NG

MEC

HA

NIS

M A

CC

ESS

OR

Y KI

T 33У.

9962

.003

-

- M

esh

bag

6

Ручка

11Ф

732.Г1

021-ОА

- -

AP

AS

Hat

ch T

ool

7

C

lean

ing

Pad

s 33У.

9938

.002

-

-

8

H

atch

Cov

er

33У.

9936

.021

-

- A

PA

S H

atch

Cov

er

9

S

tand

off C

over

Bag

Ass

y S

EM

3912

5998

-301

-

- D

ocki

ng T

arge

t Sta

ndof

f C

ross

Bag

10

Tar

get B

ase

Cov

er A

ssy

SE

M39

1259

97-3

01

- -

Doc

king

Tar

get B

ase

Pla

te C

over

11

NO

D2D

0

1

1/2

Inch

Wre

nch

528-

2094

2-1

- -

1 1/

2" O

pen

End

Wre

nch

21

Page 23: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

18-0

218

(MSG

010

) - S

tow

age

Loca

tions

for F

D03

(GM

T 32

1)

Pag

e 3

of 4

P

age

3 of

4, 1

8-02

18 (M

SG

010

)

Task

list P

roce

dure

s:

P/TV

-DC

S D

2X-C

LN

18- 0

071

3.49

9 D

2Xs

SEN

SOR

CLE

AN

ING

Ty

pe: S

tand

ard

IMS

Plan

: No

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

Wat

er M

icro

biol

ogy

Kit

SE

G46

1199

90-3

03

1001

C

HC

WM

K01

J

2 LA

B1P

4 M

icro

biol

ogy

Wat

er A

naly

sis

Syr

inge

60c

c K

LSK2

7024

8-30

2 -

- N

o ne

edle

S&M

-LA

B1S

3-PR

EP

1.2

15 P

REP

AR

E LA

B F

OR

RA

CK

INST

ALL

ATI

ON

ON

ULF

2 Ty

pe: S

tand

ard

IMS

Plan

: No

# LO

CA

TIO

N

ITEM

NA

ME

P/N

S/

N

B/C

N

otes

1

Cre

w P

ref

Dig

ital C

amer

a

2

ARIS

- Pi

vot F

ittin

g Bo

ttom

Lef

t 68

3-61

711-

31

REP

OR

T R

EPO

RT

3 C

OL1

O4_

A2

1.0

CTB

: Mec

hani

cal

Um

bilic

al A

ssy,

P

ushr

od A

ssy

S/M

S

/N 1

148,

B/C

00

4142

J

ARIS

- Pi

vot F

ittin

g Bo

ttom

Rig

ht

683-

6171

1-32

R

EPO

RT

REP

OR

T R

epor

t S/N

’s to

MC

C-H

Type

: Res

tow

IM

S Pl

an: N

o 4

Rac

k U

IP C

lose

out P

anel

68

3-60

410-

1 R

EPO

RT

REP

OR

T 5

NO

D1S

4_G

R

ack

Upp

er C

lose

out S

eal

683-

6043

1-2

REP

OR

T R

EPO

RT

6 R

ack

Gro

undi

ng S

trap

Bra

cket

68

3-56

200

REP

OR

T R

EPO

RT

7 R

ack

Gro

undi

ng S

trap

Bra

cket

68

3-56

200

REP

OR

T R

EPO

RT

8 IH

I/MH

I Piv

ot F

ittin

g Bo

ttom

, Lef

t 68

3-20

100-

1 R

EPO

RT

REP

OR

T 9

CO

L1O

4_A2

1.

0 C

TB: M

echa

nica

l U

mbi

lical

Ass

y,

Pus

hrod

Ass

y S/

M

S/N

114

8, B

/C

0041

42J

IHI/M

HI P

ivot

Fitt

ing

Botto

m, R

ight

68

3-20

100-

2 R

EPO

RT

REP

OR

T

Rep

ort S

/N’s

to M

CC

-H

22

Page 24: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

18-0

218

(MSG

010

) - S

tow

age

Loca

tions

for F

D03

(GM

T 32

1)

Pag

e 4

of 4

P

age

4 of

4, 1

8-02

18 (M

SG

010

)

S&M

-LA

B1P

4-PR

EP

1.21

5 PR

EPA

RE

LAB

FO

R R

AC

K IN

STA

LLA

TIO

N O

N U

LF2

Type

: Sta

ndar

d IM

S Pl

an: N

o #

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 C

rew

Pre

f D

igita

l Cam

era

- -

-

Type

: Res

tow

IM

S Pl

an: N

o 2

CO

L1O

4_A2

1.

