STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt...

18
STS-125 FD 02 Execute Package MSG Page(s) Title 002A 1 - 13 FD02 Flight Plan Revision (pdf) 003 14 - 15 FD02 Mission Summary (pdf) 004 16 SSE Contingency Procedure (pdf) Approved by FAO: Last Updated: May 12 2009 8:22AM GMT JEDI (Joint Execute package Development and Integration), v2.04.0003

Transcript of STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt...

Page 1: STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt date 05/12 (132) 11:00 12:00 13:00 14:00 met day 000 16:00 17:00 18:00 19:00 20:00

STS-125 FD 02 Execute Package

MSG Page(s) Title 002A 1 - 13 FD02 Flight Plan Revision (pdf) 003 14 - 15 FD02 Mission Summary (pdf) 004 16 SSE Contingency Procedure (pdf)

Approved by FAO: Last Updated: May 12 2009 8:22AM GMT JEDI (Joint Execute package Development and Integration), v2.04.0003  

 

Page 2: STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt date 05/12 (132) 11:00 12:00 13:00 14:00 met day 000 16:00 17:00 18:00 19:00 20:00

 

 

 

 

 

 

 

 

 

 

 

Page Intentionally Left Blank 

Page 3: STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt date 05/12 (132) 11:00 12:00 13:00 14:00 met day 000 16:00 17:00 18:00 19:00 20:00

MSG 002A - FD02 FLIGHT PLAN REVISION

END OF PAGE 1 OF 13, MSG 002A

MSG INDEX 1 2 MSG NO. TITLE 3 MSG002 FD02 Flight Plan Revision 4 MSG003 FD03 Mission Summary 5 MSG004 SSC Contingency Procedure 6 7 8 1. Post Sleep Cryo Config: 9

R1 O2,H2 MANF VLV TK1 (two) - OP (tb-OP) 10

TK3 HTRS A,B (four) - OFF 11

12

A11 CRYO TK4 HTRS O2,H2 A,B (four) - AUTO 13 14 2. Pre-Sleep and Post-Sleep Deltas 15

Make the following P&I changes to the Pre-Sleep and Post-Sleep procedures: 16 17 PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS) 18 Under FLIGHT DECK ACTIVITY LIST, delete step 4 until FD9. 19 20 POST-SLEEP ACTIVITY (ORB OPS, CREW SYS) 21 Under FLIGHT DECK ACTIVITY LIST, delete step 6 until FD10. 22 23 The O2/N2 Controller valve actions in Pre- and Post-Sleep are not required until the 24 PCS is active. This will occur FD9 after the cabin is repressurized to 14.7 psia. 25 26

3. SSV is currently not functional and MCC would like to utilize this capability during the 27 upcoming OBSS Inspections. In the FS P/TV C/L on p. 1-8, please re-perform P/TV01 28 Video Setup step 7, and report the status of the SSV LEDs to MCC. 29 30

4. Since the PCS will be configured for 10.2 psi later today, PCS 1(2) CONFIG (ORB OPS, 31 ECLS) which was called out in the FD1 EZ Block but was not performed, will not be 32 required. Because PCS Config isn't going to be performed add these additional 33 switchthrows to PREP FOR 10.2 PSI CABIN (EVA C/L, 10.2 PSI CABIN) after step 5 on 34 page 1-3 to be in a good PCS config: 35

36 MO10W √H20 TK N2 REG INLET SYS 1 – OP 37 SYS 2 – CL 38 39 5. PGSC: The MCC has uplinked the latest HazMat data file to the PGSCs. 40 41 6. UMB WELL PHOTOS: Drew, thank you for staying up late to attempt the image transfer 42

from the ET Umbilical Well camera to the laptop. The error message you received last 43 night is the same error message that has been recently seen during ground 44 troubleshooting with this camera. Since these images can be obtained from the memory 45 card post-flight, no further attempts to download these images while on-orbit are 46 required at this time. 47

48 49 7. REPLACE PAGES 2-4 THROUGH 2-5 and 3-8 THROUGH 3-17. 50

1

Page 4: STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt date 05/12 (132) 11:00 12:00 13:00 14:00 met day 000 16:00 17:00 18:00 19:00 20:00

05/12/09 03:02:09

FLT PLN/125/FLIGHT

ALTMAN

JOHNSON

GOOD

McARTHUR

GRUNSFELD

MASSIMINO

FEUSTEL

FD02

β = −9

SSE

SURV

EY w

/ELB

OW C

AM<

REPL

ANNE

D

2-4

S T S - 1 2 5 H S T S T S HST

07

0809

1011

1213

1415

1617

18GMT 05/12/09 (132)

12

1314

1516

1718

1920

2122

23001/00

MET

Day 000

CDR/R2

SLEEP

POST SLEEP

NOSE CAP

SRVY

M N V R

N O S E

10.2

DPRS

P R E P

FSS PREP

FOR BRTHG

POST SLEEP

L O G

S T B D

R C CSTBD WING

RCC SRVY

STBD

BELLY

TILE

SRVY

MEAL

STBD

WING

RCC

SRVY

T - 0

O M S #

PLT/R3

SLEEP

NOSE CAP

SRVY

MEAL

10.2

DPRS

P R E PPOST SLEEP

L O G

S T B D

R C CP/TV 03

FSS OPS

0 3 S / U

STBD WING

RCC SRVY

STBD

BELLY

TILE

SRVY

T A P EPOST SLEEP

STBD

WING

RCC

SRVY

T - 0

MS1/EV4/R2

SLEEP

S S V T S

POST SLEEP

A/L PREP

NOSE CAP

SRVY

EMU C/O

PORT WING

RCC SRVY

PORT

BELLY

TILE SRVY

MEAL

A S P R N

P O S T

S L E E P

POST

SLEEP

P D I P *

P D I P +

MS2/R1

SLEEP

L O GOBSS UNBRTH

MEAL

M N V R

P O R T

M N V R

S T B D

S T B D

R C C

P O R T

R C CSTBD WING

RCC SRVY

STBD

BELLY

TILE

SRVY

PORT

BELLY

TILE SRVY

STBD

WING

RCC

SRVY

PORT

WING

RCC

SRVY

T - 0POST SLEEP

MS3/EV1

SLEEP

POST SLEEP

POST SLEEP

MEAL

FSS PREP

FOR BRTHG

EMU C/O

EVA

TOOL

UNSTOW

CNFG

REBA

C/O

A S P R N

BATT &

CHRGR

SETUP

R N S *

MS4/EV3/R2

SLEEP

L O GPOST SLEEP

OBSS UNBRTH

MEAL

EMU C/O

EMU C/O

PORT WING

RCC SRVY

PORT

BELLY

TILE SRVY

A S P R N

EMU

SWAP

MS5/EV2

SLEEP

POST SLEEP

A/L PREP

MEAL

EMU C/O

L O G

EVA

TOOL

UNSTOW

CNFG

REBA

C/O

EMU C/O

A S P R N

EMU

SWAP

HST CMD

SSR

PLAY

BACK

SSR

PLAY

BACK

SSR

PLAY

BACK

SSR

PLAY

BACK

DAY/NIGHT

ORBIT

910

1112

1314

1516

TDRS

W E Z-ZLV -XVV

BIAS +XSI

+XSI

BIAS +XSI

ORB ATT

SMS DEFINED

HST ATT

SUN TRACK

SA ANGLE

#HTR RECONFIG

*OFF +L

OW*ON-ORBIT C/O

NOTES

2-4

ALTMAN

JOHNSON

GOOD

McARTHUR

GRUNSFELD

MASSIMINO

FEUSTEL

FD02

β = −9

SSE

SURV

EY w

/ELB

OW C

AM<

REPL

ANNE

D

S T S - 1 2 5 H S T S T S HST

07

0809

1011

1213

1415

1617

18GMT 05/12/09 (132)

