Stressors, Linkages, Progress, and Lessons Learned from Basin-Wide Planning and Implementation for...
-
Upload
kim-beidler -
Category
Education
-
view
51 -
download
0
description
Transcript of Stressors, Linkages, Progress, and Lessons Learned from Basin-Wide Planning and Implementation for...
Track 6: Tributaries } River } Bay
A Basin-wide Perspective
Stressors, Linkages, Progress, and Lessons Learned from
Basin-Wide Planning and Implementation for
Water Quality and Quantity Restoration and Protection
Jessica Rittler Sanchez, PhD
River Basin Planner, Delaware River Basin Commission [email protected] 609-477-7202
Accelerating Action: Delaware River Watershed Forum October 28-29, 2013
Stressors, Linkages, Progress, and Lessons Learned from Basin-Wide Planning and Implementation for Water Quality and Quantity Restoration and Protection
• Basin Context • Water Supply • Water Quality (DO) • 2030 Vision
Track 6: Tributaries } River } Bay A Basin-wide Perspective
Context: Diversity
• River @ Trenton photo
Ron Saari/with permission of the Delaware River Joint Toll Bridge Commission
Vicki Dodson
Context: Landscape
NYC reservoirs
PA-NJ-DE Port / industrial complex Energy
Generation
Special Protection
Waters
Major diversion of headwaters
Antidegredation policy on non-tidal River
Energy generation
Port
Urban-industrial complex
PCB TMDL on tidal River
Context
PCB TMDL
Drinking Water Intakes
Salt Line Range
1964
2002
Fresh Water & the Tidal River
89
102
Salinity repulsion target: 3,000 cfs Median flow: 12,000 cfs ‘60s drought low flow: 1,500 cfs ‘55 flood: >300,000 cfs
Sea Level Rise
Flow Target @Trenton= 3000 cfs
Philadelphia Intake
Philadelphia intake
oysters
Climate Change
30 day snow cover 2070-2099
Groundwater
• 2 separate critical ground water areas
• Special withdrawal limits/ review thresholds
• Emphasis on conjunctive use - surface water alternative is crucial
• Pumping in Delaware affects levels in NJ
• Where is growth desired/expected ?
DO Recovery 0
12
34
56 2001-2005
1971-1975
1981-1985
1986-1990
1991-1995
Ben Franklin D.O. - Medians of Daily ValuesRM 100
Dis
solv
ed O
xyge
n (m
g/L)
Jan
Feb
Mar
Apr
May
June
July
Aug
Sept
Oct
Nov
Dec
1966-1970
3.5 mg/L
5.0 mg/L
DO Recovery
Water Resources Plan
Water Resource Management through 2030
Progress: Recognizing Linkages
What’s Ahead?
• How do these large-picture issues affect your project(s)?
• How can your project(s) projects
help to mitigate large-scale issues?
Thank You !