0 C

TB: M

echa

nica

l U

mbi

lical

Ass

y,

Pus

hrod

Ass

y S/

M

S/N

114

8, B

/C

0041

42J

ARIS

- Pi

vot F

ittin

g Bo

ttom

Rig

ht

683-

6171

1-32

R

EPO

RT

REP

OR

T R

epor

t S/N

’s to

MC

C-H

S&M

-LA

B1D

4-PR

EP

1.21

5 PR

EPA

RE

LAB

FO

R R

AC

K IN

STA

LLA

TIO

N O

N U

LF2

Type

: Sta

ndar

d IM

S Pl

an: N

o #

LOC

ATI

ON

IT

EM N

AM

E P/

N

S/N

B

/C

Not

es

1 C

rew

Pre

f D

igita

l Cam

era

- -

-

Type

: Res

tow

IM

S Pl

an: N

o 2

CO

L1O

4_A2

1.

0 C

TB: M

echa

nica

l U

mbi

lical

Ass

y,

Pus

hrod

Ass

y S/

M

S/N

114

8, B

/C

0041

42J

ARIS

- Pi

vot F

ittin

g Bo

ttom

Rig

ht

683-

6171

1-32

R

EPO

RT

REP

OR

T R

epor

t S/N

’s to

MC

C-H

23

Page 25: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

18-0212 (MSG 014) - SSRMS DOUG SETUP NOTES FOR ULF2 Page 1 of 5

DOUG Setup for FD03 (OBSS Handoff) 1. For stand-alone procedure review, perform {1.301 DOUG Startup Procedure}, step 2

(SODF: POC: Activation and Checkout: DOUG) 2. For SSRMS real-time support, perform {1.301 DOUG Startup Procedure}, step 1 (SODF:

POC: Activation and Checkout: DOUG) 2.1 Set SSC volume such that tones are audible.

3. Configure for current ISS configuration and bring up displays.

3.1 File ► Load State 3.1.1 From Load State Dialog box, select “1.110 OBSS Unberth and Handoff”, open

4. Confirm steps 4.1-4.2 are complete with loaded state file, otherwise complete these steps as needed. 4.1 Reconfig ► SSRMS

4.1.1 In SSRMS Reconfig Dialog box, select ‘SSRMS_BASE_B’. 4.1.2 In SSRMS Reconfig Dialog box, select ‘SSRMS ->NODE2_PDGF’. 4.1.3 In SSRMS Reconfig Dialog box, select ’MT_to_WORKSITE_5’.

4.2 JntSystems ► RMS 4.2.1 In the RMS Dialog box enter “22.7, 57.5, -27.4, -99.3, 11.8, -97.9” 4.2.2 In the SPDM Dialog box enter:

“-50, -90, -45, 80, 45, -45, -90, 0, -37.5, -45, -110, -45, 45, -70, 0.1” 4.2.3 In the JEM Dialog box enter “0, 90, -149, -31, 0, 0"

4.3 Display ► Puddle Plot Shoulder/Wrist 4.4 For real-time support, Display ► Show SSRMS Target 4.5 For Real-time support, Options ► SSRMS Proximity, set all distances to 24 (inches)

Notes:

Use the Home Key to cycle through the Camera, SSRMS and SRMS Targets. Use Page Up and Page Down keys to scroll through Target selections.

Starting Target Procedure Step

Camera SSRMS RMS 1.110 OBSS GRAPPLE

2 1.110 Step 2 - Stage Park

5. For procedure “1.110 OBSS Unberth and Handoff” Step 4 configure for current ISS

configuration. 5.1 Reconfig ► Orbiter Inspection

5.1.1 In Orbiter Inspection Dialog box, select ‘OBSS_GF2_to SSRMS’ 6. For procedure “1. 111 OBSS Release at Handoff” Step 2 configure for current ISS

configuration. 6.1 Reconfig ► Orbiter Inspection

6.1.1 In Orbiter Inspection Dialog box, select ‘OBSS_GF1_to_SRMS’.

Page 1 of 5, 18-0212 (MSG 014) 24

Page 26: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

18-0212 (MSG 014) - SSRMS DOUG SETUP NOTES FOR ULF2 Page 2 of 5

DOUG Setup for FD04 (MPLM Unberth and Install) 1. For stand-alone procedure review, perform {1.301 DOUG Startup Procedure}, step 2

(SODF: POC: Activation and Checkout: DOUG) 2. For SSRMS real-time support, perform {1.301 DOUG Startup Procedure}, step 1 (SODF:

POC: Activation and Checkout: DOUG) 2.1 Set SSC volume such that tones are audible.

3. Configure for current ISS configuration and bring up displays.

3.1 File ► Load State 3.1.1 From Load State Dialog box, select “1.210 Berthed MPLM Grapple”, open -or- 3.1.2 Reconfig ► Configs_for_ROBOTICS_DAYS

3.1.2.1 In Configs_for_ROBOTICS_DAYS Dialog box, select ‘MPLM_Unberth/Install_Config’

4. Confirm steps 4.1-4.2 are complete with loaded state file, otherwise complete these steps as

needed. 4.1 Reconfig ► SSRMS

4.1.1 In SSRMS Reconfig Dialog box, select ‘SSRMS_BASE_B’. 4.1.2 In SSRMS Reconfig Dialog box, select ‘SSRMS ->NODE2_PDGF’. 4.1.3 In SSRMS Reconfig Dialog box, select ’MT_to_WORKSITE_WS5’.