12

1314

1516

1718

1920

2122

23001/00

MET

Day 000

CDR/R2

SLEEP

POST SLEEP

NOSE CAP

SRVY

M N V R

N O S E

10.2

DPRS

P R E P

FSS PREP

FOR BRTHG

POST SLEEP

L O G

S T B D

R C CSTBD WING

RCC SRVY

STBD

BELLY

TILE

SRVY

MEAL

STBD

WING

RCC

SRVY

T - 0

O M S #

PLT/R3

SLEEP

NOSE CAP

SRVY

MEAL

10.2

DPRS

P R E PPOST SLEEP

L O G

S T B D

R C CP/TV 03

FSS OPS

0 3 S / U

STBD WING

RCC SRVY

STBD

BELLY

TILE

SRVY

T A P EPOST SLEEP

STBD

WING

RCC

SRVY

T - 0

MS1/EV4/R2

SLEEP

S S V T S

POST SLEEP

A/L PREP

NOSE CAP

SRVY

EMU C/O

PORT WING

RCC SRVY

PORT

BELLY

TILE SRVY

MEAL

A S P R N

P O S T

S L E E P

POST

SLEEP

P D I P *

P D I P +

MS2/R1

SLEEP

L O GOBSS UNBRTH

MEAL

M N V R

P O R T

M N V R

S T B D

S T B D

R C C

P O R T

R C CSTBD WING

RCC SRVY

STBD

BELLY

TILE

SRVY

PORT

BELLY

TILE SRVY

STBD

WING

RCC

SRVY

PORT

WING

RCC

SRVY

T - 0POST SLEEP

MS3/EV1

SLEEP

POST SLEEP

POST SLEEP

MEAL

FSS PREP

FOR BRTHG

EMU C/O

EVA

TOOL

UNSTOW

CNFG

REBA

C/O

A S P R N

BATT &

CHRGR

SETUP

R N S *

MS4/EV3/R2

SLEEP

L O GPOST SLEEP

OBSS UNBRTH

MEAL

EMU C/O

EMU C/O

PORT WING

RCC SRVY

PORT

BELLY

TILE SRVY

A S P R N

EMU

SWAP

MS5/EV2

SLEEP

POST SLEEP

A/L PREP

MEAL

EMU C/O

L O G

EVA

TOOL

UNSTOW

CNFG

REBA

C/O

EMU C/O

A S P R N

EMU

SWAP

HST CMD

SSR

PLAY

BACK

SSR

PLAY

BACK

SSR

PLAY

BACK

SSR

PLAY

BACK

DAY/NIGHT

ORBIT

910

1112

1314

1516

TDRS

W E ZORB ATT

-ZLV -XVV

BIAS +XSI

+XSI

BIAS +XSI

HST ATT

SMS DEFINED

SA ANGLE

SUN TRACK

NOTES

#HTR RECONFIG

*OFF +L

OW*ON-ORBIT C/O

2

Page 5: STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt date 05/12 (132) 11:00 12:00 13:00 14:00 met day 000 16:00 17:00 18:00 19:00 20:00

05/12/09 03:02:09

FLT PLN/125/FLIGHT

ALTMAN

JOHNSON

GOOD

McARTHUR

GRUNSFELD

MASSIMINO

FEUSTEL

FD02

β =

NC3^

−9

*HUM SEP

REPL

ANNE

D

2-5

S T S - 1 2 5 H S T S T S HST

19

2021

2223

05/13

0102

0304

0506

GMT 05/12/09 (132)

001/00

0102

0304

0506

0708

0910

1112

MET

Day 001

CDR/R2

SLEEP

OMS

BURN

F U T

M N V R

- Z L V

- X V V

G 2 C O N

G 2 E X P

FILTER

CLEANING

C N F G

♣PMC

A/G

PRE SLEEP

I M U

ERG

SETUP

- Z L V

- X V V

W S B *

F E S - I

PRE SLEEP

PLT/R3

OMS

BURN

SLEEP

P/TV01 VIDEO SETUP

C N F G

I C B C

A U D I O

P/TV09

ICBC3D

SETUP

1 0 . 2 M

OMS

POD

SRVY

PRE SLEEP*

F E S - T

I C B C

MS1/EV4/R2

SLEEP

OBSS BERTH

PRE SLEEP

RNDZ

TOOLS

C/O

P R E

S L E E P

PORT BELLY

TILE SRVY

PORT WING

RCC SRVY

T - 0

S R V Y

MS2/R1

PRE SLEEP*

SLEEP

FCMS

OPS

F C P R G

CRYO O2 SNSR CK

PORT BELLY

TILE SRVY

PORT WING

RCC SRVY

T - 0

S R V Y

O C A #PRE SLEEP

MS3/EV1

SLEEP

PRE SLEEP

♦LDRI DNLK

EXERCISE

ERG

SETUP

PRE SLEEP

NLP

ACT

MS4/EV3/R2

SLEEP

OBSS BERTH

PRE SLEEP

PORT BELLY

TILE SRVY

PORT WING

RCC SRVY

T - 0

S R V Y

MS5/EV2

SLEEP

PRE SLEEP

RNDZ

TOOLS

C/O

®EXERCISE

PRE

SLEEP

W L E S

P/TV09

ICBC3D

SETUP

O C A #PRE SLEEP

HST CMD

SSR

PLAYBACK

CLS

DOOR

D U M P

D U M P

HST

TO RNDZ

ATT

HST

LGA

DRCT

TDRS

3 GYRO OPS RECONFIG

H/W CNTRL

LOAD

MACROS &

SPCS

F H S T

PREP

FOR

HGA

RTRCT

H G A

R T R C TDAY/NIGHT

ORBIT

1617

1819

2021

2223

24

TDRS

W E ZBIAS +XSI

-ZLV -XVV

NC-3

-ZLV -XVV

ORB ATT

SMS DEFINED

RNDZ

HST ATT

SUN TRACK

SA ANGLE

♣10.2 DPRS

⊕10.2 DPRS

♦EVA TOOL UNSTOW CNFG

®EVA TOOL UNSTOW CNFG*CNTLR SWAP

#PL MAX

NOTES

2-5

ALTMAN

JOHNSON

GOOD

McARTHUR

GRUNSFELD

MASSIMINO

FEUSTEL

FD02

β =

NC3^

−9

*HUM SEP

REPL

ANNE

D

S T S - 1 2 5 H S T S T S HST

19

2021

2223

05/13

0102

0304

0506

GMT 05/12/09 (132)

