Structured Innovation Processes with use cases of railway - and hospital - systems
description
Transcript of Structured Innovation Processes with use cases of railway - and hospital - systems
1
Structured Innovation Processeswith use cases of railway- and hospital-systems
Hold the Big Picture based on Details
Apps & Maps to get a „Think Focus Systems“ for Innovation
SOKRATES GROUP
2
Content of the presentation
• Innovation: Problems to solve• Why SokratesMapConcept? Big Picture / Details• SokratesGroup?• A use Case:
- Innovation Cockpit for Railways- Innovation Cockpit for Innovators: FACES
3
Innovation: Problems to solve?• Extremely complex decision making process• Contribution from each stakeholder is requested• Hard to enlighten the main issues• Challenging to illustrate interrelations between tasks• Problematic to perform a convincing root cause analysis• Tough to get all actionable alternatives considered• Not easy to qualify and quantify the various options• Difficult to measure the impact of the results• Missing effective continuous improvement process• Improving safety while reducing costs
4
Hold the Big Picture based on Details
Innovation: Problems to solve• The complexity of running systems is enormous• Changing a running system needs insights and overview• Visualization with the SokratesMapConcept maximize
individual and collective intelligence• Integrated pretests of collateral use and damage of innovation
is a part of an integrated governance• Testing the economic impact of innovation needs overview
5
Login
Passwort
SokratesGroup helps to collect know-how and to take innovative usage of it.• Partners are big and small companies, governments, universities, individuals, groups.• Goal is using the collective knowledge of the group to solve problems.• Main instruments are methods, which improve individual and collective insight and
will provide overview for the participants.• The main part of library of the map and the apps is open for use and scaling up the
individual and collective intelligence.
SOKRATES GROUP
6
... A powerful Development of Morphological Methods,
The SOKRATESMAPCONCEPT®
I.A.M.Sokrates
Visual Innovation ProcessHold the Big Picture based on Details
SOKRATES GROUP.com
7
Improvement of Individual and Collective Insights
Visual Innovation ProcessHold the Big Picture based on Details
8
Innovation- and Riskcockpit of an Hospital: „Hold the Big Picture, based on Details“
Medicin Facility mgt Hospitality BCM
Care 1 Kittchen HR
Care2 Cafeteria Technic
BoD – Top Management
The SokratesMapConcept uses information from existing management tools and generates massive cost savings. Organizations are entitled to expect a productivity increase of 3-10% in the first year - while at the same time increasing employee’s motivation. On top of that the liability risk of the management is largely reduced.
Through visualization with zoom and drill-down functionality, time and money wasting sources are identified much faster and can be act upon. Your organization will save money and become stronger because more options for improvements will be analyzed. The management expertise thanks to this tools will be recognized among employees, customers and the media.
9
Innovation Process: structured, visualized, fast, safe, based on collective intelligence
10
Use Case
Energy System of a Rail Infrastructure:How to check the adding value of an innovation:
E.g. “FACES” Automated Fault Analysis System for High Voltage Network
Where does the new solution impact my business process?
11
Short description of the innovation“FACES” Automated Fault Analysis System for High Voltage Network:
For additional information please visit the following web site:
http://www.systemseurope.be/faces/index.en.php
12
Use Case:Structured Innovation Processes for Rail Systems
Where does the new solution impact my business process?
13
Powerful Decision Making Process for Innovation
Visulized Specifications of the Innovation
Impact of the Innovation on running System
?
Main features
Prioritization to isolate the most critical
events
Location of the fault to
reduce recovery time
Identification of the root
cause to optimise counter
measures
ContinuousImprovement
of Protection
System
Multiplication of data makes interpretation
challenging … FACES helps with …
Ticket to Dispatching Centre: Ph-G fault on line # 2,
at 12.5 km due to Crane Contact,
Protection relay # 7 failed to detect the fault on Distance Protection
Why automation?• Power system gets more stressed• Getting focus in the most important events• Reduce outage duration and power system vulnerability• Take advantage of operational data (SCADA) and non-operational data (IED)
• Malfunctions due to accidental changes in relay settings • Detect mistake after commissioning like phase permutation, loose
contact, polarity inversion of CT and VT – Latent faults may go unnoticed
• Avoid repetitive work, retrieving files, converting files formats, simple calculations
• More cooperation among personnel in different areas
• Fast recovery change positively public perception• Regulator demands for information from utilities are increasing
ISBN: 978 – 2 – 85873 – 112 – 1
infrastructure
failure
human resourses
external
Benefits• Improving power system performance: cost of power not
delivered and reduction of restoration time
• Efficiency and response time of the company personnel: time of analysis vs quality of outcome
• Operational statistics: reporting to regulatory bodies and internal asset management tasks
• Integration of data from many points should call for standardization efforts
ISBN: 978 – 2 – 85873 – 112 – 1
FACES™ offers significant advantages …
for operations, maintenance and protection personnel and help answering the questions:
t
• What are the most critical events ?• Where or what is the problem?• Can the line be safely returned to service?• Did the right relays respond the right way?• … are there any hidden wrong settings ?
Detect hidden failures• Inconsistency between Main and Backup protection
• Detection of contacts discrepancy between circuit breaker poles
• Wrong relay reset time
• Auto-reclose initiated whereas the fault involves another phase during the dead time
• Wrong behavior of the transfer scheme (teleprotection)
NERC: protection relays are involved in about 75% of all major disturbances. Relay hidden failures causes relay malfunctions and blackouts in the past. IEEE 13 DEC 2010: ISBN: 978-1-4244-5938-4
Who is concerned?
Operating personnel are responsible for returning to service as much of the electric system as practical within the shortest time possible.
Operator
analysis available within 5 minutes
Maintenance personnel are charged with repairing and returning outages equipment to service.
Maintenance Field Service
notification within 2 hours
Protection personnel are responsible with the final assessment of the response correctness to a given fault condition. Fault clearing or equipment failure. Maintenance planning
ProtectionAsset Managementadequate time to collect data
and complete evaluation
t
20
Where does the new solution impact my business process?
Hold the Big Picture based on Details
21
„Hold the Big Picture, based on Details“Included Zoom-, Drilldown and other Functions
• Better decision making process in complex situation, reduce risks• Integrate the intellectual contribution of each stakeholder• Easier to explain the main issues• More efficient to show interrelations between tasks• Perform a root cause analysis without stress• More creative to develop suitable actionable alternatives • Qualify and quantify the options in a holistic way• Effective measurement of implementation and results• Support continuous improvement process• Reduce costs• Very easy and fast implementation of SokratesMapConcept• … and have a look on “FACES”
22
Methoden Entwicklung IT Entwicklung und Betrieb Marketing / Marktentwicklung / Angebote Partnerbetreuung Projektvermittlung Investorenbetreuung, Mäzene Über uns, Kontakt
Applikationen/Karten nach - Branchen - Themen
Sokrates Fachbücher Eigenverlag, Verlagspartner
Anwender - Branchen
- Themen Projekte Zertifizierte Partner Hochschulen Partner Mitgliedschaften
Map Factories Map Entwickler Pro Bono Projekte Wissenschaft Akademie / Ausbildung
Login
Passwort
www.sokratesgroup.comThomas Braun, [email protected], 0041 44 724 2686
„We need your brain capacity“
SOKRATES GROUP