4.2 Reconfig ►Orbiter Inspection. 4.2.1 In Orbiter Inspection Dialog box, select ‘OBSS_GF1_to_SRMS’ (SRMS @ 62.5,

25.0, -23.0, 0.0, -13.2, -21.9) 4.2.2 In the SPDM Dialog box enter:

“-50, -90, -45, 80, 45, -45, -90, 0, -37.5, -45, -110, -45, 45, -70, 0.1” 4.2.3 In the JEM Dialog box enter “0, 90, -149, -31, 0, 0"

4.3 Display ► Puddle Plot Shoulder/Wrist 4.4 For real-time support, Display ► Show SSRMS Target 4.5 For Real-time support, Options ► SSRMS Proximity, set all distances to 24 (inches)

Notes:

Use the Home Key to cycle through the Camera, SSRMS and SRMS Targets. Use Page Up and Page Down keys to scroll through Target selections.

Starting Target Procedure Step

Camera SSRMS RMS 1.210 Berthed MPLM Grapple

1 1.210 Step 1 - OBSS Back-off

5. For procedure “1.210 Berthed MPLM Grapple” Step 4 configure for current ISS configuration

5.1 Reconfig ► MPLM 5.1.1 In MPLM Reconfig Dialog box, select ‘MPLM_GF1 >SSRMS’

6. For procedure “1.220 MPLM Unberth to Install” Step 4 configure for current ISS configuration 6.1 Reconfig ► MPLM

6.1.1 In MPLM Reconfig Dialog box, select ‘MPLM >NODE2’ NOTE: If MPLM needs to be installed on Node 2 Zenith, refer to starting target ‘CONT MPLM Step 1 - Low Hover’

Page 2 of 5, 18-0212 (MSG 014) 25

Page 27: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

18-0212 (MSG 014) - SSRMS DOUG SETUP NOTES FOR ULF2 Page 3 of 5

DOUG Setup for FD05 (EVA1) 1. For stand-alone procedure review, perform {1.301 DOUG Startup Procedure}, step 2

(SODF: POC: Activation and Checkout: DOUG) 2. For SSRMS real-time support, perform {1.301 DOUG Startup Procedure}, step 1 (SODF:

POC: Activation and Checkout: DOUG)

2.1 Set SSC volume such that tones are audible. 3. Configure for current ISS configuration and bring up displays.

3.1 File ► Load State 3.1.1 From Load State Dialog box, select “1.310 - NTA Return and FHRC Retrieve”,

open -or- 3.1.2 Reconfig ► Configs_for_ROBOTICS_DAYS

3.1.2.1 In Configs_for_ROBOTICS_DAYS Dialog box, select ‘EVA1_Config’

4. Confirm steps 4.1-4.3 are complete with loaded state file, otherwise complete these steps as

needed. 4.1 Reconfig ► SSRMS

4.1.1 In SSRMS Reconfig Dialog box, select ‘SSRMS_BASE_B’. 4.1.2 In SSRMS Reconfig Dialog box, select ‘SSRMS ->NODE2_PDGF’. 4.1.3 In SSRMS Reconfig Dialog box, select ’MT_to_WORKSITE_WS5’.

4.2 Reconfig ►MPLM 4.2.1 In MPLM Dialog box, select ‘MPLM>Node2’

4.3 Reconfig ► Orbiter Inspection 4.3.1 In Orbiter Inspection Dialog box, select ‘OBSS_GF1_to_SRMS’ (SRMS @ 62.5,

25.0, -23.0, 0.0, -13.2, -21.9) 4.3.2 In the SPDM Dialog box enter:

“-50, -90, -45, 80, 45, -45, -90, 0, -37.5, -45, -110, -45, 45, -70, 0.1” 4.3.3 In the JEM Dialog box enter “0, 65, 15, -65, -180, 0"

4.4 Display ► Puddle Plot Shoulder/Wrist 4.5 For real-time support, Display ► Show SSRMS Target 4.6 For Real-time support, Options ► SSRMS Proximity, set all distances to 24 (inches)

Notes:

Use the Home Key to cycle through the Camera, SSRMS and SRMS Targets. Use Page Up and Page Down keys to scroll through Target selections.

Starting Target Procedure Step

Camera SSRMS RMS 1.310 - NTA Return and FHRC Retrieve

1 1.310 Step 2 - Overnight Park

NOTE: If NTA cannot be removed from ESP3 and FHRC needs to be installed on ESP3 site 6, refer to starting target ‘CONT EVA FHRC Step 1 - ESP3 Clearance’ If the NTA cannot be installed on the LMC and needs to return to ESP3 site 3, refer to starting target ‘CONT EVA NTA Step 1 - Cont 1’

Page 3 of 5, 18-0212 (MSG 014) 26

Page 28: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

18-0212 (MSG 014) - SSRMS DOUG SETUP NOTES FOR ULF2 Page 4 of 5

DOUG Setup for FD07 (EVA2) 1. For stand-alone procedure review, perform {1.301 DOUG Startup Procedure}, step 2

(SODF: POC: Activation and Checkout: DOUG) 2. For SSRMS real-time support, perform {1.301 DOUG Startup Procedure}, step 1 (SODF:

POC: Activation and Checkout: DOUG) 2.1 Set SSC volume such that tones are audible.