001/00

0102

0304

0506

0708

0910

1112

MET

Day 001

CDR/R2

SLEEP

OMS

BURN

F U T

M N V R

- Z L V

- X V V

G 2 C O N

G 2 E X P

FILTER

CLEANING

C N F G

♣PMC

A/G

PRE SLEEP

I M U

ERG

SETUP

- Z L V

- X V V

W S B *

F E S - I

PRE SLEEP

PLT/R3

OMS

BURN

SLEEP

P/TV01 VIDEO SETUP

C N F G

I C B C

A U D I O

P/TV09

ICBC3D

SETUP

1 0 . 2 M

OMS

POD

SRVY

PRE SLEEP*

F E S - T

I C B C

MS1/EV4/R2

SLEEP

OBSS BERTH

PRE SLEEP

RNDZ

TOOLS

C/O

P R E

S L E E P

PORT BELLY

TILE SRVY

PORT WING

RCC SRVY

T - 0

S R V Y

MS2/R1

PRE SLEEP*

SLEEP

FCMS

OPS

F C P R G

CRYO O2 SNSR CK

PORT BELLY

TILE SRVY

PORT WING

RCC SRVY

T - 0

S R V Y

O C A #PRE SLEEP

MS3/EV1

SLEEP

PRE SLEEP

♦LDRI DNLK

EXERCISE

ERG

SETUP

PRE SLEEP

NLP

ACT

MS4/EV3/R2

SLEEP

OBSS BERTH

PRE SLEEP

PORT BELLY

TILE SRVY

PORT WING

RCC SRVY

T - 0

S R V Y

MS5/EV2

SLEEP

PRE SLEEP

RNDZ

TOOLS

C/O

®EXERCISE

PRE

SLEEP

W L E S

P/TV09

ICBC3D

SETUP

O C A #PRE SLEEP

HST CMD

SSR

PLAYBACK

CLS

DOOR

D U M P

D U M P

HST

TO RNDZ

ATT

HST

LGA

DRCT

TDRS

3 GYRO OPS RECONFIG

H/W CNTRL

LOAD

MACROS &

SPCS

F H S T

PREP

FOR

HGA

RTRCT

H G A

R T R C TDAY/NIGHT

ORBIT

1617

1819

2021

2223

24

TDRS

W E ZORB ATT

BIAS +XSI

-ZLV -XVV

NC-3

-ZLV -XVV

HST ATT

SMS DEFINED

RNDZ

SA ANGLE

SUN TRACK

NOTES

♣10.2 DPRS

⊕10.2 DPRS

♦EVA TOOL UNSTOW CNFG

®EVA TOOL UNSTOW CNFG*CNTLR SWAP

#PL MAX

3

Page 6: STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt date 05/12 (132) 11:00 12:00 13:00 14:00 met day 000 16:00 17:00 18:00 19:00 20:00

05/12/09 03:02:09

FLT PLN/125/FLIGHT

FD02

FD02 EZ ACTIVITIES:

TEPC (ORB OPS, CREW SYSTEMS

) Check Status

SMOKE DETN CKT TEST

(ORB OPS, ECLS

) AIRLOCK SETUP FOR INGRESS (Block 15)

(POST INSERTION)

Har

d re

boot

all

PGS

Cs n

ot

shut

dow

n ov

erni

ght,

exc

ept:

STS6 (RPOP2) and STS7 (WLES)

ALTMAN

JOHNSON

McARTHUR

REPL

ANNE

D

3-8

STS-125 (FD )

07:00

08:00

09:00

10:00

GMT

Date

05/12

(132)

12:00

13:00

14:00

15:00

16:00

MET

Day 000

WE

Z

T D R S

~

~ ~

~

D / N

O R B 9 1 0 1 1

~ ~- Z L V - X V VS T S A T T

CDR

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Ref. MSG 002, Item 2

~

SLEEP LOGBOOK (SDBI 1634)

PLT

SLEEP

~

SLEEP LOGBOOK (SDBI 1634)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS2

SLEEP

~

SLEEP LOGBOOK (SDBI 1634)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

HST CMD

PLAYBACK SSRs

PLAYBACK SSRs

NOTES

3-8

FD02

FD02 EZ ACTIVITIES:

TEPC (ORB OPS, CREW SYSTEMS

) Check Status

SMOKE DETN CKT TEST

(ORB OPS, ECLS

) AIRLOCK SETUP FOR INGRESS (Block 15)

(POST INSERTION)

Har

d re

boot

all

PGS

Cs n

ot

shut

dow

n ov

erni

ght,

exc

ept:

STS6 (RPOP2) and STS7 (WLES)

ALTMAN

JOHNSON

McARTHUR

REPL

ANNE

DSTS-125 (FD )

07:00

08:00

09:00

10:00

GMT

Date

05/12

(132)

12:00

13:00

14:00

15:00

16:00

MET

Day 000

WE

Z

T D R SD / N

O R B 9 1 0 1 1

S T S A T T ~ ~- Z L V - X V V

CDR

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Ref. MSG 002, Item 2

SLEEP LOGBOOK (SDBI 1634)

PLT

~

SLEEP

SLEEP LOGBOOK (SDBI 1634)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS2

~

SLEEP

SLEEP LOGBOOK (SDBI 1634)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

HST CMD

PLAYBACK SSRs

PLAYBACK SSRs

NOTES

4

Page 7: STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt date 05/12 (132) 11:00 12:00 13:00 14:00 met day 000 16:00 17:00 18:00 19:00 20:00

05/12/09 03:02:09

FLT PLN/125/FLIGHT

FD02

GOOD

GRUNSFELD

MASSIMINO

FEUSTEL

REPL

ANNE

D

3-9

STS-125 (FD )

07:00

08:00

09:00

10:00

GMT

Date

05/12

(132)

12:00

13:00

14:00

15:00

16:00

MET

Day 000

WE

Z

T D R S

~

~ ~

~

D / N

O R B 9 1 0 1 1

~ ~- Z L V - X V VS T S A T T

MS1

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS3

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS4

SLEEP

~

SLEEP LOGBOOK (SDBI 1634)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS5

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP LOGBOOK (SDBI 1634)

NOTES

3-9

FD02

GOOD

GRUNSFELD

MASSIMINO

FEUSTEL

REPL

ANNE

DSTS-125 (FD )

07:00

08:00

09:00

10:00

GMT

Date

05/12

(132)

12:00

13:00

14:00

15:00

16:00

MET

Day 000

WE

Z

T D R SD / N

O R B 9 1 0 1 1

S T S A T T ~ ~- Z L V - X V V

MS1

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS3

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

~

SLEEP

SLEEP LOGBOOK (SDBI 1634)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS5

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP LOGBOOK (SDBI 1634)

NOTES

5

Page 8: STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt date 05/12 (132) 11:00 12:00 13:00 14:00 met day 000 16:00 17:00 18:00 19:00 20:00

05/12/09 03:02:09

FLT PLN/125/FLIGHT

FD02

ALTMAN

JOHNSON

McARTHUR

A A14 RCS/OMS HTR L POD - A OFF

- B AUTO

R POD - A OFF

- B AUTO

UPLINK

KU CH 2 -RNS

UPLINK

KU CH 2 -OCA

REPL

ANNE

D

3-10

STS-125 (FD )

11:00

12:00

13:00

14:00

GMT

Date

05/12

(132)

16:00

17:00

18:00

19:00

20:00

MET

Day 000

WE

Z

T D R S

~~

~

D / N

O R B 1 1 1 2 1 3 1 4

~ - Z L V - X V V ~B I A S + X S IS T S A T T

CDR

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Ref. MSG 002, Item 2

~

FSS PREP FOR BERTHING

(PL OPS, SSE ACT/FSS PREP)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Steps 1-2

OBSS ITVC BELLY TILE

SURVEY - STBD

(PDRS, ORBITER SURVEY OPS)

~

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Steps 3-4

T0 UMBILICAL AND OMS POD SURVEY

- STBD (PDRS, ORBITER SRVY OPS)

OMS POD HEATER RECONFIG A

PLT

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Steps 1-2

P/TV03 FSS OPS (OPS)

(P/TV, SCENES)

FSS Prep - Item 1

Do not perform WRIST video

requirements.

P/TV03 FSS OPS (SETUP)

(P/TV, SCENES)

OBSS ITVC BELLY TILE

SURVEY - STBD

(PDRS, ORBITER SURVEY OPS)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Steps 3-4

T0 UMBILICAL AND OMS POD SURVEY

- STBD (PDRS, ORBITER SRVY OPS)

MS2

OBSS UNBERTH

(PDRS, OBSS OPERATIONS)

MNVR (TRK) BIAS +XSI (STBD Survey)

TG=4 BV=5 P=0 Y=40 OM=350

A14/AUTO/VERN (0/18:45) Init TRK

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Steps 1-2

OBSS ITVC BELLY TILE

SURVEY - STBD

(PDRS, ORBITER SURVEY OPS)

~

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Steps 3-4

T0 UMBILICAL AND OMS POD SURVEY

- STBD (PDRS, ORBITER SRVY OPS)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

HST CMD

PLAYBACK SSRs

PLAYBACK SSRs

NOTES

3-10

FD02

ALTMAN

JOHNSON

McARTHUR

A A14 RCS/OMS HTR L POD - A OFF

- B AUTO

R POD - A OFF

- B AUTO

UPLINK

KU CH 2 -RNS

UPLINK

KU CH 2 -OCA

REPL

ANNE

DSTS-125 (FD )

11:00

12:00

13:00

14:00

GMT

Date

05/12

(132)

16:00

17:00

18:00

19:00

20:00

MET

Day 000

WE

Z

T D R SD / N

O R B 1 1 1 2 1 3 1 4

S T S A T T ~ - Z L V - X V V ~B I A S + X S I

CDR

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Ref. MSG 002, Item 2

FSS PREP FOR BERTHING

(PL OPS, SSE ACT/FSS PREP)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Steps 1-2

~

OBSS ITVC BELLY TILE

SURVEY - STBD

(PDRS, ORBITER SURVEY OPS)

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Steps 3-4

T0 UMBILICAL AND OMS POD SURVEY

- STBD (PDRS, ORBITER SRVY OPS)

OMS POD HEATER RECONFIG A

PLT

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Steps 1-2

P/TV03 FSS OPS (OPS)

(P/TV, SCENES)

FSS Prep - Item 1

Do not perform WRIST video

requirements.

P/TV03 FSS OPS (SETUP)

(P/TV, SCENES)

~

OBSS ITVC BELLY TILE

SURVEY - STBD

(PDRS, ORBITER SURVEY OPS)

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Steps 3-4

T0 UMBILICAL AND OMS POD SURVEY

- STBD (PDRS, ORBITER SRVY OPS)

MS2

OBSS UNBERTH

(PDRS, OBSS OPERATIONS)

MNVR (TRK) BIAS +XSI (STBD Survey)

TG=4 BV=5 P=0 Y=40 OM=350

A14/AUTO/VERN (0/18:45) Init TRK

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Steps 1-2

~

OBSS ITVC BELLY TILE

SURVEY - STBD

(PDRS, ORBITER SURVEY OPS)

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Steps 3-4

T0 UMBILICAL AND OMS POD SURVEY

- STBD (PDRS, ORBITER SRVY OPS)

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

HST CMD

PLAYBACK SSRs

PLAYBACK SSRs

NOTES

6

Page 9: STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt date 05/12 (132) 11:00 12:00 13:00 14:00 met day 000 16:00 17:00 18:00 19:00 20:00

05/12/09 03:02:09

FLT PLN/125/FLIGHT

FD02

GOOD

GRUNSFELD

MASSIMINO

FEUSTEL

REPL

ANNE

D

3-11

STS-125 (FD )

11:00

12:00

13:00

14:00

GMT

Date

05/12

(132)

16:00

17:00

18:00

19:00

20:00

MET

Day 000

WE

Z

T D R S

~~

~

D / N

O R B 1 1 1 2 1 3 1 4

~ - Z L V - X V V ~B I A S + X S IS T S A T T

MS1

SSV TROUBLESHOOTING

Ref. MSG 002, Item 3

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

AIRLOCK PREP

(EVA, AIRLOCK CONFIG)

Ref. STS-125 EVA CONSUMABLES

Cue Card

EMU CHECKOUT

(EVA, CHECKOUTS)

Perform for EMUs 3015 & 3017

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PDIP 1 KU BAND RATE - OFF

PDIP 1 KU BAND RATE - LOW

MS3

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

FSS PREP FOR BERTHING

(PL OPS, SSE ACT/FSS PREP)

EVA BATTERIES AND CHARGER SETUP

(EVA, AIRLOCK CONFIG)

RNS ON-ORBIT CHECKOUT

(PL OPS, SSE ACT/FSS PREP)

MS4

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

OBSS UNBERTH

(PDRS, OBSS OPERATIONS)

EMU CHECKOUT

(EVA, CHECKOUTS)

Perform for EMUs 3015 & 3017

EMU CHECKOUT

(EVA, CHECKOUTS)

EMU SWAP DURING CHECKOUT

~

MS5

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

AIRLOCK PREP

(EVA, AIRLOCK CONFIG)

Ref. STS-125 EVA CONSUMABLES

Cue Card

EMU CHECKOUT

(EVA, CHECKOUTS)

Perform for EMUs 3015 & 3017

EMU CHECKOUT

(EVA, CHECKOUTS)

EMU SWAP DURING CHECKOUT

~

NOTES

3-11

FD02

GOOD

GRUNSFELD

MASSIMINO

FEUSTEL

REPL

ANNE

DSTS-125 (FD )

11:00

12:00

13:00

14:00

GMT

Date

05/12

(132)

16:00

17:00

18:00

19:00

20:00

MET

Day 000

WE

Z

T D R SD / N

O R B 1 1 1 2 1 3 1 4

S T S A T T ~ - Z L V - X V V ~B I A S + X S I

MS1

SSV TROUBLESHOOTING

Ref. MSG 002, Item 3

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

AIRLOCK PREP

(EVA, AIRLOCK CONFIG)

Ref. STS-125 EVA CONSUMABLES

Cue Card

EMU CHECKOUT

(EVA, CHECKOUTS)

Perform for EMUs 3015 & 3017

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PDIP 1 KU BAND RATE - OFF

PDIP 1 KU BAND RATE - LOW

MS3

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

FSS PREP FOR BERTHING

(PL OPS, SSE ACT/FSS PREP)

EVA BATTERIES AND CHARGER SETUP

(EVA, AIRLOCK CONFIG)

RNS ON-ORBIT CHECKOUT

(PL OPS, SSE ACT/FSS PREP)

MS4

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

OBSS UNBERTH

(PDRS, OBSS OPERATIONS)

EMU CHECKOUT

(EVA, CHECKOUTS)

Perform for EMUs 3015 & 3017

~EMU CHECKOUT

(EVA, CHECKOUTS)

EMU SWAP DURING CHECKOUT

MS5

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

AIRLOCK PREP

(EVA, AIRLOCK CONFIG)

Ref. STS-125 EVA CONSUMABLES

Cue Card

EMU CHECKOUT

(EVA, CHECKOUTS)

Perform for EMUs 3015 & 3017

~EMU CHECKOUT

(EVA, CHECKOUTS)

EMU SWAP DURING CHECKOUT

NOTES

7

Page 10: STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt date 05/12 (132) 11:00 12:00 13:00 14:00 met day 000 16:00 17:00 18:00 19:00 20:00

05/12/09 03:02:09

FLT PLN/125/FLIGHT

FD02

ALTMAN

JOHNSON

McARTHUR

OBSS LDRI/IDC RCC SURVEY -

NOSE CAP

(PDRS, OBSS OPERATIONS)

REPL

ANNE

D

PREP FOR 10.2 PSI CABIN

(EVA, 10.2 PSI CABIN)

Ref. MSG 002, Item 4

PREP FOR 10.2 PSI CABIN

(EVA, 10.2 PSI CABIN)

Ref. MSG 002, Item 4

3-12

STS-125 (FD )

15:00

16:00

17:00

18:00

GMT

Date

05/12

(132)

20:00

21:00

22:00

23:00

00:00

MET

Day 000

WE

Z

T D R S

~~

~

D / N

O R B 1 4 1 5 1 6

~ B I A S + X S I + X S I ~B I A S + X S IS T S A T T

CDR

OBSS LDRI/IDC RCC SURVEY -

NOSE CAP

(PDRS, OBSS OPERATIONS)

MNVR (TRK) BIAS +XSI (Nose Survey)

TG=4 BV=5 P=330 Y=0 OM=335

A14/AUTO/VERN (RCC SRVY-STBD cmplt) Init TRK

CABIN DEPRESS TO 10.2 PSI

(EVA, 10.2 PSI CABIN)