3. Configure for current ISS configuration and bring up displays.

3.1 File ► Load State 3.1.1 From Load State Dialog box, select “1.410 - CETA Cart Relocate”, open -or- 3.1.2 Reconfig ► Configs_for_ROBOTICS_DAYS

3.1.2.1 In Configs_for_ROBOTICS_DAYS Dialog box, select ‘EVA2_Config’

4. Confirm steps 4.1-4.3 are complete with loaded state file, otherwise complete these steps as needed.

4.1 Reconfig ► SSRMS 4.1.1 In SSRMS Reconfig Dialog box, select ‘SSRMS_BASE_B’. 4.1.2 In SSRMS Reconfig Dialog box, select ‘SSRMS ->NODE2_PDGF’. 4.1.3 In SSRMS Reconfig Dialog box, select ’MT_to_WORKSITE_WS6’.

4.2 Reconfig ►MPLM 4.2.1 In MPLM Dialog box, select ‘MPLM>Node2’

4.3 Reconfig ► Orbiter Inspection 4.3.1 In Orbiter Inspection Dialog box, select ‘OBSS_GF1_to_SRMS’ (SRMS @ 62.5, 25, -50, -90, -13.2, 30) 6.1.2 In the SPDM Dialog box enter:

“-50, -90, -45, 80, 45, -45, -90, 0, -37.5, -45, -110, -45, 45, -70, 0.1” 6.1.3 In the JEM Dialog box enter “-7, -33.8, -45.1, -136.3, -5.8, 176"

4.4 Display ► Puddle Plot Shoulder/Wrist 4.5 For real-time support, Display ► Show SSRMS Target 4.6 For Real-time support, Options ► SSRMS Proximity, set all distances to 24 (inches)

Notes:

Use the Home Key to cycle through the Camera, SSRMS and SRMS Targets. Use Page Up and Page Down keys to scroll through Target selections.

Starting Target Procedure Step Camera SSRMS RMS

1.410 EVA - CETA Cart Relocation

2 1.410 Step 2 - Overnight Park

Page 4 of 5, 18-0212 (MSG 014) 27

Page 29: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

18-0212 (MSG 014) - SSRMS DOUG SETUP NOTES FOR ULF2 Page 5 of 5

DOUG Setup for FD12 (MPLM Uninstall) 1. For stand-alone procedure review, perform {1.301 DOUG Startup Procedure}, step 2

(SODF: POC: Activation and Checkout: DOUG) 2. For SSRMS real-time support, perform {1.301 DOUG Startup Procedure}, step 1 (SODF:

POC: Activation and Checkout: DOUG) 2.1 Set SSC volume such that tones are audible.

3. Configure for current ISS configuration and bring up displays.

3.1 File ► Load State 3.1.1 From Load State Dialog box, select ‘1.240 Node 2 Mated MPLM Grapple’, open -or- 3.1.2 Reconfig ► Configs_for_ROBOTICS_DAYS

3.1.2.1 In Configs_for_ROBOTICS_DAYS Dialog box, select ‘EVA3_EVA4_MPLM_Uninstall’

4. Confirm steps 4.1-4.3 are complete with loaded state file, otherwise complete these steps as

needed. 4.1 Reconfig ► SSRMS

4.1.1 In SSRMS Reconfig Dialog box, select ‘SSRMS_BASE_B’. 4.1.2 In SSRMS Reconfig Dialog box, select ‘SSRMS ->NODE2_PDGF’. 4.1.3 In SSRMS Reconfig Dialog box, select ’MT_to_WORKSITE_6’.

4.2 Reconfig ► MPLM 4.2.1 In MPLM Dialog box, select ‘MPLM>Node2’

4.3 Reconfig ► Orbiter Inspection 4.3.1 In Orbiter Inspection Dialog box, select ‘OBSS_GF1_to_SRMS’ (SRMS @ 62.5,

25.0, -23.0, 0.0, -13.2, -21.9) 4.3.2 In the SPDM Dialog box enter:

“-50, -90, -45, 80, 45, -45, -90, 0, -37.5, -45, -110, -45, 45, -70, 0.1” 4.3.3 In the JEM Dialog box enter “0, 90, -149, -31, 0, 0"

4.4 Display ► Puddle Plot Shoulder/Wrist 4.5 For real-time support, Display ► Show SSRMS Target 4.6 For Real-time support, Options ► SSRMS Proximity, set all distances to 24 (inches)

Notes:

Use the Home Key to cycle through the Camera, SSRMS and SRMS Targets. Use Page Up and Page Down keys to scroll through Target selections.