~

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Steps 5-11

OBSS ITVC BELLY TILE

SURVEY - STBD

(PDRS, ORBITER SURVEY OPS)

~

MEAL

PLT

MEAL

CABIN DEPRESS TO 10.2 PSI

(EVA, 10.2 PSI CABIN)

~

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Steps 5-11

OBSS ITVC BELLY TILE

SURVEY - STBD

(PDRS, ORBITER SURVEY OPS)

~

L10 VTR SWAP 3 HR TAPE

MS2

MEAL

MNVR (TRK) BIAS +XSI (Port Survey)

TG=4 BV=5 P=0 Y=323 OM=30

A14/AUTO/VERN (RCC SRVY-PORT Step 3) Init TRK

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

Steps 1-3

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Steps 5-11

OBSS ITVC BELLY TILE

SURVEY - STBD

(PDRS, ORBITER SURVEY OPS)

~

OBSS ITVC BELLY TILE

SURVEY - PORT

(PDRS, ORBITER SURVEY OPS)

~

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

Steps 4-5

HST CMD

NOTES

3-12

FD02

ALTMAN

JOHNSON

McARTHUR

OBSS LDRI/IDC RCC SURVEY -

NOSE CAP

(PDRS, OBSS OPERATIONS)

REPL

ANNE

D

PREP FOR 10.2 PSI CABIN

(EVA, 10.2 PSI CABIN)

Ref. MSG 002, Item 4

PREP FOR 10.2 PSI CABIN

(EVA, 10.2 PSI CABIN)

Ref. MSG 002, Item 4

STS-125 (FD )

15:00

16:00

17:00

18:00

GMT

Date

05/12

(132)

20:00

21:00

22:00

23:00

00:00

MET

Day 000

WE

Z

T D R SD / N

O R B 1 4 1 5 1 6

S T S A T T ~ B I A S + X S I + X S I ~B I A S + X S I

CDR

OBSS LDRI/IDC RCC SURVEY -

NOSE CAP

(PDRS, OBSS OPERATIONS)

MNVR (TRK) BIAS +XSI (Nose Survey)

TG=4 BV=5 P=330 Y=0 OM=335

A14/AUTO/VERN (RCC SRVY-STBD cmplt) Init TRK

~

CABIN DEPRESS TO 10.2 PSI

(EVA, 10.2 PSI CABIN)

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Steps 5-11

~OBSS ITVC BELLY TILE

SURVEY - STBD

(PDRS, ORBITER SURVEY OPS)

MEAL

PLT

MEAL ~

CABIN DEPRESS TO 10.2 PSI

(EVA, 10.2 PSI CABIN)

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Steps 5-11

~OBSS ITVC BELLY TILE

SURVEY - STBD

(PDRS, ORBITER SURVEY OPS)

L10 VTR SWAP 3 HR TAPE

MS2

MEAL

MNVR (TRK) BIAS +XSI (Port Survey)

TG=4 BV=5 P=0 Y=323 OM=30

A14/AUTO/VERN (RCC SRVY-PORT Step 3) Init TRK

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

Steps 1-3

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

Steps 5-11

~OBSS ITVC BELLY TILE

SURVEY - STBD

(PDRS, ORBITER SURVEY OPS)

~

OBSS ITVC BELLY TILE

SURVEY - PORT

(PDRS, ORBITER SURVEY OPS)

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

Steps 4-5

HST CMD

NOTES

8

Page 11: STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt date 05/12 (132) 11:00 12:00 13:00 14:00 met day 000 16:00 17:00 18:00 19:00 20:00

05/12/09 03:02:09

FLT PLN/125/FLIGHT

FD02

GOOD

GRUNSFELD

MASSIMINO

FEUSTEL

REPL

ANNE

D

3-13

STS-125 (FD )

15:00

16:00

17:00

18:00

GMT

Date

05/12

(132)

20:00

21:00

22:00

23:00

00:00

MET

Day 000

WE

Z

T D R S

~~

~

D / N

O R B 1 4 1 5 1 6

~ B I A S + X S I + X S I ~B I A S + X S IS T S A T T

MS1

OBSS LDRI/IDC RCC SURVEY -

NOSE CAP

(PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

Steps 1-5

OBSS ITVC BELLY TILE

SURVEY - PORT

(PDRS, ORBITER SURVEY OPS)

~

MEAL

EVA CREW: TAKE 1 ASPIRIN (325mg)

MS3

MEAL

EMU CHECKOUT

(EVA, CHECKOUTS)

Perform for EMUs 3008 & 3004

EVA TOOL UNSTOW/TOOL CNFG

(EVA, TIMELINES)

Ref. PGT CHECKOUT

(EVA, TOOLS AND STOWAGE)

~

REBA POWERED HARDWARE C/O

(EVA, CHECKOUTS)

Ref. STS-125 EVA CONSUMABLES

Cue Card

EVA CREW: TAKE 1 ASPIRIN (325mg)

MS4

MEAL

EMU CHECKOUT

(EVA, CHECKOUTS)

Perform for EMUs 3008 & 3004

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

Steps 1-5

OBSS ITVC BELLY TILE

SURVEY - PORT

(PDRS, ORBITER SURVEY OPS)

~

EVA CREW: TAKE 1 ASPIRIN (325mg)

EMU CHECKOUT

(EVA, CHECKOUTS)

EMU SWAP DURING CHECKOUT

~

MS5

MEAL

EMU CHECKOUT

(EVA, CHECKOUTS)

Perform for EMUs 3008 & 3004

EVA TOOL UNSTOW/TOOL CNFG

(EVA, TIMELINES) ~

REBA POWERED HARDWARE C/O

(EVA, CHECKOUTS)

Ref. STS-125 EVA CONSUMABLES

Cue Card

EVA CREW: TAKE 1 ASPIRIN (325mg)

EMU CHECKOUT (EVA, CHECKOUTS)

EMU SWAP DURING CHECKOUT

~

NOTES

3-13

FD02

GOOD

GRUNSFELD

MASSIMINO

FEUSTEL

REPL

ANNE

DSTS-125 (FD )

15:00

16:00

17:00

18:00

GMT

Date

05/12

(132)

20:00

21:00

22:00

23:00

00:00

MET

Day 000

WE

Z

T D R SD / N

O R B 1 4 1 5 1 6

S T S A T T ~ B I A S + X S I + X S I ~B I A S + X S I

MS1

OBSS LDRI/IDC RCC SURVEY -

NOSE CAP

(PDRS, OBSS OPERATIONS)

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

Steps 1-5

~

OBSS ITVC BELLY TILE

SURVEY - PORT

(PDRS, ORBITER SURVEY OPS)

MEAL

EVA CREW: TAKE 1 ASPIRIN (325mg)

MS3

MEAL

EMU CHECKOUT

(EVA, CHECKOUTS)

Perform for EMUs 3008 & 3004

~

EVA TOOL UNSTOW/TOOL CNFG

(EVA, TIMELINES)

Ref. PGT CHECKOUT

(EVA, TOOLS AND STOWAGE)

REBA POWERED HARDWARE C/O

(EVA, CHECKOUTS)

Ref. STS-125 EVA CONSUMABLES

Cue Card

EVA CREW: TAKE 1 ASPIRIN (325mg)

MS4

MEAL

EMU CHECKOUT

(EVA, CHECKOUTS)

Perform for EMUs 3008 & 3004

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

Steps 1-5

~

OBSS ITVC BELLY TILE

SURVEY - PORT

(PDRS, ORBITER SURVEY OPS)

EVA CREW: TAKE 1 ASPIRIN (325mg)

~EMU CHECKOUT

(EVA, CHECKOUTS)

EMU SWAP DURING CHECKOUT

MS5

MEAL

EMU CHECKOUT

(EVA, CHECKOUTS)

Perform for EMUs 3008 & 3004

~

EVA TOOL UNSTOW/TOOL CNFG

(EVA, TIMELINES)

REBA POWERED HARDWARE C/O

(EVA, CHECKOUTS)

Ref. STS-125 EVA CONSUMABLES

Cue Card

EVA CREW: TAKE 1 ASPIRIN (325mg)

~EMU CHECKOUT (EVA, CHECKOUTS)

EMU SWAP DURING CHECKOUT

NOTES

9

Page 12: STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt date 05/12 (132) 11:00 12:00 13:00 14:00 met day 000 16:00 17:00 18:00 19:00 20:00

05/12/09 03:02:09

FLT PLN/125/FLIGHT

FD02

ALTMAN

JOHNSON

McARTHUR

B SUPPLY WATER DUMP USING FES

(ORB OPS, ECLS)

Step 1 only, using FES PRI B

CABIN DEPRESS TO 10.2 PSI

(EVA, 10.2 PSI CABIN)

CABIN DEPRESS TO 10.2 PSI

(EVA, 10.2 PSI CABIN)

REPL

ANNE

D

3-14

STS-125 (FD )

19:00

20:00

21:00

22:00

GMT

Date

05/12

(132)

00:00

01:00

02:00

03:00

04:00

MET

Day 001

WE

Z

T D R S

~ ~

~

~

D / N

O R B 1 6 1 7 1 8 1 9

~ B I A S + X S I ~- Z L V - X V VS T S A T T

CDR

FILTER CLEANING

(IFM, SCHEDULED MAINTENANCE)

Wait to perform MCIU

Filter Cleaning until no SRMS

Ops are in work

10.2 PSI CABIN CONFIG

(EVA, 10.2 PSI CABIN)

~

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

CYCLE ERGOMETER OPS

(ORB OPS, CREW SYS)

Perform ERGOMETER SETUP

MNVR (TRK) -ZLV -XVV

TG=2 BV=3 OM=0 A14/AUTO/VERN

(T0 SRVY-PORT cmplt) Init TRK

R2 BLR CNTLR/HTR (three) - B

SUPPLY WATER DUMP USING FES B

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Ref. MSG 002, Item 2

~

PLT

P/TV01 VIDEO SETUP

(P/TV, SCENES)

10.2 PSI CABIN CONFIG

(EVA, 10.2 PSI CABIN)

~

P/TV09 ICBC3D (AUDIO RECORDER)

(P/TV, SCENES)

Setup, Pwrup, & Placement

P/TV09 ICBC3D (NOMINAL)

(P/TV, SCENES)

SETUP

P/TV10 EXTERNAL SURVEY (SETUP) Step 1

P/TV10 EXTERNAL SURVEY (OPS)

(P/TV, SCENES

) OMS Pod - Item 1

Best Lighting: (03:21-03:58)

ICBC3D STATUS REPORT

MS2

FC MONITORING SYS (FCMS) OPS

(ORB OPS, EPS)

FC PURGE - MANUAL

(ORB OPS, EPS)

CRYO 02 TK HTR SNSR CK

(ORB OPS, EPS)

OBSS ITVC BELLY TILE

SURVEY - PORT

(PDRS, ORBITER SURVEY OPS)

~

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

Steps 6-10

T0 UMBILICAL AND OMS POD

SURVEY - PORT

(PDRS, ORBITER SURVEY OPS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

HST CMD

PLAYBACK SSRs

NOTES

3-14

FD02

ALTMAN

JOHNSON

McARTHUR

B SUPPLY WATER DUMP USING FES

(ORB OPS, ECLS)

Step 1 only, using FES PRI B

CABIN DEPRESS TO 10.2 PSI

(EVA, 10.2 PSI CABIN)

CABIN DEPRESS TO 10.2 PSI

(EVA, 10.2 PSI CABIN)

REPL

ANNE

DSTS-125 (FD )

19:00

20:00

21:00

22:00

GMT

Date

05/12

(132)

00:00

01:00

02:00

03:00

04:00

MET

Day 001

WE

Z

T D R SD / N

O R B 1 6 1 7 1 8 1 9

S T S A T T ~ B I A S + X S I ~- Z L V - X V V

CDR

FILTER CLEANING

(IFM, SCHEDULED MAINTENANCE)

Wait to perform MCIU

Filter Cleaning until no SRMS

Ops are in work

10.2 PSI CABIN CONFIG

(EVA, 10.2 PSI CABIN)

~

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

CYCLE ERGOMETER OPS

(ORB OPS, CREW SYS)

Perform ERGOMETER SETUP

MNVR (TRK) -ZLV -XVV

TG=2 BV=3 OM=0 A14/AUTO/VERN

(T0 SRVY-PORT cmplt) Init TRK

R2 BLR CNTLR/HTR (three) - B

SUPPLY WATER DUMP USING FES B

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Ref. MSG 002, Item 2

PLT

P/TV01 VIDEO SETUP

(P/TV, SCENES)

10.2 PSI CABIN CONFIG

(EVA, 10.2 PSI CABIN)

~

P/TV09 ICBC3D (AUDIO RECORDER)

(P/TV, SCENES)

Setup, Pwrup, & Placement

P/TV09 ICBC3D (NOMINAL)

(P/TV, SCENES)

SETUP

P/TV10 EXTERNAL SURVEY (SETUP) Step 1

P/TV10 EXTERNAL SURVEY (OPS)

(P/TV, SCENES

) OMS Pod - Item 1

Best Lighting: (03:21-03:58)

ICBC3D STATUS REPORT

MS2

FC MONITORING SYS (FCMS) OPS

(ORB OPS, EPS)

FC PURGE - MANUAL

(ORB OPS, EPS)

CRYO 02 TK HTR SNSR CK

(ORB OPS, EPS)

~OBSS ITVC BELLY TILE

SURVEY - PORT

(PDRS, ORBITER SURVEY OPS)

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

Steps 6-10

T0 UMBILICAL AND OMS POD

SURVEY - PORT

(PDRS, ORBITER SURVEY OPS)

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

HST CMD

PLAYBACK SSRs

NOTES

10

Page 13: STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt date 05/12 (132) 11:00 12:00 13:00 14:00 met day 000 16:00 17:00 18:00 19:00 20:00

05/12/09 03:02:09

FLT PLN/125/FLIGHT

FD02

GOOD

GRUNSFELD

MASSIMINO

FEUSTEL

WLES RNDZ TOOLS C/O PREP

(ORB OPS, WLE SENSORS)

DIGITAL VIA VTR

(Cue Card, DIGITAL PLAYBACK)

(See pg. 3-17 for details)

REPL

ANNE

D

3-15

STS-125 (FD )

19:00

20:00

21:00

22:00

GMT

Date

05/12

(132)

00:00

01:00

02:00

03:00

04:00

MET

Day 001

WE

Z

T D R S

~ ~

~

~

D / N

O R B 1 6 1 7 1 8 1 9

~ B I A S + X S I ~- Z L V - X V VS T S A T T

MS1

OBSS BERTH

(PDRS, OBSS OPERATIONS)

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

OBSS ITVC BELLY TILE

SURVEY - PORT

(PDRS, ORBITER SURVEY OPS)

~

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

Steps 6-10

T0 UMBILICAL AND OMS POD

SURVEY - PORT

(PDRS, ORBITER SURVEY OPS)

MS3

EVA TOOL UNSTOW/TOOL CNFG

(EVA, TIMELINES)

Ref. PGT CHECKOUT

(EVA, TOOLS AND STOWAGE)

~ ~

EXERCISE

CYCLE ERGOMETER OPS

(ORB OPS, CREW SYS)

Perform ERGOMETER SETUP

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NLP ACTIVATION

(PL OPS, NLP)

Activate GAPs 1-14

MS4

OBSS BERTH

(PDRS, OBSS OPERATIONS)