Starting Target Procedure Step

Camera SSRMS RMS 1.240 Node 2 Mated MPLM Grapple

2 1.240 Step 2 - Overnight Park

5. For procedure “1.240 Node 2 Mated MPLM Grapple” Step 5 configure for current ISS

configuration. 5.1 Reconfig ► MPLM

5.1.1 In MPLM Reconfig Dialog box, select ‘MPLM_GF1 >SSRMS’

6. For procedure “1.250 Node 2 Mated MPLM Grapple” Step 12 configure for current ISS configuration. 6.1 Reconfig ► MPLM

6.1.1 In MPLM Reconfig Dialog box, select ‘MPLM >BAY’

Page 5 of 5, 18-0212 (MSG 014) 28

Page 30: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

MSG 015A - FD3 EVA DELTAS

END OF PAGE 1 OF 2, MSG 015A

FD3 EVA Deltas 1 2 Fergie, 3 Per Mike’s request, he will be assisting you with EVA Prep for EVA 3 and Sandy will be 4 assisting with EVA 4. This is a swap from the original plan. 5 6 Heide and Steve, 7 Great job yesterday on getting your suits checked out and ready to go for the mission. 8 We have several procedural pen and ink updates for you which are listed below. 9 10 11 EVA Timeline and Inhibit Pad Deltas 12 13 A. The Wheel Bogie PIP Pin was never found during the increment Tool Config. However, 14 the probe is an acceptable alternate tool for Wheel Bogie R&R, so you can delete 15 references to the Wheel Bogie PIP Pin in the Pre Tool Configs. Note, the probe is in the 16 staging bag. 17 18 B. Based on new analysis, the original APFR overnight stow plan will not work because the 19 SSRMS wrist roll between EVAs 1 and 2 requires 10" clearance between the ingress aid 20 and all SSRMS surfaces. We suggest stowing the APFR in CETA 1 WIF 2, in any 21 clocking that does not contact structure (i.e. brake handles). 22 23 C. We need to add clarification words in the TUS block of the Inhibit Pad for EVAs 1, 2, and 24 4. The inhibit is only required if the wire conductors are visible. 25 26 27 Please incorporate the following P&I's to address the above issues: 28 29 1) On pg 7-6, EVA 1 Pre Tool Config, Staging Bag, delete "Wheel Bogie PIP Pin" 30 31 2) On pg 7-9, EVA 1 Inhibit Pad, USOS Block, TUS Block, after “TUS” add "(if wire 32 conductors visible) 33 34 3) On pg 7-17, EV1 step 3, change first line to: 35 3. Tether to APFR, “retrieve, and relocate to CETA 1 WIF 2 [ __, FF, F, 12], Report 36 Clocking.” 37 38 4) On pg 7-39, EVA 2 Pre Tool Config, Staging Bag, delete "Wheel Bogie PIP Pin" 39 40 5) On pg 7-42, EVA 2 Inhibit Pad, USOS Block, TUS Block, after “TUS”, add "(if wire 41 conductors visible)” 42 43 6) On pg 7-47, EV3 step 12, change first line to: 44 12. Retrieve APFR from CETA 1 WIF 2 and install on SSRMS: [12, FF, F, 12] 45 46 7) On pg 7-73, EVA 3 Pre Tool Config, Staging Bag, delete "Wheel Bogie PIP Pin" 47 48 8) On pg 7-85, EVA 4 Pre Tool Config, Staging Bag, delete "Wheel Bogie PIP Pin" 49 50 51

29

Page 31: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

MSG 015A - FD3 EVA DELTAS

END OF PAGE 2 OF 2, MSG 015A

9) On pg 7-88, EVA 2 Inhibit Pad, USOS Block, TUS Block, after “TUS”, add "(if wire 1 conductors visible)” 2 3 10) On pg 16-3, Cribsheet, CETA Cart, Block A, step 3, add: 4 “- Use probe (Staging Bag) instead of wheel bogie PIP pin” 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

30

Page 32: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

MSG 016 - FD02 MMT SUMMARY

END OF PAGE 1 OF 1, MSG 016

FD02 MMT Summary 1 2 The FD02 MMT met today to review mission progress with only a few items of discussion. 3 These included orbiter systems and ascent imagery. At the time of the MMT, the OBSS 4 scans were in progress. 5 6 Orbiter Systems - The MMT briefly reviewed the systems anomalies that are currently 7 being tracked. Each issue was only briefly discussed since the teams are still reviewing the 8 issues. These included: 9 10

• The Ku antenna auto handover and PSP configuration issues were briefly mentioned 11 at the MMT. The team is beginning to review the details of these problems and will 12 report back to the MMT in the coming days. 13

14

• The separate Ku antenna auto track problem was also briefly discussed. The 15 problem is believed to be at the DEA or the EA Ku electronics. A similar problem 16 occurred previously that was in the EA-1 that did not affect the rendezvous radar. If 17 required, procedures and propellant do support a failed rendezvous radar approach. 18

19

• The OMS Xfeed Heater A is still under evaluation. On FD01, the Low Point Drainline 20 Temp declined to 45 deg F prior to swapping to the B heaters. The B heater is 21 performing nominally. On the previous flight, the heater cycled on about 55 deg F; 22 however, data review shows that on the first flight of Endeavour (STS-49), the same 23 heater cycled on the first time at 40 deg F. From docking through entry, the attitude 24 is such that the affected area of the crossfeed line is expected to remain thermally 25 stable and likely above limits without the heater. This next worst failure will be 26 analyzed in the coming days. 27