OBSS ITVC BELLY TILE

SURVEY - PORT

(PDRS, ORBITER SURVEY OPS)

~

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

Steps 6-10

T0 UMBILICAL AND OMS POD

SURVEY - PORT

(PDRS, ORBITER SURVEY OPS)

MS5

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

~

EVA TOOL UNSTOW/TOOL CNFG

(EVA, TIMELINES)~

EXERCISE

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

P/TV09 ICBC3D (NOMINAL)

(P/TV, SCENES)

SETUP

NOTES

3-15

FD02

GOOD

GRUNSFELD

MASSIMINO

FEUSTEL

WLES RNDZ TOOLS C/O PREP

(ORB OPS, WLE SENSORS)

DIGITAL VIA VTR

(Cue Card, DIGITAL PLAYBACK)

(See pg. 3-17 for details)

REPL

ANNE

DSTS-125 (FD )

19:00

20:00

21:00

22:00

GMT

Date

05/12

(132)

00:00

01:00

02:00

03:00

04:00

MET

Day 001

WE

Z

T D R SD / N

O R B 1 6 1 7 1 8 1 9

S T S A T T ~ B I A S + X S I ~- Z L V - X V V

MS1

OBSS BERTH

(PDRS, OBSS OPERATIONS)

~

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~OBSS ITVC BELLY TILE

SURVEY - PORT

(PDRS, ORBITER SURVEY OPS)

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

Steps 6-10

T0 UMBILICAL AND OMS POD

SURVEY - PORT

(PDRS, ORBITER SURVEY OPS)

MS3

~EVA TOOL UNSTOW/TOOL CNFG

(EVA, TIMELINES)

Ref. PGT CHECKOUT

(EVA, TOOLS AND STOWAGE)

~

EXERCISE

CYCLE ERGOMETER OPS

(ORB OPS, CREW SYS)

Perform ERGOMETER SETUP

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NLP ACTIVATION

(PL OPS, NLP)

Activate GAPs 1-14

MS4

OBSS BERTH

(PDRS, OBSS OPERATIONS)

~OBSS ITVC BELLY TILE

SURVEY - PORT

(PDRS, ORBITER SURVEY OPS)

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

Steps 6-10

T0 UMBILICAL AND OMS POD

SURVEY - PORT

(PDRS, ORBITER SURVEY OPS)

MS5

~

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

~EVA TOOL UNSTOW/TOOL CNFG

(EVA, TIMELINES)

EXERCISE

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

P/TV09 ICBC3D (NOMINAL)

(P/TV, SCENES)

SETUP

NOTES

11

Page 14: STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt date 05/12 (132) 11:00 12:00 13:00 14:00 met day 000 16:00 17:00 18:00 19:00 20:00

05/12/09 03:02:09

FLT PLN/125/FLIGHT

FD02

ALTMAN

JOHNSON

McARTHUR

C SUPPLY WATER DUMP USING FES

(ORB OPS, ECLS)

Step 2 only, FES PRI B req'd

D After LDRI D/L complete:

L10 √MUX/VTR/CC PWR - ON (LED ON)

RECONFIGURE OCA D/L RATE

(PL Max)

(ORB OPS, PGSC) Part C, omit Step 4

L10 MUX/VTR/CC PWR - OFF (LED OFF)

REPL

ANNE

D

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Crew Wake: 1/15:00

3-16

STS-125 (FD )

23:00

00:00

01:00

02:00

GMT

Date

05/12

(132)

04:00

05:00

06:00

07:00

08:00

MET

Day 001

WE

Z

T D R S

~

~

~

D / N

O R B 1 9 2 0 2 1

~ N C - 3 ~- Z L V - X V VS T S A T T

CDR

SLEEP

~

ON-ORBIT OMS BURN

(ORB OPS, OMS)

< NC3 TIG (1/04:40)

FUTURE LOADED MNVR (Simo Dump)

TG=2 BV=5 P=90 Y=300 OM=270

A1/AUTO/VERN (1/14:45) Init TRK

MNVR (TRK) -ZLV -XVV

TG=2 BV=3 OM=0

A1/AUTO/VERN Init TRK

G2 SET CONTRACTION (ORB OPS, DPS)

Configure Single G2, (1111)

G2 SET EXPANSION (ORB OPS, DPS

) Configure Dual G2, (1212)

06

√UHF MODE - OFF

L9 PAYLOAD STATION AUDIO A/G (two) - OFF

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PLT

ON-ORBIT OMS BURN

(ORB OPS, OMS) SLEEP

~

10.2 PSI MAINTENANCE

(EVA, 10.2 PSI CABIN)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√HUM SEP for H2O accumulation

SUPPLY WATER DUMP USING FES C

MS2

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√HUM SEP for H2O accumulation

SLEEP

~

RECONFIGURE OCA D/L RATE D

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

HST CMD

CLOSE APERTURE DOOR

HST486 ESB DUMP

NSSC-1 ESB DUMP

HST TO RENDEZVOUS ATTITUDE

HST LGA DIRECT TDRSS

RECONFIGURE TO 3 GYRO OPERATIONS

~

UPDATE

ORBITAL MNVR

PADNO

TES

3-16

FD02

ALTMAN

JOHNSON

McARTHUR

C SUPPLY WATER DUMP USING FES

(ORB OPS, ECLS)

Step 2 only, FES PRI B req'd

D After LDRI D/L complete:

L10 √MUX/VTR/CC PWR - ON (LED ON)

RECONFIGURE OCA D/L RATE

(PL Max)

(ORB OPS, PGSC) Part C, omit Step 4

L10 MUX/VTR/CC PWR - OFF (LED OFF)

REPL

ANNE

D

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Crew Wake: 1/15:00

STS-125 (FD )

23:00

00:00

01:00

02:00

GMT

Date

05/12

(132)

04:00

05:00

06:00

07:00

08:00

MET

Day 001

WE

Z

T D R SD / N

O R B 1 9 2 0 2 1

S T S A T T ~ N C - 3 ~- Z L V - X V V

CDR

~

SLEEP

ON-ORBIT OMS BURN

(ORB OPS, OMS)

< NC3 TIG (1/04:40)

FUTURE LOADED MNVR (Simo Dump)

TG=2 BV=5 P=90 Y=300 OM=270

A1/AUTO/VERN (1/14:45) Init TRK

MNVR (TRK) -ZLV -XVV

TG=2 BV=3 OM=0

A1/AUTO/VERN Init TRK

G2 SET CONTRACTION (ORB OPS, DPS)

Configure Single G2, (1111)

G2 SET EXPANSION (ORB OPS, DPS

) Configure Dual G2, (1212)

06

√UHF MODE - OFF

L9 PAYLOAD STATION AUDIO A/G (two) - OFF

PRIVATE MEDICAL CONFERENCE

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PLT

ON-ORBIT OMS BURN

(ORB OPS, OMS)

~

SLEEP

10.2 PSI MAINTENANCE

(EVA, 10.2 PSI CABIN)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√HUM SEP for H2O accumulation

SUPPLY WATER DUMP USING FES C

MS2

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√HUM SEP for H2O accumulation

~

SLEEP

RECONFIGURE OCA D/L RATE D

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

HST CMD

CLOSE APERTURE DOOR

HST486 ESB DUMP

NSSC-1 ESB DUMP

HST TO RENDEZVOUS ATTITUDE

HST LGA DIRECT TDRSS

~

RECONFIGURE TO 3 GYRO OPERATIONS

NOTES

UPDATE

ORBITAL MNVR

PAD

12

Page 15: STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt date 05/12 (132) 11:00 12:00 13:00 14:00 met day 000 16:00 17:00 18:00 19:00 20:00

05/12/09 03:02:09

FLT PLN/125/FLIGHT

FD02

GOOD

GRUNSFELD

MASSIMINO

FEUSTEL

D After LDRI D/L complete:

L10 √MUX/VTR/CC PWR - ON (LED ON)

RECONFIGURE OCA D/L RATE

(PL Max)

(ORB OPS, PGSC) Part C, omit Step 4

L10 MUX/VTR/CC PWR - OFF (LED OFF)

REPL

ANNE

D

Crew Wake: 1/15:00

3-17

STS-125 (FD )

23:00

00:00

01:00

02:00

GMT

Date

05/12

(132)

04:00

05:00

06:00

07:00

08:00

MET

Day 001

WE

Z

T D R S

~

~

~

D / N

O R B 1 9 2 0 2 1

~ N C - 3 ~- Z L V - X V VS T S A T T

MS1

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

~

MS3

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

DIGITAL VIA VTR

(Cue Card, DIGITAL PLAYBACK)

LDRI surveys

KU TDRW (03:34-04:02)

KU TDRE (04:18-04:26)

KU TDRE (04:28-04:36)

~

MS4

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS5

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

~

RECONFIGURE OCA D/L RATE D

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

3-17

FD02

GOOD

GRUNSFELD

MASSIMINO

FEUSTEL

D After LDRI D/L complete:

L10 √MUX/VTR/CC PWR - ON (LED ON)

RECONFIGURE OCA D/L RATE

(PL Max)

(ORB OPS, PGSC) Part C, omit Step 4

L10 MUX/VTR/CC PWR - OFF (LED OFF)

REPL

ANNE

D

Crew Wake: 1/15:00

STS-125 (FD )

23:00

00:00

01:00

02:00

GMT

Date

05/12

(132)

04:00

05:00

06:00

07:00

08:00

MET

Day 001

WE

Z

T D R SD / N

O R B 1 9 2 0 2 1

S T S A T T ~ N C - 3 ~- Z L V - X V V

MS1

~

SLEEP

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

MS3

~

SLEEP

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~DIGITAL VIA VTR

(Cue Card, DIGITAL PLAYBACK)

LDRI surveys

KU TDRW (03:34-04:02)

KU TDRE (04:18-04:26)

KU TDRE (04:28-04:36)

MS4

~

SLEEP

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS5

~

SLEEP

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

RECONFIGURE OCA D/L RATE D

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

13

Page 16: STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt date 05/12 (132) 11:00 12:00 13:00 14:00 met day 000 16:00 17:00 18:00 19:00 20:00

MSG 003 - FD02 MISSION SUMMARY

Good Morning Atlantis!!! 1 2 3 4 5 6 7 8 9

10 11 12 13 14

Your launch yesterday was spectacular!!! You will notice on your flight plan for today that we have rearranged a few events. NC2 is no longer required due to your trajectory. That allows us to put FSS Prep for Berthing before OBSS Unberth. This is much more efficient and actually, the ideal way to arrange things! Have a great day!!! YOUR CURRENT ORBIT IS: 298 X 118 NM NOTAMS: 15

16 17 18 19 20 21 22 23 24 25 26 27 28 29

EDW – LAKEBED RUNWAY 15/33 ELS ONLY. OTHER LAKEBED RWYS RED. NOR – LAKEBED RUNWAYS GREEN. GUA – 06R/24L CLOSED. GDV – RWY 03R/21L CLOSED. KIN – UNUSABLE. GSA – UNUSABLE. AMB – UNUSABLE. EIP – NOT USABLE. NO AGREEMENT. BEN – NOT RECOMMENDED/NOT SUPPORTED. BYD – POLITICALLY NOT RECOMMENDED. AAT – POLITICALLY NOT RECOMMENDED. LRB – POLITICALLY NOT RECOMMENDED. TACAN CH 85 OUT.

NEXT 2 PLS OPPORTUNITIES: 30

31 32 33 34

NOR23 ORB 15 – 00/21:53 FEW250 230/12P19 EDW04 ORB 31 – 01/22:49 SCT250 330/08P14 OMS TANK FAIL CAPABILITY: 35

36 37 38 39

L OMS FAILS: YES R OMS FAILS: YES LEAKING OMS PRPLT BURN: 40

41 42 43 44

L OMS LEAK: ALWAYS BURN OUT-OF-PLANE R OMS LEAK: ALWAYS BURN OUT-OF-PLANE OMS QUANTITIES (%) 45

46 47 48 49 50 51

L OMS OX = 82.4 R OMS OX = 81.8 FU = 82.0 FU = 81.9

END OF PAGE 1 OF 2, MSG 003 14

Page 17: STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt date 05/12 (132) 11:00 12:00 13:00 14:00 met day 000 16:00 17:00 18:00 19:00 20:00

MSG 003 - FD02 MISSION SUMMARY

END OF PAGE 2 OF 2, MSG 003

DELTA V AVAILABLE: 1 2 3

OMS 781 FPS ARCS (TOTAL ABOVE QTY1) 55 FPS 4

5 6 7 8 9

10 11 12 13 14 15 16

TOTAL IN THE AFT 836 FPS ARCS (TOTAL ABOVE QTY2) 83 FPS FRCS (ABOVE QTY 1) 39 FPS AFT QTY 1 87 % AFT QTY 2 49 % SYSTEM FAILURE IMPACT WORK AROUND

GNC ASA 1 Power Channel 1 Aerosurfaces failed. No mission duration or landing site impacts for 1 FCS failure. Next Aerosurface failure will cause mission duration and landing site impacts.

Deselect feedbacks PASS and BFS prior to Entry.

EPS Loss of the MIC KEY light at panel A2.

Loss of visual confirmation on the Flight Deck Speaker that the MS ATU is keyed.

none

17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

15

Page 18: STS-125 · 12/05/2009  · replanned uplink ku ch 2 -rns uplink ku ch 2 -oca 3-10 sts-125 (fd ) gmt date 05/12 (132) 11:00 12:00 13:00 14:00 met day 000 16:00 17:00 18:00 19:00 20:00

MSG 004 - SSE CONTINGENCY PROCEDURE

END OF PAGE 1 OF 1, MSG 004

SSE SSR-1 FMDM SWAP A->B (B->A) (PL SYS, SSE), pg 1-38, delete step 9. 1 2 Rationale: The MULE Survival Htr and MULE COPE Htr strings are fully operable and 3 monitorable thru either of the Flex 2 (MULE) FMDMs. There is no need to swap these 4 heaters with the FMDMs. 5 6 RAPID SAFING WITHOUT HST (PL OPS, CONTINGENCY OPERATIONS), pg 5-24: 7 8 WAS: 9 3. ROTATE (SINGLE MOTOR DRIVE) 10

Perform this step only if BSP installed and B/L not aligned with fixed target (+V3 FWD); 11 else, go to step 4 12

NOTE 13 Rotate to align closest berthing latch to fixed target. If hardstop encountered, reverse 14

direction 15 16 IS: 17 3. ROTATE (SINGLE MOTOR DRIVE) 18

Perform this step only if BSP installed and B/L 1 or 3 not aligned with fixed target; else, 19 go to step 4 20

NOTE 21 Rotate to align berthing latch 1 or 3 to fixed target. If hardstop encountered, reverse 22

direction 23 24 Rationale: Berthing Latch 2 forward is not an acceptable Safe-for-Landing configuration due 25 to interference with the PLB door envelope. 26 27 RAPID SAFING WITHOUT HST (PL OPS, CONTINGENCY OPERATIONS), 28 pg 5-25, step 6: 29 30 Delete the following actions: 31 A6U PL RETEN LOGIC PWR SYS 1(2) – OFF 32 R13L PL BAY MECH PWR SYS 1(2) – OFF 33 34 Rationale: Mech and Logic power need to remain on thru the completion of the step 6 FSS 35 downlock activities. Removal of these power sources are properly reflected in step 7. 36 37

38 39 40 41 42 43 44 45 46 47 48 49 50 51