28 Imagery - A quick look at the available imagery was provided. The MMT reviewed the 29 release of a small piece of debris, suspected to be FRSI blanket above the T0 LH2 umbilical 30 plate. The release occurred at MET 26 sec. The standard review process will continue for 31 this item, but it is not believed this will be a thermal concern during entry since the umbilical 32 plate itself is just painted aluminum. The black tiles on the OMS pod adjacent to the FRSI 33 blanket are there for durability and not thermal reasons. Post MMT Update: You did a great 34 job providing a great view of the suspect area. Interestingly, the area looked nominal. 35 Obviously, the team will continue to analyze the imagery and the inspection data. 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

31

Page 33: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

FS

2-1

4 P

/TV

/126

/FLT

NO

TE

CA

NO

N G

1 (C

ontin

ued)

HD

DIG

ITA

L C

C D

NLK

Not

ify M

CC

, con

figur

ing

for H

D T

V d

nlk

C

onfig

H/W

per

dw

g at

righ

t

CC

Fo

r cab

le s

train

relie

f atta

ch M

PC

-to-G

1 C

able

V

elcr

o st

rap

to C

C s

trap

A

VIU

S

YN

C/V

IDE

O –

VID

EO

H

I-Z/7

5 –

75

PW

R S

ELE

CT

– LO

O19

√T

V P

WR

– O

N

C

C

√Wid

e C

onve

rsio

n Le

ns in

stal

led

Inst

all L

AV

MIC

√N

D F

ILTE

R –

OFF

√O

UTP

UT

– C

AM

√STA

ND

BY

/LO

CK

– S

TAN

DB

Y

PW

R d

ial –

“gre

en”

M

ount

Cam

cord

er

L1

0 (M

UX)

√M

UX

/VTR

/CC

PW

R –

off

(LE

D o

ff)

√VTR

/CC

/PW

R –

off

(LE

D o

ff)

Dis

conn

ect C

HA

NN

EL

3 IE

EE

139

4 C

able

M

UX/

VTR

/CC

PW

R –

on

(LE

D o

n)

√MU

X B

YP

AS

S –

AC

T √C

HA

NN

EL

0,1

RA

TE S

EL

– 1

CH

AN

NE

L √2

RA

TE S

EL

– 8

O

19

DC

UTI

L P

WR

MN

A –

ON

M

PC

PW

R

DC

PW

R S

PLY

PW

R S

W1

– O

N

MP

C S

PLY

MP

C

PW

R-O

N (H

DV

, TA

XI, 5

V, 3

V g

reen

LE

Ds

on)

js

c480

38_

126

_021

.cvx

VT

R/C

CM

UX

/VT

R/C

C

AC

T MU

XB

YPA

SS

IEE

E13

94C

hann

el3

TXR

XC

hann

el2

RAT

ESE

L

8

MP

C-D

TV

MU

XC

ab

le(S

T-S

TO

ptica

lCa

ble

)

HD

V/D

V

N/A

J2 VID

EO

J4 J6F

DA

VIU

J1 75 J5 LO J3 J7

FLT

DE

CK

(O19)

FD

TV

Pw

rC

able

(20

ft)

ETHE

RNET

HDV

DATA

OUT

16VD

CIN

MP

C

P2P1

J2J1

SW

1D

CP

WR

SP

LY(W

hite

Bric

k)

P1

P1

J2 S2

DC

UT

ILP

WR

MN

A

O19

P2

MP

CD

CP

wr

Cab

le(6

ft)

MP

CD

CSp

lyC

able

(10

ft)

MP

C-G

1C

able

(DTV

IEE

E13

944-

PIN

toM

ale

CIR

CC

able

(5ft)

)

P2/

P2

P1

Mul

tiuse

Arm

Wid

eC

onve

rsio

nLe

nsC

C

FOR

PAO

EVEN

TS

LAV

MIC

Pho

toflo

od

AC

UTI

LP

WR

AC

1F1

(MO

52J)

Loc–

Line

(w/C

lam

p)

FOR

PAO

EV

ENTS

MS

G 0

17 H

D D

IGIT

AL

CC

DN

LK P

RO

CE

DU

RE

32

Page 34: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

FS

2-1

5 P

/TV

/126

/FLT

NO

TE

CA

NO

N G

1 (C

ontin

ued)

HD

DIG

ITA

L C

C D

NLK

(Con

tinue

d)

L10

(MU

X)

√CH

AN

NE

L 2

F/O

OK

,DA

TA L

ED

S o

n

F1(M

O52

J)

AC

UTI

L P

WR

AC

1 –

ON

Pho

toflo

od

ON

/OFF

– O

N

HI/L

O –

HI

C

abin

Lts

Fl

t Dec

k –

ON

Lt

s in

FO

V –

OFF

as

reqd

Lt

Sha

des

– in

stal

l as

reqd

W

indo

w S

hade

s –

inst

all a

s re

qd

C

C

√Sce

ne c

ompo

sitio

n

Adj

ust C

amr a

ngle

for b

est f

ram

ing

LA

V M

IC

PW

R –

ON

(tal

k),O

FF (l

iste

n)

√M

CC

if B

lack

vid

eo a

nd c

olor

bar

s re

qd

If re

qd:

PW

R d

ial -

Av

Ape

rture

- cl

ose

√Av

CLO

SE

dis

play

ed o

n to

p le

ft of

LC

D

AG

C -

OFF

√G

AIN

sw

- L

ñ0d

B d

ispl

ayed

on

LCD

O

UTP

UT

- BA

RS

Whe

n M

CC

say

s do

ne w

/bar

s:

OU

TPU

T - C

AM

Whe

n M

CC

say

s do

ne w

/bla

ck s

cree

n te

st:

PW

R d

ial -

“gre

en”

MS

G 0

17 H

D D

IGIT

AL

CC

DN

LK P

RO

CE

DU

RE

33

Page 35: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

FS

2-1

6 P

/TV

/126

/FLT

NO

TE

CA

NO

N G

1 (C

ontin

ued)

HD

DIG

ITA

L C

C D

NLK

(Con

clud

ed)

Whe

n dn

lk c

ompl

ete:

C

C

P

WR

dia

l – O

FF

O

19

TV

PW

R –

OFF

as

reqd

MP

C

P

WR

– O

FF

MP

C P

WR

DC

PW

R S

PLY

PW

R S

W1

– O

FF

MP

C S

PLY

O

19

D

C U

TIL

PW

R M

NA

– O

FF

L10

(MU

X)

M

UX/

VTR

/CC

PW

R –

off

(LE

D o

ff)

Con

nect

CH

AN

NE

L 3

IEE

E 1

394

Cab

le

N

otify

MC

C, r

etur

ned

to S

D T

V d

nlk

G

o to

DE

AC

TIV

ATI

ON

(Cue

Car

d, T

V) a

s re

qd

MS

G 0

17 H

D D

IGIT

AL

CC

DN

LK P

RO

CE

DU

RE

34

Page 36: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

18-0221 (MSG 018) – Exp 18 / STS-126 Joint Emergency Agreement Page 1 of 3

Page 1 of 3, 18-0221 (MSG 018)

Exp 18 / STS-126 Joint Emergency Agreement 1

2

General 3

• JEE cue cards will be posted in A/L and PMA2. Leave A/L cue card for ISS use. 4

Hardcopy of JEUS at RWS. 5

• If possible, ground and both CDRs should confirm JEE is in progress. Would like 6

Capcom to echo on S/G2. 7

• Preferred to make all calls on the Big Loop. 8

• Soyuz emergency requiring ISS crew to deorbit does not imply a STS 9

emergency. 10

• If ISS crew egresses to Soyuz, will be out of comm unless ground ties loops 11

together. 12

• Over-riding philosophy is to take immediate safing steps (fight fire, collect EMUs, 13

etc.) then quickly egress to shuttle. 14

• When possible, use the buddy system. 15

• ISS crew generally pushes ATM/FIRE/DpDt pushbutton unless situation is 16

obvious (i.e. Fire) 17

• STS crew encouraged to push Tox Atm if recognizable NH3 leak 18

• Treat STS messages as if ISS (“ISS Tox Atm”, etc.) 19

Pending Shuttle activities, there are time periods in which the ISS 20

alarms may NOT annunciate on STS 21

• Shuttle alarms passed via BPSMU. Otherwise no indication of shuttle alarm 22

unless passed over big loop. 23

• If SSRMS grappled to OBSS or MPLM while in MPMs (PRLAs), STS will vacate 24

ISS and let MCC perform the ungrapple. If EV crew on arm, operator will let 25

MCC know what they are doing based on the situation. 26

• If an emergency occurs when each crew is on their own vehicle, Shuttle crew will 27

come back onto the ISS to get their EMUs (if the emergency is not in their direct 28

path) while the ISS crew will deal with the emergency. 29

30

Specific Responsibilities 31

• Kimbrough, Piper, or Pettit will retrieve 22’ and 28’ hose from seat 7, 6 to close 32

hatch during Fire or Tox Atm 33

• Kimbrough is responsible for counting heads. Kimbrough (pri)/ Piper (sec) will be 34

responsible for hatch closures and reporting closures to CDR. Shuttle crew will 35

notify ISS crew and MCC when Node 2 Fwd hatch is closed. 36

• Pettit backs up Kimbrough for O2/N2 disconnect and duct stow. 37

• Boe (Pri) for putting RMS in safe config for un-docking until Kimbrough available 38

39

35

Page 37: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

18-0221 (MSG 018) – Exp 18 / STS-126 Joint Emergency Agreement Page 2 of 3

Page 2 of 3, 18-0221 (MSG 018)

EVA 1

• If in campout with A/L depress imminent and PHA Ports don’t work, use PBA if 2

necessary for emergency. 3

If PBA donned, wear to shuttle for egress. If fighting fire in path, stay back 1 4

m due to oxygen from PBA. 5

• Piper (pri) and Bowen (sec) will retrieve EMUs using cue card in the Joint Airlock. 6

Identify EMUs for return using expedited doff cue card for ISS crew 7

awareness. 8

• EV crew always recovers in ISS A/L unless directed otherwise. 9

Can recover in STS A/L on MCC call. 10

• If Piper on SSRMS w/ FHRC or NTA continue w/ RWS vacant to complete 11

JOCAS or let the ground finish. 12

13

Depress 14

• If shuttle crew feels pressure changing in ears, confirm with ISS crew member 15

before annunciating. 16

• If dP/dt during Campout, EV crew will talk to ground on Big Loop before taking 17

action unless it’s an obvious large leak in A/L. 18

• Shuttle crew will notify ISS crew when Node 2 Fwd hatch is closed and additional 19

information about hatch pulling away or slamming shut. 20

21

Toxic Atmosphere 22

• Ammonia - 23

Shuttle crew - don masks, push ATM button on C&W panel if not already in 24

alarm, close Node 2 Fwd hatch, if contamination suspected doff clothes in 25

PMA2, close APAS hatch. 26

Shuttle crew is not expected to retrieve EMUs in this situation. 27

All crews will verify levels of ammonia in own vehicles using ammonia 28

detection kit. 29

• Other unidentified odor or spill - do not push ATM button; notify ISS crew. 30

Talk plan on Big Loop before taking additional actions. 31

32

Fire 33

• Shuttle crew can push fire button for any fire with visible smoke or flame. 34

• If only indication is burning odor, preferred to talk to ISS crew before pushing 35

button. 36

• Should annunciate alarm before attempting to extinguish fire. Should call over 37

ATU visible fire, or smoke. 38

• Shuttle crew can use fire extinguishers to fight a visible fire or smoke billowing 39

from an obvious source until ISS crew arrives, then egress to shuttle. 40

• Shuttle crew does not need to unpower rack using rack power switch for smoke 41

coming from rack. 42

36

Page 38: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

18-0221 (MSG 018) – Exp 18 / STS-126 Joint Emergency Agreement Page 3 of 3

Page 3 of 3, 18-0221 (MSG 018)

• For Shuttle fire, if safe enough call ISS crew on Big Loop to push the button 1

before using Halon extinguishers. 2

Goal is to stop ventilation before or as soon as possible to prevent spreading 3

Halon to ISS. 4

37

Page 39: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

FLIGHT NOTE --------------------------------------------------------------- | | | TO: FD, CAPCOM, FAO, RENDEZVOUS, PROP, GC | | FROM: FDO | | SUBJECT: MANEUVER TIGS | | | | | | COPIES: 1 | | | | MET | | NH 001:16:08:15.300 | | NC4 001:16:48:03.300 | | NCC 001:17:33:27.000 | | TI 001:18:31:09.000 PET = 0:0 ; SS - 36 MIN | | MC1 001:18:51:09.000 | | MC2 001:19:21:03.000 ET = 0:0 | | MC3 001:19:38:03.000 MC2 + 17 MIN | | MC4 001:19:48:03.000 MC2 + 27 MIN | | DOCK 001:21:09:15.000 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | --------------------------------------------------------------- 1/ 2

MSG 019 - FD3 RNDZ PACKAGE

38

Page 40: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

MSG 019 - FD3 RNDZ PACKAGE

39

Page 41: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

PRELIMINARY ORBIT MANEUVER PAD FOR NH (RNDZ C.L. p. 3-2)

(+)125.7

(+)000.0

(+)006.2

X X

X

X

XX

XX

N/A

N/A

N/A

N/A

N/A

N/A

13

X

X 000

(+)0.5

(-)5.7

(+)5.7

252294

01/16:08:15.3

325

270

049

125.9

01:21

(+)121.4

(+)000.0

(+)033.2

191

(+)127

X

TREAT LOSS OF GPC-3 AS SECOND GIMBAL FAIL ON THE RIGHT.

MS

G 0

19 -

FD3

RN

DZ

PA

CK

AG

E

40

Page 42: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

PRELIMINARY ORBIT MANEUVER PAD FOR NC-4 (RNDZ C.L. p. 3-4)

(+)094.6

(+)000.0

(+)003.4

X X

X

X

XX

XX

N/A

N/A

N/A

N/A

N/A

N/A

13

X

X 000

(+)0.5

(-)5.7

(+)5.7

249168

01/16:48:03.3

049

113

326

094.7

01:00

(+)091.3

(+)000.0

(+)024.9

193

(+)180

X

TREAT LOSS OF GPC-3 AS SECOND GIMBAL FAIL ON THE RIGHT.

MS

G 0

19 -

FD3

RN

DZ

PA

CK

AG

E

41

Page 43: STS-126/ULF2 - NASANov 16, 2008  · STS-126/ULF2 FD 03 Execute Package MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17

MS

G 0

19 -

FD3

RN

DZ

PA

CK

AG

E

42